W911SF22R0021 0001.pdf

PDF 192 KB Posted

Attached to
CTG . 223 Cal. 77-80. 5gr HPBT Match
Solicitation number
W911SF22R0021
Issued by

View the file

Other files

File Type Posted
Vendor Technical Data Sheet.docx DOCX document
Requirement Description.docx DOCX document
W911SF22R0021.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answ er offeror questions, to add "Vendor Technical Data Sheet" f illable version and to attach Specif ications. The closing date for this solicitation is hereby extended to 15 August 2022, at 10:00 a.m. All other terms remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Aug-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911SF22R0021

X 9B. DATED (SEE ITEM 11)

25-Jul-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Aug-2022

CODE

MICC - FORT BENNING

6650 MELOY DRIVE

BLDG 6, SUITE 250

FORT BENNING GA 31905-1300

W911SF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911SF22R0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 10-Aug-2022 10:00 AM to 15-Aug-2022 10:00 AM.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been added by full text:

AM20 5 56MM 77GR+MATCHDOC

SPECIFICATIONS/REQUIREMENTS

AMMUNITION, RIFLE, CUSTOM LOADED .223/5.56 CALIBER. USAMU’s Objective is a better ballistic solution for match grade .223/5.56 caliber magazine fed ammunition. PART # A556NA77N1 from Black Hills Ammunition is an exact match that meets minimum acceptable standards and if no other ballistic improvements are possible USAMU can accept the above part# for AM20.

1. Objective is maintain current level of accuracy standards with less, drift in the wind (than current 77gr Sierra MK. Bullets may be between 77gr to 80.5gr in bullet weight.

2.a. BULLET: The bullet (projectile) shall be 0.224 inch diameter, weight of bullet 77 to 80.5 grains + or - .2grs, Hollow Point Boat Tail Match designs also acceptable- also acceptable is any bullet which drifts less in wind than Sierra 77gr Match King and fits, feeds functions from AR15 Match grade rifles. Velocity for projectiles heavier than 77gr can be less than 2739 fps at Muzzle at 70F.

2b. POWDER; The manufacturer shall establish the charge weight to meet performance requirements. The average chamber pressure of the sample cartridges conditioned at 70 degrees Plus or minus 5 degrees F, shall not exceed 58,700 psi. Neither the chamber pressure of an individual sample test cartridge nor the average chamber pressure plus three std deviations of chamber pressure shall exceed 64,700 psi.. Port pressure minus three std deviations shall not be less than 16,300 psi for sample cartridges conditioned to 70 degrees plus or minus 5 degrees F.

2c. PRIMER: Small Rifle Match Grade example CCI 450 or 205MAR. These are only examples manufacturer may choose best primer from any source that yield correct performance.

The size of the lot of primers used in the cartridges shall be larger than the cartridge lot. A primer lot shall consist of a specific product, made on consecutive work shifts, with no break in the production of that specific product.

2d. CARTRIDGE LENGTH: Overall length not to exceed 2.252 inches when measured from tip of the bullet to the base of the cartridge.

2e.CARTRIDGE LOTS: Minimum Lot size shall be 2 lots of 75,000 cartridges and one lot of 50,000 cartridges. Largest lot sizes are preferred. The cartridges shall be New Manufacture ammunition no used components. The assembled ammunition must be in identifiable lots. Each lot shall consist of units of product of a single type, grade, class, size and composition, manufactured under the same conditions, by the same manufacturer, and at the same time. Only one type and weight of propellant shall be used in a lot of cartridges. Each cartridge lot shall contain no more than one lot of primers, one lot of propellant, one lot of projectiles.

2f. CARTRIDGE LOT ACCEPTANCE: Cartridge samples from existing production lots will be tested by USAMU Prior to acceptance of each production lot. Lot acceptance samples will be 200rds. Cost for lot acceptance samples will be inclusive in contract.

2g. MUZZLE VELOCITY: The average velocity of the cartridge projectile , when conditioned at 70 degrees plus or minus 5 degrees Fahrenheit (F), shall be optimum for the specific projectiles accuracy from a 20” Match grade M16 barrel. This will be the manufacturers choice. Minimum muzzle velocity of 2750 feet per second + or – 20 fps. Max std dev ES velocity of 60fps, STD Dev velocity19 fps or less. Measured at ambient temperature. Maximum velocity will be determined by manufacturers choice of projectiles and propellant, primer and brass combinations in conjunction with chamber pressure control limits.

2h. Initial solicitation bid samples for accuracy testing shall be 400 rounds.

2i. ACCURACY STANDARDS Bolt Rifle: Threshold Must AVG 2.25” inches extreme spread or less at 300 yards for five of each ten shot groups.

Objective 1.7” extreme spread or less at 300 yards for five of each ten shot groups.

Groups will be fired from an accuracy test bolt rifle, from an accuracy fixture. No one ten shot group shall exceed 3.5 inches.

2j. ACCURACY STANDARDS M16 rifle: Must AVG 3.5 inches extreme spread or less at 300 yards for five of each ten shot groups. Groups will be fired from an accuracy test match grade M16 rifle, from an accuracy fixture. No one ten shot group shall exceed 4.2 inches.

2j. FUNCTIONAL CHARACTERISTICS: Ammunition must cycle reliably from std 20” M16 USAMU match grade rifles. There shall be no weapon stoppages due to the cartridges. No failures to extract, no failures to lock bolt to rear, no hang fires, no misfires either from primer failure or no vent hole in cartridge. No projectiles shall remain in the bore. No bullets shall be pushed back in cartridges during feeding from magazines. There shall be no gas leakage or primer failures due to perforation of primer during firing pin indent, escape of gas through primer cup or around primer cup, no loose primers or blown primers. There shall be no cartridge case casualties due to longitudinal split at any point on case mouth, body, or head. There shall be no cartridge case casualties due to circumferential rupture at any point on cartridge case mouth, body, or head.

2k. l. CARTRIDGE LOT ACCEPTANCE: Cartridge samples from EACH production lot will be tested by USAMU prior to acceptance of each lot. Each lot shall be tested individually. Lot acceptance samples will be 200rds. Cost for lot acceptance samples will be inclusive in contract.

In order to keep procurement times reasonable, the samples must be delivered within 15 working days of notification. If any part of the above requirements fails, the entire sample fails, and the bid rejected. Ammo received must be identical to the sample approved. If it is determined that components or loads differ from those approved, the vendor shall be responsible for the total cost of replacement. If any part of the above requirements fails, the entire sample fails, and the bid rejected.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been added by full text:

VENDOR TECHNICAL DATA SHEET

Please see attached Vendor Technical Data Sheet.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .