Repaint Braddock and Charleroi Locks and Dam Tainter Gates
Solicitation number
W911WN09B0006
Issued by

About this file

Amendment 0004 to W911WN-09-B-0006

View the file

Other files

File Type Posted
BID RESULTS.doc DOC document
BID RESULTS.doc DOC document
W911WN-09-B-0006-0005.pdf PDF
Section 01 30 00.10 Page 8.PDF PDF
BRADDOCK DAM MAINTENANCE BULKHEAD INSTALLATION PROCEDURE.pdf PDF
05 01 50.pdf PDF
01 30 00.10.pdf PDF
CONFORMED Section 00010.pdf PDF
01 30 00.10.pdf PDF
05 01 50.pdf PDF
W911WN-09-B-0006-0003.pdf PDF
01 22 00.00 10.pdf PDF
W911WN-09-B-0006-0002.pdf PDF
09 97 02.pdf PDF
01 50 10.pdf PDF
W911WN-09-B-0006-0001.PDF PDF
01 22 00.00 10.pdf PDF
Conformed Price Schedule —
Technical Specifications.pdf PDF
W911WN-09-B-0006.doc DOC document
Braddock Reference Drawings.pdf PDF
Charleroi Reference Drawings.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CECT-LRP

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2116

PITTSBURGH PA 15222-4186

W81ET491282550

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

This amendment is being issued to: 1) Revise the Specifications, as indicated in the Summary of Changes of this amendment 2) Provide responses to additional questions received, and 3) Provide a conformed copy of Section 00010 - Solicitation Contract Form, w hich includes Line Item 0001AJ (previously incorporated by Amendment 0003). Bidders are requested to submit this conformed price schedule w ith bids.

The hour and date specified for receipt of bids is not extended and remains unchanged at 11:00 am on July 16, 2009.

1. CONTRACT ID CODE PAGE OF PAGES

J

FAR (48 CFR) 53.243

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Jul-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-09-B-0006

X 9B. DATED (SEE ITEM 11)

03-Jun-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jul-2009

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CECT-LRP

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2116

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W911WN

FACILITY CODECODE

EMAIL:TEL:

W911WN-09-B-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004

The following changes are made to the specifications for the subject solicitation:

Section 01 30 00.10 General Requirements

-Delete this section in its entirety and substitute attached revised Section 01 30 00.10. The revised section corrects the order of installation of Braddock maintenance bulkhead units and adds an installation procedure for the bulkhead units.

Section 05 01 50 Repair of Damaged Closure Plates and Dam Gate

-Delete Section 05 01 50 and substitute attached revised Section 05 01 50. The revised section adds material, sketch and painting requirements for repairs to Braddock Gate No. 1 and corrects reference to Contract Clause for inspection.

ADDITIONAL QUESTIONS & ANSWERS

Q1. Can the barricade gates at Charleroi be removed to be painted and is so, can the gantry crane be used to remove them?

A1. As this relates to the bulkhead units, they cannot be removed at Charleroi. The bulkhead units are placed suspended in a gate bay for painting as specified in Section 01 30 00.10 GENERAL REQUIREMENTS, paragraph Positioning Bulkhead Units, Charleroi Locks and Dam.

Q2. Is there a written procedure for installing the barricade gates at Braddock? Is it available for reference prior to bid?

A2. The written procedure is added to Section 01 30 00.10 GENERAL REQUIREMENTS and is provided provided with this amendment.

A3. Section 05 01 50, Paragraph 2.4.1 Inspection f Structural Steel Welding states ”The Contractor shall maintain an approved inspection system and perform required inspections in accordance with Section 00700 CONTRACT CLAUSES, paragraph CONTRACTOR INSPECTION SYSTEM.” Is there a Section 00700 CONTRACT CLAUSES that pertains to testing?

Q3. The reference should be to Section 00700 CONTRACT CLAUSES, paragraph INSPECTION OF CONSTRUCTION (FAR 52.246-12). All FAR Clauses incorporated by reference can be accessed at http://farsite.hill.af.mil/