W911S7-16-B-0025_-_0001_Intersection_Improvement.pdf

PDF 88 KB Posted

Attached to
INTERSECTION IMPROVEMENT
Solicitation number
W911S7-16-B-0025
Issued by

About this file

W911S7-16-B-0025-0001 Intersection Improvement Amendment

View the file

Other files

File Type Posted
W911S7-16-B-0025_Bid_Abstract.pdf PDF
Drawings_to_Questions.pdf PDF
DBA_Wage_Determination_MO160019 _19_Aug_2016.pdf PDF
Questions.pdf PDF
7899_s2v8.pdf PDF
7899_c7v8.pdf PDF
7899_c5v8.pdf PDF
7899_c3v8.pdf PDF
7899_c2v8.pdf PDF
7899_s1v8.pdf PDF
7899_c1v8.pdf PDF
W911S716B0025.pdf PDF
7899_coverv8.pdf PDF
7899_s3v8.pdf PDF
7899_c4v8.pdf PDF
W911S716B0025_SOW_Final.pdf PDF
7899_c6v8.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0010866810

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate the follow ing; Q&A effective 01 September 2016, revised draw ing C7899.10 Sheet C1 of 7 and updated DBA Wage Determination.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911S7-16-B-0025

X 9B. DATED (SEE ITEM 11)

12-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Sep-2016

CODE

MICC - FT LEONARD WOOD

U.S. ARMY MISSION AND INSTALLATION CONTRACTIN

8112 NEBRASKA AVENUE, BUILDING 11400

FORT LEONARD WOOD MO 65473

W911S7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911S7-16-B-0025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required performance has changed from 1. Improve the intersection at Pulaski and Missouri roads, Fort Leonard Wood, Missouri. See SOW for specifications.2. This acquisition is restricted to Total Small Business.

The NAICIS is 237310 with a size standard of $36.5M.3. The magnitude of this effort is between $500,000 to

$1,000,000.4. Drawing 7899 is electronically available for this project and will be provided at Solicitation. 5. A Site

Visit will be conducted at 1:00PM (local time) on 19 August 2016. See FAR 52.236-27 for details. 6. Written questions shall be submitted to Shamarian.n.plummer.civ@mail.mil not later than 3:00PM (local time) 26 August

2016.7. Contractor shall start physical performance of awarded project in accordance with the specifications and drawings as incorporated not later than close of business, 31 December 2016. (DoD FMR 7000.14-R, Vol.

3;080305) to 1. Improve the intersection at Pulaski and Missouri roads, Fort Leonard Wood, Missouri. See SOW for specifications.2. This acquisition is restricted to Total Small Business. The NAICIS is 237310 with a size standard of $36.5M.3. The magnitude of this effort is between $500,000 to $1,000,000.4. Drawing 7899 is electronically available for this project and will be provided at Solicitation. 5. A Site Visit will be conducted at 1:00PM (local time) on 19 August 2016. See FAR 52.236-27 for details. 6. Written questions shall be submitted to

Shamarian.n.plummer.civ@mail.mil not later than 3:00PM (local time) 26 August 2016.7. Contractor shall start physical performance of awarded project in accordance with the specifications and drawings as incorporated not later than close of business, 31 December 2016. (DoD FMR 7000.14-R, Vol. 3;080305)..

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

WAGE DETERMINATION

General Decision Number: MO160019 08/19/2016 MO19

Superseded General Decision Number: MO20150019

State: Missouri

Construction Type: Building

County: Pulaski County in Missouri.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least

$10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/08/2016

1 03/04/2016

2 05/20/2016

3 06/17/2016

4 06/24/2016

5 07/01/2016

6 07/29/2016

7 08/19/2016

ASBE0063-002 11/01/2015

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 25.47 11.25

BRMO0011-009 03/01/2016

TILE SETTER......................$ 29.26 16.31

CARP0012-002 05/03/2015

CARPENTER (Including Drywall

Hanging & Form Work).............$ 35.61 15.05

CARP1310-003 05/01/2015

CARPENTER (Floor Layer)

(Resilient & Vinyl Flooring

Only)............................$ 31.08 15.45

ELEC0453-003 09/01/2015

ELECTRICIAN......................$ 29.80 14.83

ENGI0513-001 05/01/2016

POWER EQUIPMENT OPERATOR:

Backhoe/Excavator/ Trackhoe.$ 28.86 24.98

Bulldozer...................$ 28.86 24.98

Grader/Blade................$ 28.86 24.98

Loader......................$ 28.86 24.98

Paver.......................$ 28.86 24.98

Roller......................$ 28.86 24.98

IRON0396-017 07/30/2014

IRONWORKER, STRUCTURAL...........$ 28.01 22.36

LABO0840-003 03/01/2016

LABORER

Brick Mason Tender..........$ 25.81 12.44

Common or General &

Landscape...................$ 23.91 12.44

PAIN1265-002 07/01/2013

PAINTER: Drywall

Finishing/Taping.................$ 26.64 13.27

PAIN1265-008 07/01/2013

PAINTER

Brush & Roller Only.........$ 25.64 13.27

PLAS0527-006 06/01/2016

CEMENT MASON/CONCRETE FINISHER...$ 31.64 17.78

PLUM0562-011 07/01/2016

PIPEFITTER, Includes HVAC

Pipe Installation

Mechanical Contracts including all piping and temperature control work

$7.0 million & under........$ 36.66 21.49

Mechanical Contracts including all piping and temperature control work over $7.0 million...........$ 38.00 26.93

PLUMBER, Excludes HVAC Pipe

Installation

Mechanical Contracts including all piping and temperature control work

$7.0 million & under........$ 36.66 21.49

Mechanical Contracts including all piping and temperature control work over $7.0 million...........$ 38.00 26.93

ROOF0020-012 09/19/2014

ROOFER...........................$ 29.30 14.52

* SFMO0669-003 04/01/2016

SPRINKLER FITTER (Fire

Sprinklers)......................$ 33.49 19.45

SHEE0036-010 02/01/2011

SHEET METAL WORKER (HVAC Duct

& System Installation Only)......$ 35.86 21.20

SUMO2010-018 03/08/2010

BRICKLAYER.......................$ 23.65 7.92

GLAZIER..........................$ 29.87 1.47

IRONWORKER, REINFORCING..........$ 20.90 8.88

LABORER: Asbestos Abatement

(Removal from Floors, Walls, & Ceilings)......................$ 24.90 0.00

PAINTER: Spray..................$ 18.79 8.12

SHEET METAL WORKER, Excludes

HVAC Duct and Unit

Installation.....................$ 23.65 4.50

TRUCK DRIVER: Dump Truck........$ 25.57 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)

File details come from the government source that posted it. Updated .