W911PT-18-R-0021-0002.docx
DOCX document 30 KB Posted
- Attached to
- Construction of 11 each Machine Foundations Federal contract opportunity
- Solicitation number
- W911PT-18-R-0021
About this file
Amendment with final RFIs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised_Foundation_Drawings_-_7OD010,_7OD012,_7OD013_and_Prelim_7OD006.pdf | ||
| W911PT-18-R-0021-0001.docx | DOCX document | |
| Existing_Foundations_7OD0010,_7OD012.pdf | ||
| Existing_Foundations_7OD011.pdf | ||
| 7OD006,_7OD007,_7OD009_and_7OD0013_Existing_Foundations.pdf | ||
| ENVIRONMENTAL_WORK_SOW.doc | DOC document | |
| electrical_specs.pdf | ||
| SITEVISIT.doc | DOC document | |
| 7OD010_SOW_26' Dual Carriage Lathes.pdf | ||
| 7OD006_SOW_Hollow Spindle Lathe.pdf | ||
| 7OD009_SOW_39' Single Carriage Lathe.pdf | ||
| W911PT18R0021.docx | DOCX document | |
| 03 WVA 00 - Machine Foundation Requirements.doc | DOC document | |
| NY_2_Wages_4-27-2018.pdf | ||
| 7OD008_SOW_26' Single Carriage Lathe.pdf | ||
| electrical specs.pdf | ||
| 7OD007_SOW_39' Dual Carriage Lathe.pdf | ||
| 7OD011_SOW_26' Single Carriage Lathe.pdf | ||
| 7OD013_SOW Rifler.pdf | ||
| 7OD012_SOW_26' Dual Carriage Lathes.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911PT18R0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been added by full text:
REQUESTS FOR INFORMATION FINAL
Technical Questions:
1. The correct drawings for bidding purposes for SOW# 7OD006 is Drawings #2203-01059. All other drawings to be utilized are in the previous amendment, or marked as final.
2. How much concrete removal is required for 7OD008, 7OD010, 7OD011 and 7OD012?
A. For the existing Wohlenberg Lathes foundations, use should bid 180 cubic yards of concrete removal.
3. What is quantity to bid the airline install to?
A. Bid quantity for the airlines install to 50 linear feet.
(End of Summary of Changes) image1.wmf