A02_-_PWS_Amendment_2.pdf

PDF 297 KB Posted

Attached to
Warehouse Shelving Replacment
Solicitation number
W911QX-19-Q-0223
Issued by

About this file

Amended PWS

View the file

Other files

File Type Posted
B01_-Solicitation_Amend_2.pdf PDF
Questions_and_Answers_Amendment_2.pdf PDF
Questions_and_Answers.docx DOCX document
B01_-Solicitation_Amendment_1_0223.pdf PDF
A02_-_PWS_rev1_0223.pdf PDF
A02_-_PWS.pdf PDF
B01_-Solicitation.pdf PDF
B01_-_Provisions_and_Clauses_Full_Text_Attachment.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Distribution authorized to U.S. Government agencies and their contractors for administrative/operational uses only.

(Diagram 1)

PERFORMANCE WORK STATEMENT

BUILDING 102 Warehouse Shelving Replacement

6 February 2019 C.1 Project Overview

C.1.1 Project Location: The project for the warehouse shelving replacement, is located on Building 102 at the Army Research Laboratory (ARL), Adelphi Laboratory Center (ALC), Adelphi, MD 20783.

C.1.2 Comply with UFC 1-200-01, General Building Requirements. Unified Facility Criteria (UFC) 1-200-01 provides applicability of model building codes and government unique criteria for typical design disciplines and building systems, as well as for accessibility, antiterrorism, security, high performance and sustainability requirements, and safety. Use this Warehouse Facility Criteria in addition to UFC 1-200-01 and the UFCs and government criteria referenced therein. The demolition and renovation is located specifically in building 102.

C.1.3 General Purpose Warehouse includes, conditioned, semi-conditioned, and unconditioned types, with and without overhead crane capability. The general purpose warehouse provides space for bulk and bin storage, aisle space, receiving and shipping space, packing and crating space, and office and toilet space. The shelving shall prevent industrial pallet racks units from overturning due to uplifting forces and to comply with OSHA regulations and recommendations.

Shelving is used for economical storage of small hand stackable items which are not suited to mechanized handling and storage due to their handling characteristics, activity, or quantity. Shelving is most often used for small parts storage in order picking systems and is suitable for either manual or mechanized operations.

Shelving is generally available in standard unit heights of 85 to 87 inches (2160 millimeter ((mm)) to 2210mm) and a unit width of 36 inches (914mm). Typical depths are 12 inches (304mm), 18 inches (457mm), and 24 inches (609mm). The range of widths varies from 24 to 48 (609mm to 1220mm) inches while the depth ranges from 9 to 36 inches (228mm to 914mm). Shelf uprights are available in either beaded post or angle post configurations.

Shelving is available in either open or closed design. Closed design includes solid back and side panels which provide load containment and minimize possible accumulation of unwanted dust and dirt. Open shelving is less expensive and utilizes sway braces to provide rigidity.

C.2 Demolition

C.2.1 The Contractor shall provide the management, supervision, labor, equipment, supplies, and materials necessary to remove existing old shelving units while observing the following tolerances for installation and operation of storage equipment per UFC guidelines.

• C.2.2 The Contractor shall disassemble remove and dispose of existing one hundred and seven (107)- 9’ wide X 12’ high and 44” deep shelving

C.2.3 The Contractor shall remove and dispose of all nuts, bolts, floor fasteners, metal legs and bracing from the warehouse.

C.2.4 The Contractor shall sweep and wet mop the concrete floor after all shelving units are disassembled and removed from the project area.

C.2.5 The Contractor shall remove fence system and all hardware associated with fence system which is covering shelving unit in larger warehouse area.

C.3 Renovation

Distribution authorized to U.S. Government agencies and their contractors for administrative/operational uses only.

• The Contractor shall provide the management, supervision, labor, equipment, supplies, and materials necessary to install one hundred and ten (110) – 9’ wide X 12’ tall X 42” deep shelving uprights in accordance with Exhibit 1 allowing for tunnel bay one beam level 120” from floor to allow forklift to travel through, while observing the following tolerances for installation and operation of storage equipment per UFC guidelines. The shelving unit shall be capable of handling a load of 2.5lb per square inch (approximately 10,000lbs.).

• The Contractor shall provide a wire rack shelving system for each shelf installed.

These tolerances apply in the absence of more stringent manufacturer tolerances.

a. Plumbness of pallet racks and high rise shelving +/- 1/16 inch (+-1.6 mm) over total height.

b. Pallet rack beam elevation +-1/4 inch (+-6.4 mm) between adjacent beams.

c. Rail guide position +1/4, -0 inches (+6.4 mm, -0 mm) from specified rail spacing.

d. Wire guide position +-1/4 inch (+-6.4 mm) from specified centerline.

e. Pallet rack aisle spacing +-1/4 inch (+-6.4 mm) from design aisle width.

f. Down-aisle rack offset +-1/4 inch (+-6.4 mm) from aisle centerline.

C. 4 Equipment

• The Contractor shall furnish and provide a new or used (with less than 10,000 hours on odometer) stand-in electric forklift with a 3,000 - 4,000lb load capacity, 14’ height capacity and a built-in scale. The forklift shall be compatible with in house charging system. If forklift is not compatible, the Contractor shall provide a charging system and install.

C.5 Working Conditions

C.5.1 The Contractor shall restrict disturbances in low impact areas identified in Diagram 1.

C.6 Safety:

C.6.1 All U.S. Army construction contracts fall within the purview of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385–1–1, http://140.194.76.129/publications/eng-manuals/em385-1- 1/2008_English/entire_2008_English.pdf and Part 1910, Title 29, Code of Federal Regulations (29 CFR 1910) and Part 1926, Title 29, Code of Federal Regulations (29 CFR 1926) http://www.dol.gov/ that establish legal requirements. The version in effect at time of contract award will be used to ensure that adequate safety requirements are included in all Army construction contracts.

C.6.2 Construction and architect-engineer contracts will include the Federal Acquisition Regulations (FAR) clause 52 https://www.acquisition.gov/far/ 236–13 and will include the Unified Facilities Guide Specifications (UFGS) 013529 (formerly 01525) as appropriate http://www.wbdg.org/ccb/browse_org.php?o=70 .

C.6.3 The Government will review the Contractor’s Safety Plan for adequacy (Safety Plan), completeness and compliance with OSHA and EM 385–1–1 requirements within 10 days of starting the work.

C.6.4 Fire protection plans shall be reviewed during the pre-operational planning to ensure that they provide the level of protection necessary to address possible fires in the operation. Exits and egress will meet the requirements of 29 CFR 1910.33 through 29 CFR 1910.39, Subpart E; fire prevention plans; and The Life Safety Code (NFPA

101) and Americans with Disabilities Act (ADA) Standards.

C.6.5 Hot work permits (DA Form 5383, Jan 2009) will require prior approval from the Fire Protection Office (394- 3695) and conform to NFPA 51B and 29 CFR 1910.252 and in accordance with the American National Standards Institute (ANSI) AWS Z49.1 SAFETY IN WELDING AND CUTTING AND ALLIED PROCESSES. (Safety Plan)

Formatted: Font: Bold http://140.194.76.129/publications/eng-manuals/em385-1-1/2008_English/entire_2008_English.pdf http://140.194.76.129/publications/eng-manuals/em385-1-1/2008_English/entire_2008_English.pdf http://www.dol.gov/ https://www.acquisition.gov/far/ http://www.wbdg.org/ccb/browse_org.php?o=70

Distribution authorized to U.S. Government agencies and their contractors for administrative/operational uses only.

C.6.6 Permit-required confined space and permit space must conform to Occupational Safety and Health Administration’s (OSHA) standard for confined spaces (29 CFR 1910.146) http://www.osha.gov which contains the requirements for practices and procedures to protect employees in general industry from the hazards of entering permit spaces and Z117.1 - 2003, Safety Requirements for Confined Spaces. Any employer who allows employee entry into a confined space must develop and implement a written program for the space. (Confined Space)

C.6.7 During site visits and inspections, the Contractor’s compliance with the safety plan, regulatory safety requirements, and accepted practices will be observed. Safety violations will be documented and provided to the contracting officer for transmittal to the contractor who will be required to take corrective action. Depending upon the severity of the findings, follow-up inspections to determine that specific deficiencies have been corrected may be required.

C.6.8 Where appropriate, the Contractor shall provide personal protective equipment such as, but not limited to:

protective clothing, eyewear, hearing protection, gloves and safety shoes. The contractor shall ensure the proper use of this personal protective equipment.

C.6.9 The Contractor shall ensure all personnel operating and performing construction, to include subcontractors shall be fully trained, experienced and certified/licensed where required by federal, state or local laws for performing the required tasks and meet required health, safety and environmental standards.

C.6.10 All Contractor provided equipment must conform to an approved testing laboratory standard i.e. UL, ANSI, ASTM, etc…and approved by the Contracting Officer Representative (COR) prior to being used on or within Government property. Contractor will ensure equipment is inspected, tested and/or maintained in accordance with manufacturing requirements/standards and operated within the safe operational parameter. All defective equipment will be removed from service immediately.

C.6.11 Contractor shall ensure all emergency notifications systems i.e. fire alarm, gas alarms, weather alerts are understood by their employees and the contractor shall ensure an emergency action plan is implemented.

C.6.12 Contractor shall not create hazardous conditions for its employees, governmental employees, or any personnel whom are in or around the construction /working area, including but not limited to hazardous conditions such as noise, vibration, falling-slipping-tripping, respiratory, visual, and hearing. Work areas will be continuously maintained in a clean (as reasonably possible), orderly and sanitary condition.

C.6.13 The Contractor shall record and report promptly to the COR, all available facts relating to each instance of damage to Government property or injury to either Contractor or Government personnel. The Contractor shall maintain an accurate record of exposure data on all accidents or incidents related to work performed under this contract resulting in death, traumatic injury, occupational disease, or damage to property, materials, supplies, or equipment.

C.6.14 The Contractor shall immediately secure any accident scene or wreckage until released by the accident investigative authority through the Contracting Officer.

C.6.15 The Contractor shall confirm through the COR that no known hazardous conditions currently exist within the area of proposed work, i.e. the existence of Asbestos, Toxic gas, Toxic metals, including "heavy metals".

C.6.16 The Contractor shall coordinate with the facilities electricians prior to conducting any electrical related work, and will implement lockout –tagout (LOTO) procedures as appropriate.

C.6.17 All construction sites shall be provided either ground-fault circuit interrupters (GFCI) or assured equipment grounding conductor program to protect employees from electrical energy.

C.6.18 The Contractor shall notify Directorate of Public Works (DPW) electrician(s) prior to connecting or disconnecting facility electrical energy. The DPW electrician(s) shall inform contract employees of known http://www.osha.gov/

Distribution authorized to U.S. Government agencies and their contractors for administrative/operational uses only.

(electrical) hazards that are related to the contract employer’s work, and that might not be recognized by the contract employer or its employees. The DPW electrician(s) shall provide information about the installation that the contract employer needs to make a hazard assessment and the contractor shall instruct these hazards to their employees or subcontractors.

C.6.19 The Contractor shall develop, implement and maintain at the workplace a written hazardous communication program.

C.6.20 The Contractor is responsible to insure that all sub-contractors hired by comply with these contractual requirements for construction and are fully briefed on these provisions. A documented record will be maintained at the job site, which will include the list of persons briefed, signatures, contents of the briefing, date and time.

C.6.21 Prior written approval must be obtained from the installation radiation safety officer allowing use, storage, or possessing ionizing radiation sources on this installation or Blossom Point. Application for approval will be made by submitting DA Form 3337 along with supporting documentation.

C.6.22 All compressed gas cylinders shall be stored in an upright secured position, valve protection caps affixed when transporting, moving or storing and gasses will be properly marked and segregated.

C.6.23 All walls and faces of trenches 5 feet or more deep and all excavations, in which employees are exposed to danger from moving ground or cave in, shall be guarded by shoring system, sloping or some equivalent means. A ladder or ramp or other safe means of egress shall be located in the trench excavations that are 4 feet or more deep.

C.6.24 Scaffolds and their components shell be capable of supporting, without failure, at least 4 times the maximum intended load. Guardrails and toe-boards shall be installed on all open sides and ends of platforms more than 6 feet about the ground floor. All planking shall be scaffold grade or equivalent.

C.6.25 Each employee on a walking/working surface (Horizontal/Vertical) with an unprotected side or edge which is 6 feet or more above the lower level shall be protected from falling. The Contractor will use guardrail systems, safety net systems, or personal fall arrest systems to protect employees.

C.6.26 Seatbelt usage is mandatory at all times.

• The Contractor shall comply with all applicable Federal, State local and Army regulations governing environmental control. The Contractor shall obtain and provide copies of any required licenses and permits, as necessary, to comply with applicable Federal, State, local or municipal laws, codes or regulations during the performance of this work.

• The Contractor shall ensure that their work is conducted in accordance with and in support of the goals of the Adelphi Laboratory Center (ALC) Environmental Management System (EMS).The ALC EMS goals are the following: (1) reduce hazardous waste generation, (2) recycle solid waste generated to the maximum extent practicable, and (3) reduce energy consumption.

C.7 Environmental:

C.7.1 “The Contractor shall comply with all applicable Federal, State, Local, and Army regulations governing environmental control. The Contractor shall obtain and provide copies of any required licenses and permits, as necessary, to comply with applicable Federal, State, local or municipal laws, codes or regulations during the performance of this work.

The Contractor shall ensure that their work is conducted in accordance with and in support of the goals of the ALC Environmental Management System (EMS). The ALC EMS goals are the following: (1) reduce hazardous waste generation, (2) recycle solid waste generated to the maximum extent practicable, and (3) reduce energy and water consumption.

Distribution authorized to U.S. Government agencies and their contractors for administrative/operational uses only.

The Contractor shall be responsible for the management of all hazardous materials they use and store onsite. Any hazardous materials or chemicals brought onto the Installation by the Contractor must be pre-approved for use by the ALC Environmental Division, ATTN: IMNE-ALC-PWE. The Contractor shall provide complete and current copies of Material Safety Data Sheets (MSDS's) to the ALC Environmental Division for approval no less than 10 days prior to bringing any hazardous materials or chemicals onto the Installation (301.394.6309 or 301.394.6300).

The Contractor shall minimize the quantity and use of hazardous materials as much as possible. Whenever possible, the Contractor shall use environmentally-friendly or less hazardous products.

Containers of hazardous materials and chemicals approved for use on the Installation shall be of sound integrity, with a tight lid or cap, and properly labeled. Secondary containment shall be provided, if possible, and is mandatory for any container greater than 50 gallons in volume. Product MSDS's shall be readily available for all materials.

The Contractor shall not use any materials that contain toxic organics or any liquid with a pH below 5.0 on the Adelphi site. The Contractor shall not use any Class 1Ozone Depleting Substance. The Contractor is responsible for the prompt removal of all empty drums, containers and general refuse on a daily basis.

The Contractor shall be responsible for the removal of all hazardous materials from the jobsite when the work is complete. No hazardous materials shall be left behind or abandoned on the Installation.

The Contractor shall be responsible for the management and disposal of all hazardous wastes they generate.

Hazardous wastes shall be managed and disposed in accordance with all applicable Federal, State, Local, and Army regulations. All costs associated with the management and disposal of hazardous wastes are the responsibility of the contractor."

C.8 Anti-Terrorism Operational Security (AT-OPSEC):

C.8.1 Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

C.8.2 Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

9/17/2019

X Tommy Kim

Contracting Officer (KO) Signed by: KIM.TOMMY.INJUNG.1455519930

Distribution authorized to U.S. Government agencies and their contractors for administrative/operational uses only.

File details come from the government source that posted it.