Attachment_0001_-_Compliance_Sheet.xls

XLS spreadsheet 47 KB Posted

Attached to
Water Blast Roadwheel Denuding System
Solicitation number
W911RQ-19-R-0019
Issued by

About this file

This document contains a federal contract opportunity solicitation for a water blast roadwheel denuding system and an associated compliance sheet. The U.S. Army Contracting Command - Warren will issue a request for proposal to obtain a new denuding system for Red River Army Depot capable of removing bonded rubber from roadwheels fully automatically using a high-intensity water blast. The system must fit within dimensions of 25 feet wide by 40 feet long and remove 1 inch of rubber within 6 minutes without damaging metal wheels. Interested offerors should periodically check the website for any amendments as the solicitation will be issued electronically with a response due 30 days after release. The compliance sheet appears to list technical requirements for offerors to indicate their ability to meet or provide alternatives.

View the file

Other files

File Type Posted
W911RQ19R0019.pdf PDF
FBO_Synopsis.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wire EDM

OFFEROR'S STATEMENT OF COMPLIANCE
NON-FOR NON-COMPLIANCE, JUSTIFICATION OR
PARAGRAPHCOMPLYCOMPLYALTERNATIVE/EQUIVALENT OFFER
1.1Supplying a Water Blast Roadwheel Denuding System
to satisfy all requirements of solictation
3.1Will adhere to standards listed
3.2Will fulfill all requirements as listed
3.2.1Conforms to all requirements listed for Cabinet
3.2.2Conforms to all specifications listed for
Water Blast System
3.2.3Conforms to all specifications listed for the type of
controls
3.2.3.1Conforms to all specifications listed for
Programmable Logic Controllers (PLC)
3.2.4Conforms to all specifications for type of filtration
listed
3.3Conforms to all specifications listed for
Safety
3.4Conforms to all specifications listed for
3.4.1Electrical System to include Lock Out Tag Out
3.5Conforms to all specifications listed for
to operate in Environmental Conditions listed
3.7Conforms to all specifications listed for
installation to include off loading, complete installation
Utility Connection, and installation schedule
3.8Will provide Training
3.8.1and adhere to requirements in Training Location
3.9Will provide all manuals as specfied
3.10Conforms with all Performance requirements
3.10.1Will Provide Performance Design
3.10.2Conforms to all specifications listed for
Factory Acceptance Testing
3.10.3Conforms to all specifications listed for
Installation Time Period
3.12Will provide Warranty as specfied in Warranty
section
Conforms to all specifications listed for
4.00Preparation to include Preservation, Packing, Marking
4.2.1Conforms to all specifications listed for
installation's Spill Prevention Control and Countermeasures Plan (SPCC)
4.2.2Conforms to all enviironmental compliances

&CPage &P&RFY18 One NEW 6-Axes Wire EDM Comply Sheet.xls Spec # 37-18-3419 &CPage &P&R________________________

AUTHORIZED SIGNATURE

Sheet1

File details come from the government source that posted it. Updated .