W911PT16Q00060001.docx
DOCX document 32 KB Posted
- Attached to
- Ion Nitride Spindles DWG 11583062
- Solicitation number
- W911PT16Q0006
About this file
Amendment 01 to Solicitation W911PT16Q0006
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911PT16Q0006.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911PT-16-Q-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0003
The CLIN extended description has changed from:
Description:Ion Nitride Services of MMI Spindle per drawing and QAP 11583062 for the 155mm Cannon M776.Estimated quantity of 250 Option one. - QUANITIES ARE NOT GUARANTEEDDD Form 2345 is required in order to receive award of contract.3 test samples will be provided for development of tooling and process to include validation. 1 of 3 samples shall be destructively tested. Prove out must be completed no later than 8 weeks from award of contract with Production deliveries shall commence no later than 12 weeks after validation. Meeting all Pre-Production and prove out requirements. COST FOR PROVE OUT AND VALIDATION ___________________Estimated minimum 40 to maximum of 80 spindles to be completed per month. Confirmation that contractor CAN complete Ion Nitride of 80 spindles per month______YES _____NO If no, state how many_____________per monthQuote must include a turnaround time per lot size. Lot Size Minimum of 10 per lot. Turnaround Time__________________Calendar DaysTesting will be completed by Benet Laboratory located on Watervliet Arsenal and Certification for completed shall be provided by the contractor. Simplified Past Performance Evaluation will be a criteria for award.. Ref: 52.0000-4851 SIMPLIFIED PAST PERFORMANCE EVALUATION (NOV 1995) (ACC-WRN (WVA) included in this solicitation FOB is Destination- All return shipping cost must be included in contractor proposal.TOTAL COST PER LOT of 10________ UNIT PRICE______RETURN SHIPPING COST PER LOT OF 10_________________Certificate of Conformance is required with every return shipment per COC CN5. Wage Determination WD 05-2367 (Rev.-16) dated 07/08/2015 applies and is attached. Technical POC is Greg Circulao 518-266-4563EH14UWV506EHM7
To:
Description:Ion Nitride Services of MMI Spindle per drawing and QAP 11583062 for the 155mm Cannon M776.Estimated quantity of 250 Option one. - QUANITIES ARE NOT GUARANTEEDDD Form 2345 is required in order to receive award of contract.Estimated minimum 40 to maximum of 80 spindles to be completed per month. Confirmation that contractor CAN complete Ion Nitride of 80 spindles per month______YES _____NO If no, state how many_____________per monthQuote must include a turnaround time per lot size. Lot Size Minimum of 10 per lot. Turnaround Time__________________Calendar DaysTesting will be completed by Benet Laboratory located on Watervliet Arsenal and Certification for completed shall be provided by the contractor. Simplified Past Performance Evaluation will be a criteria for award.. Ref: 52.0000-4851 SIMPLIFIED PAST PERFORMANCE EVALUATION (NOV 1995) (ACC-WRN (WVA) included in this solicitation FOB is Destination- All return shipping cost must be included in contractor proposal.TOTAL COST PER LOT of 10________ UNIT PRICE______RETURN SHIPPING COST PER LOT OF 10_________________Certificate of Conformance is required with every return shipment per COC CN5. Wage Determination WD 05-2367 (Rev.-16) dated 07/08/2015 applies and is attached. Technical POC is Greg Circulao 518-266-4563EH14UWV506EHM7.
CLIN 0005
The CLIN extended description has changed from:
Description:Ion Nitride Services of MMI Spindle per drawing and QAP 11583062 for the 155mm Cannon M776.Estimated quantity of option 2 of 200. - QUANITIES ARE NOT GUARANTEEDDD Form 2345 is required in order to receive award of contract.3 test samples will be provided for development of tooling and process to include validation. 1 of 3 samples shall be destructively tested. Prove out must be completed no later than 8 weeks from award of contract with Production deliveries shall commence no later than 12 weeks after validation. Meeting all Pre-Production and prove out requirements. COST FOR PROVE OUT AND VALIDATION ___________________Estimated minimum 40 to maximum of 80 spindles to be completed per month. Confirmation that contractor CAN complete Ion Nitride of 80 spindles per month______YES _____NO If no, state how many_____________per monthQuote must include a turnaround time per lot size. Lot Size Minimum of 10 per lot. Turnaround Time__________________Calendar DaysTesting will be completed by Benet Laboratory located on Watervliet Arsenal and Certification for completed shall be provided by the contractor. Simplified Past Performance Evaluation will be a criteria for award.. Ref: 52.0000-4851 SIMPLIFIED PAST PERFORMANCE EVALUATION (NOV 1995) (ACC-WRN (WVA) included in this solicitation FOB is Destination- All return shipping cost must be included in contractor proposal.TOTAL COST PER LOT of 10________ UNIT PRICE______RETURN SHIPPING COST PER LOT OF 10_________________Certificate of Conformance is required with every return shipment per COC CN5. Wage Determination WD 05-2367 (Rev.-16) dated 07/08/2015 applies and is attached. Technical POC is Greg Circulao 518-266-4563EH14UWV506EHM7
To:
Description:Ion Nitride Services of MMI Spindle per drawing and QAP 11583062 for the 155mm Cannon M776.Estimated quantity of option 2 of 200. - QUANITIES ARE NOT GUARANTEEDDD Form 2345 is required in order to receive award of contract.Estimated minimum 40 to maximum of 80 spindles to be completed per month. Confirmation that contractor CAN complete Ion Nitride of 80 spindles per month______YES _____NO If no, state how many_____________per monthQuote must include a turnaround time per lot size. Lot Size Minimum of 10 per lot. Turnaround Time__________________Calendar DaysTesting will be completed by Benet Laboratory located on Watervliet Arsenal and Certification for completed shall be provided by the contractor. Simplified Past Performance Evaluation will be a criteria for award.. Ref: 52.0000-4851 SIMPLIFIED PAST PERFORMANCE EVALUATION (NOV 1995) (ACC-WRN (WVA) included in this solicitation FOB is Destination- All return shipping cost must be included in contractor proposal.TOTAL COST PER LOT of 10________ UNIT PRICE______RETURN SHIPPING COST PER LOT OF 10_________________Certificate of Conformance is required with every return shipment per COC CN5. Wage Determination WD 05-2367 (Rev.-16) dated 07/08/2015 applies and is attached. Technical POC is Greg Circulao 518-266-4563EH14UWV506EHM7.
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it. Updated .