20170511_-_Appx_3.4_VCC_Submittal_Register.pdf
PDF 1 MB Posted
- Attached to
- Construct Visitor Control Center, Fort Drum, NY Federal contract opportunity
- Solicitation number
- W911S2-17-B-0001
About this file
20170511 - Appx_3.4 VCC_Submittal_Register
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 120 PAGES
ACP VCC
01 33 00 SD-01 Preconstruction Submittals
Submittal Register
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9Verification Statement
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
SD-06 Test Reports
2.2.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.9 GSolid Waste Management Permit
1.5.2 GRegulatory Notifications
1.6 GEnvironmental Protection Plan
3.2.1.1 GStormwater Notice of Intent
1.6.9.1 GDirt and Dust Control Plan
1.5.5 GEmployee Training Records
1.5.4 GEnvironmental Manager
Qualifications
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 120 PAGES
01 57 19 Laboratory Analysis
3.2.1.2Inspection Reports
3.7.2.1 GSolid Waste Management Report
SD-07 Certificates
1.5.5 GEmployee Training Records
1.5.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.2.1.3 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.4 GStormwater Notice of Termination
3.7.1 GWaste Determination
Documentation
3.7.3.5 GDisposal Documentation for
Hazardous and Regulated Waste
1.5.5 GAssembled Employee Training
Records
1.9 GSolid Waste Management Permit
3.7.2.1 GSolid Waste Management Report
3.7.3.1 GHazardous Waste/Debris
Management
1.5.2 GRegulatory Notifications
3.7.2.1 GSales Documentation
3.7.2.1Contractor Certification
As-Built Topographic Survey
01 78 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 120 PAGES
01 78 00 1.4.1Warranty Management Plan
Warranty Tags
1.3Spare Parts Data
SD-08 Manufacturer’s Instructions
1.4.1Instructions
SD-10 Operation and Maintenance
Data
3.3Operation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1As-Built Drawings
3.2Record Drawings
Final Approved Shop Drawings
Construction Contract
Specifications
2.1Certification of EPA Designated
Items
01 78 23 SD-10 Operation and Maintenance
Data
1.3O&M Database
3.1.1Training Plan
3.1.3Training Outline
3.1.2Training Content
SD-11 Closeout Submittals
Training Video Recording
3.1.5Validation of Training Completion
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 120 PAGES
03 11 13.00 10 SD-02 Shop Drawings
2.2.1 GFormwork
3.1.1 GFormwork
2.2.1 GForm Removal Schedule
SD-03 Product Data
2.2Form Materials
SD-04 Samples
1.3 GSample Panels
2.2.4 GFiber Voids
SD-05 Design Data
2.1Calculations
SD-06 Test Reports
3.2Inspection
SD-07 Certificates
2.2.4Fiber Voids
03 11 19.00 10 SD-03 Product Data
2.1.2 GInsulating Concrete Form
1.6.1Local/Regional Materials
1.6.2Environmental Data
2.4Accessories
SD-04 Samples
1.3.4 GMock-Up Installation of ICF
SD-06 Test Reports
1.3.1ICC ES Evaluation Report
SD-07 Certificates
2.33rd Party Agency Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 120 PAGES
03 11 19.00 10 SD-08 Manufacturer’s Instructions
3.3Installation
SD-10 Operation and Maintenance
Data
1.6.3Plastic Identification
03 15 00.00 10 SD-03 Product Data
2.2Preformed Expansion Joint Filler
2.3Sealant
SD-04 Samples
2.3.2Lubricant for Preformed
Compression Seals
2.3.3Field-Molded Type
SD-07 Certificates
2.2Preformed Expansion Joint Filler
2.3Sealant
03 20 00.00 10 SD-01 Preconstruction Submittals
GButt-Splices
SD-02 Shop Drawings
3.1 GReinforcement
SD-04 Samples
2.3.2Epoxy-Coated Bars
SD-07 Certificates
2.3Reinforcing Steel
1.3.1Qualified Welders
1.3.2Qualification of Steel Bar
Butt-Splicers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 120 PAGES
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Plan
1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
GForm Removal Schedule
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.8Joint Sealants
2.4.7Joint Filler
2.1Materials for Forms
2.4.3.2Recycled Aggregate Materials
2.4.1Cementitious Materials
2.4.6Vapor Retarder
2.3.3Concrete Curing Materials
2.5Reinforcement
Liquid Chemical Floor Hardener
2.4.5Admixtures
2.5.4Synthetic Reinforcing Fibers
Mechanical Reinforcing Bar
Connectors
2.2.1Waterstops
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 120 PAGES
03 30 00 Local/Regional Materials
2.4.9Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
Finishing Plan
SD-05 Design Data
2.3.1 GMix Design
Formwork Calculations
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Ground Granulated Blast-Furnace
Slag
2.4.3Aggregates
GFiber-Reinforced Concrete
3.10.2.1Tolerance Report
3.13.2.3 GCompressive Strength Tests
Unit Weight of Structural
Concrete
Ion Concentration
3.13.2.4Air Content
3.13.2.1Slump Tests
2.4.2Water
SD-07 Certificates
2.5.1Reinforcing Bars
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 120 PAGES
03 30 00 Welder Qualifications
Silica Fume Manufacturer's
Representative
VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.3Material Safety Data Sheets
Forest Stewardship Council
(FSC) Certification
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
Liquid Chemical Floor Hardener
2.3.3Curing Compound
03 30 53 SD-02 Shop Drawings
1.5 GInstallation Drawings
SD-03 Product Data
2.2.3.1Air-Entraining Admixture
2.2.3.2Accelerating Admixture
2.2.3.3Water-Reducing or Retarding
Admixture
2.2.11Curing Materials
2.2.6Expansion Joint Filler Strips, Premolded
2.2.7Joint Sealants - Field Molded
Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 120 PAGES
03 30 53 2.4.1Waterstops
2.4.2Chemical Floor Hardener
3.1.4.3Batching and Mixing Equipment
3.2Conveying and Placing Concrete
2.2.8Formwork
2.3 GMix Design Data
2.3Ready-Mix Concrete
2.4.3Curing Compound
2.2.5Mechanical Reinforcing Bar
Connectors
SD-06 Test Reports
2.2.2Aggregates
2.1.3 GConcrete Mixture Proportions
3.3.3.2Measurement of Floor Tolerances
3.9.3 GCompressive Strength Testing
3.9.3 GSlump
3.9.3Air Content
2.2.4Water
SD-07 Certificates
2.2.1Cementitious Materials
2.2.1.2Pozzolan
1.5.1CPG for recycled materials or appropriate Waiver Form
2.2.2Aggregates
2.3Delivery Tickets
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 120 PAGES
03 30 53 2.4.2Chemical Floor Hardener
2.4.3Curing Compound
03 35 00.00 10 SD-03 Product Data
Part 2Recycled Content Products
SD-04 Samples
1.3.1Field Test Panels
1.3.1.1Sample Wall Panels
1.3.1.2Slab Panels
SD-08 Manufacturer’s Instructions
3.3.7Dry Shake Finish
03 37 00 SD-03 Product Data
2.3Grout Mixture Proportioning
2.4.2.3Grout Mixer
2.4Equipment
3.5.2.9.2Vibrators
3.5Testing and Quality Verification for Contractor Quality Control
3.4 GCuring and Protection
3.2.3 GCold-Weather Placing
3.2.4 GHot-Weather Placing
SD-04 Samples
3.5.2.3 GAggregates
1.4.1.2 GCementitious Materials, Admixtures, and Curing
Compound
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 120 PAGES
03 37 00 3.5.2.3 GQuality of Aggregates
3.5Testing and Quality Verification for Contractor Quality Control
SD-07 Certificates
2.2.1Cementitious Materials
2.2.1Impervious-Sheet Curing
Materials
2.2.1Air-Entraining Admixture
2.2.1Nonshrink Grout
2.2.1Grout Fluidifier
2.2.1Membrane-Forming Curing
Compound
03 37 29 SD-03 Product Data
2.1 GConcrete Mixture Proportions
2.3.2Batch Plant
2.3.3Concrete Mixers
2.3.3Capacity
2.3.4Conveying Equipment
2.3Plant and Equipment
3.3Tests and Inspections
3.1 GVertical Construction Joints
3.2 GCuring and Protection
SD-04 Samples
2.2.1 GCementitious Materials
2.2.3 GAdmixtures
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 120 PAGES
03 37 29 2.2.2Aggregates
3.3.2.3 GQuality of Aggregates
3.3.2.10Mixer Uniformity
3.3Tests and Inspections
1.4Unacceptable Concrete
SD-07 Certificates
2.2.1 GCementitious Materials
2.2Air-Entraining Admixture
2.2Accelerators
2.2Other Chemical Admixtures
03 39 00.00 10 SD-03 Product Data
2.1Curing Materials
SD-06 Test Reports
3.2Testing and Inspection for CQC
SD-08 Manufacturer’s Instructions
2.1Curing Compound
03 44 00 SD-02 Shop Drawings
1.5 GFabrication Drawings
1.5 GInstallation Drawings
2.6.3 GReinforcement
SD-04 Samples
1.6.5 GPAAC Framing Mock-up
SD-05 Design Data
1.6.4.2 GDesign Mix
SD-06 Test Reports
2.7.1Fabrication
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 120 PAGES
03 44 00 1.6.4.2Compressive Strength
1.6.4.2Compressive Strength
1.6.4.2Moisture Content
1.6.4.2Dry Bulk Density
1.6.4.2Dry Bulk Density
1.6.4.2Drying Shrinkage
1.6.4.2Modulus of Elasticity
SD-07 Certificates
1.6.1PAAC Manufacturer
1.6.2Installer
1.6.3Qualifications for Welding Work
SD-08 Manufacturer’s Instructions
1.6.3Welding Sequence and
Procedure
3.6.3Epoxy-Resin Grout
03 52 16 SD-02 Shop Drawings
2.1 GLow Density Roof Systems
SD-06 Test Reports
2.1.1Design Mix
03 52 16.19 SD-03 Product Data
3.1Performance requirements
SD-06 Test Reports
3.1Performance requirements
SD-07 Certificates
1.7.1Fabricator's Compatibility
Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 120 PAGES
03 52 16.19 SD-08 Manufacturer’s Instructions
3.5Application
03 53 14.00 20 SD-03 Product Data
2.2 GNon-oxidizing metallic aggregate
SD-04 Samples
1.2.1Sample installation
1.2.2Material sample
SD-07 Certificates
1.2.3 Galternates
03 62 16 SD-01 Preconstruction Submittals
1.3.1 GGrout Placement and Inspection
Reports
SD-04 Samples
2.1.2 GAggregates
2.1.4 GExpansive Admixtures
SD-06 Test Reports
3.3 GExpansion
3.3 GCompressive Strength
1.3.1 GGrout Placement and Inspection
Reports
2.1.5 GExpansive Grout
2.1.1 GPortland Cement
SD-07 Certificates
2.1.1 GPortland Cement
2.1.4 GExpansive Admixtures
2.1.5 GExpansive Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 120 PAGES
03 62 16 2.1.2 GAggregates
04 01 20.70 SD-01 Preconstruction Submittals
1.5.1 GQuality Control Plan
1.5.1 GProject Training Program
1.5.2 GQualifications
SD-02 Shop Drawings
1.5.5Photographic Documentation
3.5.1 GStructural Upgrades
SD-03 Product Data
1.5.2Qualifications
1.5.6 GCleaning and Restoration
Methods
2.1 GCleaning Materials
2.1.4Biocides
2.2.2.2 GReplacement Mortar And Stucco
2.4 GMortar Mix
3.4.8.3 GWater Repellents Infiltration
3.4.8.4 GStone Consolidants
SD-04 Samples
1.5.7 GMock-ups
SD-05 Design Data
3.5.1 GStructural Upgrades
SD-06 Test Reports
2.2.2.1Testing and Matching
3.5.2Existing Sealants for Asbestos and PCBs
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 120 PAGES
04 01 20.70 SD-07 Certificates
2.2Repair Materials
04 01 20.73 SD-01 Preconstruction Submittals
1.5.1 GQuality Control Plan
1.5.3.1System Manufacturer
1.5.3.2 GContractor Qualifications
1.5.3.3 GContractor's Field Representative
Qualifications
SD-02 Shop Drawings
2.1.3 GFRP Composite System
SD-03 Product Data
1.5.2Material Safety Data Sheets
(MSDS)
2.2.2 GFRP Rods And Shapes
2.2.3 GStructural Paste/Adhesive
Material
SD-04 Samples
2.2 GMaterials
2.2.2 GFRP Rods And Shapes
2.2.3 GStructural Paste/Adhesive
Material
SD-05 Design Data
2.1.3.3 GDesign Calculations
SD-06 Test Reports
1.5.4Wall Tests
2.2.1.2.1 GWall Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 120 PAGES
04 01 20.73 2.2.2FRP Rods And Shapes
2.2.3Structural Paste/Adhesive
Material
3.2.2Laboratory Testing
3.4.2Field Testing
SD-07 Certificates
1.5.2Regulatory Requirements
1.5.2Pastes/Adhesives
1.5.3.4Applicators
1.5.3.4.1Applicator Training
SD-08 Manufacturer’s Instructions
2.1.3 GFRP Composite System
2.2.1.2.2 GManufacturer's Installation
Instructions
SD-10 Operation and Maintenance
Data
3.4.4 GRecord Maintenance
3.6 GMaintenance
04 01 20.75 SD-01 Preconstruction Submittals
1.5.1 GQuality Control Plan
SD-02 Shop Drawings
2.1.1 GFRP Composite System
SD-03 Product Data
1.5.2Material Safety Data Sheets
(MSDS)
2.2.3.2.3 GSystem Properties
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 120 PAGES
04 01 20.75 SD-04 Samples
2.2.3.2.2 GSystem Material Sample
2.5 GAnchors
SD-05 Design Data
2.1.1 GDesign Calculations
2.1.1 GHygrothermal Analysis
SD-06 Test Reports
3.4.1Laboratory Testing During
Construction
3.4.1.3Witness Panel Test Report
3.4.2Field Testing
3.4.2.1.3Mixed Resin Hardness Test
Report
3.4.2.2.1Shore Hardness Values
3.4.3.3 GDelaminations
SD-07 Certificates
1.5.2Regulatory Requirements
1.5.3.1Manufacturer Qualifications
1.5.3.2Contractor Qualifications
1.5.3.3.1Field Representative
Qualifications
1.5.3.3Installers' Qualifications
1.5.3.3.3Laboratory Qualifications
2.2.3.2.3System Properties
2.3.2Finish Coat Compatibility Letter from FRP Manufacturer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 120 PAGES
04 01 20.75 2.3.2Finish Coat Compatibility Letter from Finish Coat Manufacturer
SD-08 Manufacturer’s Instructions
2.2.3.2.6 GSystem Installation Instructions
3.5.1.1 GRepair Methods for Application
Defects
SD-10 Operation and Maintenance
Data
3.4.3.5 GRecord Retention
3.6 GMaintenance Procedures
04 20 00 SD-02 Shop Drawings
3.3.3.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.2 GCold Weather Procedures
GCement
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
SD-06 Test Reports
3.6.1.1Field Testing of Grout
SD-07 Certificates
Glazed Structural Clay Facing
Tile
Glazed Brick
Concrete Brick
Precast Concrete Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 120 PAGES
04 20 00 2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
05 05 23.16 SD-01 Preconstruction Submittals
3.2Welding Quality Assurance Plan
SD-03 Product Data
1.3Welding Procedure Qualifications
1.3.5Welder, Welding Operator, and
Tacker Qualification
Inspector Qualification
1.3.2Previous Qualifications
1.3.3Pre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
SD-07 Certificates
1.3.1Certified Welding Procedure
Specifications (WPS)
1.3.1Certified Welder Performance
Qualifications (WPQ)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 120 PAGES
05 12 00 SD-01 Preconstruction Submittals
1.5.1.1 GErection Drawings
SD-02 Shop Drawings
1.5.2 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.3Tension Control Bolts
SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
3.7.1.2Weld Inspection Reports
3.7.2.1Direct Tension Indicator Washer
Inspection Reports
3.7.3.1Bolt Testing Reports
3.7.4Embrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
Pins and Rollers
1.3AISC Fabrication Plant Quality
Certification
1.3AISC Erector Quality Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 120 PAGES
05 12 00 1.5.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
05 30 00 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.1.6Galvanizing Repair Paint
2.2.15Mechanical Fasteners
2.1.6Touch-Up Paint
2.1.2Sound Absorbing Materials
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
SD-04 Samples
2.1.1Metal Roof Deck Units
Cellular Metal Floor Deck Units
2.2.3Flexible Closure Strips
Acoustical Material
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.3Welder Qualifications
1.3.3Welding Procedures
1.3.4.1Fire Safety
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 120 PAGES
05 30 00 1.3.4.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
2.2.10Stud Manufacture's Certification
2.2.10Stud Manufacture's Test Reports
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products
05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
SD-05 Design Data
1.6.2 GMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.1.1Welds
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products
05 50 13 SD-02 Shop Drawings
2.12Structural Steel Door Frames
2.5 GCover Plates and Frames
2.6 GExpansion Joint Covers
GWindow And Door Guards
2.10 GAngles and Plates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 120 PAGES
05 50 13 SD-03 Product Data
Frames
2.3Control-Joint Covers
2.6Expansion Joint Covers
Steel Door Frames
Window and Door Guards
SD-04 Samples
2.6Expansion Joint Covers
2.3Control-Joint Covers
06 20 00 SD-02 Shop Drawings
1.3 GDetail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.2Wood Products
1.4Treated Wood Products
2.6 GHardware and Accessories
Reduce Volatile Organic
Compounds (VOC) Contents, G
2.1.2Biobased Content
2.1.3Recycled Content
SD-04 Samples
GSamples, materials and colors
SD-07 Certificates
1.7.1Certificates of Grade
1.7.1Compliance
1.7.1Certification of Sustainable Wood
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 120 PAGES
06 20 00 SD-11 Closeout Submittals
2.1.1 GReduce Volatile Organic
Compounds (VOC) Contents
2.1.2 GBiobased Content
2.1.3 GRecycled Content
06 41 16.00 10 SD-02 Shop Drawings
2.11Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
2.9Wood Finishes
2.11.7.3Finish Schedule
Certification
SD-04 Samples
Plastic Laminates and color chart
2.6Cabinet Hardware
SD-07 Certificates
1.4Quality Assurance
2.9Laminate Clad Casework
3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
GDetail Drawings
3.1 GInstallation
SD-03 Product Data
2.1Solid Polymer Material
1.4.1Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 120 PAGES
06 61 16 2.3Fabrications
SD-04 Samples
GMaterial and color chart for approval prior to fabrication
SD-06 Test Reports
2.1Solid Polymer Material
SD-07 Certificates
2.3Fabrications
1.4.1Qualifications
SD-10 Operation and Maintenance
Data
3.2Clean-up
07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-03 Product Data
2.2 GThermal Imaging Camera
SD-05 Design Data
3.2 GEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
1.6.3Date Of Last Calibration
SD-06 Test Reports
3.5 GPressure Test Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 120 PAGES
07 05 23 3.5.7 GAir Leakage Test Report
3.6.5 GDiagnostic Test Report
07 11 13 SD-07 Certificates
1.3Materials
07 16 19 SD-04 Samples
1.4Metallic waterproofing
SD-06 Test Reports
1.3Iron content
1.3Oxidizing agent content
SD-08 Manufacturer’s Instructions
3.3Mixing
07 17 00 SD-03 Product Data
2.1 GBentonite Materials
2.1.3 GBentonite Panels
1.3 GAccessories
SD-08 Manufacturer’s Instructions
3.2Application
3.3Protection
3.5 GCorrections
07 19 00 SD-03 Product Data
2.2Water repellents
SD-06 Test Reports
1.3.2Water absorption
2.3.1Water absorption
2.3.2Water absorption
2.3.3Water absorption
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 120 PAGES
07 19 00 2.3.1Accelerated weathering
2.3.2Accelerated weathering
2.3.3Accelerated weathering
2.3.4Accelerated weathering
2.3.1Resistance to chloride ion penetration
2.3.2Resistance to chloride ion penetration
2.3.3Resistance to chloride ion penetration
2.3.4Resistance to chloride ion penetration
1.3.2Moisture vapor transmission
2.3.1Moisture vapor transmission
2.3.2Moisture vapor transmission
2.3.3Moisture vapor transmission
2.3.4Moisture vapor transmission
2.3.1Scaling resistance
2.3.2Scaling resistance
2.3.3Scaling resistance
2.3.4Scaling resistance
1.3.2Water Penetration and Leakage
SD-07 Certificates
1.3.1Manufacturer's qualifications
1.3.1Applicator's qualifications
1.3.3Evidence of acceptable variation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 120 PAGES
07 19 00 1.12Warranty
SD-08 Manufacturer’s Instructions
3.4Application
1.7.1material safety data sheets
07 21 13 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.1 GBlock or Board Insulation
2.2 GVapor Retarder
2.3 GPressure Sensitive Tape
1.4 GProtection Board or Coatings
2.5 GAccessories
SD-07 Certificates
2.1 GBlock or Board Insulation
2.2 GVapor Retarder
2.4 GProtection Board or Coating
3.4.5 GProtection Board or Coating
1.7 GSpecial Warranties
1.7 GSpecial Warranties
SD-08 Manufacturer’s Instructions
2.1Block or Board Insulation
2.5.1Adhesive
SD-11 Closeout Submittals
SVolatile Organic Compound
(VOC) Content
SRecycled Content
07 21 16 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 120 PAGES
07 21 16 2.2Blanket Insulation
2.3Sill Sealer Insulation
2.5Vapor Retarder
2.6Pressure Sensitive Tape
2.7Accessories
SD-08 Manufacturer’s Instructions
3.3.1Insulation
SD-11 Closeout Submittals
2.1.1 SRecycled Content for Insulation
Materials
2.1.2 SReduce Volatile Organic
Compounds (VOC)
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
1.3 GVerification of Existing Conditions
SD-03 Product Data
2.2 GInsulation
1.4 GProtection Board
2.5 GFasteners
GSheathing Paper
2.4 GMoisture Control
1.10.1 GAsphalt
SD-06 Test Reports
1.8.1 GFlame Spread Rating
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 120 PAGES
07 22 00 1.9 GVolatile Organic Compounds
(VOC) Content
1.6 GInstaller Qualifications
1.6 GCertificates Of Compliance For
Felt Materials
SD-08 Manufacturer’s Instructions
2.5 GFasteners
2.2 GInsulation
SD-11 Closeout Submittals
1.9 SVolatile Organic Compounds
(VOC) Content
07 24 00 SD-02 Shop Drawings
3.3Shop Drawings
SD-03 Product Data
2.3Sheathing Board
2.7Thermal Insulation
2.4Adhesive
2.6Mechanical Fasteners
2.13Accessories
2.8Base Coat
2.9Portland Cement
2.10Reinforcing Fabric
2.11Finish Coat
2.14Joint Sealant
2.12Sealant Primer
2.15Bond Breaker
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 120 PAGES
07 24 00 2.16Backer Rod
1.4.5Insulation Board
1.7Warranty
SD-04 Samples
1.2.3.7 GSample Boards
1.2.1.4Mock-up Installation of EIFS
SD-05 Design Data
1.2.1.2Wind Load
1.2.4Moisture Analysis
SD-06 Test Reports
1.2.3.1Abrasion Resistance
1.2.3.2Accelerated Weathering
1.2.2.3Impact Resistance
1.2.3.3Mildew Resistance
1.2.3.4Salt Spray Resistance
1.2.4Vapor Transmission
1.2.3.6Absorption-Freeze-Thaw
1.2.1.3Wall Fire Test
1.2.1.1Water Penetration
1.2.3.5Water Resistance
1.2.1.3Full Scale or Intermediate Scale
Fire Test
1.2.2.1Surface Burning Characteristics
1.2.2.2Radiant Heat
3.1Substrate
1.2.1.2Wind Load
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 120 PAGES
07 24 00 SD-07 Certificates
1.4.1Qualifications of EIFS
Manufacturer
1.4.2Qualification of EIFS Installer
1.4.3Qualification of Sealant Applicator
1.4.4Qualifications of Third Party
Inspector
3.5.2 GInspection Check List
SD-08 Manufacturer’s Instructions
3.3Installation
SD-10 Operation and Maintenance
Data
1.7EIFS
SD-11 Closeout Submittals
2.1.1 SRecycled Content for Insulation
Materials
2.1.2 SRecycled Content for Metal
System Accessories
07 27 10.00 10 SD-04 Samples
3.1.2 GMock-Up
SD-06 Test Reports
1.8 GDesign Review Report
3.1.3 GTesting and Inspection
SD-07 Certificates
1.7 GAir Barrier Inspector
07 41 13 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 120 PAGES
07 41 13 1.4.5 GRoofing Panels
1.4.5 GFlashing and Accessories
1.4.5 GGutter/Downspout Assembly
SD-03 Product Data
2.1 GRoof Panels
1.4.5 GFactory-Applied Color Finish
2.4 GAccessories
1.4.5 GFasteners
1.4.5 GPressure Sensitive Tape
2.7 GUnderlayments
2.8 GGaskets and Sealing/Insulating
Compounds
1.4.5 GCoil Stock
GAluminized Steel Repair Paint
GEnamel Repair Paint
GGalvanizing Repair Paint
SD-04 Samples
2.1 GRoof Panels
1.4.5 GFactory-applied Color Finish
2.4 GAccessories
1.4.5 GFasteners
1.4.5 GGaskets and Sealant/Insulating
Compounds
SD-05 Design Data
1.2.1.2 GWind Uplift Resistance
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 120 PAGES
07 41 13 1.2.1.1 GLeakage Test Report
1.2.1.2 GWind Uplift Test Report
2.6.2 GFire Rating Test Report
2.2 GFactory Finish and Color
Performance Requirements
SD-07 Certificates
2.1 GRoof Panels
1.4.5 GCoil Stock Compatibility
2.7.2 GSelf-Adhering Modified Bitumen
Underlayment
1.4.1 GQualification of Manufacturer
1.4.2 GQualification of Applicator
SD-08 Manufacturer’s Instructions
2.6 GInsulation
1.4.5 GInstallation Manual
SD-09 Manufacturer’s Field
Reports
3.10.1 GManufacturer's Field Inspection
Reports
SD-11 Closeout Submittals
1.8 GWarranties
3.11 GInformation Card
07 41 63 SD-01 Preconstruction Submittals
1.5.1 GQualification of Manufacturer
1.5.3 GQualification of Manufacturer
1.5.1 GQualification of Installer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 120 PAGES
07 41 63 1.5.1 GQualifications for Welding
SD-02 Shop Drawings
1.5.1 GRoofing Panels
1.5.1 GFlashing and Accessories
1.5.1 GGutter/Downspout Assembly
SD-03 Product Data
1.5.1 GSustainable Acquisition
1.5.1 GCoil Stock
1.5.1 GFactory Color Finish
1.5.1 GSub-girts and Formed Shapes
1.5.1 GClosure Materials
1.5.1 GInsulation
1.5.1 GPressure Sensitive Tape
1.5.1 GSealants and Caulking
1.5.1 GRated Wall Assembly
1.5.1 GGalvanizing Repair Paint
1.5.1 GEnamel Repair Paint
1.5.1 GAluminized Steel Repair Paint
1.5.1 GAccessories
SD-04 Samples
1.5.1 GCoil Stock
1.5.1 GRoofing Panels
2.2.2 GFasteners
2.4.1 GMetal Closure Strips
1.5.1 GInsulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 120 PAGES
07 41 63 1.5.1 GManufacturer's Color Charts and
Chips
SD-05 Design Data
1.5.1 GWind Design Analysis
1.5.1 GSeismic Design Analysis
SD-06 Test Reports
2.1.4 GTest Reports
3.7.2 GLeakage Tests
1.5.1 GFire Rating Test Report
3.1 GCoatings and Base Metals of
Metal Roofing
1.5.1 GFactory Finish and Color
Performance Requirements
1.5.1 GWind Uplift Test Report
1.5.1 GSeismic Test Report
SD-07 Certificates
1.5.1 GCoil Stock
2.2.2 GFasteners
1.5.1 GGalvanizing Repair Paint
1.5.1 GEnamel Repair Paint
SD-08 Manufacturer’s Instructions
1.5.1 GInstallation of Roof Panel
Assemblies
SD-11 Closeout Submittals
1.8 GWarranty
3.10 GInformation Form and Placard
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 120 PAGES
07 41 63 3.9.1 GManufacturer's Field Inspection
Reports
1.5.1 GInstructions
1.5.1 GMaterial Safety Data Sheets
07 42 13 SD-01 Preconstruction Submittals
1.5.3 GQualification of Manufacturer
1.5.4 GQualification of Installation
Contractor
1.5.4.1 GQualification of Welders
1.8 GWarranty
SD-02 Shop Drawings
1.5.1.1 GInstallation Drawings
SD-03 Product Data
2.1Recycled Content;
2.2.1 GWall Panels
2.2.2 GWall Panels
2.2.3Factory Color Finish
1.5.5Closure Materials
2.5.4.4Pressure Sensitive Tape
2.5.4.1Sealants and Caulking
1.5.3.1Galvanizing Repair Paint
1.5.3.1Enamel Repair Paint
Aluminized Steel Repair Paint
1.5.5Accessories
2.5Accessories
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 120 PAGES
07 42 13 2.2.1 GWall Panels
2.2.2 GWall Panels
1.5.3.1 GFasteners
2.5.3 GMetal Closure Strips
2.2.3.5 GColor chart
SD-05 Design Data
1.5.1.2 GWind load design analysis
SD-06 Test Reports
3.7.2 GLeakage Tests
1.3.2 GWind Load Tests
2.2.3.6 GCoating
2.2.3.6 GChalking
SD-07 Certificates
1.5.3.1 GCoil Stock
1.5.3.1 GFasteners
1.5.3.1 GGalvanizing Repair Paint
1.5.3.1 GEnamel Repair Paint
SD-08 Manufacturer’s Instructions
3.3 GInstallation
SD-09 Manufacturer’s Field
Reports
3.8.1 GManufacturer's Field Reports
SD-11 Closeout Submittals
1.8 GWarranty
1.5.6 GMaintenance Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 120 PAGES
07 42 13 1.8.120 year 'No Dollar Limit' warranty for labor and material
07 60 00 SD-02 Shop Drawings
3.1.22 GCovering on flat, sloped, or
curved surfaces
3.1.16 GGutters
3.1.17 GDownspouts
3.1.23 GExpansion joints
3.1.18 GFlashing for roof drains
3.1.11 GBase flashing
3.1.12 GCounterflashing
3.1.24 GFlashing at roof penetrations
3.1.13 GReglets
3.1.19 GScuppers
3.1.27 GCopings
3.1.15 GDrip edge
3.1.20Conductor heads
3.1.21 GEave flashing
SD-11 Closeout Submittals
3.5Quality Control Plan
07 61 14.00 20 SD-02 Shop Drawings
1.2.5 GRoofing
SD-03 Product Data
2.1 GRoofing panels
2.3Attachment clips
2.4.1Closures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 120 PAGES
07 61 14.00 20 2.4Accessories
2.4.2Fasteners
2.4.3Sealants
2.5Insulation
1.7 Gwarranty
SD-04 Samples
2.1panel
2.4Accessories
2.4.3Sealants
2.2Intermediate Support
SD-05 Design Data
1.5Design calculations
SD-06 Test Reports
3.6Field Inspection
1.3.3Structural performance
1.6.6Finish
SD-07 Certificates
1.6.3Manufacturer's Technical
Representative
1.6.4Installer's Qualifications
2.1 GCoil stock
SD-08 Manufacturer’s Instructions
3.3 GInstallation
SD-11 Closeout Submittals
3.8Information card
07 81 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 120 PAGES
07 81 00 3.3 GFireproofing Material
SD-04 Samples
GSpray-Applied Fireproofing
SD-06 Test Reports
1.2.2 GFire Resistance Rating
GField Tests
1.2.3 GEvaluation Reports
SD-07 Certificates
1.4.1 GInstaller Qualifications
3.1 GSurface Preparation Report
3.5.2 GManufacturer's Inspection Report
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 120 PAGES
07 92 00 3.1 GField Adhesion
SD-07 Certificates
3.4.7 GSealant
2.2 GPrimers
2.3 GBond Breakers
1.4 GVolatile Organic Compounds
(VOC) Content
2.1.1 GVolatile Organic Compounds
(VOC) Content
SD-11 Closeout Submittals
1.4Volatile Organic Compounds
(VOC) Content
2.1.1Volatile Organic Compounds
(VOC) Content
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.5 GFrames
2.5 GFrames
2.3Accessories
2.6Weatherstripping
SD-03 Product Data
2.1 GDoors
2.5 GFrames
2.3Accessories
2.6Weatherstripping
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 120 PAGES
08 11 13 SD-04 Samples
2.8.2 GFactory-applied enamel finish
08 11 16 SD-02 Shop Drawings
1.5.1 GDoors, windows and frames
SD-04 Samples
1.5.2.1Finish sample
SD-05 Design Data
1.2.1 Gcalculations
SD-08 Manufacturer’s Instructions
2.1Doors and frames
08 34 02 SD-02 Shop Drawings
3.3 GInstallation
SD-03 Product Data
1.4Bullet Resistant Components
2.5.2Bifold Doors
SD-07 Certificates
1.4Bullet Resistant Components
SD-10 Operation and Maintenance
Data
1.4…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .