FACID CHECKLIST

CONTRACTOR PERFORMANCE INSPECTION CHECKLIST & SUMMARY REPORT V 1.6Method of Surveillance: Periodic Surveillance
Service Provided: Custodial Services
Contractor Name:
Contract Number: Contractor email:
FAC ID:
Building Number(s):
Contracting Officer Representative:Meeting Contract Requirements
Designated Representative:
Contracting Officer:
Contract Specialist:
PWS PART 1 General, Yes, No, or n/aYesNo
1PWS # 1.6.16 ID OF EMPLOYEE'S: Are contractor personnel wearing ID badges in a conspicuous place on the front exterior clothing above the waist and are the contractor personnel wearing the ID badges on the employee list provided by the contractor?YesNo
COMMENTS:
PWS PART 5 Specific Tasks: General Requirements, 1, 0, n/a, n/oSATUNSAT
2PWS 5.1 MANAGEMENT: For required cleaning services not scheduled via the T&F, has the contractor met with the COR and determined a schedule for the days of the week these services will be perfomed?1
COMMENTS:
3PWS 5.2.22 JANITOR CLOSET: is the closet kept neat and clean and odor free?1
COMMENTS:
PWS PART 5 Specific Tasks: Annual Requirements (April), 1, 0, n/a, n/oSATUNSAT
4PWS 5.2.1 INTERIOR WINDOW SURFACES: Are the interior window frames, casings, sills and glass free of cobwebs, film, dirt, smudges, water and other foreign matter?n/a
COMMENTS:
5PWS 5.2.2 EXTERIOR WINDOWS SURFACES: Are the exterior window frames, casings, sills and glass free of cobwebs, film, dirt, smudges, water and other foreign matter?n/a
COMMENTS:
6PWS # 5.2.9 STRIP WAX: Did the Contractor strip wax from floors completely removing all marks, scuffs, stains, heel marks, etc. (except in cases in which there is damage to the floor surface), and did the Contractor remove all non-fixed/movable items (defined in 2.1.12) prior to stripping and replace these items after waxing and buffing was completed?n/a
COMMENTS:
7PWS# 5.2.10 SEAL, POLISH, or WAX AFTER STRIPPING: Was a sufficient amount of wax and coats of wax used to fully protect the floor surface and once wax dried was the reflectance uniform with no visible streaks or swirls, and were the baseboards, doors and other adjacent surfaces wax free from floor finish or residue upon completion?n/a
COMMENTS:
8PWS# 5.2.11 BUFFING / BURNISHING: Did the Contractor buff all floors to a glossy appearance free of scuff marks, heel marks, and other stains and have a uniform coating?n/a
COMMENTS:
9PWS# 5.2.15 EXTRACTION CLEANING, CARPET SHAMPOO: Did the Contractor shampoo carpet free of visible litter, stains, soils, deeply embedded dirt, and other residue?n/a
COMMENTS:
PWS PART 5 Specific Tasks: Semi-Annual Requirements, 1, 0, n/a, n/oSATUNSAT
10PWS 5.2.12 SPRAY BUFFING: Did the Contractor spray buff the floor surface and restore a uniform gloss and protective finish to the resilient tile?n/a
COMMENTS:
11PWS# 5.2.20 HIGH DUSTING: Were all high dusting areas free of cobwebs, dust, lint, litter, soil and smudges?n/a
COMMENTS:
PWS PART 5 Specific Tasks: Monthly Requirements (Monday after BA), 1, 0, n/a, n/oSATUNSAT
12PWS# 5.2.3 REMOVE TRASH & RECYCLABLES: Did the Contractor remove trash and recyclables after Drill Weekend?1
COMMENTS:
13PWS# 5.2.4, 5.2.7, 5.2.13 VACUUM: Did the contractor vacum carpets free of visable litter, grit and stains?1
COMMENTS:
14PWS# 5.2.5 SWEEP/DUST MOP: Did the Contractor sweep/dust mop floors after Drill Weekend?1
COMMENTS:
15PWS # 5.2.6 DAMP MOP: Did the Contractor Damp Mop all required floors after after Drill Weekend?1
COMMENTS:
16PWS# 5.2.19 LOW DUSTING: Were all low dusting areas free of dust, lint, litter, and soil?1
COMMENTS:
17PWS# 5.2.25.4 RESTROOM WALLS AND PARTITIONS: Do wall and partitions have have a clean, uniform appearance, free of streaks, spots and any evidence of soil?1
COMMENTS:
18PWS# 5.2.34 INTERIOR GLASS: Is glass free of film, dirt, smudges, water and other foreign matter?1
COMMENTS:
PWS PART 5 Specific Tasks: Weekly Requirements (Monday), 1, 0, n/a, n/oSATUNSAT
19PWS# 5.2.3 REMOVE TRASH & RECYCLABLES: Did the Contractor remove trash and recyclables?1
COMMENTS:
20PWS# 5.2.4, 5.2.7, 5.2.13 VACUUM: Did the contractor vacum carpets free of visable litter, grit and stains?1
COMMENTS:
21PWS # 5.2.5 SWEEP/DUSTMOP: Did the Contractor sweep/dust mopfloors free of litter, dust, foreign debris and spots caused by spills?1
COMMENTS:
22PWS # 5.2.6 DAMP MOP: Did the Contractor damp mop floors so that they have a uniform appearance, with no streaks, swirl marks, detergent residue, or any evidence of soil, stains, film, debris, or standing water?1
COMMENTS:
23PWS# 5.2.7 WALK OFF MATT CLEANING: Were the mats free of soil and grit?1
COMMENTS:
24PWS# 5.2.16 SWEEP STAIRWAYS: Is surface area free of litter, dust and foreign debris?1
COMMENTS:
25PWS# 5.2.21 CLEAN DRINKING FOUNTAINS & SINKS: were all fountains & sinks disinfeced and free of streaks, stains, spots, smudges, and other obvious soil residue?1
COMMENTS:
PWS PART 5 Specific Tasks: Twice Weekly Requirements (Monday & Thursday), 1, 0, n/a, n/oSATUNSAT
26PWS# 5.2.3 REMOVE TRASH & RECYCLABLES: Did the Contractor remove trash and recyclables?1
COMMENTS:
27PWS 5.2.25.1 TOILET BOWLS AND URINALS: Is the the surface, including fittings and plumbing pipes, free of scale, scum, mineral deposits, rust, stains, dirt and grime?1
COMMENTS:
28PWS 5.2.25.2 RESTROOM WASH BOWLS: is the surface, including fixtures and plumbing pipes, free of grease, dirt, soil, stains?1
COMMENTS:
29PWS 5.2.25.3 RESTROOM FLOORS: Does the floor have a clean uniform appearance with no streaks, swirl marks, detergent residue or any evidence of soil remaining on the floor surface?1
COMMENTS:
30PWS 5.2.25.5 GLASS CLEANING IN RESTROOM: Do the mirrors and glass surfaces have a clean uniform appearance free of streaks, spots and cleaning solution residue?1
COMMENTS:
31PWS 5.2.25.6 SHOWERS & STALLS: Do the showers and stalls have a clean uniform surface free of all soil and residue?1
COMMENTS:
32PWS 5.2.26 SINKS HAND WASHING AREAS: Is the surface area free of grease, dirt, soil, stains and residue?1
COMMENTS:
PWS PART 7 Deliverables, (Yes, No, or n/a)YesNo
33PWS 1.6.2. Quality Assurance: When issued an NCR did the contractor provide corrective action and/or provide an acceptable corrective action plan by the suspense date?YesNo
COMMENTS:
34PWS 1.6.11. Hazardous Materials: Is the Safety Data Sheet (SDS) maintained in the same location as stored cleaning materials and chemicals?YesNo
COMMENTS:
35PWS 1.6.15. Key Personnel: Did the contractor provide contact information of the designated and alternate POC 5 days after contract award and update this contact information as changes occur?YesNo
COMMENTS:
36PWS 1.6.16. ID Badge List: Did the contractor provide an employee list of issued ID cards prior to contractor empolyee(s) entering the building(s), and if changes occurred did the contractor provide an updated list prior to new employee's entering the building(s)?YesNo
COMMENTS:
37PWS 1.7.1. AT Level 1 Training: Did Contractor provide the COR certificates verifying all employees completed AT Level 1 Training within 30 days of the contract start date or new hire start date?YesNo
COMMENTS:
38PWS 1.7.2.1. NCIC-III/TSDB: Did the contractor request via COR, a background check for all contractor employees, including subcontractor employees, requiring unescorted access to government facilities?YesNo
COMMENTS:
39PWS 1.7.2.1.1.a. Did the COR receive completed 88th RD Forms 451 and 452 from Contractor Project Manager?YesNo
COMMENTS:
40PWS 1.7.5. iWATCH Training: Was this training to be completed within 30 calendar days of Notice to Proceed and within 30 calendar days of new employees commencing performance with the results reported to the Contracting Officer no later than 60 calendar days after Notice to Proceed?YesNo
COMMENTS:
41PWS 5.4., 5.5. Did the Contractor submit a service ticket the end of the month after the service occurred?YesNo
COMMENTS:
42PWS 5.5. Did the contractor invoice in the appropriate invoicing system?YesNo
COMMENTS:
43PWS 5.6. Did the Contractor provide required annual CMRA data NLT 31 October?YesNo
COMMENTS:
Total:230
85.00% - 100.00% Found Acceptable100.00%
0.0% - 84.99% Found Unacceptable
All tasks have been inspected in accordance with this checklist per method of surveillance
Summary Report (Required):
Designated Representative name and date of inspection:
NAME: DATE:
COR name and date of reviewed and accepted inspection results:
NAME: DATE:

W911SAXXXXXXX LOG

W911SAXXXXXXX Performance FYXX
#MonthContract NumberContractor NameContracting OfficeCustomerContract ValueType ContractKO NameCOR Supervisor NameCOR NameTotal PRS FactorsCompliant PRS FactorsNoncompliant PRS FactorsCompliant Rate
1OctoberMcCoy0ERROR:#DIV/0!
2NovemberMcCoy0ERROR:#DIV/0!
3DecemberMcCoy0ERROR:#DIV/0!
4JanuaryMcCoy0ERROR:#DIV/0!
5FebruaryMcCoy0ERROR:#DIV/0!
6MarchMcCoy0ERROR:#DIV/0!
7AprilMcCoy0ERROR:#DIV/0!
8MayMcCoy0ERROR:#DIV/0!
9JuneMcCoy0ERROR:#DIV/0!
10JulyMcCoy0ERROR:#DIV/0!
11AugustMcCoy0ERROR:#DIV/0!
12SeptemberMcCoy0ERROR:#DIV/0!
Totals000ERROR:#DIV/0!

W911SAXXXXXXX Performance FYXX W911SAXXXXXXX Performance FYXX October November December January February March April May June July August September 0 0 0 0 0 0 0 0 0 0 0 0

W911SAXXXXXXX Performance

Contractor Performance Inspection ChecklistFYXXTOTALS
OctNovDecJanFebMarAprMayJunJulAugSep
PERFORMANCE STANDARDPFPFPFPFPFPFPFPFPFPFPFPFSATUSAT
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
3100
3200
TOTALS00000000000000000000000000

USAT Factors

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

W911SAXXXXXXX Compliance Rates

File details come from the government source that posted it. Updated .