W911SD-23-R-0067-0001- TEMP CHILLERS.pdf

PDF 587 KB Posted

Attached to
TEMPORARY CHILLER-SUMMER 2023-WEST POINT
Solicitation number
W911SD-23-R-0067
Issued by

About this file

This solicitation requests proposals for temporary chillers at various buildings on the campus of the United States Military Academy in West Point, New York for the summer of 2023. The Mission Installation Contracting Command West Point requires the supply and installation of eight trailer-mounted air-cooled chillers ranging from 100 to 500 tons at buildings 602, 735, 745C, 745D, 751, 753, 755, and 756 to be delivered by May 15th and remain operational until October 15th. Proposals are due by March 17th and must include a site visit, detailed cost breakdown, and completion of required provisions. The Department of the Army Materiel Command Mission and Installation Contracting Command will award a contract for these temporary chiller rental and installation services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011908331

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

THE PURPOSE OF THIS AMENDMENT IS TO UPDATE - SOW AND DETAILED COST BREAKDOWN- VENDORS MUST SUBMIT COPY OF SBA 8(a) CERTIFICATION LETTER TO BE CONSIDER FOR AWARD.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Feb-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911SD23R0067

X 9B. DATED (SEE ITEM 11)

17-Feb-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Feb-2023

CODE

MICC - WEST POINT

681 HARDEE PLACE

WEST POINT NY 10996-1514

W911SD 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911SD23R0067

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

FY23 Temporary Chillers-Project Location: Bldgs. 602, 735, 745C, 745D, 751, 753, 755, and 756.All chillers shall be delivered and installed and fully operational from May 15th to October 15, 2023.

To:

FY23 Temporary Chillers-Project Location: Bldgs. 602, 735, 745C, 745D, 751, 753, 755, and 756.All chillers shall be delivered and installed and fully operational from May 15th to October 15, 2023. TOTAL OF NINE (9)

CHILLERS.

The following have been added by full text:

SBA-CERTIFICATION LETTER

SBA 8(a) CERTIFICATION LETTER

IN ORDER TO BE CONSIDER FOR AWARD ALL POTENTIAL VENDORS MUST PROVIDE PROOF- SBA

8(A) CERTIFICATION LETTER.

The following have been modified:

DETAILED COST BREAKDOWN

TO BE CONSIDER FOR AWARD THE FOLLOWING DETAILED COST BREAKDOWN MUST BE

PROVIDED.

Calcaulatuions are based on monthly rental rate. 5 month duration- May 15th, 2023 – Oct 15th, 2023

1) Supply, install, and test operate one 200-ton trailer mounted air-cooled chiller with pumps and 500 KVA transformer at Bldg. 745D, MacArthur (short) Barracks.

Monthly rental rate $

2) Supply, install, and test operate one 200-ton trailer mounted air-cooled chiller with pumps at Bldg. 602, Grant Barracks.

3) Supply, install, and test operate one 400-ton trailer mounted air-cooled chiller with pumps at Bldg. 745C, Eisenhower Barracks.

4) Supply, install, and test operate one 100–150-ton trailer mounted air-cooled chiller with pumps at Bldg. 751, Pershing Barracks.

5) Supply, install, and test operate one 400-ton trailer mounted air-cooled chiller with pumps at Bldg. 735, Scott Barracks.

6) Supply, install, and test operate two - 200-ton trailer mounted air-cooled chiller with pumps and 750 KVA transformer at Bldg. 753, Bartlett Hall parking tunnel.

7) Supply, install, and test operate one 500-ton trailer mounted air-cooled chiller with pumps at Bldg. 755, Davis Barracks.

8) Supply, install, and test operate one 400-ton trailer mounted air-cooled chiller with pumps at Bldg. 756, Bradley Barracks.

SOW

Subject: Scope of Work Contract name: Temporary Chillers - Summer 2023

IJO: CH 22329 2J

Project Location: Bldgs. 602, 735, 745C, 745D, 751, 753, 755, and 756.

Date: 3 February 2023

Scope:

Contractor to provide all labor, material, equipment, and supervision in accordance with all applicable codes and specifications to the following locations at USMA West Point, NY 10996:

9) Supply, install, and test operate one 200-ton trailer mounted air-cooled chiller with pumps and 500 KVA transformer at Bldg. 745D, MacArthur (short) Barracks.

10) Supply, install, and test operate one 200-ton trailer mounted air-cooled chiller with pumps at Bldg. 602, Grant Barracks.

11) Supply, install, and test operate one 400-ton trailer mounted air-cooled chiller with pumps at Bldg. 745C, Eisenhower Barracks.

12) Supply, install, and test operate one 100–150-ton trailer mounted air-cooled chiller with pumps at Bldg. 751, Pershing Barracks.

13) Supply, install, and test operate one 400-ton trailer mounted air-cooled chiller with pumps at Bldg. 735, Scott Barracks.

14) Supply, install, and test operate two - 200-ton trailer mounted air-cooled chiller with pumps and 750 KVA transformer at Bldg. 753, Bartlett Hall parking tunnel.

15) Supply, install, and test operate one 500-ton trailer mounted air-cooled chiller with pumps at Bldg. 755, Davis Barracks.

16) Supply, install, and test operate one 400-ton trailer mounted air-cooled chiller with pumps at Bldg. 756, Bradley Barracks.

All chillers shall be delivered and installed and fully operational from May 15th to October 15, 2023.

Description of Work:

Contractor shall mobilize, install, inspect, and test operation of the trailer mounted chillers no later than May 15th for start of full operational service. On October 15th, the contractor will disconnect mechanically, electrically, and demobilize the temporary chillers and all associated material and equipment.

1) Supply and install one 200-ton chiller with pumps at Bldg. 745D, Mac Long Barracks and have all associated work needed for installation completed and the chiller ready and in operation by May 15th. The existing building power and disconnect is 230/460 VAC. Supply transformer to supply power to the chiller unit. The contractor will be responsible to tap existing 13-8 line and run cables from existing manhole and open conduit path to chiller location and connect to the supplied 500 KVA transformer. Install approximately 200’ ft. of 6” in. rubber hose with connection ends to attach chiller to building 745 supply and return piping. Supply and install all pipe fittings as necessary for a complete installation. Supply and install all temporary electrical cable and accessories needed to connect chiller to the supplied transformer. The proposed site location and attachment locations (electrical disconnect, piping, etc.) to existing building systems will be shown at pre-bid site visit. The contractor shall have a qualified HVAC subcontractor at the pre-bid site visit to review this location and determine the exact details (specific location, attachment details, piping / cable length etc.). The contractor shall have a qualified high voltage electrical company do the transformer cabling, connections, and supply a fiberglass pad for the transformer. All taps and cable connections to the transformer will be done by other personnel.

The government PM will be notified when new cabling is ready to be connected and PM will then notify Electric shop for terminations.

2) Supply and install one 100–150-ton chiller with pumps at Bldg. 751, Pershing Barracks and have all associated work needed for installation completed and the chiller ready and in operation by May 15th. The existing building power and disconnect is 230/460 VAC. Supply chiller to match existing power and or if required supply and install transformer to use with temporary chiller and house power. Install 6” in. rubber hose with connection ends to attach chiller to building 753 supply and return piping. Supply and install all pipe fittings as necessary for a complete installation. Supply and install all temporary electrical cable and appurtenances needed to connect chiller to the supplied transformer. The proposed site location and attachment locations (electrical disconnect, piping, etc.) to existing building systems will be shown at pre-bid site visit. The contractor shall have a qualified HVAC subcontractor at the pre-bid site visit to review this location and determine the exact details (specific location, attachment details, piping/cable length etc.). The contractor shall have a qualified high voltage electrical company do the transformer cabling, connections, and supply a fiberglass pad for the transformer. All taps and cable connections to the transformer will be done by other personnel. The government PM will be notified when new cabling is ready to be connected and PM will then notify Electric shop for terminations.

3) Supply and install one 200-ton chiller with pumps at Bldg. 602, Grant Barracks and have all associated work needed for installation completed and the chiller ready and in operation by May 15th. The existing building power and disconnect is 230/460 VAC. Supply chiller to match existing power and or if required supply and install transformer to use with temporary chiller and house power. Install 6” in. rubber hose with connection ends to attach chiller to building supply and return piping. Supply and install all pipe fittings as necessary for a complete installation.

Supply and install all temporary electrical cable and appurtenances needed to connect chiller to the supplied transformer. The proposed site location and attachment locations (electrical disconnect, piping, etc.) to existing building systems will be shown at pre-bid site visit. The contractor shall have a qualified HVAC subcontractor at the pre-bid site visit to review this location and determine the exact details (specific location, attachment details, piping/cable length etc.). The contractor shall have a qualified high voltage electrical company do the transformer cabling, connections, and supply a fiberglass pad for the transformer. All taps and cable connections to the transformer will be done by other personnel. The government PM will be notified when new cabling is ready to be connected and PM will then notify Electric shop for terminations.

4) Supply and install one 400-ton chiller with pumps at Bldg. 735, Scott Barracks and have all associated work needed for installation completed and the chiller ready and in operation by May 15th. The existing building power and disconnect is 230/460 VAC. Supply chiller to match existing power and or if required supply and install transformer to use with temporary chiller and house power. Install 6” in. rubber hose with connection ends to attach chiller to building supply and return piping. Supply and install all pipe fittings as necessary for a complete installation.

Supply and install all temporary electrical cable and appurtenances needed to connect chiller to the supplied transformer. The proposed site location and attachment locations (electrical disconnect, piping, etc.) to existing building systems will be shown at pre-bid site visit. The contractor shall have a qualified HVAC subcontractor at the pre-bid site visit to review this location and determine the exact details (specific location, attachment details, piping/cable length etc.). The contractor shall have a qualified high voltage electrical company do the transformer cabling, connections, and supply a fiberglass pad for the transformer. All taps and cable connections to the transformer will be done by other personnel. The government PM will be notified when new cabling is ready to be connected and PM will then notify Electric shop for terminations.

5) Supply and install one 400-ton chiller with pumps at Bldg. 745C, Eisenhower Barracks and have all associated work needed for installation completed and the chiller ready and in operation by May 15th. The existing building power and disconnect is 230/460 VAC. Supply chiller to match existing power and or if required supply and install transformer to use with temporary chiller and house power. Install 6” in. rubber hose with connection ends to attach chiller to building supply and return piping. Supply and install all pipe fittings as necessary for a complete installation. Supply and install all temporary electrical cable and appurtenances needed to connect chiller to the supplied transformer. The proposed site location and attachment locations (electrical disconnect, piping, etc.) to existing building systems will be shown at pre-bid site visit. The contractor shall have a qualified HVAC subcontractor at the pre-bid site visit to review this location and determine the exact details (specific location, attachment details, piping/cable length etc.). The contractor shall have a qualified high voltage electrical company do the transformer cabling, connections, and supply a fiberglass pad for the transformer. All taps and cable connections to the transformer will be done by other personnel. The government PM will be notified when new cabling is ready to be connected and PM will then notify Electric shop for terminations.

6) Supply and install two 200-ton chiller with pumps at Bldg. 753, Bartlett Hall/parking tunnel and have all associated work needed for installation completed and the chiller ready and in operation by May 15th. The existing building power and disconnect is 230/460 VAC. Supply transformer to supply power to the chiller unit. The contractor will be responsible to tap existing 13-8 line and run cables from existing manhole and open conduit path to chiller location and connect to the supplied 750 KVA transformer. Install approximately 200’ ft. of 6” in. rubber hose with connection ends to attach chiller to building 745 supply and return piping. Supply and install all pipe fittings as necessary for a complete installation. Supply and install all temporary electrical cable and appurtenances needed to connect chiller to the supplied transformer. The proposed site location and attachment locations (electrical disconnect, piping, etc.) to existing building systems will be shown at pre-bid site visit. The contractor shall have a qualified HVAC subcontractor at the pre-bid site visit to review this location and determine the exact details (specific location, attachment details, piping / cable length etc.). The contractor shall have a qualified high voltage electrical company do the transformer cabling, connections, and supply a fiberglass pad for the transformer. All taps and cable connections to the transformer will be done by other personnel. The government PM will be notified when new cabling is ready to be connected and PM will then notify Electric shop for terminations.

7) Supply and install one 500-ton chiller with pumps at Bldg. 755, Davis Barracks and have all associated work needed for installation completed and the chiller ready and in operation by May 15th. The existing building power and disconnect is 230/460 VAC, 1000 amps. Supply transformer to supply power to the chiller unit (if necessary). The contractor will be responsible to install approximately 200’ ft. of 6” in. rubber hose with connection ends to attach chiller to building 755 chill water supply and return piping. Supply and install all pipe fittings as necessary for a complete installation. Supply and install all temporary electrical cable and appurtenances needed to connect chiller to the supplied building power electrical disconnect. The proposed site location and attachment locations (electrical disconnect, piping, etc.) to existing building systems will be shown at site visit. The contractor shall have a qualified HVAC subcontractor at the site visit to review this location and determine the exact details (specific location, attachment details, piping / cable length etc.). The government PM will be notified when new cabling is ready to be connected and PM will then notify Electric shop for terminations.

8) Supply and install one 500-ton chiller with pumps at Bldg. 756, Bradley Barracks and have all associated work needed for installation completed and the chiller ready and in operation by May 15th. The existing building power and disconnect is 230/460 VAC, 1000 amps. Supply transformer to supply power to the chiller unit (if necessary). The contractor will be responsible to install approximately 200’ ft. of 6” in. rubber hose with connection ends to attach chiller to building 756 chill water supply and return piping. Supply and install all pipe fittings as necessary for a complete installation. Supply and install all temporary electrical cable and appurtenances needed to connect chiller to the supplied building power electrical disconnect. The proposed site location and attachment locations (electrical disconnect, piping, etc.) to existing building systems will be shown at site visit. The contractor shall have a qualified HVAC subcontractor at the site visit to review this location and determine the exact details (specific location, attachment details, piping / cable length etc.). The government PM will be notified when new cabling is ready to be connected and PM will then notify Electric shop for terminations.

Supply all labor and materials required to disconnect existing building piping for temporary chiller hook-up. Supply all labor and materials required to reconnect all piping after temporary chillers are removed. All existing system components, electrical connections, structures, roadways, etc. shall be returned to their original existing conditions upon completion of this work for acceptable closing.

Specific Requirements:

a) All work shall be performed in accordance with applicable federal, state, local, and USMA requirements laws and regulations.

b) Supply material needed to support temporary chillers at site locations. Plywood, boards, chalks, etc. shall be installed under and chalked around tires and front trailer supports to protect the surface underneath chiller trailer.

c) Remove building louvers as necessary to run piping and electrical cables into building.

Install temporary enclosures around temporary piping to cover the opening where louvers were removed.

d) Use hard rubber piping to connect chiller to building connections.

e) Supply all supervision, labor, equipment, and materials needed for installation and removal of temporary chillers.

f) Supply and install the automatic “red” high-capacity air bleeder for normal operations on each chiller unit. Supply the following brand: Bell & Gossett - High-Capacity Air Vent, Model 107A.

g) In addition to the work described above, the contractor shall also provide on-call maintenance and repair service for their supplied equipment during the periods of operation as described above. Contractor shall respond within two hours of placed call. After normal work hours, the contractor shall respond within four hours of placed call. The COR will initiate these on-call maintenance and repair services. There will be no additional payment for repair parts or materials needed as these are to be included in the cost of provided operational chiller units.

***Contractor will supply / install all supply and return piping risers with Victaulic blank solid flanges upon completion of demobilization. ***

Submittals:

The contractor shall provide the following submittals as a minimum for review and approval.

The government shall have 14 calendar days to review each deliverable:

1) Contractor bid/proposal:

Work plan for the execution of the design, procurement, installation, and testing of the work.

This plan shall describe how they will be executed and how it will be accomplished so as to not interfere with the ongoing operations of the affected buildings and facilities.

Coordination / Schedule:

Contractor shall attend a site visit/existing conditions survey as scheduled by the COR. The contractor shall:

1) Coordinate the date and time of the work with COR within 5 days of Notice to Proceed.

2) Complete material, equipment, delivery, and installation by no later than May 15th.

Quality Control:

The contractor shall develop a Quality Control Plan to ensure that the requirements of the contract are provided as specified. This plan shall be submitted for review and approval prior to executing any design or construction work. The plan shall contain the minimum of the following:

1) An inspection program covering all the services to be performed under this contract.

2) A description of the process to be used for verifying compliance with the contract requirements including non-destructive examinations of welds.

3) The methodology to be used for identifying deficiencies in the quality of services performed before the level of performance has an adverse impact on the execution of the project.

4) A description of the daily quality control reports to be generated during the performance of the work including photographs of the work.

5) Qualifications of the QA/QC representative.

Health, Safety and Environmental Protection:

The contractor shall develop and submit for review and approval their Health and Safety Plan along with their Environmental Protection Plan for this work. These plans shall cover the being performed including fall protection. These plans shall comply with all federal, state, local, and USMA requirements, laws, and regulations.

Reports / Records:

Within 10 days of completion of construction, the contractor shall submit all records of the work including but not limited to quality inspection reports (including photographs), test reports, and manufacturer’s documentation.

(End of Summary of Changes)