20170511_-_Appx_3.4_VCC_Submittal_Register.pdf

PDF 1 MB Posted

Attached to
Construct Visitor Control Center, Fort Drum, NY Federal contract opportunity
Solicitation number
W911S2-17-B-0001
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Drum

About this file

20170511 - Appx_3.4 VCC_Submittal_Register

View the file

Other files for this federal contract opportunity

Other files attached to Construct Visitor Control Center, Fort Drum, NY, newest first.
File Type Posted
20170509_-_Appx_3.2_Revised_VCC_Narrative_Final_Design_For_Construction.pdf PDF
20170907_-_W911S2-17-B-0001-0003.pdf PDF
20170830_-_RFIs_VCC_HE-00001-5J.pdf PDF
20170830_-_VCC-Revised_dwgs.pdf PDF
20170830_-_W911S2-17-B-0001-0002.pdf PDF
20170810_-_W911S2-17-B-0001-0001.pdf PDF
20170509_-_Appx_3.5_VCC_SWPPP_Stormwater_Pollution_Prevention_Plan.pdf PDF
20170705_-_Exhibit_D-CDRLs_D001-D004.pdf PDF
20170721_-_W911S2-17-B-0001.pdf PDF
20140812_-_Exhibit_C_-_Excavation_Permit_Policy.pdf PDF
20170509_-_Appx_3.3_VCC_Construction_Specifications.pdf PDF
20130103_-_Appx_3.6_015_As-Built_Record_Drawings.pdf PDF
20170705_-_Exhibit_D-CDRLs_D009-D012.pdf PDF
20170515_-_Appx_3.7_Proposed_Comm_Tie-in_Location.dwg DWG drawing
20170705_-_Exhibit_D-CDRLs_D005-D008.pdf PDF
20120413_-_Appx_3.8__Access_Control_Points_Army_Standard.pdf PDF
20120530_-_Appx_3.6_002_PWES_Clearing_and_Grubbing.pdf PDF
20170705_-_Exhibit_A_-_Water_Supply_Improvement_Submittal_Procedures.pdf PDF
20120530_-_Appx_3.6_001_PWES_General_Requirements.pdf PDF
20170705_-_Exhibit_D-CDRLs_D017-D018.pdf PDF
20170509_-_Appx_3.2_VCC_Narrative_Final_Design_For_Construction.pdf PDF
20170120_-_Exhibit_E_-_Confined_Space_Entry_Procedures.pdf PDF
20170515_-_Appx_3.7_Proposed_Comm_Tie-in_Location.pdf PDF
20150608_-_Endangered_Species_Act_Requirements.pdf PDF
20170608_-_Exhibit_F_-_Fort_Drum_Endangered_Species_Act_Implementing_Document.pdf PDF
20170705_-_Exhibit_D-CDRLs_D013-D016.pdf PDF
20170511_-_Appx_3.1_VCC_Drawings_Final_Design_For_Construction.pdf PDF
20170705_-_Exhibit_B_-_Sewer_Submittal_Procedures.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 120 PAGES

ACP VCC

01 33 00 SD-01 Preconstruction Submittals

Submittal Register

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

3.9Verification Statement

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

SD-06 Test Reports

2.2.5Backflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.5.1Preconstruction Survey

1.9 GSolid Waste Management Permit

1.5.2 GRegulatory Notifications

1.6 GEnvironmental Protection Plan

3.2.1.1 GStormwater Notice of Intent

1.6.9.1 GDirt and Dust Control Plan

1.5.5 GEmployee Training Records

1.5.4 GEnvironmental Manager

Qualifications

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 120 PAGES

01 57 19 Laboratory Analysis

3.2.1.2Inspection Reports

3.7.2.1 GSolid Waste Management Report

SD-07 Certificates

1.5.5 GEmployee Training Records

1.5.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

3.2.1.3 GStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.4 GStormwater Notice of Termination

3.7.1 GWaste Determination

Documentation

3.7.3.5 GDisposal Documentation for

Hazardous and Regulated Waste

1.5.5 GAssembled Employee Training

Records

1.9 GSolid Waste Management Permit

3.7.2.1 GSolid Waste Management Report

3.7.3.1 GHazardous Waste/Debris

Management

1.5.2 GRegulatory Notifications

3.7.2.1 GSales Documentation

3.7.2.1Contractor Certification

As-Built Topographic Survey

01 78 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 120 PAGES

01 78 00 1.4.1Warranty Management Plan

Warranty Tags

1.3Spare Parts Data

SD-08 Manufacturer’s Instructions

1.4.1Instructions

SD-10 Operation and Maintenance

Data

3.3Operation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1As-Built Drawings

3.2Record Drawings

Final Approved Shop Drawings

Construction Contract

Specifications

2.1Certification of EPA Designated

Items

01 78 23 SD-10 Operation and Maintenance

Data

1.3O&M Database

3.1.1Training Plan

3.1.3Training Outline

3.1.2Training Content

SD-11 Closeout Submittals

Training Video Recording

3.1.5Validation of Training Completion

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 120 PAGES

03 11 13.00 10 SD-02 Shop Drawings

2.2.1 GFormwork

3.1.1 GFormwork

2.2.1 GForm Removal Schedule

SD-03 Product Data

2.2Form Materials

SD-04 Samples

1.3 GSample Panels

2.2.4 GFiber Voids

SD-05 Design Data

2.1Calculations

SD-06 Test Reports

3.2Inspection

SD-07 Certificates

2.2.4Fiber Voids

03 11 19.00 10 SD-03 Product Data

2.1.2 GInsulating Concrete Form

1.6.1Local/Regional Materials

1.6.2Environmental Data

2.4Accessories

SD-04 Samples

1.3.4 GMock-Up Installation of ICF

SD-06 Test Reports

1.3.1ICC ES Evaluation Report

SD-07 Certificates

2.33rd Party Agency Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 120 PAGES

03 11 19.00 10 SD-08 Manufacturer’s Instructions

3.3Installation

SD-10 Operation and Maintenance

Data

1.6.3Plastic Identification

03 15 00.00 10 SD-03 Product Data

2.2Preformed Expansion Joint Filler

2.3Sealant

SD-04 Samples

2.3.2Lubricant for Preformed

Compression Seals

2.3.3Field-Molded Type

SD-07 Certificates

2.2Preformed Expansion Joint Filler

2.3Sealant

03 20 00.00 10 SD-01 Preconstruction Submittals

GButt-Splices

SD-02 Shop Drawings

3.1 GReinforcement

SD-04 Samples

2.3.2Epoxy-Coated Bars

SD-07 Certificates

2.3Reinforcing Steel

1.3.1Qualified Welders

1.3.2Qualification of Steel Bar

Butt-Splicers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 120 PAGES

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.5 GQuality Control Plan

1.6.6 GQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8 GLaboratory Accreditation

GForm Removal Schedule

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data

2.4.8Joint Sealants

2.4.7Joint Filler

2.1Materials for Forms

2.4.3.2Recycled Aggregate Materials

2.4.1Cementitious Materials

2.4.6Vapor Retarder

2.3.3Concrete Curing Materials

2.5Reinforcement

Liquid Chemical Floor Hardener

2.4.5Admixtures

2.5.4Synthetic Reinforcing Fibers

Mechanical Reinforcing Bar

Connectors

2.2.1Waterstops

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 120 PAGES

03 30 00 Local/Regional Materials

2.4.9Biodegradable Form Release

Agent

1.6.3.2Pumping Concrete

Finishing Plan

SD-05 Design Data

2.3.1 GMix Design

Formwork Calculations

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Ground Granulated Blast-Furnace

Slag

2.4.3Aggregates

GFiber-Reinforced Concrete

3.10.2.1Tolerance Report

3.13.2.3 GCompressive Strength Tests

Unit Weight of Structural

Concrete

Ion Concentration

3.13.2.4Air Content

3.13.2.1Slump Tests

2.4.2Water

SD-07 Certificates

2.5.1Reinforcing Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 120 PAGES

03 30 00 Welder Qualifications

Silica Fume Manufacturer's

Representative

VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.3Material Safety Data Sheets

Forest Stewardship Council

(FSC) Certification

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

Liquid Chemical Floor Hardener

2.3.3Curing Compound

03 30 53 SD-02 Shop Drawings

1.5 GInstallation Drawings

SD-03 Product Data

2.2.3.1Air-Entraining Admixture

2.2.3.2Accelerating Admixture

2.2.3.3Water-Reducing or Retarding

Admixture

2.2.11Curing Materials

2.2.6Expansion Joint Filler Strips, Premolded

2.2.7Joint Sealants - Field Molded

Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 120 PAGES

03 30 53 2.4.1Waterstops

2.4.2Chemical Floor Hardener

3.1.4.3Batching and Mixing Equipment

3.2Conveying and Placing Concrete

2.2.8Formwork

2.3 GMix Design Data

2.3Ready-Mix Concrete

2.4.3Curing Compound

2.2.5Mechanical Reinforcing Bar

Connectors

SD-06 Test Reports

2.2.2Aggregates

2.1.3 GConcrete Mixture Proportions

3.3.3.2Measurement of Floor Tolerances

3.9.3 GCompressive Strength Testing

3.9.3 GSlump

3.9.3Air Content

2.2.4Water

SD-07 Certificates

2.2.1Cementitious Materials

2.2.1.2Pozzolan

1.5.1CPG for recycled materials or appropriate Waiver Form

2.2.2Aggregates

2.3Delivery Tickets

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 120 PAGES

03 30 53 2.4.2Chemical Floor Hardener

2.4.3Curing Compound

03 35 00.00 10 SD-03 Product Data

Part 2Recycled Content Products

SD-04 Samples

1.3.1Field Test Panels

1.3.1.1Sample Wall Panels

1.3.1.2Slab Panels

SD-08 Manufacturer’s Instructions

3.3.7Dry Shake Finish

03 37 00 SD-03 Product Data

2.3Grout Mixture Proportioning

2.4.2.3Grout Mixer

2.4Equipment

3.5.2.9.2Vibrators

3.5Testing and Quality Verification for Contractor Quality Control

3.4 GCuring and Protection

3.2.3 GCold-Weather Placing

3.2.4 GHot-Weather Placing

SD-04 Samples

3.5.2.3 GAggregates

1.4.1.2 GCementitious Materials, Admixtures, and Curing

Compound

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 120 PAGES

03 37 00 3.5.2.3 GQuality of Aggregates

3.5Testing and Quality Verification for Contractor Quality Control

SD-07 Certificates

2.2.1Cementitious Materials

2.2.1Impervious-Sheet Curing

Materials

2.2.1Air-Entraining Admixture

2.2.1Nonshrink Grout

2.2.1Grout Fluidifier

2.2.1Membrane-Forming Curing

Compound

03 37 29 SD-03 Product Data

2.1 GConcrete Mixture Proportions

2.3.2Batch Plant

2.3.3Concrete Mixers

2.3.3Capacity

2.3.4Conveying Equipment

2.3Plant and Equipment

3.3Tests and Inspections

3.1 GVertical Construction Joints

3.2 GCuring and Protection

SD-04 Samples

2.2.1 GCementitious Materials

2.2.3 GAdmixtures

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 120 PAGES

03 37 29 2.2.2Aggregates

3.3.2.3 GQuality of Aggregates

3.3.2.10Mixer Uniformity

3.3Tests and Inspections

1.4Unacceptable Concrete

SD-07 Certificates

2.2.1 GCementitious Materials

2.2Air-Entraining Admixture

2.2Accelerators

2.2Other Chemical Admixtures

03 39 00.00 10 SD-03 Product Data

2.1Curing Materials

SD-06 Test Reports

3.2Testing and Inspection for CQC

SD-08 Manufacturer’s Instructions

2.1Curing Compound

03 44 00 SD-02 Shop Drawings

1.5 GFabrication Drawings

1.5 GInstallation Drawings

2.6.3 GReinforcement

SD-04 Samples

1.6.5 GPAAC Framing Mock-up

SD-05 Design Data

1.6.4.2 GDesign Mix

SD-06 Test Reports

2.7.1Fabrication

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 120 PAGES

03 44 00 1.6.4.2Compressive Strength

1.6.4.2Compressive Strength

1.6.4.2Moisture Content

1.6.4.2Dry Bulk Density

1.6.4.2Dry Bulk Density

1.6.4.2Drying Shrinkage

1.6.4.2Modulus of Elasticity

SD-07 Certificates

1.6.1PAAC Manufacturer

1.6.2Installer

1.6.3Qualifications for Welding Work

SD-08 Manufacturer’s Instructions

1.6.3Welding Sequence and

Procedure

3.6.3Epoxy-Resin Grout

03 52 16 SD-02 Shop Drawings

2.1 GLow Density Roof Systems

SD-06 Test Reports

2.1.1Design Mix

03 52 16.19 SD-03 Product Data

3.1Performance requirements

SD-06 Test Reports

3.1Performance requirements

SD-07 Certificates

1.7.1Fabricator's Compatibility

Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 120 PAGES

03 52 16.19 SD-08 Manufacturer’s Instructions

3.5Application

03 53 14.00 20 SD-03 Product Data

2.2 GNon-oxidizing metallic aggregate

SD-04 Samples

1.2.1Sample installation

1.2.2Material sample

SD-07 Certificates

1.2.3 Galternates

03 62 16 SD-01 Preconstruction Submittals

1.3.1 GGrout Placement and Inspection

Reports

SD-04 Samples

2.1.2 GAggregates

2.1.4 GExpansive Admixtures

SD-06 Test Reports

3.3 GExpansion

3.3 GCompressive Strength

1.3.1 GGrout Placement and Inspection

Reports

2.1.5 GExpansive Grout

2.1.1 GPortland Cement

SD-07 Certificates

2.1.1 GPortland Cement

2.1.4 GExpansive Admixtures

2.1.5 GExpansive Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 120 PAGES

03 62 16 2.1.2 GAggregates

04 01 20.70 SD-01 Preconstruction Submittals

1.5.1 GQuality Control Plan

1.5.1 GProject Training Program

1.5.2 GQualifications

SD-02 Shop Drawings

1.5.5Photographic Documentation

3.5.1 GStructural Upgrades

SD-03 Product Data

1.5.2Qualifications

1.5.6 GCleaning and Restoration

Methods

2.1 GCleaning Materials

2.1.4Biocides

2.2.2.2 GReplacement Mortar And Stucco

2.4 GMortar Mix

3.4.8.3 GWater Repellents Infiltration

3.4.8.4 GStone Consolidants

SD-04 Samples

1.5.7 GMock-ups

SD-05 Design Data

3.5.1 GStructural Upgrades

SD-06 Test Reports

2.2.2.1Testing and Matching

3.5.2Existing Sealants for Asbestos and PCBs

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 120 PAGES

04 01 20.70 SD-07 Certificates

2.2Repair Materials

04 01 20.73 SD-01 Preconstruction Submittals

1.5.1 GQuality Control Plan

1.5.3.1System Manufacturer

1.5.3.2 GContractor Qualifications

1.5.3.3 GContractor's Field Representative

Qualifications

SD-02 Shop Drawings

2.1.3 GFRP Composite System

SD-03 Product Data

1.5.2Material Safety Data Sheets

(MSDS)

2.2.2 GFRP Rods And Shapes

2.2.3 GStructural Paste/Adhesive

Material

SD-04 Samples

2.2 GMaterials

2.2.2 GFRP Rods And Shapes

2.2.3 GStructural Paste/Adhesive

Material

SD-05 Design Data

2.1.3.3 GDesign Calculations

SD-06 Test Reports

1.5.4Wall Tests

2.2.1.2.1 GWall Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 120 PAGES

04 01 20.73 2.2.2FRP Rods And Shapes

2.2.3Structural Paste/Adhesive

Material

3.2.2Laboratory Testing

3.4.2Field Testing

SD-07 Certificates

1.5.2Regulatory Requirements

1.5.2Pastes/Adhesives

1.5.3.4Applicators

1.5.3.4.1Applicator Training

SD-08 Manufacturer’s Instructions

2.1.3 GFRP Composite System

2.2.1.2.2 GManufacturer's Installation

Instructions

SD-10 Operation and Maintenance

Data

3.4.4 GRecord Maintenance

3.6 GMaintenance

04 01 20.75 SD-01 Preconstruction Submittals

1.5.1 GQuality Control Plan

SD-02 Shop Drawings

2.1.1 GFRP Composite System

SD-03 Product Data

1.5.2Material Safety Data Sheets

(MSDS)

2.2.3.2.3 GSystem Properties

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 120 PAGES

04 01 20.75 SD-04 Samples

2.2.3.2.2 GSystem Material Sample

2.5 GAnchors

SD-05 Design Data

2.1.1 GDesign Calculations

2.1.1 GHygrothermal Analysis

SD-06 Test Reports

3.4.1Laboratory Testing During

Construction

3.4.1.3Witness Panel Test Report

3.4.2Field Testing

3.4.2.1.3Mixed Resin Hardness Test

Report

3.4.2.2.1Shore Hardness Values

3.4.3.3 GDelaminations

SD-07 Certificates

1.5.2Regulatory Requirements

1.5.3.1Manufacturer Qualifications

1.5.3.2Contractor Qualifications

1.5.3.3.1Field Representative

Qualifications

1.5.3.3Installers' Qualifications

1.5.3.3.3Laboratory Qualifications

2.2.3.2.3System Properties

2.3.2Finish Coat Compatibility Letter from FRP Manufacturer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 120 PAGES

04 01 20.75 2.3.2Finish Coat Compatibility Letter from Finish Coat Manufacturer

SD-08 Manufacturer’s Instructions

2.2.3.2.6 GSystem Installation Instructions

3.5.1.1 GRepair Methods for Application

Defects

SD-10 Operation and Maintenance

Data

3.4.3.5 GRecord Retention

3.6 GMaintenance Procedures

04 20 00 SD-02 Shop Drawings

3.3.3.1 GCut CMU

3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.2 GCold Weather Procedures

GCement

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

SD-06 Test Reports

3.6.1.1Field Testing of Grout

SD-07 Certificates

Glazed Structural Clay Facing

Tile

Glazed Brick

Concrete Brick

Precast Concrete Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 120 PAGES

04 20 00 2.4.1.1Cementitious Materials

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.3Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

05 05 23.16 SD-01 Preconstruction Submittals

3.2Welding Quality Assurance Plan

SD-03 Product Data

1.3Welding Procedure Qualifications

1.3.5Welder, Welding Operator, and

Tacker Qualification

Inspector Qualification

1.3.2Previous Qualifications

1.3.3Pre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports

3.3Nondestructive Testing

SD-07 Certificates

1.3.1Certified Welding Procedure

Specifications (WPS)

1.3.1Certified Welder Performance

Qualifications (WPQ)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 120 PAGES

05 12 00 SD-01 Preconstruction Submittals

1.5.1.1 GErection Drawings

SD-02 Shop Drawings

1.5.2 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.3.2.3Direct Tension Indicator Washers

2.4.2Non-Shrink Grout

2.3.3Tension Control Bolts

SD-06 Test Reports

2.6.2Class B Coating

2.3Bolts, Nuts, and Washers

3.7.1.2Weld Inspection Reports

3.7.2.1Direct Tension Indicator Washer

Inspection Reports

3.7.3.1Bolt Testing Reports

3.7.4Embrittlement Test Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

Pins and Rollers

1.3AISC Fabrication Plant Quality

Certification

1.3AISC Erector Quality Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 120 PAGES

05 12 00 1.5.3.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.1.6Galvanizing Repair Paint

2.2.15Mechanical Fasteners

2.1.6Touch-Up Paint

2.1.2Sound Absorbing Materials

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

SD-04 Samples

2.1.1Metal Roof Deck Units

Cellular Metal Floor Deck Units

2.2.3Flexible Closure Strips

Acoustical Material

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 120 PAGES

05 30 00 1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

2.2.10Stud Manufacture's Certification

2.2.10Stud Manufacture's Test Reports

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products

05 40 00 SD-02 Shop Drawings

1.6.1 GFraming Components

SD-03 Product Data

2.1Studs, Joists

SD-05 Design Data

1.6.2 GMetal Framing Calculations

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.1.1Welds

SD-11 Closeout Submittals

2.1 SRecycled Content of Steel

Products

05 50 13 SD-02 Shop Drawings

2.12Structural Steel Door Frames

2.5 GCover Plates and Frames

2.6 GExpansion Joint Covers

GWindow And Door Guards

2.10 GAngles and Plates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 120 PAGES

05 50 13 SD-03 Product Data

Frames

2.3Control-Joint Covers

2.6Expansion Joint Covers

Steel Door Frames

Window and Door Guards

SD-04 Samples

2.6Expansion Joint Covers

2.3Control-Joint Covers

06 20 00 SD-02 Shop Drawings

1.3 GDetail Drawings Indicating All

Wood Assemblies

SD-03 Product Data

2.2Wood Products

1.4Treated Wood Products

2.6 GHardware and Accessories

Reduce Volatile Organic

Compounds (VOC) Contents, G

2.1.2Biobased Content

2.1.3Recycled Content

SD-04 Samples

GSamples, materials and colors

SD-07 Certificates

1.7.1Certificates of Grade

1.7.1Compliance

1.7.1Certification of Sustainable Wood

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 120 PAGES

06 20 00 SD-11 Closeout Submittals

2.1.1 GReduce Volatile Organic

Compounds (VOC) Contents

2.1.2 GBiobased Content

2.1.3 GRecycled Content

06 41 16.00 10 SD-02 Shop Drawings

2.11Shop Drawings

3.1Installation

SD-03 Product Data

2.1Wood Materials

2.9Wood Finishes

2.11.7.3Finish Schedule

Certification

SD-04 Samples

Plastic Laminates and color chart

2.6Cabinet Hardware

SD-07 Certificates

1.4Quality Assurance

2.9Laminate Clad Casework

3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

GDetail Drawings

3.1 GInstallation

SD-03 Product Data

2.1Solid Polymer Material

1.4.1Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 120 PAGES

06 61 16 2.3Fabrications

SD-04 Samples

GMaterial and color chart for approval prior to fabrication

SD-06 Test Reports

2.1Solid Polymer Material

SD-07 Certificates

2.3Fabrications

1.4.1Qualifications

SD-10 Operation and Maintenance

Data

3.2Clean-up

07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-05 Design Data

3.2 GEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1Pressure Test Agency

1.6.2.2Thermographer Qualifications

1.6.3Test Instruments

1.6.3Date Of Last Calibration

SD-06 Test Reports

3.5 GPressure Test Procedures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 120 PAGES

07 05 23 3.5.7 GAir Leakage Test Report

3.6.5 GDiagnostic Test Report

07 11 13 SD-07 Certificates

1.3Materials

07 16 19 SD-04 Samples

1.4Metallic waterproofing

SD-06 Test Reports

1.3Iron content

1.3Oxidizing agent content

SD-08 Manufacturer’s Instructions

3.3Mixing

07 17 00 SD-03 Product Data

2.1 GBentonite Materials

2.1.3 GBentonite Panels

1.3 GAccessories

SD-08 Manufacturer’s Instructions

3.2Application

3.3Protection

3.5 GCorrections

07 19 00 SD-03 Product Data

2.2Water repellents

SD-06 Test Reports

1.3.2Water absorption

2.3.1Water absorption

2.3.2Water absorption

2.3.3Water absorption

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 120 PAGES

07 19 00 2.3.1Accelerated weathering

2.3.2Accelerated weathering

2.3.3Accelerated weathering

2.3.4Accelerated weathering

2.3.1Resistance to chloride ion penetration

2.3.2Resistance to chloride ion penetration

2.3.3Resistance to chloride ion penetration

2.3.4Resistance to chloride ion penetration

1.3.2Moisture vapor transmission

2.3.1Moisture vapor transmission

2.3.2Moisture vapor transmission

2.3.3Moisture vapor transmission

2.3.4Moisture vapor transmission

2.3.1Scaling resistance

2.3.2Scaling resistance

2.3.3Scaling resistance

2.3.4Scaling resistance

1.3.2Water Penetration and Leakage

SD-07 Certificates

1.3.1Manufacturer's qualifications

1.3.1Applicator's qualifications

1.3.3Evidence of acceptable variation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 120 PAGES

07 19 00 1.12Warranty

SD-08 Manufacturer’s Instructions

3.4Application

1.7.1material safety data sheets

07 21 13 SD-03 Product Data

1.3 GManufacturer's Standard Details

2.1 GBlock or Board Insulation

2.2 GVapor Retarder

2.3 GPressure Sensitive Tape

1.4 GProtection Board or Coatings

2.5 GAccessories

SD-07 Certificates

2.1 GBlock or Board Insulation

2.2 GVapor Retarder

2.4 GProtection Board or Coating

3.4.5 GProtection Board or Coating

1.7 GSpecial Warranties

1.7 GSpecial Warranties

SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

2.5.1Adhesive

SD-11 Closeout Submittals

SVolatile Organic Compound

(VOC) Content

SRecycled Content

07 21 16 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 120 PAGES

07 21 16 2.2Blanket Insulation

2.3Sill Sealer Insulation

2.5Vapor Retarder

2.6Pressure Sensitive Tape

2.7Accessories

SD-08 Manufacturer’s Instructions

3.3.1Insulation

SD-11 Closeout Submittals

2.1.1 SRecycled Content for Insulation

Materials

2.1.2 SReduce Volatile Organic

Compounds (VOC)

07 22 00 SD-02 Shop Drawings

1.3 GInsulation Board Layout

1.3 GVerification of Existing Conditions

SD-03 Product Data

2.2 GInsulation

1.4 GProtection Board

2.5 GFasteners

GSheathing Paper

2.4 GMoisture Control

1.10.1 GAsphalt

SD-06 Test Reports

1.8.1 GFlame Spread Rating

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 120 PAGES

07 22 00 1.9 GVolatile Organic Compounds

(VOC) Content

1.6 GInstaller Qualifications

1.6 GCertificates Of Compliance For

Felt Materials

SD-08 Manufacturer’s Instructions

2.5 GFasteners

2.2 GInsulation

SD-11 Closeout Submittals

1.9 SVolatile Organic Compounds

(VOC) Content

07 24 00 SD-02 Shop Drawings

3.3Shop Drawings

SD-03 Product Data

2.3Sheathing Board

2.7Thermal Insulation

2.4Adhesive

2.6Mechanical Fasteners

2.13Accessories

2.8Base Coat

2.9Portland Cement

2.10Reinforcing Fabric

2.11Finish Coat

2.14Joint Sealant

2.12Sealant Primer

2.15Bond Breaker

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 120 PAGES

07 24 00 2.16Backer Rod

1.4.5Insulation Board

1.7Warranty

SD-04 Samples

1.2.3.7 GSample Boards

1.2.1.4Mock-up Installation of EIFS

SD-05 Design Data

1.2.1.2Wind Load

1.2.4Moisture Analysis

SD-06 Test Reports

1.2.3.1Abrasion Resistance

1.2.3.2Accelerated Weathering

1.2.2.3Impact Resistance

1.2.3.3Mildew Resistance

1.2.3.4Salt Spray Resistance

1.2.4Vapor Transmission

1.2.3.6Absorption-Freeze-Thaw

1.2.1.3Wall Fire Test

1.2.1.1Water Penetration

1.2.3.5Water Resistance

1.2.1.3Full Scale or Intermediate Scale

Fire Test

1.2.2.1Surface Burning Characteristics

1.2.2.2Radiant Heat

3.1Substrate

1.2.1.2Wind Load

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 120 PAGES

07 24 00 SD-07 Certificates

1.4.1Qualifications of EIFS

Manufacturer

1.4.2Qualification of EIFS Installer

1.4.3Qualification of Sealant Applicator

1.4.4Qualifications of Third Party

Inspector

3.5.2 GInspection Check List

SD-08 Manufacturer’s Instructions

3.3Installation

SD-10 Operation and Maintenance

Data

1.7EIFS

SD-11 Closeout Submittals

2.1.1 SRecycled Content for Insulation

Materials

2.1.2 SRecycled Content for Metal

System Accessories

07 27 10.00 10 SD-04 Samples

3.1.2 GMock-Up

SD-06 Test Reports

1.8 GDesign Review Report

3.1.3 GTesting and Inspection

SD-07 Certificates

1.7 GAir Barrier Inspector

07 41 13 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 120 PAGES

07 41 13 1.4.5 GRoofing Panels

1.4.5 GFlashing and Accessories

1.4.5 GGutter/Downspout Assembly

SD-03 Product Data

2.1 GRoof Panels

1.4.5 GFactory-Applied Color Finish

2.4 GAccessories

1.4.5 GFasteners

1.4.5 GPressure Sensitive Tape

2.7 GUnderlayments

2.8 GGaskets and Sealing/Insulating

Compounds

1.4.5 GCoil Stock

GAluminized Steel Repair Paint

GEnamel Repair Paint

GGalvanizing Repair Paint

SD-04 Samples

2.1 GRoof Panels

1.4.5 GFactory-applied Color Finish

2.4 GAccessories

1.4.5 GFasteners

1.4.5 GGaskets and Sealant/Insulating

Compounds

SD-05 Design Data

1.2.1.2 GWind Uplift Resistance

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 120 PAGES

07 41 13 1.2.1.1 GLeakage Test Report

1.2.1.2 GWind Uplift Test Report

2.6.2 GFire Rating Test Report

2.2 GFactory Finish and Color

Performance Requirements

SD-07 Certificates

2.1 GRoof Panels

1.4.5 GCoil Stock Compatibility

2.7.2 GSelf-Adhering Modified Bitumen

Underlayment

1.4.1 GQualification of Manufacturer

1.4.2 GQualification of Applicator

SD-08 Manufacturer’s Instructions

2.6 GInsulation

1.4.5 GInstallation Manual

SD-09 Manufacturer’s Field

Reports

3.10.1 GManufacturer's Field Inspection

Reports

SD-11 Closeout Submittals

1.8 GWarranties

3.11 GInformation Card

07 41 63 SD-01 Preconstruction Submittals

1.5.1 GQualification of Manufacturer

1.5.3 GQualification of Manufacturer

1.5.1 GQualification of Installer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 120 PAGES

07 41 63 1.5.1 GQualifications for Welding

SD-02 Shop Drawings

1.5.1 GRoofing Panels

1.5.1 GFlashing and Accessories

1.5.1 GGutter/Downspout Assembly

SD-03 Product Data

1.5.1 GSustainable Acquisition

1.5.1 GCoil Stock

1.5.1 GFactory Color Finish

1.5.1 GSub-girts and Formed Shapes

1.5.1 GClosure Materials

1.5.1 GInsulation

1.5.1 GPressure Sensitive Tape

1.5.1 GSealants and Caulking

1.5.1 GRated Wall Assembly

1.5.1 GGalvanizing Repair Paint

1.5.1 GEnamel Repair Paint

1.5.1 GAluminized Steel Repair Paint

1.5.1 GAccessories

SD-04 Samples

1.5.1 GCoil Stock

1.5.1 GRoofing Panels

2.2.2 GFasteners

2.4.1 GMetal Closure Strips

1.5.1 GInsulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 120 PAGES

07 41 63 1.5.1 GManufacturer's Color Charts and

Chips

SD-05 Design Data

1.5.1 GWind Design Analysis

1.5.1 GSeismic Design Analysis

SD-06 Test Reports

2.1.4 GTest Reports

3.7.2 GLeakage Tests

1.5.1 GFire Rating Test Report

3.1 GCoatings and Base Metals of

Metal Roofing

1.5.1 GFactory Finish and Color

Performance Requirements

1.5.1 GWind Uplift Test Report

1.5.1 GSeismic Test Report

SD-07 Certificates

1.5.1 GCoil Stock

2.2.2 GFasteners

1.5.1 GGalvanizing Repair Paint

1.5.1 GEnamel Repair Paint

SD-08 Manufacturer’s Instructions

1.5.1 GInstallation of Roof Panel

Assemblies

SD-11 Closeout Submittals

1.8 GWarranty

3.10 GInformation Form and Placard

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 120 PAGES

07 41 63 3.9.1 GManufacturer's Field Inspection

Reports

1.5.1 GInstructions

1.5.1 GMaterial Safety Data Sheets

07 42 13 SD-01 Preconstruction Submittals

1.5.3 GQualification of Manufacturer

1.5.4 GQualification of Installation

Contractor

1.5.4.1 GQualification of Welders

1.8 GWarranty

SD-02 Shop Drawings

1.5.1.1 GInstallation Drawings

SD-03 Product Data

2.1Recycled Content;

2.2.1 GWall Panels

2.2.2 GWall Panels

2.2.3Factory Color Finish

1.5.5Closure Materials

2.5.4.4Pressure Sensitive Tape

2.5.4.1Sealants and Caulking

1.5.3.1Galvanizing Repair Paint

1.5.3.1Enamel Repair Paint

Aluminized Steel Repair Paint

1.5.5Accessories

2.5Accessories

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 120 PAGES

07 42 13 2.2.1 GWall Panels

2.2.2 GWall Panels

1.5.3.1 GFasteners

2.5.3 GMetal Closure Strips

2.2.3.5 GColor chart

SD-05 Design Data

1.5.1.2 GWind load design analysis

SD-06 Test Reports

3.7.2 GLeakage Tests

1.3.2 GWind Load Tests

2.2.3.6 GCoating

2.2.3.6 GChalking

SD-07 Certificates

1.5.3.1 GCoil Stock

1.5.3.1 GFasteners

1.5.3.1 GGalvanizing Repair Paint

1.5.3.1 GEnamel Repair Paint

SD-08 Manufacturer’s Instructions

3.3 GInstallation

SD-09 Manufacturer’s Field

Reports

3.8.1 GManufacturer's Field Reports

SD-11 Closeout Submittals

1.8 GWarranty

1.5.6 GMaintenance Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 120 PAGES

07 42 13 1.8.120 year 'No Dollar Limit' warranty for labor and material

07 60 00 SD-02 Shop Drawings

3.1.22 GCovering on flat, sloped, or

curved surfaces

3.1.16 GGutters

3.1.17 GDownspouts

3.1.23 GExpansion joints

3.1.18 GFlashing for roof drains

3.1.11 GBase flashing

3.1.12 GCounterflashing

3.1.24 GFlashing at roof penetrations

3.1.13 GReglets

3.1.19 GScuppers

3.1.27 GCopings

3.1.15 GDrip edge

3.1.20Conductor heads

3.1.21 GEave flashing

SD-11 Closeout Submittals

3.5Quality Control Plan

07 61 14.00 20 SD-02 Shop Drawings

1.2.5 GRoofing

SD-03 Product Data

2.1 GRoofing panels

2.3Attachment clips

2.4.1Closures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 120 PAGES

07 61 14.00 20 2.4Accessories

2.4.2Fasteners

2.4.3Sealants

2.5Insulation

1.7 Gwarranty

SD-04 Samples

2.1panel

2.4Accessories

2.4.3Sealants

2.2Intermediate Support

SD-05 Design Data

1.5Design calculations

SD-06 Test Reports

3.6Field Inspection

1.3.3Structural performance

1.6.6Finish

SD-07 Certificates

1.6.3Manufacturer's Technical

Representative

1.6.4Installer's Qualifications

2.1 GCoil stock

SD-08 Manufacturer’s Instructions

3.3 GInstallation

SD-11 Closeout Submittals

3.8Information card

07 81 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 120 PAGES

07 81 00 3.3 GFireproofing Material

SD-04 Samples

GSpray-Applied Fireproofing

SD-06 Test Reports

1.2.2 GFire Resistance Rating

GField Tests

1.2.3 GEvaluation Reports

SD-07 Certificates

1.4.1 GInstaller Qualifications

3.1 GSurface Preparation Report

3.5.2 GManufacturer's Inspection Report

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

1.5.2Inspector Qualifications

2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

2.4 GBackstops

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 120 PAGES

07 92 00 3.1 GField Adhesion

SD-07 Certificates

3.4.7 GSealant

2.2 GPrimers

2.3 GBond Breakers

1.4 GVolatile Organic Compounds

(VOC) Content

2.1.1 GVolatile Organic Compounds

(VOC) Content

SD-11 Closeout Submittals

1.4Volatile Organic Compounds

(VOC) Content

2.1.1Volatile Organic Compounds

(VOC) Content

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.5 GFrames

2.5 GFrames

2.3Accessories

2.6Weatherstripping

SD-03 Product Data

2.1 GDoors

2.5 GFrames

2.3Accessories

2.6Weatherstripping

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 120 PAGES

08 11 13 SD-04 Samples

2.8.2 GFactory-applied enamel finish

08 11 16 SD-02 Shop Drawings

1.5.1 GDoors, windows and frames

SD-04 Samples

1.5.2.1Finish sample

SD-05 Design Data

1.2.1 Gcalculations

SD-08 Manufacturer’s Instructions

2.1Doors and frames

08 34 02 SD-02 Shop Drawings

3.3 GInstallation

SD-03 Product Data

1.4Bullet Resistant Components

2.5.2Bifold Doors

SD-07 Certificates

1.4Bullet Resistant Components

SD-10 Operation and Maintenance

Data

1.4…