DATE BY/APP/APPREV
SIZE FSCM No.
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
DESCRIPTIONQTYITEM PART NUMBER
GENERAL NOTES:
1. PROPER OPERATION OF THIS SYSTEM IS DEPENDENT UPON THE LOCATION OF ALL SYSTEM
COMPONENTS IN ACCORDANCE WITH THIS DRAWING.
2. ANY MODIFICATION TO THE PROPOSED INSTALLATION MUST BE COMMUNICATED TO AND
APPROVED BY SSI IN WRITING, PRIOR TO INSTALLATION. ANY CHANGES MUST BE
RECORDED AS A SSI REVISED DRAWING.
3. FOR FIELD WIRING AND SPECIFIC WIRE CONNECTIONS, CONSULT SSI SHEET 1D.
4. FOR INSTALLATION STANDARDS, GENERAL INFORMATION AND SAFETY REQUIREMENTS,
REFER TO THE FOLLOWING: ANSI B31.1 - PIPING AND FITTINGS, ANSI B16.5 - FLANGES, NFPA
69, NFPA 72, FIKE SPECIFICATION E06-018 - EXPLOSION SUPPRESSION CONTAINERS
INSTALLATION AND OPERATING INSTRUCTIONS AND FIKE MOUNTING DETAILS.
5. IN THE EVENT THAT ANY DESIGN PARAMETERS CHANGE, A SYSTEM PERFORMANCE REVIEW
SHALL BE CONDUCTED BY FIKE TO DETERMINE THE EFFECT, IF ANY, OF SUCH CHANGES ON
SYSTEM PERFORMANCE.
MECHANICAL NOTES:
1. DO NOT INSTALL GAS CARTRIDGE ACTUATORS (GCA'S) UNTIL SYSTEM HAS BEEN FULLY
TESTED BY A FIKE SYSTEM TECHNICIAN OR OTHER QUALIFIED PERSONNEL. GCA'S MUST
BE HANDLED IN ACCORDANCE WITH FIKE MANUALS E06-017, E06-018 AND THE
MANUFACTURER'S RECOMMENDATIONS.
2. ALL CONDUIT AND FITTINGS FOR FIKE SYSTEM MUST BE WEATHER TIGHT.
3. WHEN ASSEMBLING, SEAL ALL PROCESS PRESSURE THREADS WITH TFE TAPE OR EQUAL.
4. THE 4" STANDARD NOZZLE ASSEMBLY IS SUPPLIED WITH
(8) STUDS, 3/4"-10 UNC-2A X 6" LONG AND (8) NUTS, 3/4"-10 UNC-2B.
5. THE SUPPRESSANT CONTAINER SHALL BE FACTORY FILLED WITH FIKE POWDER AGENT
AND PRESSURIZED WITH DRY NITROGEN AT THE JOB SITE, BY FIKE SYSTEM TECHNICIAN OR
OTHER QUALIFIED PERSONNEL.
6. WHEN RECHARGING THE SUPPRESSANT CONTAINER, THE FOLLOWING COMPONENTS ARE
REQUIRED.
ITEMS NOT SHOWN ON DRAWING: ITEM NO. 1. LOCATION TO BE DETERMINED BY OTHER THAN SSI.
LOCATE CONTROL MODULES, IN AN ELECTRICALLY CLASSIFIED NON-HAZARDOUS LOCATION.
TEMPERATURE RANGE 0° F TO 110° F. REFERENCE FIKE SPECIFICATION E06-051, E06-052 , E06-053, E06-054, E06-061 & E06-018 FOR FURTHER DETAILS.
LOCATE CAUTION SIGNS, NEAR PROCESS ACCESS DOORS AND AREAS OF FREQUENT
MAINTENANCE.
29945022-C-S
E02-0081 CAUTION SIGN
CERAMIC PRESSURE DETECTOR
RIGID MOUNT FOR CERAMIC DETECTOR
02-4134
GAS CARTRIDGE ACTUATOR (GCA)
E70-030-SBC 20 LITER HRD CONTAINER w/ 42 LB. SBC4
E10-0066 EXPLOSION PROTECTION CONTROLLER (EPC)
E10-0067 POWER SUPPLY (PSU)
E10-0068 ANNUNCIATOR MODULE (AM)
E10-0083-3 BATTERY KIT, 12V, 44AH
E10-0111 ENCLOSURE BREATHER DRAIN KIT, BRASS
02-10644 TRANSFORMER, 120/240V
10-2557 DIN RAIL KIT, 20"
10-2457 820 ohm EOL RESISTOR
10-2459 2.4V ZENER DIODE SERIES CONTACT DEVICE
E70-063 9 LOCKOUT, HRD ASSEMBLY - 4", w/SENSOR
E10-0105 DISABLE POWER SWITCH2
E61-063-1
E80-025-2
E02-0172-5
E70-0064-1
SPREADER NOZZLE COVER NEOPRENE - 4"
SPREADER NOZZLE BOLTING PAD, CS-4"
SPREADER NOZZLE ASSEMBLY w/LOCKOUT
02-9073 VERTICAL MOUNT TRI-CLOVER FERRULE
SURGE PROTECTION DEVICE
36 X 24 WINDOW KIT FOR ENCLOSURE
36 X 24 BACK PANEL FOR ENCLOSURE
ENCLOSURE, 36x24x8 NEMA 4 SST ENCLOSURE
DIN RAIL TO BE CENTERED
HORIZONTALLY IN PANEL
24"
36"
BACKING PLATE
ENCLOSURE
FIKE FIELD WIRE
ENTRANCE
PREFERRED
BREATHER (TYP.)
FIKE FIELD WIRE
ENTRANCE
ALTERNATE
SHUTDOWNS/INTERLOCKS
ENTRANCE
PREFERRED
AC INPUT
ENTRANCE
PREFERRED
SYSTEM 1 BOOTH 44 - BUILDING 350
SYSTEM DESIGN NOTES:
THE FIKE SYSTEM IS DESIGNED AND INTENDED TO LIMIT PRESSURE DEVELOPED BY THE
HEAT OF COMBUSTION AND CHEMICALLY BLOCK PROPAGATION PATHWAYS IN THE EVENT OF
AN EXPLOSION (DEFLAGRATION) WITHIN THE PROTECTED VOLUME. DURING SYSTEM
ACTIVATION, A MOMENTARY PRESSURE EXCURSION WITHIN THE DUST COLLECTOR VOLUME
NOT EXCEEDING 3.0 PSIG AND THE CYCLONE NOT EXCEEDING 4.1 PSIG CAN BE EXPECTED.
THIS VALUE IS A MAXIMUM PREDICTED IMPULSE PRESSURE BASED UPON TOTALLY
ENCLOSED VOLUMES AND WILL BE LOWER DUE TO PRESSURE EQUALIZATION THROUGH
OPEN INLET/OUTLET DUCTS AS WELL AS ANY OTHER PRESSURE RELIEF PATHS SUCH AS
EXPLOSION VENTS. ENCLOSURES NOT CAPABLE OF WITHSTANDING PREDICTED PRESSURES
SHOULD BE REINFORCED OR FITTED WITH SUFFICIENT EXPLOSION VENT AREA RELEASING
TO A SAFE AREA.
THE SUPPRESSION SYSTEMS DEFINED WITHIN THESE DRAWINGS HAVE BEEN DESIGNED
BASED ON PROCESS OPERATING PARAMETERS AS DEFINED BY CUSTOMER. FIKE ACCEPTS
NO RESPONSIBILITY AS TO THE AUTHENTICITY OR ACCURACY OF THIS SUPPLIED
INFORMATION. NOR DOES FIKE ACCEPT ANY RESPONSIBILITY FOR ANY DAMAGE RESULTING
FROM THE APPLICATION OF THE SUPPLIED INFORMATION. IT MUST BE UNDERSTOOD THAT
EACH SUPPRESSION SYSTEM IS SPECIFICALLY ENGINEERED FOR APPLICATION TO THE
RESPECTIVE PROCESS ENCLOSURE AND FUEL FOR WHICH IT WAS ORIGINALLY DESIGNED.
ANY ATTEMPT TO ALTER, CHANGE OR REAPPLY THIS SYSTEM OR FAILURE TO ADHERE TO A
FIKE FACTORY RECOMMENDED MAINTENANCE SCHEDULE COULD RESULT IN SYSTEM
MALFUNCTION AND/OR PERSONAL INJURY.
INSTALLATION NOTES:
1. DUCT MOUNTED COMPONENT LOCATION DIMENSIONS ARE FROM DUCT CENTERLINE.
2. ANY INTERCONNECTED DUCTS, (LOCATED BETWEEN THE UNITS AND THE HRD), NOT
ILLUSTRATED IN THIS DRAWING WILL BE UNPROTECTED WITH THIS SYSTEM. ANY DUCTS
NOT SHOWN ON THIS DRAWING WILL BE UNPROTECTED WITH THIS SYSTEM.
3. HRD SHALL NOT BE INSTALLED CLOSER THAN 1 PIPE DIAMETER TO UPSTREAM
BRANCHES.
4. FIKE CONTROL PANEL MUST BE DISARMED WHEN LOADING, UNLOADING, OR
PERFORMING MAINTENANCE ON PROTECTED EQUIPMENT.
5. DETECTORS EXPOSED TO TEMPERATURE BELOW 0° C (32° F) MUST BE HEATED OR
INSULATED, BY CUSTOMER.
6. DO NOT OPEN PROCESS ACCESS AREAS UNLESS THE FIKE SYSTEM IS DISABLED.
7. FIKE EQUIPMENT MUST NOT BE COVERED BY PRODUCT.
E70-064 1 LOCKOUT, HRD ASSEMBLY - 6", w/SENSOR
E70-030-SBC 20 LITER HRD CONTAINER w/ 42 LB. SBC4
E80-029-2
E80-0060-2
E80-0065-1
HYGIENIC NOZZLE COVER SST - 4"
HYGIENIC NOZZLE BOLTING PAD, SST-4"
HYGIENIC NO NOZZLE ASSEMBLY
E70-030-SBC 20 LITER HRD CONTAINER w/ 42 LB. SBC1
E80-0067-2
E80-0148
E80-0065-1
HYGIENIC TELESCOPIC NOZZLE COVER SST - 4"
HYGIENIC TELESCOPIC NOZZLE BOLTING PAD, SST-4"
HYGIENIC TELESCOPIC NOZZLE ASSEMBLY w/LOCKOUT
E70-033-SBC 50 LITER HRD CONTAINER w/ 100 LB. SBC1
E80-018-2
E80-0038
E80-0043
HYGIENIC TELESCOPIC NOZZLE COVER SST - 6"
HYGIENIC TELESCOPIC NOZZLE BOLTING PAD, SST-6"
HYGIENIC TELESCOPIC NOZZLE ASSEMBLY w/LOCKOUT
02-14426
E70-048 LOW PRESSURE SWITCH - HRD10
* INCLUDES GCA.TO REORDER GCA USE FIKE PART NO. 02-4134.
CONTAINER
SIZE
RELOAD
KITS/PART
NOZZLE
COVER
AGENT
AGENT
WEIGHT
NITROGEN CHARGE
PRESSURE @ 70°F
50 LITER E85-027 E80-0038 E85-038-50 SBC 100 LBS. 900 PSIG
20 LITER E85-005 E02-0172-5 E85-038-20 SBC 42 LBS. 900 PSIG
20 LITER E85-026 E80-0148 E85-038-20 SBC 42 LBS. 900 PSIG
20 LITER E85-029 E80-0060-2 E85-038-20 SBC 42 LBS. 900 PSIG
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
REPRESENTATIVE.
DETECTION SET PRESSURE 1.0 PSIG
MIN. STATIC WARNING -2.0 PSIG
MAX. STATIC WARNING 0.5 PSIG
DETECTION PROGRAMMING
VOLUME TOTAL
EXPLOSION HAZARD
EQUIPMENT DESIGN PRESSURE
VOLUME DIRTY (LESS FILTERS)
FILTERS
PROCESS OPERATING PRESSURE
PROCESS TEMPERATURE
AMBIENT TEMPERATURE
170°F MAX
70°F MAX
SUPPRESSANT CONCENTRATION
4.5 LBS / m
PROCESS OPERATING PARAMETERS
2350.5 FT
*WALNUT SHELL
KSt 101 bar*m/s, Pmax 7.02 BARG
1308.9 FT
168 FILTERS, Ø13-7/8" X 3' LONG
TO BE DETERMINED
VECT-AIRE COLLECTOR
VOLUME TOTAL
EXPLOSION HAZARD
EQUIPMENT DESIGN PRESSURE
PROCESS OPERATING PRESSURE
PROCESS TEMPERATURE
AMBIENT TEMPERATURE
SUPPRESSANT CONCENTRATION
4.9 LBS / m
PROCESS OPERATING PARAMETERS
1030.3 FT
CYCLONE
BOOTH 44
MODEL: SVA-168-36P4
BOOTH 44
*WALNUT SHELL
KSt 101 bar*m/s, Pmax 7.02 BARG
170°F MAX
70°F MAX
TO BE DETERMINED
ATMOSPHERIC TO -5" WC
ATMOSPHERIC TO -5" WC
*REFERENCE FIKE EXPLOSION REPORT #11152380EXP
*REFERENCE FIKE EXPLOSION REPORT #11152380EXP
12/23/14 RDS/JY/TLA ISSUED, APPROVED BY FIKE
4/10/15 RDS/JY/TLB
CYCLONE INLET DUCT SIZE CHANGE, ADDED (1) ISOLATION HRD. APPROVED BY FIKE
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
SYSTEM 1 BOOTH 44 - BUILDING 350
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
REPRESENTATIVE.
4" ASME, 6" ASME HRD'S AND DOT SRD CONTAINER DETAIL
4" ASME HRD CONTAINER AND SPREADER NOZZLE ASSEMBLY
4" ASME HRD CONTAINER AND TELESCOPIC NOZZLE ASSEMBLY
6" ASME HRD CONTAINER AND TELESCOPIC NOZZLE ASSEMBLY
4" ASME HRD CONTAINER AND NO NOZZLE ASSEMBLY
12/23/14 RDS/JY/TLA ISSUED, APPROVED BY FIKE
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
SYSTEM 1 BOOTH 44 - BUILDING 350
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
REPRESENTATIVE.
K:\Engineering\2014\14168-Letterkenny Army Depot\14168 REV A 122314\14168-1 DESIGN B 041015.dwg
12/23/14 RDS/JY/TLA ISSUED, APPROVED BY FIKE
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
SYSTEM 1 BOOTH 44 - BUILDING 350
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
REPRESENTATIVE.
K:\Engineering\2014\14168-Letterkenny Army Depot\14168 REV A 122314\14168-1 DESIGN B 041015.dwg
12/23/14 RDS/JY/TLA ISSUED, APPROVED BY FIKE
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
DESCRIPTIONQTYITEM PART NUMBER
GENERAL NOTES:
1. PROPER OPERATION OF THIS SYSTEM IS DEPENDENT UPON THE LOCATION OF ALL SYSTEM
COMPONENTS IN ACCORDANCE WITH THIS DRAWING.
2. ANY MODIFICATION TO THE PROPOSED INSTALLATION MUST BE COMMUNICATED TO AND
APPROVED BY SSI IN WRITING, PRIOR TO INSTALLATION. ANY CHANGES MUST BE
RECORDED AS A SSI REVISED DRAWING.
3. FOR FIELD WIRING AND SPECIFIC WIRE CONNECTIONS, CONSULT SSI SHEET 2D.
4. FOR INSTALLATION STANDARDS, GENERAL INFORMATION AND SAFETY REQUIREMENTS,
REFER TO THE FOLLOWING: ANSI B31.1 - PIPING AND FITTINGS, ANSI B16.5 - FLANGES, NFPA
69, NFPA 72, FIKE SPECIFICATION E06-018 - EXPLOSION SUPPRESSION CONTAINERS
INSTALLATION AND OPERATING INSTRUCTIONS AND FIKE MOUNTING DETAILS.
5. IN THE EVENT THAT ANY DESIGN PARAMETERS CHANGE, A SYSTEM PERFORMANCE REVIEW
SHALL BE CONDUCTED BY FIKE TO DETERMINE THE EFFECT, IF ANY, OF SUCH CHANGES ON
SYSTEM PERFORMANCE.
MECHANICAL NOTES:
1. DO NOT INSTALL GAS CARTRIDGE ACTUATORS (GCA'S) UNTIL SYSTEM HAS BEEN FULLY
TESTED BY A FIKE SYSTEM TECHNICIAN OR OTHER QUALIFIED PERSONNEL. GCA'S MUST
BE HANDLED IN ACCORDANCE WITH FIKE MANUALS E06-017, E06-018 AND THE
MANUFACTURER'S RECOMMENDATIONS.
2. ALL CONDUIT AND FITTINGS FOR FIKE SYSTEM MUST BE WEATHER TIGHT.
3. WHEN ASSEMBLING, SEAL ALL PROCESS PRESSURE THREADS WITH TFE TAPE OR EQUAL.
4. THE 4" STANDARD NOZZLE ASSEMBLY IS SUPPLIED WITH
(8) STUDS, 3/4"-10 UNC-2A X 6" LONG AND (8) NUTS, 3/4"-10 UNC-2B.
5. THE SUPPRESSANT CONTAINER SHALL BE FACTORY FILLED WITH FIKE POWDER AGENT
AND PRESSURIZED WITH DRY NITROGEN AT THE JOB SITE, BY FIKE SYSTEM TECHNICIAN OR
OTHER QUALIFIED PERSONNEL.
6. WHEN RECHARGING THE SUPPRESSANT CONTAINER, THE FOLLOWING COMPONENTS ARE
REQUIRED.
ITEMS NOT SHOWN ON DRAWING: ITEM NO. 1. LOCATION TO BE DETERMINED BY OTHER THAN SSI.
LOCATE CONTROL MODULES, IN AN ELECTRICALLY CLASSIFIED NON-HAZARDOUS LOCATION.
TEMPERATURE RANGE 0° F TO 110° F. REFERENCE FIKE SPECIFICATION E06-051, E06-052 , E06-053, E06-054, E06-061 & E06-018 FOR FURTHER DETAILS.
LOCATE CAUTION SIGNS, NEAR PROCESS ACCESS DOORS AND AREAS OF FREQUENT
MAINTENANCE.
29945022-C-S
E02-0081 CAUTION SIGN
CERAMIC PRESSURE DETECTOR
RIGID MOUNT FOR CERAMIC DETECTOR
02-4134
GAS CARTRIDGE ACTUATOR (GCA)
DETECTION SET PRESSURE 1.0 PSIG
MIN. STATIC WARNING -2.0 PSIG
MAX. STATIC WARNING 0.5 PSIG
DETECTION PROGRAMMING
E70-030-SBC 20 LITER HRD CONTAINER w/ 42 LB. SBC4
E10-0066 EXPLOSION PROTECTION CONTROLLER (EPC)
E10-0067 POWER SUPPLY (PSU)
E10-0068 ANNUNCIATOR MODULE (AM)
E10-0083-3 BATTERY KIT, 12V, 44AH
E10-0111 ENCLOSURE BREATHER DRAIN KIT, BRASS
02-10644 TRANSFORMER, 120/240V
10-2557 DIN RAIL KIT, 20"
10-2457 820 ohm EOL RESISTOR
10-2459 2.4V ZENER DIODE SERIES CONTACT DEVICE
* INCLUDES GCA.TO REORDER GCA USE FIKE PART NO. 02-4134.
E70-063 9 LOCKOUT, HRD ASSEMBLY - 4", w/SENSOR
SSI BP-EP BYPASS SWITCH3
VOLUME TOTAL
EXPLOSION HAZARD
EQUIPMENT DESIGN PRESSURE
VOLUME DIRTY (LESS FILTERS)
FILTERS
PROCESS OPERATING PRESSURE
PROCESS TEMPERATURE
AMBIENT TEMPERATURE
170°F MAX
70°F MAX
SUPPRESSANT CONCENTRATION
4.5 LBS / m
PROCESS OPERATING PARAMETERS
2350.5 FT
*WALNUT SHELL
KSt 101 bar*m/s, Pmax 7.02 BARG
1308.9 FT
168 FILTERS, Ø13-7/8" X 3' LONG
TO BE DETERMINED
VECT-AIRE COLLECTOR
E61-063-1
E80-025-2
E02-0172-5
E70-0064-1
SPREADER NOZZLE COVER NEOPRENE - 4"
SPREADER NOZZLE BOLTING PAD, CS-4"
SPREADER NOZZLE ASSEMBLY w/LOCKOUT
02-9073 VERTICAL MOUNT TRI-CLOVER FERRULE
SURGE PROTECTION DEVICE
36 X 24 WINDOW KIT FOR ENCLOSURE
36 X 24 BACK PANEL FOR ENCLOSURE
ENCLOSURE, 36x24x8 NEMA 4 SST ENCLOSURE
VOLUME TOTAL
EXPLOSION HAZARD
EQUIPMENT DESIGN PRESSURE
PROCESS OPERATING PRESSURE
PROCESS TEMPERATURE
AMBIENT TEMPERATURE
SUPPRESSANT CONCENTRATION
4.9 LBS / m
PROCESS OPERATING PARAMETERS
1030.3 FT
CYCLONE
BOOTH 50
DIN RAIL TO BE CENTERED
HORIZONTALLY IN PANEL
24"
36"
BACKING PLATE
ENCLOSURE
FIKE FIELD WIRE
ENTRANCE
PREFERRED
BREATHER (TYP.)
FIKE FIELD WIRE
ENTRANCE
ALTERNATE
SHUTDOWNS/INTERLOCKS
ENTRANCE
PREFERRED
AC INPUT
ENTRANCE
PREFERRED
MODEL: SVA-168-36P4
BOOTH 50
SYSTEM 2 BOOTH 50 - BUILDING 350
SYSTEM DESIGN NOTES:
THE FIKE SYSTEM IS DESIGNED AND INTENDED TO LIMIT PRESSURE DEVELOPED BY THE
HEAT OF COMBUSTION AND CHEMICALLY BLOCK PROPAGATION PATHWAYS IN THE EVENT OF
AN EXPLOSION (DEFLAGRATION) WITHIN THE PROTECTED VOLUME. DURING SYSTEM
ACTIVATION, A MOMENTARY PRESSURE EXCURSION WITHIN THE DUST COLLECTOR VOLUME
NOT EXCEEDING 3.0 PSIG AND THE CYCLONE NOT EXCEEDING 4.1 PSIG CAN BE EXPECTED.
THIS VALUE IS A MAXIMUM PREDICTED IMPULSE PRESSURE BASED UPON TOTALLY
ENCLOSED VOLUMES AND WILL BE LOWER DUE TO PRESSURE EQUALIZATION THROUGH
OPEN INLET/OUTLET DUCTS AS WELL AS ANY OTHER PRESSURE RELIEF PATHS SUCH AS
EXPLOSION VENTS. ENCLOSURES NOT CAPABLE OF WITHSTANDING PREDICTED PRESSURES
SHOULD BE REINFORCED OR FITTED WITH SUFFICIENT EXPLOSION VENT AREA RELEASING
TO A SAFE AREA.
THE SUPPRESSION SYSTEMS DEFINED WITHIN THESE DRAWINGS HAVE BEEN DESIGNED
BASED ON PROCESS OPERATING PARAMETERS AS DEFINED BY CUSTOMER. FIKE ACCEPTS
NO RESPONSIBILITY AS TO THE AUTHENTICITY OR ACCURACY OF THIS SUPPLIED
INFORMATION. NOR DOES FIKE ACCEPT ANY RESPONSIBILITY FOR ANY DAMAGE RESULTING
FROM THE APPLICATION OF THE SUPPLIED INFORMATION. IT MUST BE UNDERSTOOD THAT
EACH SUPPRESSION SYSTEM IS SPECIFICALLY ENGINEERED FOR APPLICATION TO THE
RESPECTIVE PROCESS ENCLOSURE AND FUEL FOR WHICH IT WAS ORIGINALLY DESIGNED.
ANY ATTEMPT TO ALTER, CHANGE OR REAPPLY THIS SYSTEM OR FAILURE TO ADHERE TO A
FIKE FACTORY RECOMMENDED MAINTENANCE SCHEDULE COULD RESULT IN SYSTEM
MALFUNCTION AND/OR PERSONAL INJURY.
INSTALLATION NOTES:
1. DUCT MOUNTED COMPONENT LOCATION DIMENSIONS ARE FROM DUCT CENTERLINE.
2. ANY INTERCONNECTED DUCTS, (LOCATED BETWEEN THE UNITS AND THE HRD), NOT
ILLUSTRATED IN THIS DRAWING WILL BE UNPROTECTED WITH THIS SYSTEM. ANY DUCTS
NOT SHOWN ON THIS DRAWING WILL BE UNPROTECTED WITH THIS SYSTEM.
3. HRD SHALL NOT BE INSTALLED CLOSER THAN 1 PIPE DIAMETER TO UPSTREAM
BRANCHES.
4. FIKE CONTROL PANEL MUST BE DISARMED WHEN LOADING, UNLOADING, OR
PERFORMING MAINTENANCE ON PROTECTED EQUIPMENT.
5. DETECTORS EXPOSED TO TEMPERATURE BELOW 0° C (32° F) MUST BE HEATED OR
INSULATED, BY CUSTOMER.
6. DO NOT OPEN PROCESS ACCESS AREAS UNLESS THE FIKE SYSTEM IS DISABLED.
7. FIKE EQUIPMENT MUST NOT BE COVERED BY PRODUCT.
*WALNUT SHELL
KSt 101 bar*m/s, Pmax 7.02 BARG
170°F MAX
70°F MAX
TO BE DETERMINED
E70-064 1 LOCKOUT, HRD ASSEMBLY - 6", w/SENSOR
E70-030-SBC 20 LITER HRD CONTAINER w/ 42 LB. SBC4
E80-029-2
E80-0060-2
E80-0065-1
HYGIENIC TELESCOPIC NOZZLE COVER SST - 4"
HYGIENIC TELESCOPIC NOZZLE BOLTING PAD, SST-4"
HYGIENIC NO NOZZLE ASSEMBLY w/LOCKOUT
E70-030-SBC 20 LITER HRD CONTAINER w/ 42 LB. SBC1
E80-0067-2
E80-0148
E80-0065-1
HYGIENIC TELESCOPIC NOZZLE COVER SST - 4"
HYGIENIC TELESCOPIC NOZZLE BOLTING PAD, SST-4"
HYGIENIC TELESCOPIC NOZZLE ASSEMBLY w/LOCKOUT
E70-033-SBC 50 LITER HRD CONTAINER w/ 100 LB. SBC1
E80-018-2
E80-0038
E80-0043
HYGIENIC TELESCOPIC NOZZLE COVER SST - 6"
HYGIENIC TELESCOPIC NOZZLE BOLTING PAD, SST-6"
HYGIENIC TELESCOPIC NOZZLE ASSEMBLY w/LOCKOUT
E70-048 LOW PRESSURE SWITCH - HRD10
02-14426
ATMOSPHERIC TO -5" WC
ATMOSPHERIC TO -5" WC
CONTAINER
SIZE
RELOAD
KITS/PART
NOZZLE
COVER
AGENT
AGENT
WEIGHT
NITROGEN CHARGE
PRESSURE @ 70°F
50 LITER E85-027 E80-0038 E85-038-50 SBC 100 LBS. 900 PSIG
20 LITER E85-005 E02-0172-5 E85-038-20 SBC 42 LBS. 900 PSIG
20 LITER E85-026 E80-0148 E85-038-20 SBC 42 LBS. 900 PSIG
20 LITER E85-029 E80-0060-2 E85-038-20 SBC 42 LBS. 900 PSIG
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
REPRESENTATIVE.
*REFERENCE FIKE EXPLOSION REPORT #11152380EXP
*REFERENCE FIKE EXPLOSION REPORT #11152380EXP
K:\Engineering\2014\14168-Letterkenny Army Depot\14168 REV A 122314\14168-2 DESIGN B 040915.dwg
12/23/14 RDS/JY/TLA ISSUED, APPROVED BY FIKE
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
SYSTEM 2 BOOTH 50 - BUILDING 350
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
REPRESENTATIVE.
4" ASME, 6" ASME HRD'S AND DOT SRD CONTAINER DETAIL
4" ASME HRD CONTAINER AND SPREADER NOZZLE ASSEMBLY
4" ASME HRD CONTAINER AND TELESCOPIC NOZZLE ASSEMBLY
6" ASME HRD CONTAINER AND TELESCOPIC NOZZLE ASSEMBLY
4" ASME HRD CONTAINER AND NO NOZZLE ASSEMBLY
K:\Engineering\2014\14168-Letterkenny Army Depot\14168 REV A 122314\14168-2 DESIGN B 040915.dwg
4/9/15 RDS/JY/TLB CYCLONE INLET DUCT SIZE CHANGE, ADDED (1) ISOLATION HRD. APPROVED BY FIKE
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
SYSTEM 2 BOOTH 50 - BUILDING 350
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
REPRESENTATIVE.
K:\Engineering\2014\14168-Letterkenny Army Depot\14168 REV A 122314\14168-2 DESIGN B 040915.dwg
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
SYSTEM 2 BOOTH 50 - BUILDING 350
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
REPRESENTATIVE.
12/23/14 RDS/JY/TL
A
ISSUED, APPROVED BY FIKE
4/9/15 RDS/JYB CYCLONE INLET DUCT SIZE CHANGE, ADDED (1) ISOLATION HRD. APPROVED BY FIKE
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
DESCRIPTIONQTYITEM PART NUMBER
GENERAL NOTES:
1. PROPER OPERATION OF THIS SYSTEM IS DEPENDENT UPON THE LOCATION OF ALL SYSTEM
COMPONENTS IN ACCORDANCE WITH THIS DRAWING.
2. ANY MODIFICATION TO THE PROPOSED INSTALLATION MUST BE COMMUNICATED TO AND
APPROVED BY SSI IN WRITING, PRIOR TO INSTALLATION. ANY CHANGES MUST BE
RECORDED AS A SSI REVISED DRAWING.
3. FOR FIELD WIRING AND SPECIFIC WIRE CONNECTIONS, CONSULT SSI SHEET 5C.
4. FOR INSTALLATION STANDARDS, GENERAL INFORMATION AND SAFETY REQUIREMENTS,
REFER TO THE FOLLOWING: ANSI B31.1 - PIPING AND FITTINGS, ANSI B16.5 - FLANGES, NFPA
69, NFPA 72, FIKE SPECIFICATION E06-018 - EXPLOSION SUPPRESSION CONTAINERS
INSTALLATION AND OPERATING INSTRUCTIONS AND FIKE MOUNTING DETAILS.
5. IN THE EVENT THAT ANY DESIGN PARAMETERS CHANGE, A SYSTEM PERFORMANCE REVIEW
SHALL BE CONDUCTED BY FIKE TO DETERMINE THE EFFECT, IF ANY, OF SUCH CHANGES ON
SYSTEM PERFORMANCE.
MECHANICAL NOTES:
1. DO NOT INSTALL GAS CARTRIDGE ACTUATORS (GCA'S) UNTIL SYSTEM HAS BEEN FULLY
TESTED BY A FIKE SYSTEM TECHNICIAN OR OTHER QUALIFIED PERSONNEL. GCA'S MUST
BE HANDLED IN ACCORDANCE WITH FIKE MANUALS E06-017, E06-018 AND THE
MANUFACTURER'S RECOMMENDATIONS.
2. ALL CONDUIT AND FITTINGS FOR FIKE SYSTEM MUST BE WEATHER TIGHT.
3. WHEN ASSEMBLING, SEAL ALL PROCESS PRESSURE THREADS WITH TFE TAPE OR EQUAL.
4. THE 4" STANDARD NOZZLE ASSEMBLY IS SUPPLIED WITH
(8) STUDS, 3/4"-10 UNC-2A X 6" LONG AND (8) NUTS, 3/4"-10 UNC-2B.
5. THE SUPPRESSANT CONTAINER SHALL BE FACTORY FILLED WITH FIKE POWDER AGENT
AND PRESSURIZED WITH DRY NITROGEN AT THE JOB SITE, BY FIKE SYSTEM TECHNICIAN OR
OTHER QUALIFIED PERSONNEL.
6. WHEN RECHARGING THE SUPPRESSANT CONTAINER, THE FOLLOWING COMPONENTS ARE
REQUIRED.
ITEMS NOT SHOWN ON DRAWING: ITEM NO. 1. LOCATION TO BE DETERMINED BY OTHER THAN SSI.
LOCATE CONTROL MODULES, IN AN ELECTRICALLY CLASSIFIED NON-HAZARDOUS LOCATION.
TEMPERATURE RANGE 0° F TO 110° F. REFERENCE FIKE SPECIFICATION E06-051, E06-052 , E06-053, E06-054, E06-061 & E06-018 FOR FURTHER DETAILS.
LOCATE CAUTION SIGNS, NEAR PROCESS ACCESS DOORS AND AREAS OF FREQUENT
MAINTENANCE.
29945022-C-S
E02-0081 CAUTION SIGN
CERAMIC PRESSURE DETECTOR
RIGID MOUNT FOR CERAMIC DETECTOR
02-4134
GAS CARTRIDGE ACTUATOR (GCA)
DETECTION SET PRESSURE 1.0 PSIG
MIN. STATIC WARNING -2.0 PSIG
MAX. STATIC WARNING 0.5 PSIG
DETECTION PROGRAMMING
E70-029-SBC 10 LITER HRD CONTAINER w/ 20 LB. SBC1
E10-0066 EXPLOSION PROTECTION CONTROLLER (EPC)
E10-0067 POWER SUPPLY (PSU)
E10-0068 ANNUNCIATOR MODULE (AM)
E10-0083-1 BATTERY KIT, 12V, 35AH
E10-0111 ENCLOSURE BREATHER DRAIN KIT, BRASS
02-10644 TRANSFORMER, 120/240V
10-2557 DIN RAIL KIT, 20"
10-2457 820 ohm EOL RESISTOR
10-2459 2.4V ZENER DIODE SERIES CONTACT DEVICE
E70-063 2 LOCKOUT, HRD ASSEMBLY - 4", w/SENSOR
E10-0105 DISABLE POWER SWITCH1
CONTAINER
SIZE
RELOAD
KITS/PART
GCA
NOZZLE
COVER
AGENT
AGENT
WEIGHT
NITROGEN CHARGE
PRESSURE @ 70°F
5 LITER E85-005 02-4134 E80-0172-5 E85-038-05 SBC 10 LBS. 900 PSIG
10 LITER E85-005 02-4134 E80-0172-5 E85-038-10 SBC 20 LBS. 900 PSIG
9 LITER E85-002 02-4134 E02-0164-1 E85-038-09 SBC 18 LBS. 500 PSIG
VOLUME TOTAL
EXPLOSION HAZARD
EQUIPMENT DESIGN PRESSURE
VOLUME DIRTY (LESS FILTERS)
FILTERS
PROCESS OPERATING PRESSURE
PROCESS TEMPERATURE
AMBIENT TEMPERATURE
170°F MAX
70°F MAX
SUPPRESSANT CONCENTRATION
4.0 LBS / m
PROCESS OPERATING PARAMETERS
359 FT
*QUICK STRIP PLASTIC ABRASIVE
KSt 73 bar*m/s, Pmax 6.05 BARG
218 FT
32 FILTERS, 11.4" X 14.4 OVAL X 26" LONG
TO BE DETERMINED BY CUSTOMER
DONALDSON DFO 4-32 DUST COLLECTOR
R1005
E61-063-1
E80-025-2
E02-0172-5
E70-0064-1
SPREADER NOZZLE COVER NEOPRENE - 4"
SPREADER NOZZLE BOLTING PAD, CS-4"
SPREADER NOZZLE ASSEMBLY w/LOCKOUT
02-9073 VERTICAL MOUNT TRI-CLOVER FERRULE
SURGE PROTECTION DEVICE
ENCLOSURE, 24x24x8 NEMA 4 CS ENCLOSURE
SYSTEM 5 R1005 - BUILDING 350
SYSTEM DESIGN NOTES:
THE FIKE SYSTEM IS DESIGNED AND INTENDED TO LIMIT PRESSURE DEVELOPED BY THE
HEAT OF COMBUSTION AND CHEMICALLY BLOCK PROPAGATION PATHWAYS IN THE EVENT OF
AN EXPLOSION (DEFLAGRATION) WITHIN THE PROTECTED VOLUME. DURING SYSTEM
ACTIVATION, A MOMENTARY PRESSURE EXCURSION WITHIN THE DUST COLLECTOR VOLUME
NOT EXCEEDING 3.2 PSIG CAN BE EXPECTED. THIS VALUE IS A MAXIMUM PREDICTED
IMPULSE PRESSURE BASED UPON TOTALLY ENCLOSED VOLUMES AND WILL BE LOWER DUE
TO PRESSURE EQUALIZATION THROUGH OPEN INLET/OUTLET DUCTS AS WELL AS ANY OTHER
PRESSURE RELIEF PATHS SUCH AS EXPLOSION VENTS. ENCLOSURES NOT CAPABLE OF
WITHSTANDING PREDICTED PRESSURES SHOULD BE REINFORCED OR FITTED WITH
SUFFICIENT EXPLOSION VENT AREA RELEASING TO A SAFE AREA.
THE SUPPRESSION SYSTEMS DEFINED WITHIN THESE DRAWINGS HAVE BEEN DESIGNED
BASED ON PROCESS OPERATING PARAMETERS AS DEFINED BY CUSTOMER. FIKE ACCEPTS
NO RESPONSIBILITY AS TO THE AUTHENTICITY OR ACCURACY OF THIS SUPPLIED
INFORMATION. NOR DOES FIKE ACCEPT ANY RESPONSIBILITY FOR ANY DAMAGE RESULTING
FROM THE APPLICATION OF THE SUPPLIED INFORMATION. IT MUST BE UNDERSTOOD THAT
EACH SUPPRESSION SYSTEM IS SPECIFICALLY ENGINEERED FOR APPLICATION TO THE
RESPECTIVE PROCESS ENCLOSURE AND FUEL FOR WHICH IT WAS ORIGINALLY DESIGNED.
ANY ATTEMPT TO ALTER, CHANGE OR REAPPLY THIS SYSTEM OR FAILURE TO ADHERE TO A
FIKE FACTORY RECOMMENDED MAINTENANCE SCHEDULE COULD RESULT IN SYSTEM
MALFUNCTION AND/OR PERSONAL INJURY.
INSTALLATION NOTES:
1. DUCT MOUNTED COMPONENT LOCATION DIMENSIONS ARE FROM DUCT CENTERLINE.
2. ANY INTERCONNECTED DUCTS, (LOCATED BETWEEN THE DUST COLLECTOR AND SRD),
NOT ILLUSTRATED IN THIS DRAWING WILL BE UNPROTECTED WITH THIS SYSTEM.
3. DUCT LAYOUT AND TRANSITIONS MAY NOT BE TO SCALE OR AN ACCURATE DEPICTION.
4. SRDs SHALL NOT BE INSTALLED CLOSER THAN 1 PIPE DIAMETER TO
UPSTREAM/DOWNSTREAM BRANCHES.
5. UP TO 2 BENDS/ELBOWS ≤90° CAN BE PRESENT BETWEEN PRIMARY EXPLOSION
VOLUME AND BARRIER LOCATION.
6. FIKE CONTROL PANEL MUST BE DISARMED WHEN LOADING, UNLOADING OR
PERFORMING MAINTENANCE ON PROTECTED EQUIPMENT.
7. DETECTORS EXPOSED TO TEMPERATURES BELOW 0°C (32°F) MUST BE HEATED OR
INSULATED, BY CUSTOMER.
8. DO NOT OPEN PROCESS ACCESS AREAS UNLESS THE FIKE SYSTEM IS DISABLED.
9. FIKE EQUIPMENT MUST NOT BE COVERED BY PRODUCT.
02-14426
E70-0048 LOW PRESSURE SWITCH - HRD2
E70-028-SBC 5 LITER HRD CONTAINER w/ 10 LB. SBC1
ATMOSPHERIC TO -5" WC
E70-0049 LOW PRESSURE SWITCH - SRD4
E70-035-SBC
9 LITER SRD CONTAINER w/ 18 LB. SBC4
E80-055-1 SRD HYGIENIC NOZZLE ASSY-1-1/4"TRI-CLAMP, Ni/SST COVER4
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
REPRESENTATIVE.
*REFERENCE FIKE EXPLOSIBILITY REPORT #11152375EXP
4" ASME, 6" ASME HRD'S AND DOT SRD CONTAINER DETAIL
4" ASME HRD CONTAINER AND SPREADER NOZZLE ASSEMBLY
12/23/14 RDS/JY/TLA ISSUED, APPROVED BY FIKE
3/23/15 RDS/JYB DUCT SIZE CHANGE/ADDED (2) SRD'S
5/17/19 JB/DTC GENERAL REVISIONS
6/28/19 JB/DTD MECHANICAL / ELECTRICAL AS BUILT
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN
DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
DIN RAIL TO BE CENTERED
HORIZONTALLY IN PANEL
24"
24"
BACKING PLATE
ENCLOSURE
FIKE FIELD WIRE
ENTRANCE
PREFERRED
BREATHER (TYP.)
FIKE FIELD WIRE
ENTRANCE
ALTERNATE
SHUTDOWNS/INTERLOCKS
ENTRANCE
PREFERRED
AC INPUT
ENTRANCE
PREFERRED
SYSTEM 5 R1005 - BUILDING 350
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
REPRESENTATIVE.
K:\Engineering\2014\14168-Letterkenny Army Depot\14168-5A REV D.dwg
12/23/14 RDS/JY/TLA ISSUED, APPROVED BY FIKE
3/23/15 RDS/JYB DUCT SIZE CHANGE/ADDED (2) SRD'S
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
SYSTEM 5 R1005 - BUILDING 350
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
REPRESENTATIVE.
12/23/14 RDS/JY/TLA ISSUED, APPROVED BY FIKE
3/23/15 RDS/JYB DUCT SIZE CHANGE/ADDED (2) SRD'S
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
DESCRIPTIONQTYITEM PART NUMBER
GENERAL NOTES:
1. PROPER OPERATION OF THIS SYSTEM IS DEPENDENT UPON THE LOCATION OF ALL SYSTEM
COMPONENTS IN ACCORDANCE WITH THIS DRAWING.
2. ANY MODIFICATION TO THE PROPOSED INSTALLATION MUST BE COMMUNICATED TO AND
APPROVED BY SSI IN WRITING, PRIOR TO INSTALLATION. ANY CHANGES MUST BE
RECORDED AS A SSI REVISED DRAWING.
3. FOR FIELD WIRING AND SPECIFIC WIRE CONNECTIONS, CONSULT SSI SHEET 8C.
4. FOR INSTALLATION STANDARDS, GENERAL INFORMATION AND SAFETY REQUIREMENTS,
REFER TO THE FOLLOWING: ANSI B31.1 - PIPING AND FITTINGS, ANSI B16.5 - FLANGES, NFPA
69, NFPA 72, FIKE SPECIFICATION E06-018 - EXPLOSION SUPPRESSION CONTAINERS
INSTALLATION AND OPERATING INSTRUCTIONS AND FIKE MOUNTING DETAILS.
5. IN THE EVENT THAT ANY DESIGN PARAMETERS CHANGE, A SYSTEM PERFORMANCE REVIEW
SHALL BE CONDUCTED BY FIKE TO DETERMINE THE EFFECT, IF ANY, OF SUCH CHANGES ON
SYSTEM PERFORMANCE.
MECHANICAL NOTES:
1. DO NOT INSTALL GAS CARTRIDGE ACTUATORS (GCA'S) UNTIL SYSTEM HAS BEEN FULLY
TESTED BY A FIKE SYSTEM TECHNICIAN OR OTHER QUALIFIED PERSONNEL. GCA'S MUST
BE HANDLED IN ACCORDANCE WITH FIKE MANUALS E06-017, E06-018 AND THE
MANUFACTURER'S RECOMMENDATIONS.
2. ALL CONDUIT AND FITTINGS FOR FIKE SYSTEM MUST BE WEATHER TIGHT.
3. WHEN ASSEMBLING, SEAL ALL PROCESS PRESSURE THREADS WITH TFE TAPE OR EQUAL.
4. THE 4" STANDARD NOZZLE ASSEMBLY IS SUPPLIED WITH
(8) STUDS, 3/4"-10 UNC-2A X 6" LONG AND (8) NUTS, 3/4"-10 UNC-2B.
5. THE SUPPRESSANT CONTAINER SHALL BE FACTORY FILLED WITH FIKE POWDER AGENT
AND PRESSURIZED WITH DRY NITROGEN AT THE JOB SITE, BY FIKE SYSTEM TECHNICIAN OR
OTHER QUALIFIED PERSONNEL.
6. WHEN RECHARGING THE SUPPRESSANT CONTAINER, THE FOLLOWING COMPONENTS ARE
REQUIRED.
ITEMS NOT SHOWN ON DRAWING: ITEM NO. 1. LOCATION TO BE DETERMINED BY OTHER THAN SSI.
LOCATE CONTROL MODULES, IN AN ELECTRICALLY CLASSIFIED NON-HAZARDOUS LOCATION.
TEMPERATURE RANGE 0° F TO 110° F. REFERENCE FIKE SPECIFICATION E06-051, E06-052 , E06-053, E06-054, E06-061 & E06-018 FOR FURTHER DETAILS.
LOCATE CAUTION SIGNS, NEAR PROCESS ACCESS DOORS AND AREAS OF FREQUENT
MAINTENANCE.
29945022-C-S
E02-0081 CAUTION SIGN
CERAMIC PRESSURE DETECTOR
RIGID MOUNT FOR CERAMIC DETECTOR
02-4134
GAS CARTRIDGE ACTUATOR (GCA)
DETECTION SET PRESSURE 1.0 PSIG
MIN. STATIC WARNING -2.0 PSIG
MAX. STATIC WARNING 0.5 PSIG
DETECTION PROGRAMMING
E70-030-SBC 20 LITER HRD CONTAINER w/ 42 LB. SBC3
E10-0066 EXPLOSION PROTECTION CONTROLLER (EPC)
E10-0067 POWER SUPPLY (PSU)
E10-0068 ANNUNCIATOR MODULE (AM)
E10-0083-1 BATTERY KIT, 12V, 33AH
E10-0111 ENCLOSURE BREATHER DRAIN KIT, BRASS
02-10644 TRANSFORMER, 120/240V
10-2557 DIN RAIL KIT, 20"
10-2457 820 ohm EOL RESISTOR
10-2459 2.4V ZENER DIODE SERIES CONTACT DEVICE
* INCLUDES GCA.TO REORDER GCA USE FIKE PART NO. 02-4134.
E70-063 6 LOCKOUT, HRD ASSEMBLY - 4", w/SENSOR
E10-0105 DISABLE POWER SWITCH1
CONTAINER
SIZE
RELOAD
KITS/PART
NOZZLE
COVER
AGENT
AGENT
WEIGHT
NITROGEN CHARGE
PRESSURE @ 70°F
2.5 LITER E85-005 E80-0172-5 E85-038-2.5 SBC 5 LBS. 900 PSIG
20 LITER E85-005 E80-0172-5 E85-038-20 SBC 42 LBS. 900 PSIG
20 LITER E85-029 E80-0060-2 E85-038-20 SBC 42 LBS. 900 PSIG
E61-063-1
E80-025-2
E02-0172-5
E70-0064-1
SPREADER NOZZLE COVER NEOPRENE - 4"
SPREADER NOZZLE BOLTING PAD, CS-4"
SPREADER NOZZLE ASSEMBLY w/LOCKOUT
02-9073 VERTICAL MOUNT TRI-CLOVER FERRULE
SURGE PROTECTION DEVICE
ENCLOSURE, 24x24x8 NEMA 4 CS ENCLOSURE
SYSTEM 8 R6094 - BUILDING 57
SYSTEM DESIGN NOTES:
THE FIKE SYSTEM IS DESIGNED AND INTENDED TO LIMIT PRESSURE DEVELOPED BY THE
HEAT OF COMBUSTION AND CHEMICALLY BLOCK PROPAGATION PATHWAYS IN THE EVENT OF
AN EXPLOSION (DEFLAGRATION) WITHIN THE PROTECTED VOLUME. DURING SYSTEM
ACTIVATION, A MOMENTARY PRESSURE EXCURSION WITHIN THE DUST COLLECTOR VOLUME
NOT EXCEEDING 4.3 PSIG CAN BE EXPECTED. THIS VALUE IS A MAXIMUM PREDICTED
IMPULSE PRESSURE BASED UPON TOTALLY ENCLOSED VOLUMES AND WILL BE LOWER DUE
TO PRESSURE EQUALIZATION THROUGH OPEN INLET/OUTLET DUCTS AS WELL AS ANY OTHER
PRESSURE RELIEF PATHS SUCH AS EXPLOSION VENTS. ENCLOSURES NOT CAPABLE OF
WITHSTANDING PREDICTED PRESSURES SHOULD BE REINFORCED OR FITTED WITH
SUFFICIENT EXPLOSION VENT AREA RELEASING TO A SAFE AREA.
THE SUPPRESSION SYSTEMS DEFINED WITHIN THESE DRAWINGS HAVE BEEN DESIGNED
BASED ON PROCESS OPERATING PARAMETERS AS DEFINED BY CUSTOMER. FIKE ACCEPTS
NO RESPONSIBILITY AS TO THE AUTHENTICITY OR ACCURACY OF THIS SUPPLIED
INFORMATION. NOR DOES FIKE ACCEPT ANY RESPONSIBILITY FOR ANY DAMAGE RESULTING
FROM THE APPLICATION OF THE SUPPLIED INFORMATION. IT MUST BE UNDERSTOOD THAT
EACH SUPPRESSION SYSTEM IS SPECIFICALLY ENGINEERED FOR APPLICATION TO THE
RESPECTIVE PROCESS ENCLOSURE AND FUEL FOR WHICH IT WAS ORIGINALLY DESIGNED.
ANY ATTEMPT TO ALTER, CHANGE OR REAPPLY THIS SYSTEM OR FAILURE TO ADHERE TO A
FIKE FACTORY RECOMMENDED MAINTENANCE SCHEDULE COULD RESULT IN SYSTEM
MALFUNCTION AND/OR PERSONAL INJURY.
INSTALLATION NOTES:
1. DUCT MOUNTED COMPONENT LOCATION DIMENSIONS ARE FROM DUCT CENTERLINE.
2. ANY INTERCONNECTED DUCTS, (LOCATED BETWEEN THE DUST COLLECTOR AND THE
HRD), NOT ILLUSTRATED IN THIS DRAWING WILL BE UNPROTECTED WITH THIS SYSTEM.
ANY DUCTS NOT SHOWN ON THIS DRAWING WILL BE UNPROTECTED WITH THIS SYSTEM.
3. HRD SHALL NOT BE INSTALLED CLOSER THAN 1 PIPE DIAMETER TO UPSTREAM
BRANCHES.
4. FIKE CONTROL PANEL MUST BE DISARMED WHEN LOADING, UNLOADING, OR
PERFORMING MAINTENANCE ON PROTECTED EQUIPMENT.
5. DETECTORS EXPOSED TO TEMPERATURE BELOW 0° C (32° F) MUST BE HEATED OR
INSULATED, BY CUSTOMER.
6. DO NOT OPEN PROCESS ACCESS AREAS UNLESS THE FIKE SYSTEM IS DISABLED.
7. FIKE EQUIPMENT MUST NOT BE COVERED BY PRODUCT.
02-14426
E70-0048 LOW PRESSURE SWITCH - HRD6
E70-027-SBC 2.5 LITER HRD CONTAINER w/ 5 LB. SBC3
E80-029-2
E80-0060-2
E80-0065-1
HYGIENIC NOZZLE COVER SST - 4"
HYGIENIC NOZZLE BOLTING PAD, SST-4"
HYGIENIC NO NOZZLE ASSEMBLY
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
REPRESENTATIVE.
VOLUME TOTAL
EXPLOSION HAZARD
EQUIPMENT DESIGN PRESSURE
VOLUME DIRTY (LESS FILTERS)
FILTERS
PROCESS OPERATING PRESSURE
PROCESS TEMPERATURE
AMBIENT TEMPERATURE
170°F MAX
70°F MAX
SUPPRESSANT CONCENTRATION
6.4 LBS / m
PROCESS OPERATING PARAMETERS
551.6 FT
*QUICK STRIP PLASTIC ABRASIVE
KSt 73 bar*m/s, Pmax 6.05 BARG
314 FT
48 FILTERS, Ø14" X 23" LONG
TO BE DETERMINED
R6094 DUST COLLECTOR
ATMOSPHERIC TO -5" WC
*REFERENCE FIKE EXPLOSION REPORT #11152375EXP
4" ASME, 6" ASME HRD'S AND DOT SRD CONTAINER DETAIL
4" ASME HRD CONTAINER AND SPREADER NOZZLE ASSEMBLY
4" ASME HRD CONTAINER AND NO NOZZLE ASSEMBLY
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
DIN RAIL TO BE CENTERED
HORIZONTALLY IN PANEL
24"
24"
BACKING PLATE
ENCLOSURE
FIKE FIELD WIRE
ENTRANCE
PREFERRED
BREATHER (TYP.)
FIKE FIELD WIRE
ENTRANCE
ALTERNATE
SHUTDOWNS/INTERLOCKS
ENTRANCE
PREFERRED
AC INPUT
ENTRANCE
PREFERRED
SYSTEM 8 R6094 - BUILDING 57
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
REPRESENTATIVE.
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
SYSTEM 8 R6094 - BUILDING 57
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
DESCRIPTIONQTYITEM PART NUMBER
GENERAL NOTES:
1. PROPER OPERATION OF THIS SYSTEM IS DEPENDENT UPON THE LOCATION OF ALL SYSTEM
COMPONENTS IN ACCORDANCE WITH THIS DRAWING.
2. ANY MODIFICATION TO THE PROPOSED INSTALLATION MUST BE COMMUNICATED TO AND
APPROVED BY SSI IN WRITING, PRIOR TO INSTALLATION. ANY CHANGES MUST BE
RECORDED AS A SSI REVISED DRAWING.
3. FOR FIELD WIRING AND SPECIFIC WIRE CONNECTIONS, CONSULT SSI SHEET 7C.
4. FOR INSTALLATION STANDARDS, GENERAL INFORMATION AND SAFETY REQUIREMENTS,
REFER TO THE FOLLOWING: ANSI B31.1 - PIPING AND FITTINGS, ANSI B16.5 - FLANGES, NFPA
69, NFPA 72, FIKE SPECIFICATION E06-018 - EXPLOSION SUPPRESSION CONTAINERS
INSTALLATION AND OPERATING INSTRUCTIONS AND FIKE MOUNTING DETAILS.
5. IN THE EVENT THAT ANY DESIGN PARAMETERS CHANGE, A SYSTEM PERFORMANCE REVIEW
SHALL BE CONDUCTED BY FIKE TO DETERMINE THE EFFECT, IF ANY, OF SUCH CHANGES ON
SYSTEM PERFORMANCE.
MECHANICAL NOTES:
1. DO NOT INSTALL GAS CARTRIDGE ACTUATORS (GCA'S) UNTIL SYSTEM HAS BEEN FULLY
TESTED BY A FIKE SYSTEM TECHNICIAN OR OTHER QUALIFIED PERSONNEL. GCA'S MUST
BE HANDLED IN ACCORDANCE WITH FIKE MANUALS E06-017, E06-018 AND THE
MANUFACTURER'S RECOMMENDATIONS.
2. ALL CONDUIT AND FITTINGS FOR FIKE SYSTEM MUST BE WEATHER TIGHT.
3. WHEN ASSEMBLING, SEAL ALL PROCESS PRESSURE THREADS WITH TFE TAPE OR EQUAL.
4. THE 4" STANDARD NOZZLE ASSEMBLY IS SUPPLIED WITH
(8) STUDS, 3/4"-10 UNC-2A X 6" LONG AND (8) NUTS, 3/4"-10 UNC-2B.
5. THE SUPPRESSANT CONTAINER SHALL BE FACTORY FILLED WITH FIKE POWDER AGENT
AND PRESSURIZED WITH DRY NITROGEN AT THE JOB SITE, BY FIKE SYSTEM TECHNICIAN OR
OTHER QUALIFIED PERSONNEL.
6. WHEN RECHARGING THE SUPPRESSANT CONTAINER, THE FOLLOWING COMPONENTS ARE
REQUIRED.
ITEMS NOT SHOWN ON DRAWING: ITEM NO. 1. LOCATION TO BE DETERMINED BY OTHER THAN SSI.
LOCATE CONTROL MODULES, IN AN ELECTRICALLY CLASSIFIED NON-HAZARDOUS LOCATION.
TEMPERATURE RANGE 0° F TO 110° F. REFERENCE FIKE SPECIFICATION E06-051, E06-052 , E06-053, E06-054, E06-061 & E06-018 FOR FURTHER DETAILS.
LOCATE CAUTION SIGNS, NEAR PROCESS ACCESS DOORS AND AREAS OF FREQUENT
MAINTENANCE.
29945022-C-S
E02-0081 CAUTION SIGN
CERAMIC PRESSURE DETECTOR
RIGID MOUNT FOR CERAMIC DETECTOR
02-4134
GAS CARTRIDGE ACTUATOR (GCA)
DETECTION SET PRESSURE 1.0 PSIG
MIN. STATIC WARNING -2.0 PSIG
MAX. STATIC WARNING 0.5 PSIG
DETECTION PROGRAMMING
E70-030-SBC 20 LITER HRD CONTAINER w/ 42 LB. SBC3
E10-0066 EXPLOSION PROTECTION CONTROLLER (EPC)
E10-0067 POWER SUPPLY (PSU)
E10-0068 ANNUNCIATOR MODULE (AM)
E10-0083-1 BATTERY KIT, 12V, 33AH
E10-0111 ENCLOSURE BREATHER DRAIN KIT, BRASS
02-10644 TRANSFORMER, 120/240V
10-2557 DIN RAIL KIT, 20"
10-2457 820 ohm EOL RESISTOR
10-2459 2.4V ZENER DIODE SERIES CONTACT DEVICE
* INCLUDES GCA.TO REORDER GCA USE FIKE PART NO. 02-4134.
E70-063 6 LOCKOUT, HRD ASSEMBLY - 4", w/SENSOR
E10-0105 DISABLE POWER SWITCH1
CONTAINER
SIZE
RELOAD
KITS/PART
NOZZLE
COVER
AGENT
AGENT
WEIGHT
NITROGEN CHARGE
PRESSURE @ 70°F
2.5 LITER E85-005 E80-0172-5 E85-038-2.5 SBC 5 LBS. 900 PSIG
20 LITER E85-005 E80-0172-5 E85-038-20 SBC 42 LBS. 900 PSIG
20 LITER E85-029 E80-0060-2 E85-038-20 SBC 42 LBS. 900 PSIG
VOLUME TOTAL
EXPLOSION HAZARD
EQUIPMENT DESIGN PRESSURE
VOLUME DIRTY (LESS FILTERS)
FILTERS
PROCESS OPERATING PRESSURE
PROCESS TEMPERATURE
AMBIENT TEMPERATURE
170°F MAX
70°F MAX
SUPPRESSANT CONCENTRATION
6.4 LBS / m
PROCESS OPERATING PARAMETERS
551.6 FT
*QUICK STRIP PLASTIC ABRASIVE
KSt 73 bar*m/s, Pmax 6.05 BARG
314 FT
48 FILTERS, Ø14" X 23" LONG
TO BE DETERMINED
R6185 DUST COLLECTOR
E61-063-1
E80-025-2
E02-0172-5
E70-0064-1
SPREADER NOZZLE COVER NEOPRENE - 4"
SPREADER NOZZLE BOLTING PAD, CS-4"
SPREADER NOZZLE ASSEMBLY w/LOCKOUT
02-9073 VERTICAL MOUNT TRI-CLOVER FERRULE
SURGE PROTECTION DEVICE
ENCLOSURE, 24x24x8 NEMA 4 CS ENCLOSURE
SYSTEM 7 R6185 - BUILDING 37
SYSTEM DESIGN NOTES:
THE FIKE SYSTEM IS DESIGNED AND INTENDED TO LIMIT PRESSURE DEVELOPED BY THE
HEAT OF COMBUSTION AND CHEMICALLY BLOCK PROPAGATION PATHWAYS IN THE EVENT OF
AN EXPLOSION (DEFLAGRATION) WITHIN THE PROTECTED VOLUME. DURING SYSTEM
ACTIVATION, A MOMENTARY PRESSURE EXCURSION WITHIN THE DUST COLLECTOR VOLUME
NOT EXCEEDING 4.3 PSIG CAN BE EXPECTED. THIS VALUE IS A MAXIMUM PREDICTED
IMPULSE PRESSURE BASED UPON TOTALLY ENCLOSED VOLUMES AND WILL BE LOWER DUE
TO PRESSURE EQUALIZATION THROUGH OPEN INLET/OUTLET DUCTS AS WELL AS ANY OTHER
PRESSURE RELIEF PATHS SUCH AS EXPLOSION VENTS. ENCLOSURES NOT CAPABLE OF
WITHSTANDING PREDICTED PRESSURES SHOULD BE REINFORCED OR FITTED WITH
SUFFICIENT EXPLOSION VENT AREA RELEASING TO A SAFE AREA.
THE SUPPRESSION SYSTEMS DEFINED WITHIN THESE DRAWINGS HAVE BEEN DESIGNED
BASED ON PROCESS OPERATING PARAMETERS AS DEFINED BY CUSTOMER. FIKE ACCEPTS
NO RESPONSIBILITY AS TO THE AUTHENTICITY OR ACCURACY OF THIS SUPPLIED
INFORMATION. NOR DOES FIKE ACCEPT ANY RESPONSIBILITY FOR ANY DAMAGE RESULTING
FROM THE APPLICATION OF THE SUPPLIED INFORMATION. IT MUST BE UNDERSTOOD THAT
EACH SUPPRESSION SYSTEM IS SPECIFICALLY ENGINEERED FOR APPLICATION TO THE
RESPECTIVE PROCESS ENCLOSURE AND FUEL FOR WHICH IT WAS ORIGINALLY DESIGNED.
ANY ATTEMPT TO ALTER, CHANGE OR REAPPLY THIS SYSTEM OR FAILURE TO ADHERE TO A
FIKE FACTORY RECOMMENDED MAINTENANCE SCHEDULE COULD RESULT IN SYSTEM
MALFUNCTION AND/OR PERSONAL INJURY.
INSTALLATION NOTES:
1. DUCT MOUNTED COMPONENT LOCATION DIMENSIONS ARE FROM DUCT CENTERLINE.
2. ANY INTERCONNECTED DUCTS, (LOCATED BETWEEN THE DUST COLLECTOR AND THE
HRD), NOT ILLUSTRATED IN THIS DRAWING WILL BE UNPROTECTED WITH THIS SYSTEM.
ANY DUCTS NOT SHOWN ON THIS DRAWING WILL BE UNPROTECTED WITH THIS SYSTEM.
3. HRD SHALL NOT BE INSTALLED CLOSER THAN 1 PIPE DIAMETER TO UPSTREAM
BRANCHES.
4. FIKE CONTROL PANEL MUST BE DISARMED WHEN LOADING, UNLOADING, OR
PERFORMING MAINTENANCE ON PROTECTED EQUIPMENT.
5. DETECTORS EXPOSED TO TEMPERATURE BELOW 0° C (32° F) MUST BE HEATED OR
INSULATED, BY CUSTOMER.
6. DO NOT OPEN PROCESS ACCESS AREAS UNLESS THE FIKE SYSTEM IS DISABLED.
7. FIKE EQUIPMENT MUST NOT BE COVERED BY PRODUCT.
02-14426
E70-0048 LOW PRESSURE SWITCH - HRD6
E70-027-SBC 2.5 LITER HRD CONTAINER w/ 5 LB. SBC3
ATMOSPHERIC TO -5" WC
E80-029-2
E80-0060-2
E80-0065-1
HYGIENIC NOZZLE COVER SST - 4"
HYGIENIC NOZZLE BOLTING PAD, SST-4"
HYGIENIC NO NOZZLE ASSEMBLY
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
REPRESENTATIVE.
*REFERENCE FIKE EXPLOSION REPORT #11152375EXP
4" ASME, 6" ASME HRD'S AND DOT SRD CONTAINER DETAIL
4" ASME HRD CONTAINER AND SPREADER NOZZLE ASSEMBLY
4" ASME HRD CONTAINER AND NO NOZZLE ASSEMBLY
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
DIN RAIL TO BE CENTERED
HORIZONTALLY IN PANEL
24"
24"
BACKING PLATE
ENCLOSURE
FIKE FIELD WIRE
ENTRANCE
PREFERRED
BREATHER (TYP.)
FIKE FIELD WIRE
ENTRANCE
ALTERNATE
SHUTDOWNS/INTERLOCKS
ENTRANCE
PREFERRED
AC INPUT
ENTRANCE
PREFERRED
SYSTEM 7 R6185 - BUILDING 37
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
SYSTEM 7 R6185 - BUILDING 37
FIKE PROTECTION SYSTEMS EQUIPMENT SHALL BE USED. THE SYSTEM SHALL BE FURNISHED,
INSTALLED AND TESTED BY THE AUTHORIZED FIKE PROTECTION SYSTEMS DISTRIBUTOR:
(DIRECT) 610.295.5852
SUPPRESSION SYSTEMS, INC.
(PHONE) 800.360.0687
EXPLOSION SALES MANAGER: RICK SEIDEL
THE INFORMATION ON THESE DRAWINGS REFLECTS THE DESIGN OF THE EXPLOSION PROTECTION
SYSTEM PROPOSED BY SUPPRESSION SYSTEMS INC., FINAL COMMISSIONING OF THIS SYSTEM
WILL NOT OCCUR WITHOUT THESE DRAWINGS BEING APPROVED BY THE CUSTOMER / CUSTOMER
SCALE
DWG NO.
SHEET OF
REV
TITLE
EXPLOSION PROTECTION SYSTEM
DESCRIPTION
CHKD
DRN DATE
DATE SYSD2
SYSD1 DATE
DATE
PURCHASED BY: INSTALLED AT:
DESCRIPTIONQTYITEM PART NUMBER
GENERAL NOTES:
1. PROPER OPERATION OF THIS SYSTEM IS DEPENDENT UPON THE LOCATION OF ALL SYSTEM
COMPONENTS IN ACCORDANCE WITH THIS DRAWING.
2. ANY MODIFICATION TO THE PROPOSED INSTALLATION MUST BE COMMUNICATED TO AND
APPROVED BY SSI IN WRITING, PRIOR TO INSTALLATION. ANY CHANGES MUST BE
RECORDED AS A SSI REVISED DRAWING.
3. FOR FIELD WIRING AND SPECIFIC WIRE CONNECTIONS, CONSULT SSI SHEET 11C.
4. FOR INSTALLATION STANDARDS, GENERAL INFORMATION AND SAFETY REQUIREMENTS,
REFER TO THE FOLLOWING: ANSI B31.1 - PIPING AND FITTINGS, ANSI B16.5 - FLANGES, NFPA
69, NFPA 72, FIKE SPECIFICATION E06-018 - EXPLOSION SUPPRESSION CONTAINERS
INSTALLATION AND OPERATING INSTRUCTIONS AND FIKE MOUNTING DETAILS.
5. IN THE EVENT THAT ANY DESIGN PARAMETERS CHANGE, A SYSTEM PERFORMANCE REVIEW
SHALL BE CONDUCTED BY FIKE TO DETERMINE THE EFFECT, IF ANY, OF SUCH CHANGES ON
SYSTEM PERFORMANCE.
MECHANICAL NOTES:
1. DO NOT INSTALL GAS CARTRIDGE ACTUATORS (GCA'S) UNTIL SYSTEM HAS BEEN FULLY
TESTED BY A FIKE SYSTEM TECHNICIAN OR OTHER QUALIFIED PERSONNEL. GCA'S MUST
BE HANDLED IN ACCORDANCE WITH FIKE MANUALS E06-017, E06-018 AND THE
MANUFACTURER'S RECOMMENDATIONS.
2. ALL CONDUIT AND FITTINGS FOR FIKE SYSTEM MUST BE WEATHER TIGHT.
3. WHEN ASSEMBLING, SEAL ALL PROCESS PRESSURE THREADS WITH TFE TAPE OR EQUAL.
4. THE 4" STANDARD NOZZLE ASSEMBLY IS SUPPLIED WITH
(8) STUDS, 3/4"-10 UNC-2A X 6" LONG AND (8) NUTS, 3/4"-10 UNC-2B.
5. THE SUPPRESSANT CONTAINER SHALL BE FACTORY FILLED WITH FIKE POWDER AGENT
AND PRESSURIZED WITH DRY NITROGEN AT THE JOB SITE, BY FIKE SYSTEM TECHNICIAN OR
OTHER QUALIFIED PERSONNEL.
6. WHEN RECHARGING THE SUPPRESSANT CONTAINER, THE FOLLOWING COMPONENTS ARE
REQUIRED.
ITEMS NOT SHOWN ON DRAWING: ITEM NO. 1. LOCATION TO BE DETERMINED BY OTHER THAN SSI.
LOCATE CONTROL MODULES, IN AN ELECTRICALLY CLASSIFIED NON-HAZARDOUS LOCATION.
TEMPERATURE RANGE 0° F TO 110° F. REFERENCE FIKE SPECIFICATION E06-051, E06-052 , E06-053, E06-054, E06-061 & E06-018 FOR FURTHER DETAILS.
LOCATE CAUTION SIGNS, NEAR PROCESS ACCESS DOORS AND AREAS OF FREQUENT
MAINTENANCE.
29945022-C-S
E02-0081 CAUTION SIGN
CERAMIC PRESSURE DETECTOR
RIGID MOUNT FOR CERAMIC DETECTOR
02-4134
GAS CARTRIDGE ACTUATOR (GCA)
DETECTION SET PRESSURE 1.0 PSIG
MIN. STATIC WARNING -2.0 PSIG
MAX. STATIC WARNING 0.5 PSIG
DETECTION PROGRAMMING
E70-030-SBC 20 LITER HRD CONTAINER w/ 42 LB. SBC1
E10-0066 EXPLOSION PROTECTION CONTROLLER (EPC)
E10-0067 POWER SUPPLY (PSU)
E10-0068 ANNUNCIATOR MODULE (AM)
E10-0083-1 BATTERY KIT, 12V, 33AH
E10-0111 ENCLOSURE BREATHER DRAIN KIT, BRASS
02-10644 TRANSFORMER, 120/240V
10-2557…