Roof
| Roof Requirements Contract | |||||||||||||||
| Base Year | Option Year 1 | Option Year 2 | |||||||||||||
| Task Description Fort Leonard Wood Military Reservation | Task | Qty | U/M | Unit Price | Total | Qty | U/M | Unit Price | Total | Task | Qty | U/M | Unit Price | Total | |
| Remove Shingles system down to roof sheathing, including flashing, edge metal, boots and vents. All roofing materials and accessories shall be removed down to the roof sheathing. (up to two layers) | 1 | 400 | SQ | 101 | 400 | SQ | 201 | 1000 | SQ | ||||||
| Remove Shingles system down to roof sheathing, including flashing, edge metal, boots and vents. All roofing materials and accessories shall be removed down to the roof sheathing. (up to three layers) | 2 | 50 | SQ | 102 | 50 | SQ | 202 | 300 | SQ | ||||||
| Remove Deteriorated roof sheathing and replace with new | 3 | 1000 | SF | 103 | 1000 | SF | 203 | 1000 | SF | ||||||
| Remove Deteriorated roof framing and replace with new | 4 | 1300 | BF | 104 | 1300 | BF | 204 | 1300 | BF | ||||||
| Remove existing soffit and fascia and install new soffit and fascia. See DWG No. 2 at the end of the specifications. | 5 | 1200 | LF | 105 | 1200 | LF | 205 | 1200 | LF | ||||||
| Remove existing residential gutters and downspouts | 6 | 1500 | LF | 106 | 1500 | LF | 206 | 1500 | LF | ||||||
| Remove existing commercial gutters and downspouts | 7 | 1500 | LF | 107 | 1500 | LF | 207 | 1500 | LF | ||||||
| Remove existing built-up roof system, including membrane, insulation, fasteners, protection board, and vapor barrier. All roofing materials and accessories shall be removed down to the roof decking. | 8 | 200 | SQ | 108 | 200 | SQ | 208 | 200 | SQ | ||||||
| Remove existing fully-adhered EPDM roof system, including membrane, insulation, fasteners, protection board, flashings, and vapor barrier. All roofing materials and accessories shall be removed down to the roof decking. | 9 | 600 | SQ | 109 | 600 | SQ | 209 | 600 | SQ | ||||||
| Remove existing fully-adhered TPO roof system, including membrane, insulation, fasteners, protection board, flashings, and vapor barrier. All roofing materials and accessories shall be removed down to the roof decking. | 10 | 600 | SQ | 110 | 600 | SQ | 210 | 400 | SQ | ||||||
| Remove EPDM membrane, edge metal, boots and flashings only (no insulation). | 11 | 1400 | SQ | 111 | 1400 | SQ | 211 | 600 | SQ | ||||||
| Remove walkways | 12 | 600 | SF | 112 | 600 | SF | 212 | 300 | SF | ||||||
| Demolish, remove and dispose of metal roof panels (corrugated, or ribbed and the underlying wood purlins if applicable (no insulation). | 13 | 400 | SQ | 113 | 400 | SQ | 213 | 400 | SQ | ||||||
| Demolish, remove and dispose of metal roof panels (standing seam and the underlying top hat and clips if applicable (no insulation). | 14 | 400 | SQ | 114 | 400 | SQ | 214 | 400 | SQ | ||||||
| Remove ballast from EPDM roof membrane | 15 | 200 | SQ | 115 | 200 | SQ | 215 | 200 | SQ | ||||||
| Remove existing deteriorated termination bar and install new termination bar. | 16 | 100 | LF | 116 | 100 | LF | 216 | 100 | LF | ||||||
| Remove and install new metal facia system including support clips with inverted standing seam to match line fifty-one (51). | 17 | 4800 | SF | 117 | 4800 | SF | 217 | 4800 | SF | ||||||
| Remove and install new metal vented soffit system including supports. | 18 | 3200 | SF | 118 | 3200 | SF | 218 | 4800 | SF | ||||||
| Remove, cut masonry and install counter flashing | 19 | 100 | LF | 119 | 100 | LF | 219 | 100 | LF | ||||||
| Remove thermoplastic polyolefin (TPO) roof system to include membrane, edge metal, boots and flashings only (no insulation). | 20 | 600 | SQ | 120 | 600 | SQ | 220 | 600 | SQ | ||||||
| Install new asphalt-saturated fiberglass plain shingles , with new asphalt-saturated felt underlayment, new edge strips, and new flashing, including new roof vents and boots. See DWG No. 1 at the end of the specifications. | 21 | 200 | SQ | 121 | 200 | SQ | 221 | 600 | SQ | ||||||
| Install new asphalt-saturated fiberglass archechitectural shingles , with new asphalt-saturated felt underlayment, new edge strips, and new flashing, including new roof vents and boots. See DWG No. 1 at the end of the specifications. | 22 | 200 | SQ | 122 | 200 | SQ | 222 | 600 | SQ | ||||||
| Install new commercial aluminum gutters, gutter screens and downspouts. | 23 | 1200 | LF | 123 | 1200 | LF | 223 | 2500 | LF | ||||||
| Install new residential aluminum gutters, gutter screens and downspouts. | 24 | 1200 | LF | 124 | 1200 | LF | 224 | 1800 | LF | ||||||
| Provide liquid gutter sealer per spec. | 25 | 500 | SF | 125 | 500 | SF | 225 | 500 | SF | ||||||
| Install Spash blocks at gutter down spouts. | 26 | 50 | EA | 126 | 50 | EA | 226 | 50 | EA | ||||||
| Install new continuous ridge vents, with external baffling extending 12 inch below ridge opening each side of ridge. | 27 | 400 | LF | 127 | 400 | LF | 227 | 400 | LF | ||||||
| Install new fully-adhered EPDM roof system, curbs and flashings only (boots and edge metal separate line item) (no insulation), including over the peripet wall. | 28 | 400 | SQ | 128 | 400 | SQ | 228 | 400 | SQ | ||||||
| Install new fully-adhered thermoplastic polyolefin (TPO) roof system, curbs and flashings (boots and edge metal separate line item) (no insulation), including over the peripet wall. | 29 | 900 | SQ | 129 | 900 | SQ | 229 | 900 | SQ | ||||||
| Install new mechanically attached and thermally welded thermoplastic polyolefin (TPO) roof system w/, curbs and flashings (boots and edge metal separate line item) (no insulation), including over the peripet wall. | 30 | 300 | SQ | 130 | 300 | SQ | 230 | 200 | SQ | ||||||
| Install ¼” glass mat gypsum roof board | 31 | 1100 | SQ | 131 | 1100 | SQ | 231 | 800 | SQ | ||||||
| Install ½” glass mat gypsum roof board | 32 | 500 | SQ | 132 | 500 | SQ | 232 | 300 | SQ | ||||||
| Provide edge metal for roof edge. | 33 | 200 | LF | 133 | 200 | LF | 233 | 400 | LF | ||||||
| Provide weldable edge metal for TPO roof system | 34 | 1000 | LF | 134 | 1000 | LF | 234 | 800 | LF | ||||||
| Provide metal Hat channel for Metal/Standing seam roof | 35 | 800 | LF | 135 | 1000 | LF | 235 | 500 | LF | ||||||
| Provide treated wood nailers around perimeter of roof on single ply roof system. | 36 | 1600 | BF | 136 | 1600 | BF | 236 | 1000 | BF | ||||||
| Install new R-10 foam insulation | 37 | 800 | SQ | 137 | 800 | SQ | 237 | 600 | SQ | ||||||
| Install new R-20 foam insulation | 38 | 200 | SQ | 138 | 200 | SQ | 238 | 150 | SQ | ||||||
| Install new R-30 foam insulation | 39 | 100 | SQ | 139 | 100 | SQ | 239 | 75 | SQ | ||||||
| Install tapered insulation 1/4" per foot. | 40 | 500 | BF | 140 | 500 | BF | 240 | 500 | BF | ||||||
| Install tapered insulation 1/2" per foot. | 41 | 250 | BF | 141 | 250 | BF | 241 | 250 | BF | ||||||
| Provide snow Rail system. | 42 | 500 | LF | 142 | 500 | EA | 242 | 300 | EA | ||||||
| Provide snow guards | 43 | 500 | EA | 143 | 500 | EA | 243 | 500 | EA | ||||||
| Provide residential gutter screens | 44 | 800 | LF | 144 | 800 | LF | 244 | 1000 | LF | ||||||
| Provide comercial gutter screens | 45 | 600 | LF | 145 | 600 | LF | 245 | 600 | LF | ||||||
| Remove and Install coping | 46 | 1000 | LF | 146 | 1000 | LF | 246 | 600 | LF | ||||||
| Provide 26 Gauge Aluminum Coping on TPO and EPDM roofs to 24 inch width. | 47 | 2000 | SF | 147 | 2000 | SF | 247 | 1000 | SF | ||||||
| Provide 26 Gauge Aluminum Coping on TPO and EPDM roofs over 24 inch width. | 48 | 800 | SF | 148 | 800 | SF | 248 | 400 | SF | ||||||
| Provide new steel ribbed roof panels with ice-dam protection membrane. | 49 | 200 | SQ | 149 | 200 | SQ | 249 | 200 | SQ | ||||||
| Provide standing seam roof system with vented ridge and ice-dam protection membrane and no exposed fasteners or screws. | 50 | 800 | SQ | 150 | 800 | SQ | 250 | 800 | SQ | ||||||
| Provide standing seam roof system with non-vented ridge and ice-dam protection membrane and no exposed fasteners or screws . | 51 | 1300 | SQ | 151 | 1300 | SQ | 251 | 1300 | SQ | ||||||
| Install walkways on EPDM roofs | 52 | 500 | SF | 152 | 500 | SF | 252 | 200 | SF | ||||||
| Install walkways on TPO roofs | 53 | 750 | SF | 153 | 750 | SF | 253 | 500 | SF | ||||||
| Patching of holes in existing EPDM membrane, to include sweeping away of ballast, washing the membrane with water to reveal holes, and visually locating each hole and patching it and replacing ballast. | 54 | 1000 | SF | 154 | 1000 | SF | 254 | 1000 | SF | ||||||
| Repair seams in existing EPDM membrane by covering seam with 12-inch wide cured self-adhesive EPDM tape. | 55 | 1000 | LF | 155 | 1000 | LF | 255 | 1500 | LF | ||||||
| Repair EPDM roof edge termination according to the sheet "DETAIL: EPDM EDGE TERMINATION REPAIR" at the end of the specifications | 56 | 700 | LF | 156 | 700 | LF | 256 | 400 | LF | ||||||
| Patching of holes in existing TPO membrane, to include washing the membrane with water to reveal holes, and visually locating each hole and patching it. | 57 | 1000 | SF | 157 | 1000 | SF | 257 | 800 | SF | ||||||
| Repair seams in existing TPO membrane by hot air welding with 12 inch seam patch. | 58 | 500 | LF | 158 | 500 | LF | 258 | 500 | LF | ||||||
| Remove and provide new roof drain. | 59 | 20 | EA | 159 | 20 | EA | 259 | 15 | EA | ||||||
| Repair seams in existing TPO membrane by hot air welding. | 60 | 600 | LF | 160 | 600 | LF | 260 | 600 | LF | ||||||
| Replace exposed screws and caulking with new, including removal and reinstallation of ridge cap, joint metal covers, and edge metal for removal of old caulking and installing new. | 61 | 4000 | LF | 161 | 4000 | LF | 261 | 3000 | LF | ||||||
| Provide white liquid elastimeric coating to roof, with primer (with rust inhibitor), seam tape and heavy caulking over screws. Including repairs per spec. | 62 | 400 | SQ | 162 | 400 | SQ | 262 | 600 | SQ | ||||||
| Provide white liquid elastimeric coating to roof, with primer, seam tape and heavy caulking over screws to extend warrantee to ten years after roof work or at end of privious warrantee. | 63 | 100 | SQ | 163 | 100 | SQ | 263 | 100 | SQ | ||||||
| EPDM boot to 6 inches compatible with Manufacturers material for EPDM roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom. | 64 | 50 | Each | 164 | 75 | Each | 264 | 30 | Each | ||||||
| TPO boot to 6 inches compatible with Manufacturers material for TPO roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom. | 65 | 75 | Each | 165 | 100 | Each | 265 | 30 | Each | ||||||
| EPDM boot 7 to 11 inches compatible with Manufacturers material for EPDM roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom. | 66 | 30 | Each | 166 | 30 | Each | 266 | 15 | Each | ||||||
| TPO boot 7 to 11 inches compatible with Manufacturers material for TPO roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom. | 67 | 30 | Each | 167 | 30 | Each | 267 | 15 | Each | ||||||
| Split TPO boot to 6 inches compatible with Manufacturers material for EPDM roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom. | 68 | 50 | Each | 168 | 50 | Each | 268 | 30 | Each | ||||||
| Split EPDM boot to 6 inches compatible with Manufacturers material for EPDM roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom. | 69 | 50 | Each | 169 | 50 | Each | 269 | 30 | Each | ||||||
| Split EPDM boot 7 to 11 inches compatible with Manufacturers material for EPDM roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom. | 70 | 20 | Each | 170 | 20 | Each | 270 | 15 | Each | ||||||
| Split TPO boot 7 to 11 inches compatible with Manufacturers material for TPO roofing 60 mils thick minimum. Sealant inside and out at top and bottom as recommended by manufacturer. Attached with clamp on top and screws or anchors at bottom. | 71 | 20 | Each | 171 | 20 | Each | 271 | 15 | Each | ||||||
| Spray Closed cell form insulation, Per inch thick per Square. | 72 | 200 | SQ x inch | 172 | 200 | SQ x inch | 272 | 100 | SQ x inch |