Drawing_Attachment_B_W25G1Q7123001Y.pdf

PDF 53 KB Posted

Attached to
Blast Booth Media Recycling System
Solicitation number
W911N2-17-R-0045
Issued by

About this file

Attachment B

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Blast Booth 44 Attachment B April 2017

Letterkenny Army Depot /Production Engineering - Environmental Group

Scalping Screen

Blast Pot 8cubic foot double cham-ber blast pot

Stainless Steel Grit Media 30- 40 grit size

Media Loader

E#4

Media Elevator Basement Auger

Blast Floor

(#1)Media screen equipment will be added here.

Dicharge to Dust Collector #2

(#2)Dust sent to dust collector outside building.

(#3)Fines sent to fine drum. Next to blast pot

SN#1

Special Notes:

Air Wash

Blast Booth 44, Bldg 350

(#4)Two blasters using 1/2” nozzles blast with an estimated flow rate of 5,400lbs/hour.

Dicharge to Fines Barrel #3

Screw Conveyor

SN#5

(#5)A transfer system (ex. such as an elevator) to transfer media to blast pot shall be included if necessary to design.

File details come from the government source that posted it. Updated .