Questions_and_Answers _UCS_at_TA79 _final.pdf

PDF 197 KB Posted

Attached to
Construct Unified Command Suite (UCS) at TA 79 Federal contract opportunity
Solicitation number
W911S7-16-B-0016
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Leonard Wood

View the file

Other files for this federal contract opportunity

Other files attached to Construct Unified Command Suite (UCS) at TA 79, newest first.
File Type Posted
W911S7-16-B-0016_Abstract_of_Offers.pdf PDF
8028_c2v8.pdf PDF
W911S7-16-B-0016-0001_UCS_at_TA_79 _UCS_at_TA79 _Amendment.pdf PDF
8028_a2v8REV.pdf PDF
8028_a3v8REV.pdf PDF
8028_c3v8.pdf PDF
DBA_Wage_Determination _19_August_2016.pdf PDF
8028_a1v8REV.pdf PDF
W911S7-16-B-0016_Sign-In_Sheet_17_Aug_2016.pdf PDF
W911S7-16-B-0016_UCS_at_TA_79_Solicitation _Final.pdf PDF
DBA_Wage_Determination_MO160019_29_July_2016.pdf PDF
Attachment_A _SOW_16-B-0016__Final.pdf PDF
Attachment_B _Drawings_16-B-0016.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911S7-16-B-0016

Unified Command Suite (UCS) AT TA79

Question and Answer

1. There were no specs provided for Door canopies. Will the government please provide specs?

Government Answer: Canopies are the building manufacturer’s standard design.

2. Please verify there are 3 doors canopies. The floor plan and building elevations are conflicting.

Drawing M6 of 7 show/detail flushometer toilets and urinal. Detail of restroom elevation, drawing page A2 of 3 shows tank toilets. Please confirm which type is required?

Government Answer: Yes, Doors 101, 102, and 103 receive canopies. The elevations on sheet

A2 were incorrect, drawings were revised in Amendment. Toilets are flushometer type.

3. Please confirm main water line from Tap/meter to building is to be fire suppression line; there for domestic water by plumbing contractor will begin at tee after sprinkler riser?

Is the sanitary sewer 6’’ or 4’’ from man hole to the building?

Government Answer: 4” SCH 40.

4. Is the sewer line to building to be schedule 40 PVC?

Government Answer: Yes.

5. When the contractor removes the existing fence, what Material is the contractor to fill the post with?

Government Answer: Concrete (Reference Section 03300 Cast in Place Concrete) updated drawing C2 of 3 per Amendment.

6. Will you accept fax modifications for proposals?

Government Answer: No, Per Section 1, Number 7 and Section L, S-3 FACSIMILE SUBMISSION

OF BIDS Original bids will not be accepted by facsimile. Facsimile modifications or withdrawals will not be permitted.

7. I noticed the drawings on the FBO site are odd page sizes which makes it difficult to print to scale. What is the original document size for the plans?

Government Answer: Drawings are ANSI D size.

8. Solicitation call for 120 day completion. Would the government add an additional 90 days to the completion period due to the submittal process, concrete foundation design, Leed time for the building, controls design?

Government Answer: Government will consent to 180 days, per Amendment

11 If the concrete foundation changes (from the provided drawings in the solicitation) after the government receives and review the reactions from the metal building manufacture. Will the government require a deductive or and increase modification for the foundation change if necessary?

Government Answer: No.

12 On Drawing Sheet A1 of 3. Notes states. Provide 10 gauge wire mesh on the inside between the

Gypsum board layers in the Comsec room. Will the government please provide spec of the wire mesh?

Government Answer: Updated Drawing A1 of 3, Reflects wire mesh is not required in this project per the Amendment

13 On sheet A2 of 3 shows a 28’ eave height. On sheet A3 of 3 show an eave height of 20’. Will the government please clarify the eave height of the new building?

Government Answer: Update Drawing A3 of 3, Eave height is 28’0” Change made in the

Amendment

14 On sheet A3 of 3 the Door schedule for Door Number 115 shows a 10’ x 10’ overhead door. On the same sheet Typical Doors show Overhead door E for Door 115 being a 14’ x 14’. Will the government please clarify?

Government Answer: Updated Drawing A3 of 3 in Amendment, Door type E is a 10’0” x 10’0” insulated metal sectional overhead door.

15 Will the government please provide information / building drawing of building 2136 so that the contractor can review building erection drawing to install the Overhead door in building 2136?

The contractor will also need color spec for Building 2136.

Government Answer: Overhead door is to be installed per building manufacturer’s recommendations. Kirby Building Systems, Job No. K10D0440A. Color selection will be part of the submittal.

16 In section 13, 13120 Metal building. Is the roof system for this building to concealed fasteners

(standing seam) or non-canceled fastness?

Government Answer: Concealed fasteners.

17 Will a full time superintendent be required for this project?

Government Answer: Contractor shall reference incorporated clause FAR 52.236-6.

File details come from the government source that posted it. Updated .