W911PT-18-R-0021-0002.docx

DOCX document 30 KB Posted

Attached to
Construction of 11 each Machine Foundations Federal contract opportunity
Solicitation number
W911PT-18-R-0021
Issued by
Department of the Army Materiel Command TACOM Life Cycle Management Command

About this file

Amendment with final RFIs

View the file

Other files for this federal contract opportunity

Other files attached to Construction of 11 each Machine Foundations, newest first.
File Type Posted
Revised_Foundation_Drawings_-_7OD010,_7OD012,_7OD013_and_Prelim_7OD006.pdf PDF
W911PT-18-R-0021-0001.docx DOCX document
Existing_Foundations_7OD0010,_7OD012.pdf PDF
Existing_Foundations_7OD011.pdf PDF
7OD006,_7OD007,_7OD009_and_7OD0013_Existing_Foundations.pdf PDF
ENVIRONMENTAL_WORK_SOW.doc DOC document
electrical_specs.pdf PDF
SITEVISIT.doc DOC document
7OD010_SOW_26' Dual Carriage Lathes.pdf PDF
7OD006_SOW_Hollow Spindle Lathe.pdf PDF
7OD009_SOW_39' Single Carriage Lathe.pdf PDF
W911PT18R0021.docx DOCX document
03 WVA 00 - Machine Foundation Requirements.doc DOC document
NY_2_Wages_4-27-2018.pdf PDF
7OD008_SOW_26' Single Carriage Lathe.pdf PDF
electrical specs.pdf PDF
7OD007_SOW_39' Dual Carriage Lathe.pdf PDF
7OD011_SOW_26' Single Carriage Lathe.pdf PDF
7OD013_SOW Rifler.pdf PDF
7OD012_SOW_26' Dual Carriage Lathes.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911PT18R0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been added by full text:

REQUESTS FOR INFORMATION FINAL

Technical Questions:

1. The correct drawings for bidding purposes for SOW# 7OD006 is Drawings #2203-01059. All other drawings to be utilized are in the previous amendment, or marked as final.

2. How much concrete removal is required for 7OD008, 7OD010, 7OD011 and 7OD012?

A. For the existing Wohlenberg Lathes foundations, use should bid 180 cubic yards of concrete removal.

3. What is quantity to bid the airline install to?

A. Bid quantity for the airlines install to 50 linear feet.

(End of Summary of Changes) image1.wmf