Attachment A Statement of Work (SOW)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911S7-16-B-0016_Abstract_of_Offers.pdf | ||
| Questions_and_Answers _UCS_at_TA79 _final.pdf | ||
| 8028_c2v8.pdf | ||
| W911S7-16-B-0016-0001_UCS_at_TA_79 _UCS_at_TA79 _Amendment.pdf | ||
| 8028_a2v8REV.pdf | ||
| 8028_a3v8REV.pdf | ||
| 8028_c3v8.pdf | ||
| DBA_Wage_Determination _19_August_2016.pdf | ||
| 8028_a1v8REV.pdf | ||
| W911S7-16-B-0016_Sign-In_Sheet_17_Aug_2016.pdf | ||
| W911S7-16-B-0016_UCS_at_TA_79_Solicitation _Final.pdf | ||
| DBA_Wage_Determination_MO160019_29_July_2016.pdf | ||
| Attachment_B _Drawings_16-B-0016.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX - PAGE 1
PART IV SPECIFICATIONS
CONSTRUCT UNIFIED COMMAND SUITE (UCS) AT TA 79
INDEX
SECTION NO. DESCRIPTION
DIVISION 1 - GENERAL REQUIREMENTS
01010 Summary of Work
01300 Submittals
DIVISION 2 - SITEWORK
02050 Demolition
02221 Excavation, Filling and Backfilling for Buildings
02231 Clearing and Grubbing
02531 Sanitary Sewers
02660 Water Distribution System
02722 Graded Crushed Aggregate Base Course for Flexible Pavement
02731 Aggregate Surface Course
02821 Fencing
02935 Turf
DIVISION 3 - CONCRETE
03100 Structural Concrete Formwork
03200 Concrete Reinforcement
03300 Cast-in-Place Concrete
DIVISION 5 - METAL
05400 Cold-Formed Metal Framing
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07840 Firestopping
07920 Caulking and Sealants
DIVISION 8 - DOORS AND WINDOWS
08110 Steel Doors and Frames
08360 Sectional Overhead Doors
08700 Hardware, Builders’ (General Purpose)
08810 Glass and Glazing
DIVISION 9 - FINISHES
09250 Gypsum Board
09510 Acoustical Ceilings
09900 Painting, General
DIVISION 10 – SPECIALITIES
10170 Plastic Toilet Partitions
10440 Interior Signage
10800 Toilet Accessories
INDEX - PAGE 2
DIVISION 13 – SPECIAL CONSTRUCTION
13100 Lightning Protection System
13120 Metal Buildings
13851A Fire Detection and Alarm System, Addressable
13930 Wet Pipe Sprinkler System, Fire Protection
DIVISION 15 – MECHANICAL
15080 Thermal Insulation for Mechanical Systems
15400 Plumbing, General Purpose
15895 Air Supply, Distribution, Ventilation, and Exhaust System
15951 Lonworks Direct Digital Control for HVAC and Other Building Control Systems
15990 Testing, Adjusting, and Balancing for HVAC
DIVISION 16 – ELECTRICAL
16000 Communications Work
16375 Electrical Distribution System, Underground
16415 Electrical Work, Interior
CONSTRUCT UNIFIED COMMAND SUITE (UCS) AT TA 79
SECTION 01010
SUMMARY OF WORK
1 DESCRIPTION OF WORK:
1.1 Work to be Done: The work consists of furnishing all plant, labor, equipment, supplies, and materials, and performing all work in accordance with these specifications and drawings as indicated at Fort
Leonard Wood, Missouri.
1.2 Location: The site of the proposed work is at TA 79.
2 PRINCIPAL FEATURES: The work to be performed will include, but not be limited to, the following principal features:
2.1 Construct a metal building with a vehicle bay, general purpose room, COMSEC room, and restrooms at TA 79. Modify the existing fence to enclose the new building and provide a new sectional overhead door to existing building 2136.
3 SEQUENCE OF WORK: The area concerned in this project is Government owned and will be in use during the course of this project. The Contractor shall arrange his operations to cause as little interference as possible to the users and to adjacent buildings, or other activities.
4 SCHEDULING:
4.1 The Contractor shall schedule all activity at the job site through the DPW Contract Inspection Branch a minimum of 24 hours in advance of work.
4.2 Contractor shall schedule his working hours to coincide with the working hours of the military reservation. Normal working hours of the reservation are 7:30 a.m. to 4:00 p.m., Monday thru Friday, legal public holidays excepted. The Contractor shall not perform work on the reservations beyond the aforementioned working hours without the written approval of the Contracting Officer.
4.3 If the Contractor, for his convenience, desires to perform work during other than normal working hours or on other than normal workdays, he shall notify the Directorate of Public Works Inspection Branch at least
72 hours in advance. The Contractor shall not perform work beyond the normal working hours or normal workdays without the DPW Inspection Branch approval. The Contractor shall reimburse the Government for any additional expense occasioned the Government thereby, such as, but not limited to, overtime pay for Government inspectors, utilities service, etc.
4.4 Time extensions due to adverse weather or material lead time must be received in writing prior to scheduled completion date.
5 UTILITY INTERRUPTIONS: Coordinate with the Contracting Officer, DPW Contract Inspection Branch, and the user for any utility work that interrupts service to the facility, any area outside the facility, or any real property facility. Establish a schedule of interruptions listing starting and ending times of disconnection 48 hours prior to interruption.
6 FIELD MEASUREMENTS: The Contractor shall verify all measurements at the project site and shall be responsible for all dimensions, fittings, and the proper installation of all materials and equipment specified.
7 PERMITS: The Contractor shall be responsible for obtaining permits for each worksite.
7.1 Digging: A digging permit is required prior to ANY earthwork operations. The DPW Contract
Inspection Branch will assist the Contractor in obtaining this free permit.
7. 2 Torch: A "hot" permit is required prior to using a torch or any welding or cutting device that produces sparks. The DPW Contract Inspection Branch will assist the Contractor in obtaining this free permit.
7.3 Land Disturbance: A land disturbance permit is required for any projects that disturb one (1) acre or more. . Land disturbance is defined as any activity that disturbs the roots of vegetations such as clearing, grubbing and grading.
The Contractor shall apply for the permit from the Missouri Department of Natural Resources (MODNR).
MODNR by law may take up to 180 days to review and issue a permit. Copy of the permit shall be forwarded to the
DPW Environmental Office. The Contractor shall not begin land disturbance operations until they have received and complied with the MODNR permit. MODNR charges a fee for the permits.
8 SAFETY REQUIRMENTS:
8.1 Protection From Hazards: During progress of work, the Contractor shall protect all personnel, whether Government or civilian, from any and all safety hazards caused by the construction operations.
8.2 Confined Space Entry:
8.2.1 Title 29 CFR 1910.146 OSHA (Confined Space Entry), and FLW Regulation 385-7 sets forth the definitions of confined spaces and establishes responsibilities and procedures for protecting personnel that shall be entering, working in, and existing confined spaces.
8.2.2 Confined Space Entry Plan: The Contractor shall submit for approval
Confined Space Entry Plan that is specific for this project and meets the requirements of the regulator requirements listed above. Work on the Contract shall not commence until the Confined Space Entry Plan has been approved by the Government.
9. SPECIAL REQUIREMENTS:
9.1 Use of Fire Hydrants – The temporary use of fire hydrants as sources of water is not authorized without prior approval by the Fire Department, 596-0886. Fire hydrant connections shall include an approved backflow preventer. Use of backflow preventers must comply with Missouri Department of Natural Resources, Division 60, Public Drinking Water Program, Chapter 11 – Backflow Prevention, Title 10CSR60-11. Government furnished backflow preventers shall be utilized and are available at Bldg. 1601, Water Treatment Plant on a first come basis. The Contractor shall be required to sign a hand receipt prior to obtaining a backflow preventer. The
Contractor shall be accountable to return the checked out backflow preventer equipment undamaged and as soon as possible. The contractor shall furnish and use an approved fire plug wrench to open and close the hydrant. Pipe wrenches shall not be used. When the hydrant is not being used it shall be shut off. When the need for the hydrant is finished, the hydrant shall be shut off , the temporary connection and backflow preventer shall be removed, the fire hydrant caps shall be replaced and the Fire Department shall be notified that the hydrant will no longer be used.
9.2 Dust Walls - Provide tightly sealed dust curtains to prevent dust from either demolition or construction work from spreading to other parts of the facility.
9.3 Building Number – – Contractor shall provide a facility number sign with the street address included.
Display in a prominent location near the entrance of the job site. Sign numbers shall be white, minimum of 4” tall on brown background, Bold Helvetica style. Sign shall be mounted 7' from ground to bottom of sign and shall be maintained in a legible condition from start of actual work on site to final acceptance. The building number is
2140.
10. SECURITY:
10.1 In unoccupied facilities, the Contractor shall be responsible for the security of the facility; i.e., all exterior doors shall be locked, windows closed and locked, etc.
10.2 The Contractor shall not be on site without prior notification to the DPW Contract
Inspection Branch.
10.3 Contractor personnel shall have valid civilian ID’s and Contractor vehicles shall have a valid Fort
Leonard Wood registration.
11. APPLICABLE PUBLICATIONS: The publications referenced herein after shall be the most recent at the time of solicitation, unless otherwise specified at the beginning of each Specification Section under paragraph 1.
APPLICABLE PUBLICATIONS.
12. WORKSITE HOUSEKEEPING:
12.1 The Contractor shall remove all trash and disposal material from the worksite before the end of each day, to the extent it is consistent with standard construction practices on Government work sites. The Contractor shall take all possible precautions to maintain the work site, at all times, in a condition that will prevent damage or injury to person or property, Government or otherwise. The above precautions shall include protection from weather conditions. The Contractor shall be responsible for all damages caused by the negligent acts or omissions of his employees, sub-contractors, or agents during Contract performance.
12.2 Materials to be used within 1 week of delivery and scrap material to be used as work progresses shall not be required to be in screened area. However, all such items shall be placed in an orderly manner (i.e.
dirt, rock, etc., in piles and stackable items such as pipe, brick, lumber, etc., stacked off the ground on pallets in an orderly manner).
12.3 Grass and weeds at work/storage site shall be kept at a height of 4”or less. Work site/storage site shall be policed for trash and disposal material a minimum of once per day.
12.4 All trailer and material storage sites shall have an identification board/sign, with company and job name on it, i.e. ABC Construction – ABC building complex. Signs shall meet the following criteria: min 3’ X 3’ max of 4’ X 8’ in size, 3” high legible print, and be approved by DPW Inspection Branch.
13 RESPONSIBLITY FOR DAMAGE
13.1 Damage to Personal Property: The Contractor shall be solely responsible for all damage to
Government and occupant personal property caused by the Contractors’ personnel, subcontractors, his agents, or by the performance of his work.
13.2 Damage by Negligence: Damage resulting in gas leaks, electrical outages, loss of heat during cold weather, water leaks, unsecured facilities, weather damage, or oil/hazardous waste spills shall be responded to by the Contractor within 2 hours and repaired within one workday. If the Contractor fails to comply with these requirements, the Government reserves the right to repair the damage and charge the cost to the Contractor.
Contractor shall protect all areas through which he will be transporting demolition debris or construction materials. Any damaged turf, sidewalks, roads, vegetation, site amenities, etc, shall be replaced or repaired by the
Contractor prior to final Contract closeout.
14 DISPOSAL OF MATERIALS: All materials removed and not reused or designated as salvage material in this project shall become the property of the Contractor, unless otherwise specified, and shall be the Contractor's responsibility for lawful disposal.
14.1 The Contractor may use the Fort Leonard Wood Compost area for the disposal of wood chips, leaves, and grass clippings generated by this project.
14.2 Concrete, masonry, rock, and asphaltic concrete shall be disposed of in the Clean Fill Area located on FLW Route 30, approximately one mile from FLW Route 1. All metal protruding from concrete shall be cut away and removed. Uncontaminated soil with rocks less than 6 inches will be truck dumped on FLW Landfill #3 located east of the south water tower near the airfield at marked locations.
14.3 All other wastes generated during Contractor operations shall be disposed of off post by the
Contractor at his/her expense.
14.3.1 The disposal of demolition waste is regulated by the Missouri Department of Natural
Resources under Chapter 260, Revised Statutes of Missouri and 10 Code of State Regulations Chapter 80 -4. Such waste, in types and quantities established by the Department, shall be taken to a demolition landfill or a sanitary landfill off of the Installation for disposal. The Contractor shall provide any information requested by the landfill operator to complete forms required by the Missouri Department of Natural Resources or other Government-required landfill records.
14.3.2 Wastes classified as hazardous wastes under the Resource Conservation and Recovery
Act shall be disposed of off the installation, unless otherwise specified in this contract. No hazardous waste shall be disposed of without prior review of the disposal documents, and the approval of the Contracting Officer and the
Directorate of Public Works Environmental Coordinator, or his designated representative. The Contractor shall provide an original copy of the disposal document from the approved EPA or State permitted disposal facility for each shipment of hazardous waste generated in this project to the Contracting Officers Representative.
15 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES:
15.1 All Contractor and sub-contractor personnel performing tasks on this SOW shall comply with all applicable installation, facility and area commander installation/facility access and local security policies and procedures which will be provided to the Contractor by a Government representative upon written request to the
Contracting Officer. Contractor shall provide all information required for background checks to meet installation access requirements as performed by the installation Provost Marshal Office, Director of Emergency Services or
Security Office. Requesting Contractor shall submit request for installation pass to the KO at https://vcc1.icmvcc.com/im3500/. There is no charge to the Contractor for this pass. Contractor personnel shall comply with all personal identity verification requirements as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of the base contract to this task order, should the Force Protection Condition (FPCON) at any facility or installation change, the Government may require changes in Contractor security matters or processes.
15.1.1 In the event that the automated system at https://jkodirect.jten.mil is not available (e.g., server problems), Level I AT Awareness Training can be provided by a qualified instructor. However, if the training is not completed online, the Level I AT Awareness Instructor qualification must be coordinated with the https://jkodirect.jten.mil/
Installation Antiterrorism Officer (or Installation Security equivalent) and the resultant name(s) of approved instructors shall be provided to the KO.
15.2 Antiterrorism (AT) Level I Training: All contractor and sub-contractor employees requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training avai lable at https://jkodirect.jten.mil.Users need to enroll in "Course #JS-US007-14" to receive credit for the training within 10 calendar days of contract award; or for new employees within 10 working days of beginning performance on this contract. Contractor shall submit certificates of completion for all personnel to the KO within five calendar days of completion of the training. There is no charge to the Contractor for this training. The burden to complete this training is approximately 1-hour per employee.
15.3 iWatch Training: Within 10 calendar days of contract award and within 10 calendar days of new
Contractor employees commencing work on this contract, all Contractor and sub-contractor employees shall review the FLW Directorate of Emergency Services (DES) web link for iWatch training located at http://www.wood.army.mil/LEC/iWatch/iWatch.htm. This locally developed training will inform employees of the types of behavior to watch for and how to report suspicious activity. Suspicious activity shall be reported to the
KO. There is no charge to the Contractor for this review. The burden to complete this training is approximately 20 -minutes per employee.
15.4 OPSEC Standard Operating Procedure/Plan (SOP): The KO will ensure the contractor (after selected) is aware of the MSCoE OPSEC Plan and is in compliance with the MSCoE OPSEC Plan during contract performance.
15.5 OPSEC Training: New contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty in accordance with AR 530-1. All contractors shall complete annual
OPSEC Awareness training if the contract duration is longer than 30-days. MSCoE OPSEC Officer will provide training. Coordination of training shall be through Rick Bowser, (573)563-2402. Proof of training, including a detailed listing of attendees, shall be provided to the KO. A nominal fee shall be charged to the Contractor for this training equal to 1-hour of Government time. The burden to complete this training is approximately 1-hour per training evolution. There are no restrictions to number of attendees in a given training evolution.
15.5.1 All costs associated with employee training and review must be included in the CLIN prices bid/offered for the underlying requirement. No other payments are authorized.
15.5.2 Contractor shall reimburse the Government for classroom OPSEC training. The established fee is $30 per face-to-face training session conducted. Contractor personnel may all attend the same training session; however, in the event of new hires, additional session(s) shall be required. The Contractor may include this cost in his submitted offer. No other payment for this expense shall be authorized. Contractor shall submit payment to the US Treasury, Attention: Budget Officer, MSCoE G-8, 1000 MSCoE Loop, Ste 335, Fort
Leonard Wood, MO 65473.
https://jkodirect.jten.mil/
01300 - 1
SECTION 01300
SUBMITTALS
1 GENERAL: All items of equipment and/or materials that are defined or described in the contract require submission in accordance with this section. Brochures, samples, certificates of compliance, test reports, as applicable, shall be submitted by the Contractor to the Contracting Officer, and approval given by the Contracting
Officer before any equipment or material is installed under this contract.
1.1 All of the data required shall be submitted at one time. Approval of materials and equipment will be withheld until all of the required information has been submitted and is in the hands of the Contracting Officer. All submissions must be in sufficient detail to adequately determine that the item will meet the requirements of this
Specification.
1.2 All submittals shall be transmitted to the Contracting Officer for review and approval within 30 calendar days after contract award date on Engineer Form 4025 in quadruplicate. The forms shall be completed as directed. No submittal will be accepted unless it is on the subject form. The forms will be furnished to the
Contractor by the Government. All attachments to the transmittal form, such as catalog cuts, brochures, certifications, etc., shall be submitted in four (4) copies.
1.3 The contractor shall complete and submit to the contracting officer for approval, four copies of ENG
Form 4288 Submittal Register. At a minimum, the submittal register shall include a listing of all items listed in paragraph 2 of this section. This submittal register shall be provided with the initial set of submittals the contractor submits for approval. ENG form 4288 will be furnished to the contractor by the Government. This register will be maintained by the Government to insure that all required materials are submitted and approved IAW the contract requirements.
1.4 Scheduling: A minimum of 20 calendar days will be scheduled for review and approval of material submittals and possible resubmittal of any items subject to approval. For shop drawings submittals, a minimum of
30 calendar days will be allowed for review and approval and possible resubmittal. If submittals are disapproved due to Contractor negligence, the performance period will be reduced by the number of additional days (after receipt of rejection notice) required for approval. The scheduling shall be coordinated with the approved progress schedule.
2 MATERIAL APPROVAL SUBMITTALS:
2.1 At the minimum the following list of materials will require approval under the Contract Clause, I-7, titled Material and Workmanship. The Contracting Officer may require submission of additional materials as deemed necessary. If additional items are required to be submitted a revised ENG form 4288, SUBMITTAL
REGISTER, shall be prepared by the Contractor and submitted with the additional material submittals. The
Contractor shall not proceed with any work using materials, which are subject to approval, until materials are approved.
2.1.1 Material Requiring Approval:
02050 Demolition
02221 Excavation, Filling and Backfilling for Buildings
02231 Clearing and Grubbing
01300 - 2
02531 Sanitary Sewers
02660 Water Distribution System
02722 Graded Crushed Aggregate Base Course for Flexible Pavement
02731 Aggregate Surface Course\
02821 Fencing
02935 Turf
03100 Structural Concrete Formwork
03200 Concrete Reinforcement
03300 Cast-in-Place Concrete
05400 Cold-Formed Metal Framing
07840 Firestopping
07920 Caulking and Sealant
08110 Steel Doors and Frames
08360 Sectional Overhead Doors
08700 Hardware; Builders’ (General Purpose)
08810 Glass and Glazing
09250 Gypsum Board
09510 Acoustical Ceilings
09900 Painting, General
10170 Plastic Toilet Partitions
10440 Interior Signage
10800 Toilet Accessories
13100 Lightning Protection System
13120 Metal Buildings
13851A Fire Detection and Alarm System, Addressable
13930 Wet Pipe Sprinkler System, Fire Protection
15080 Thermal Insulation for Mechanical Systems
15400 Plumbing, General Purpose
15895 Air Supply, Distribution, Ventilation, and Exhaust Systems
15951 Lonworks Direct Digital Control for HVAC and Other Building Control Systems
15990 Testing, Adjusting, and Balancing for HVAC
16000 Communications Work
16375 Electrical Distribution System, Underground
16415 Electrical Work, Interior
NOTE: For specific quantities of materials to be submitted see the individual SECTIONS.
02050 - 1
SECTION 02050
DEMOLITION
PART 1 - GENERAL
1.1 SUBMITTALS: The procedures proposed for the accomplishment of salvage and demolition work shall be submitted for approval. The procedures shall provide for safe conduct of the work, careful removal and disposition of materials specified to be salvaged, protection of property which is to remain undisturbed, coordination with other work in progress, and timely disconnection of utility services. The procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations.
1.2 GENERAL REQUIREMENTS: The work includes demolition or removal of all construction indicated or specified. All materials resulting from demolition work, except as indicated or specified otherwise, shall become the property of the Contractor and shall be removed from the limits of Government property. Rubbish and debris shall be removed from Government property daily unless otherwise directed so as to not allow accumulation inside or outside the building. Materials that cannot be removed daily shall be stored in areas specified by the Contracting
Officer.
1.3 DUST CONTROL: The amount of dust resulting from demolition shall be controlled to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted when it will result in, or create, hazardous or objectionable conditions such as ice, flooding and pollution.
1.4 PROTECTION: Protection of Existing Work: Before beginning any cutting or demolition work, the
Contractor shall carefully survey the existing work and examine the drawings and specifications to determine the extent of the work. The Contractor shall take all necessary precautions to insure against damage to existing work to remain in place, to be reused, or to remain the property of the Government, and any damage to such work shall be repaired or replaced as approved by the Contracting Officer at no additional cost to the Government. The
Contractor shall carefully coordinate the work of this section with all other work and construct and maintain shoring, bracing and supports, as required. The Contractor shall insure that structural elements are not overloaded and be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under any part of this Contract.
1.5 BURNING: The use of burning at the project site for the disposal of refuse and debris will not be permitted.
1.6 USE OF EXPLOSIVES: Use of explosives will not be permitted.
1.7 AVAILABILITY OF WORK AREAS: Areas in which salvage and demolition work is to be accomplished will be available in accordance with the schedule established by the Contracting Officer.
PART 2 - EXECUTION
2.1 EXISTING FACILITIES:
2.1.1 Utilities: Existing utilities shall be removed as indicated. When utility lines are encountered that are not indicated on the drawings the Contracting Officer shall be notified.
2.1.2 Filling: Holes, open trenches and other hazardous openings shall be filled.
02050 - 2
2.2 DISPOSITION OF MATERIAL: Title to all materials and equipment to be demolished, excepting
Government salvage, is vested in the Contractor upon removal from the building. The Government will not be responsible for the condition, loss, or damage to such property after notice to proceed.
2.2.1 Material for Contractor Salvage: Material for salvage shall be stored as approved by the
Contracting Officer. Salvage materials shall be removed from Government property before completion of the
Contract. Material for salvage shall not be sold on the site.
2.2.2 Unsalvageable Materials: Concrete, masonry, and other noncombustible materials other than concrete permitted to remain in place shall be disposed in the disposal area as directed by Contracting Officer.
2.2.3 Material for Government Salvage: Control panal and controls within, electric actuators and hot water sensors, Boiler with controls and burner with associated piping, and hot water pumps. (Refer to
Mechanical Plans)
2.3 CLEAN-UP:
2.3.1 Debris and Rubbish: Debris and rubbish shall be removed from area of work and job site as soon as possible.
2.3.2 Debris Control: Debris shall be removed and transported in a manner as to prevent spillage on streets.
02221-1
SECTION 02221
EXCAVATION, FILLING AND BACKFILLING FOR BUILDINGS
PART 1 GENERAL
1. REFERENCES: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
1.1 AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM):
D 1556 (1990) Density and Unit Weight of Soil in Place by the Sand-Cone Method
D 1557 (1991) Laboratory Compaction Characteristics of Soil Using Modified Effort
(56,000 ft-lbf/cu. ft. (2,700 kN-m/cu. m.))
D 2167 (1984; R 1990) Density and Unit Weight of Soil in Place by the Rubber Balloon
Method
D 2216 (1990) Laboratory Determination of Water (Moisture) Content of Soil, and
Rock
D 2922 (1991) Density of Soil and Soil-Aggregate in Place by Nuclear Methods
(Shallow Depth)
D 3017 (1988) Water Content of Soil and Rock in Place by Nuclear Methods (Shallow
Depth)
2. DEFINITIONS:
2.1 Degree of Compaction: Degree of compaction required is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D 1557, Method B, C, or D, abbreviated hereinafter as percent laboratory maximum density.
2.2 Rock excavation shall consist of the removal and disposal of boulders 1 cubic yard or more in volume; solid rock; materials that cannot be removed without systematic drilling and blasting such as rock material in ledges or aggregate conglomerate deposits that are so firmly cemented as to possess the characteristics of solid rock; and concrete or masonry structures exceeding 1 cubic yard in volume, except sidewalks and paving. Hard and compact materials such as cemented gravel, glacial till, and relatively soft or disintegrated rock that can be removed without continuous and systematic drilling and blasting will not be considered as rock excavation. Rock excavation will not be considered as such because of intermittent drilling that is performed merely to increase production.
Rock excavation shall be considered a change site condition and require a modification to the contract. Excavation of the material claimed as rock shall not be performed until a unit price has been established and the material has been cross-sectioned by the Contractor and approved by the Contracting Officer. Common excavation shall consist of all excavation not classified as rock excavation. All common excavation shall be performed at no additional cost to the Government. Excavation shall be by open cut.
3. SUBMITTALS: The following shall be submitted in accordance with Section 01300 SUBMITTALS:
3.1 Granular Material and Capillary Water Barrier: Certified copies of aggregate type and gradation showing compliance to appropriate specification.
02221-2
PART 2 PRODUCTS
4. CAPILLARY WATER BARRIER: Capillary Water Barrier shall consist of clean, crushed, nonporous rock, crushed gravel, or uncrushed gravel. The maximum particle size shall be 1-1/2 inches and no more than 2 percent by weight shall pass the No. 4 size sieve.
5. SATISFACTORY MATERIALS:
5.1 Satisfactory material under turf or aggregate surfacing shall consist of job excavated or borrow material free of trash, debris, roots or other organic matter, or stones larger than 3 inches in any dimension.
5.2 Satisfactory material under concrete shall consist of clean, sound, durable particles of crushed stone, crushed gravel, and screenings. The aggregates shall be free of silt and clay as defined by ASTM D 2487, vegetable matter, and other objectionable materials or coatings. The portion retained on the No. 4 sieve shall be known as coarse aggregate; that portion passing the No. 4 sieve shall be known as fine aggregate. The fraction passing the number 40 sieve shall have a plasticity index not to exceed 6. The aggregate base shall conform to the following gradation:
Percent Passing
Passing 1-inch sieve 100
Passing 1/2-inch sieve 60 - 90
Passing No. 4 sieve 40 - 60
Passing No. 40 sieve 15 - 35
6. UNSATISFACTORY MATERIALS: Unsatisfactory materials include all materials which contain debris, roots, organic matter, frozen matter, stones larger than three inches or other materials that are determined by the
Contracting Officer as too wet or otherwise unsuitable for providing a stable subgrade or stable foundation for structures.
PART 3 EXECUTION
7. CLEARING AND GRUBBING: The areas within building line and areas to receive fill/backfill shall be cleared and grubbed of trees, stumps, roots, brush and other vegetation, debris and other items that would interfere with construction operations. Stumps, logs, roots, and other organic matter shall be completely removed and the resulting depressions shall be filled with satisfactory materials.
8. EXCAVATION: Excavation shall conform to the dimensions and elevations indicated for each building, structure, and footing except as specified hereinafter. Excavation shall extend a sufficient distance from walls and footings to allow for placing and removal of forms. Excavations below indicated depths will not be permitted except to remove unsatisfactory material. Unsatisfactory material encountered below the grades shown shall be removed as directed and replaced with satisfactory material. Satisfactory material removed below the depths indicated shall be replaced at no additional cost to the Government to the indicated excavation grade with satisfactory materials, except that concrete footings shall be increased in thickness to the bottom of the overdepth excavations and over-break in rock excavation.
9. CLASSIFICATION OF EXCAVATION: Excavation will be unclassified regardless of the nature of material encountered.
10. DRAINAGE: Surface water shall be directed away from excavation and construction sites so as to prevent erosion and undermining of foundations. Diversion ditches, dikes and grading shall be provided and maintained as
02221-3 necessary during construction. Excavated slopes and backfill surfaces shall be protected to prevent erosion and sloughing. Excavation shall be performed so that the site and the area immediately surrounding the site and affecting operations at the site shall be continually and effectively drained.
11. SHORING: Shoring, including sheet piling, shall be furnished and installed as necessary to protect workmen, banks, adjacent paving, structures, and utilities. Shoring, bracing, and sheeting shall be removed as excavations are backfilled, in a manner to prevent caving.
12. BLASTING: Blasting will not be permitted.
13. FINAL GRADE OF SURFACES TO SUPPORT CONCRETE: Excavation to final grade shall not be made until just before concrete is to be placed.
14. SUBGRADE PREPARATION: Unsatisfactory material in surfaces to receive fill or in excavated areas shall be removed and replaced with satisfactory materials. The surface shall be scarified to a depth of 6 inches before the fill is started. Sloped surfaces steeper than 1 vertical to 4 horizontal shall be plowed, stepped, benched, or broken up so that the fill material will bond with the existing material. When subgrades are less than the specified density, the ground surface shall be broken up to a minimum depth of 6 inches, pulverized, and compacted to 90 percent of maximum density. Material shall not be placed on surfaces that are muddy, frozen, or contain frost. Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, or other approved equipment well suited to the soil being compacted. Material shall be moistened or aerated as necessary to provide the moisture content that will readily facilitate obtaining the specified compaction with the equipment used.
Minimum subgrade density shall be as specified in paragraph FILLING AND BACKFILLING.
15. FILLING AND BACKFILLING:
15.1 Satisfactory materials in turf areas shall be placed in horizontal layers not exceeding 8 inches in loose thickness, or 6 inches when hand-operated compactors are used. After placing, each layer shall be plowed, disked, or otherwise broken up, moistened or aerated as necessary, thoroughly mixed and compacted as specified.
Backfilling shall not begin until construction below finish grade has been approved, forms removed, and the excavation cleaned of trash and debris. Backfill shall be brought to indicated finish grade. Backfill shall not be placed in wet or frozen areas. Heavy equipment for spreading and compacting backfill shall not be operated closer to foundation or retaining walls than a distance equal to the height of backfill above the top of footing; the area remaining shall be compacted in layers not more than 4 inches in compacted thickness with power-driven hand tampers suitable for the material being compacted. Backfill shall not be placed against foundation walls prior to 7 days after completion of the walls. As far as practicable, backfill shall be brought up evenly on each side of the wall and sloped to drain away from the wall. Each layer of fill and backfill shall be compacted to not less than 85 percent of maximum density. Approved compacted subgrades that are disturbed by the Contractor's operations or adverse weather shall be scarified and compacted as specified herein before to the required density prior to further construction thereon.
15.2 Aggregate fill shall be placed in layers of equal thickness with no layer exceeding 6-inches when compacted. Each layer of aggregate fill shall be compacted to produce an average field-measured density, through the full depth, of at least 95 percent of standard maximum density as determined by the Standard Proctor Method ASTM D-
16. TESTING: Testing shall be the responsibility of the Contractor and shall be performed at no additional cost to the Government. Testing shall be performed by an approved commercial testing laboratory. Field in-place density shall be determined in accordance with ASTM D 1556, ASTM D 2167, or ASTM D 2922. When ASTM D 2922 is used, the calibration curves shall be checked and adjusted if necessary by the procedure described in ASTM D
2922, paragraph ADJUSTING CALIBRATION CURVE. ASTM D 2922 results in a wet unit weight of soil and when using this method ASTM D 3017 shall be used to determine the moisture content of the soil. The calibration
02221-4 curves furnished with the moisture gauges shall also be checked along with density calibration checks as described in ASTM D 3017. The calibration checks of both the density and moisture gauges shall be made at the beginning of a job on each different type of material encountered and at intervals as directed by the Contracting Officer. ASTM
D 2937 shall be used only for soft, fine-grained, cohesive soils. The following number of tests, if performed at the appropriate time, shall be the minimum acceptable for each type operation. The Contractor shall make as many additional tests as required to ensure the specified density at all points.
16.1 In-Place Densities:
16.1.1 In-Place Density of Subgrades:
16.1.1.1 Subgrade for Slab on Grade: One test per 2000 square feet or fraction thereof.
16.1.1.2 Subgrade for Footings: One test per 100 linear feet or fraction thereof. In addition, four tests shall be required for spread footings in locations as directed by the DPW project inspector.
16.1.2 In-Place Density of Backfills in Turf Areas: Backfill shall be tested at the rate of one test per lift for each 2000 square feet or fraction thereof.
16.2 Moisture Content: In the stockpile, excavation or borrow areas, a minimum of two tests per day per type of material or source of materials being placed is required during stable weather conditions. During unstable weather, tests shall be made as dictated by local conditions and approved moisture content shall be tested in accordance with ASTM D 2216.
16.3 Optimum Moisture and Laboratory Maximum Density: A moisture/density curve shall be made for each type of material to determine the laboratory optimum moisture and maximum density values. Additional testing shall be required when any change in material occurs which may affect the optimum moisture content or laboratory maximum density will be made.
17. CAPILLARY WATER BARRIER: Capillary water barrier under slab on grade shall be placed and compacted with a minimum of two passes of a hand-operated plate-type vibratory compactor.
18. GRADING: Areas outside of building line shall be constructed true-to-grade, shaped to drain, and shall be maintained free of trash and debris until final inspection has been completed and the work has been accepted.
20. PROTECTION: Settlement or washing that occurs in graded, or backfilled areas prior to acceptance of the work shall be repaired and grades reestablished to the required elevations and slopes at no additional cost to the
Government.
-- End of Section –
SECTION 02231
CLEARING AND GRUBBING
PART 3 EXECUTION
3.2 CLEARING
Clearing shall consist of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Trees, stumps, roots, brush, and other vegetation in areas to be cleared shall be cut off flush with or below the original ground surface, except such trees and vegetation as may be indicated or directed to be left standing. Limbs and branches to be trimmed shall be neatly cut close to the bole of the tree or main branches.
3.5 GRUBBING
Grubbing shall consist of the removal and disposal of stumps, roots larger than 2 inches in diameter, and matted roots from the designated grubbing areas. Material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, shall be removed to a depth of not less than 18 inches below the original surface level of the ground in areas indicated to be grubbed and in areas indicated as construction areas under this contract, such as areas to be cleared for roads. Depressions made by grubbing shall be filled with 3-inch clean rock and compacted to make the surface conform with the original adjacent surface of the ground.
3.6 DISPOSAL OF MATERIALS
3.6.1 Saleable Timber
3.6.1.1. The Government shall, by separate contract, harvest all saleable timber from the project site. All remaining timber, limbs, tops, stumps, and debris shall be cleared and disposed of by the Contractor as specified.
3.6.2 Nonsaleable Materials
Logs, stumps, roots, brush, rotten wood, and other refuse from the clearing and grubbing operations, except for salable timber, shall be disposed of, except when otherwise directed in writing. Such directive will state the conditions covering the disposal of such products and will also state the areas in which they may be placed.
-- End of Section -
02531 - 1
SECTION 02531
SANITARY SEWERS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C104/A21.4 (2008; Errata 2010) Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water
AWWA C110/A21.10 (2012) Ductile-Iron and Gray-Iron Fittings for Water
AWWA C111/A21.11 (2012) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings
AWWA C153/A21.53 (2011) Ductile-Iron Compact Fittings for Water Service
AWWA C600 (2010) Installation of Ductile-Iron Water Mains and Their Appurtenances
AWWA C605 (2005) Underground Installation of Polyvinyl Chloride (PVC) Pressure Pipe and Fittings for Water
AWWA C900 (2007; Errata 2008) Polyvinyl Chloride (PVC) Pressure Pipe, and Fabricated Fittings, 4 In. Through 12 In. (100 mm Through 300 mm), for Water Distribution
AWWA M23 (2002; 2nd Ed) Manual: PVC Pipe - Design and Installation
AWWA M9 (20083rd Ed) Manual: Concrete Pressure Pipe
ASME INTERNATIONAL (ASME)
ASME B1.20.1 (1983; R 2006) Pipe Threads, General Purpose (Inch)
ASTM INTERNATIONAL (ASTM)
ASTM A123 (2012) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM C150 (2012) Standard Specification for Portland Cement
ASTM C270 (2012a) Standard Specification for Mortar for Unit Masonry
ASTM C443 (2011) Standard Specification for Joints for Concrete Pipe and Manholes, Using Rubber Gaskets
ASTM C478 (2012a) Standard Specification for Precast Reinforced Concrete
Manhole Sections
02531 - 2
ASTM C923 (2008) Standard Specification for Resilient Connectors
Between Reinforced Concrete Manhole Structures, Pipes and Laterals
ASTM C94 (2012) Standard Specification for Ready-Mixed Concrete
ASTM C969 (2002; R 2009) Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines
ASTM C972 (2000; R 2011) Compression-Recovery of Tape Sealant
ASTM C990 (2009) Standard Specification for Joints for Concrete Pipe, Manholes and Precast Box Sections Using Preformed Flexible Joint Sealants
ASTM D1784 (2011) Standard Specification for Rigid Poly(Vinyl Chloride)
(PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds
ASTM D1785 (2012) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120
ASTM D2241 (2009) Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series)
ASTM D2321 (2011) Standard Practice for Underground Installation of
Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications
ASTM D2464 (2006) Standard Specification for Threaded Poly(Vinyl Chloride)
(PVC) Plastic Pipe Fittings, Schedule 80
ASTM D2466 (2006) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40
ASTM D2467 (2006) Standard Specification for Poly(Vinyl Chloride) (PVC)
Plastic Pipe Fittings, Schedule 80
ASTM D2680 (2001; R 2009) Standard Specification for Acrylonitrile-
Butadiene-Styrene (ABS) and Poly(Vinyl Chloride) (PVC) Composite Sewer Piping
ASTM D2751 (2005) Standard Specification for Acrylonitrile-Butadiene-
Styrene (ABS) Sewer Pipe and Fittings
ASTM D3034 (2008) Standard Specification for Type PSM Poly(Vinyl Chloride)
(PVC) Sewer Pipe and Fittings
ASTM D3139 (1998; R 2011) Joints for Plastic Pressure Pipes Using Flexible Elastomeric Seals
ASTM D3212 (2007) Standard Specification for Joints for Drain and Sewer
Plastic Pipes Using Flexible Elastomeric Seals
ASTM D412 (2006a; E 2008; R 2008) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
ASTM D624 (2000; R 2012) Tear Strength of Conventional
02531 - 3
Vulcanized Rubber and
ASTM F477 (2010) Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe
ASTM F949 (2010) Poly(Vinyl Chloride) (PVC) Corrugated Sewer Pipe with a Smooth Interior and Fittings
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
CID A-A-60005 (Basic; Notice 2) Frames, Covers, Gratings, Steps, Sump And Catch Basin, Manhole
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.27 Fixed Ladders
UNI-BELL PVC PIPE ASSOCIATION (UBPPA)
UBPPA UNI-B-6 (1998) Recommended Practice for Low-Pressure Air Testing of
Installed Sewer Pipe
1.2 SYSTEM DESCRIPTION
1.2.1 Sanitary Sewer Gravity Pipeline
Provide mains and laterals of polyvinyl chloride (PVC) plastic pipe. Provide building connections of polyvinyl chloride (PVC) plastic pipe. Provide new and modify existing exterior sanitary gravity sewer piping and appurtenances. Provide each system complete and ready for operation. The exterior sanitary gravity sewer system includes equipment, materials, installation, and workmanship as specified herein more than 5 feet outside of building walls.
1.2.2 Sanitary Sewer Pressure Lines
Provide pressure lines of polyvinyl chloride (PVC) plastic pressure pipe.
1.2.3 General Requirements
The construction required herein shall include appurtenant structures and building sewers to points of connection with the building drains 5 feet outside the building to which the sewer system is to be connected.
Replace damaged material and redo unacceptable work at no additional cost to the Government. Backfilling shall be accomplished after inspection by the Contracting Officer. Before, during, and after installation, plastic pipe and fittings shall be protected from any environment that would result in damage or deterioration to the material. Keep a copy of the manufacturer's instructions available at the construction site at all times and shall follow these instructions unless directed otherwise by the Contracting Officer. Solvents, solvent compounds, lubricants, elastomeric gaskets, and any similar materials required to install the plastic pipe shall be stored in accordance with the manufacturer's recommendation and shall be discarded if the storage period exceeds the recommended shelf life. Solvents in use shall be discarded when the recommended pot life is exceeded.
1.3 SUBMITTALS
Submit the following in accordance with Section 01300 SUBMITTALS:
Shop Drawings
Precast concrete manhole Metal items Frames, covers, and gratings
02531 - 4
Product Data
Pipeline materials
Test Reports
Reports
Certificates
Portland Cement Gaskets
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery and Storage
1.4.1.1 Piping
Inspect materials delivered to site for damage; store with minimum of handling. Store materials on site in enclosures or under protective coverings. Store plastic piping and jointing materials and rubber gaskets under cover out of direct sunlight. Do not store materials directly on the ground. Keep inside of pipes and fittings free of dirt and debris.
1.4.1.2 Metal Items
Check upon arrival; identify and segregate as to types, functions, and sizes. Store off the ground in a manner affording easy accessibility and not causing excessive rusting or coating with grease or other objectionable materials.
1.4.2.3 Handling
Handle pipe, fittings, and other accessories in such manner as to ensure delivery to the trench in sound undamaged condition. Carry, do not drag, pipe to trench.
2.1 PIPELINE MATERIALS
Pipe shall conform to the respective specifications and other requirements specified below. Submit manufacturer's standard drawings or catalog cuts.
2.1.1 PVC Plastic Gravity Sewer Piping
2.1.2 PVC Plastic Gravity Pipe and Fittings
ASTM D3034, SDR 35, or ASTM F949 with ends suitable for elastomeric gasket joints.
2.1.3 PVC Plastic Gravity Joints and Jointing Material
Joints shall conform to ASTM D3212.
Gaskets shall conform to ASTM F477.
2.1.4 PVC Plastic Pressure Pipe and Associated Fittings
2.1.5.1 PVC Plastic Pressure Pipe and Fittings
a. Pipe and Fittings Less Than 4 inch Diameter: Pipe, couplings and fittings shall be manufactured of materials conforming to ASTM D1784, Class 12454B.
02531 - 5
(1) Screw-Joint: Pipe shall conform to dimensional requirements of ASTM D1785, Schedule 80, with joints meeting requirements of 150 psi working pressure, 200 psi hydrostatic test pressure, unless otherwise shown or specified. Fittings for threaded pipe shall conform to requirements of ASTM D2464, threaded to conform to the requirements of ASME B1.20.1 for use with Schedule 80 pipe and fittings. Pipe couplings when used, shall be tested as required by ASTM D2464.
(2) Push-On Joint: ASTM D3139, with ASTM F477 gaskets.Fittings for push-on joints shall be iron conforming to AWWA C110/A21.10 or AWWA C111/A21.