W911-12-R-0028-0003.pdf
PDF 582 KB Posted
- Solicitation number
- W911KB-12-R-0028
About this file
Amend 0003 Add pre-proposal meeting minutes. Questions and Answers. Update to 1.6 Site Qualifications Duties and Meetings. Update Wage Determination
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12-R-0028-0006.pdf | ||
| 12-R-0028-0005.pdf | ||
| W911KB-12-R-0028-0004.pdf | ||
| 12-R-0028 Unalakleet Amend 0002.pdf | ||
| 12-R-0028-0001.pdf | ||
| DWGS-FULLSIZE-UNK337747-RFP.pdf | ||
| SPECS-UNK337747-RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Reference Project Title and Location: Coastal Erosion Control Phase II, Unalakleet, Alaska
a. The above numbered Solicitation is hereby amended to add the pre-proposal meeting minutes; and update to 1.6 Site Qualif ications, Duties and Meetings. 1.6.1.1 Site Safety and Health Officer (SSHO) and the Buy American clauses. The specif ic changes are identif ied on Page 2, Summary of Changes.
b. The date/time for receipt of bids remains unchanged at 7 August 2012 at 2:00 PM.
c. Point of contact for this amendment is Yolanda M. Ikner at (907) 753-2553.
d. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 21
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Jul-2012
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-12-R-0028
X 9B. DATED (SEE ITEM 11)
15-Jun-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Jul-2012
CODE
U.S. ARMY ENGINEER DISTRICT, ALASKA
ATTN: CEPOA-CT( W911KB)
PO BOX 6898
JBER AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KB-12-R-0028
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
Summary of Changes for Amendment 0003
Reference Project Title and Location: Coastal Erosion Control Phase II Unalakleet, Alaska
1. SECTION 01 35 26 – GOVERNMENTAL SAFETY REQUIREMENTS, Page 7, Paragraph 1.4.1.1 Site Safety and Health Officer (SSHO) is changed to read:
“The Contractor Quality Control (QC) person can be the SSHO on this project.”
2. SECTION 0021 00 AND 00 22 11, Part III: Proposal Submittal Requirements, Para 6. This is amended to state the following:
Provide an original and five copies of Volume I. Up to 10 pages will be acceptable for Volume I AM #3… (excluding table of contents, charts, resumes, other tables and the summary)…AM#3. Care should be taken to ensure no pricing information is included in Volume I. A single-sided, 8 ½ by 11-inch sheet is considered one page. Double-sided sheets will count as two pages. Over-sized sheets (up to 11 by 17-inch) will count as two pages. Double-sided, over-sized sheets will count as four pages. Font size shall be no less than 10 point. Resumes, Certificates, and Past
Performance Questionnaires are not part of the page count.
3. Section 00 45 00 CONTRACT CLAUSE: Replaced FAR Provision 52.225-12 Buy American Act – Construction Materials under Trade Agreement (FEB 2009) with FAR Provision 52.225-10 Buy American act – Construction Material. (Attachment 1)
4. Section 00 72 00 CONTRACT CLAUSE: Replaced FAR Clause 52.225-11 Buy American Act – Construction Materials under Trade Agreement with FAR Clause 52.225-9 Buy American act – Construction Material. (Attachment 2)
5. Replaced Wage Determination AK1 dated 05/15/2012 with updated Waged Determination AK1 dated 07/20/2012 (Attachment 3)
6. Attached are the Minutes to the Pre-Proposal Conference and Questions and Answers (Attachment 4)
Attachment 1
SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS
The following have been added by full text:
52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT--CONSTRUCTION MATERIALS (FEB 2009)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American
Act--Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy
American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers.
The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR
52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy
American Act, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR
52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR
52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
ATTACHMENT 2
SECTION 00 72 00 - CONTRACT CLAUSES
The following have been added by full text:
52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (SEP 2010)
(a) Definitions. As used in this clause--
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if--
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the
Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the
Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting
Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) \1\
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
(End of clause)
7. SECTION 01 35 26 – GOVERNMENTAL SAFETY REQUIREMENTS, Page 7, Paragraph 1.4.1.1 Site Safety and
Health Officer (SSHO) is changed to read:
“The Contractor Quality Control (QC) person can be the SSHO on this project.”
2. The date/time for receipt of bids remains unchanged at 7 August 2012 at 2:00 PM.
ATTACHMENT 3
General Decision Number: AK120001 07/20/2012 AK1
Superseded General Decision Number: AK20100001
State: Alaska
Construction Types: Building and Heavy
Counties: Alaska Statewide.
BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 01/06/2012
1 01/20/2012
2 02/03/2012
3 02/10/2012
4 02/17/2012
5 04/13/2012
6 04/20/2012
7 05/25/2012
8 06/29/2012
9 07/13/2012
10 07/20/2012
ASBE0097-001 01/01/2012
Rates Fringes
Asbestos Workers/Insulator
(includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 33.58 17.92
ASBE0097-002 01/01/2012
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 33.58 17.92
BOIL0502-002 07/01/2011
BOILERMAKER......................$ 42.70 24.86
BRAK0001-002 07/01/2011
Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 37.39 17.60
Tile & Terrazzo Finisher.........$ 31.78 17.60
CARP1501-001 09/01/2011
MILLWRIGHT.......................$ 33.89 18.23
CARP2520-003 07/01/2010
Diver
Stand-by....................$ 39.80 18.73
Tender......................$ 38.80 18.73
Working.....................$ 79.60 18.73
Piledriver
Carpenter...................$ 35.49 18.73
Piledriver; Skiff Operator and Rigger..................$ 34.49 18.73
Sheet Stabber...............$ 35.49 18.73
Welder......................$ 41.05 18.73
DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:
50-100 feet $1.00 per foot
101 feet and deeper $2.00 per foot
ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:
5-50 FEET $1.00 PER FOOT/DAY
51-100 FEET $2.00 PER FOOT/DAY
101 FEET AND ABOVE $3.00 PER FOOT/DAY
SATURATION DIVING:
The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP4059-001 09/01/2011
CARPENTER
Carpenter...................$ 35.49 20.38
Lather/Drywall Applicator...$ 35.49 20.38
ELEC1547-004 04/01/2012
CABLE SPLICER....................$ 39.77 3%+$21.93
Electrician;Technician...........$ 38.02 3%+$21.93
ELEC1547-005 04/01/2012
Line Construction
CABLE SPLICER....................$ 49.92 3%+$24.08
Linemen (Including Equipment
Operators, Technician)...........$ 48.17 3%+24.08
Powderman........................$ 46.17 3%+$24.08
TREE TRIMMER.....................$ 33.62 3%+$18.58
ELEV0019-002 01/01/2012
ELEVATOR MECHANIC................$ 49.035 23.535+a+b
FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:
New Year's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day; Friday after
Thanksgiving and Christmas Day
ENGI0302-002 01/01/2012
Power equipment operators:
GROUP 1.....................$ 37.43 19.00
GROUP 1A....................$ 39.19 19.00
GROUP 2.....................$ 36.66 19.00
GROUP 3.....................$ 35.94 19.00
GROUP 4.....................$ 29.73 19.00
TUNNEL WORK
GROUP 1....................$ 41.17 19.00
GROUP 1A...................$ 43.11 19.00
GROUP 2....................$ 40.33 19.00
GROUP 3....................$ 39.53 19.00
GROUP 4....................$ 32.70 19.00
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller; Back Filler; Barrier Machine
(Zipper); Batch Plant Operator: Batch and Mixer over 200 yds.; Beltcrete with power pack and similar conveyors;
Bending Machine; Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine;
Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a)
Shovels, Backhoes, excavators with all attachments, Draglines, Clamshells; Gradalls-3 yards and under; (b)
Hydralifts or Transporters, all track or truck type,(c)
Derricks; Crushers; Deck Winches-Double Drum; Ditching or
Trenching Machine (16 inch or over); Drilling Machines, core, cable, rotary and exploration; Finishing Machine
Operator, concrete paving, Laser Screed, sidewalk, curb and gutter machine; Helicopters; Hover Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain Vehicle, Rollagon, Bargecable, Nodwell Sno Cat; Hydro Ax: Feller Buncher and similar; Loaders: Forklifts with power boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps, Loaders, elevating belt type, Euclid and similar types; Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking Machines:
Mole, Tunnel Drill, Horizontal/Directional Drill Operator, and/or Shield; Operator on Dredges; Piledriver Engineers, L. B. Foster, Puller or similar Paving Breaker; Power
Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.); Sauerman-Bagley;
Scrapers-through 40 yards; Service Oiler/Service Engineer;
Sidebooms-under 45 tons; Shot Blast Machine; Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine;
Sub-grader (Gurries, C.M.I. and C.M.I. Roto Mills and similar types); Tack tractor; Truck mounted Concrete Pumps, Conveyor, Creter; Water Kote Machine; Unlicensed off road hauler; Welder; Electrical Mechanic, Camp Maintenance
Engineer
GROUP 1A: Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Shovels, backhoes,excavators with all attachments, draglines, clamshells-over 3 yards, (b) Tower cranes;Licensed Water/Waste Water Treatment Operator;
Loaders over 5 yds.;Certified Welder, Electrical Mechanic, Camp Maintenance Engineer, Mechanic (over 10,000 hours);
Motor Patrol Grader, Dozer, Grade Tractor (finish: when finishing to final grade and/or to hubs, or for asphalt);
Power Plants: 1000 k.w. and over; Quad; Screed; Sidebooms over 45 tons; Slip Form Paver C.M.I. and similar types;
Scrapers over 40 yards; Camera/Tool/Video Operator
(Slipline).
GROUP 2: Batch Plant Operators: Batch and Mixer 200 yds. per hour and under; Boiler-fireman; Cement Hog and Concrete
Pump Operator; Conveyors (except as listed in group 1);
Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator;Licensed Grade
Technician; Loaders, Elevating Grader, Dumor and similar;
Locomotives: rod and geared engines; Mixers; Screening, Washing Plant; Sideboom (cradling rock drill regardless of size); Skidder; Trencing Machine under 16 inches; Waste/
Waste Water Treatment Operator.
GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air
Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber
Green and similar types (b) Forklifts or Lumber Carrier
(on construction job site) (c) Forklifts with Tower (d)
Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey
(air, steam, gas and electric) Speeders; Mechanics (light duty); Mixers: Concrete Mixers and Batch 200 yds. per hour and under; Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 300 k.w.; Pumps-water; Roller-other than Plantmix; Saws, concrete; Skid Steer with all attachments; Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Assistant Engineer (if over 85 tons or
100 ft. boom);Parts and Equipment Coordinator; Swamper (on trenching machines or shovel type equipment); Spotter;
Steam Cleaner; Drill Helper.
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.
IRON0751-003 08/01/2011
Ironworkers:
BRIDGE, STRUCTURAL,
ORNAMENTAL, REINFORCING
MACHINERY MOVER, RIGGER,
SHEETER, STAGE RIGGER,
BENDER OPERATOR.............$ 33.40 23.16
FENCE, BARRIER AND
GUARDRAIL INSTALLERS........$ 29.90 23.16
GUARDRAIL LAYOUT MAN........$ 30.64 23.16
HELICOPTER, TOWER...........$ 34.40 23.16
LABO0341-005 07/01/2011
Laborers: North of the 63rd
Parallel & East of Longitude
138 Degrees
GROUP 1.....................$ 29.00 20.02
GROUP 2.....................$ 30.00 20.02
GROUP 3.....................$ 30.90 20.02
GROUP 3A....................$ 34.18 20.02
GROUP 3B....................$ 35.01 20.02
GROUP 4.....................$ 18.57 20.02
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 31.90 20.02
GROUP 2....................$ 33.00 20.02
GROUP 3....................$ 33.99 20.02
GROUP 3A...................$ 37.60 20.02
GROUP 3B...................$ 38.51 20.02
Laborers: South of the 63rd
Parallel & West of Longitude
138 Degrees
GROUP 1.....................$ 29.00 20.02
GROUP 2.....................$ 30.00 20.02
GROUP 3.....................$ 30.90 20.02
GROUP 3A....................$ 34.18 20.02
GROUP 3B....................$ 35.01 20.02
GROUP 4.....................$ 18.57 20.02
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 31.90 20.02
GROUP 2....................$ 33.00 20.02
GROUP 3....................$ 33.99 20.02
GROUP 3A...................$ 37.60 20.02
GROUP 3B...................$ 38.51 20.02
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush
Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke
Setters, Hook Tender, Rigger, Signalman; Concrete
Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos
(limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail
Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of
Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or
Power Tools; Portable or Chemical Toilet Serviceman; Pump
Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot
Tender; Saw Tenders; Scaffold Building and Erecting; Slurry
Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor
Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or
Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine
Operator; Green Cutter (dam work); Gunnite Operator; Hod
Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and
Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad
Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer
Plant Maintenance Man; Thermal Plastic Applicator; Timber
Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine
Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill
Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill
Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
PAIN1959-001 07/01/2011
NORTH OF THE 63RD PARALLEL
PAINTER
BRUSH/ROLLER PAINT OR WALL
COVERER.....................$ 29.17 18.47
TAPING, TEXTURING,
STRUCTURAL PAINTING,
SANDBLASTING, POT TENDER,
FINISH METAL, SPRAY,
BUFFER OPERATOR, RADON
MITIGATION, LEAD BASED
PAINT ABATEMENT, HAZARDOUS
MATERIAL HANDLER............$ 29.67 18.47
PAIN1959-002 07/01/2011
SOUTH OF THE 63RD PARALLEL
Painters:
Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and
Commercial Spray............$ 26.98 18.22
Machine Taper/Drywall.......$ 28.18 18.22
Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 29.48 16.22
PAIN1959-003 07/01/2011
NORTH OF THE 63RD PARALLEL
GLAZIER..........................$ 34.09 17.28
PAIN1959-004 07/01/2011
FLOOR LAYER: Carpet.............$ 30.52 12.39
PAIN1959-006 07/01/2011
SOUTH OF THE 63RD PARALLEL
GLAZIER..........................$ 34.09 17.23
PLAS0867-001 02/01/2012
PLASTERER
North of the 63rd parallel..$ 33.93 19.07
South of the 63rd parallel..$ 33.68 19.07
PLAS0867-004 02/01/2012
CEMENT MASON/CONCRETE FINISHER
North of the 63rd parallel..$ 33.68 19.07
South of the 63rd parallel..$ 33.43 19.07
PLUM0262-002 07/01/2012
East of the 141st Meridian
Plumber; Steamfitter.............$ 36.02 24.42
PLUM0367-002 07/01/2011
South of the 63rd Parallel
Plumber; Steamfitter.............$ 36.98 18.72
PLUM0375-002 07/01/2011
North of the 63rd Parallel
Plumber; Steamfitter.............$ 39.71 18.45
PLUM0669-002 04/01/2012
SPRINKLER FITTER.................$ 41.23 21.52
* ROOF0190-002 07/01/2012
ROOFER
NORTH OF THE 63RD PARALLEL..$ 29.25 2.69 + a
SOUTH OF THE 63RD PARALLEL..$ 29.25 2.69 + a
FOOTNOTE:
a. Employers are to supply employees with comprehensive medical insurance. Employer is responsible to cover, at minimum one-half (1/2) of the individual premium. The individual will be responsible for the remaining premium.
SHEE0023-003 06/01/2010
South of the 63rd Parallel
Sheet Metal Worker...............$ 38.84 18.35
SHEE0023-004 07/02/2010
North of the 63rd Parallel
Sheet Metal Worker...............$ 42.98 18.56
TEAM0959-003 09/01/2011
TRUCK DRIVER
GROUP 1.....................$ 37.77 16.43
GROUP 1A....................$ 39.04 16.43
GROUP 2.....................$ 36.51 16.43
GROUP 3.....................$ 35.69 16.43
GROUP 4.....................$ 35.11 16.43
GROUP 5.....................$ 34.35 16.43
GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon
(250 Bbls and above); Tireman, Heavy Duty/Fueler
GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps
(driver under load)
GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;
Dump Trucks (including Rockbuggy and Trucks with pups) over
20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;
Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards;
GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Partsman;
Oil Distributor Drivers; Trucks/Jeeps (push or pull);
Traffic Control Technician
GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;
Tireman (light duty); Dump Trucks (including Rockbuggy and
Truck with pups) up to and including 10 yards; Track Truck
Equipment; Stringing Truck; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate);
Lumber Carrier; Water Wagon, semi; Water Truck, dual axle;
Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A"
Frame manufactured rating over 5 tons; Bull Lifts and Fork
Lifts with Power Boom and Swing attachments, over 5 tons;
Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle;
Hydro-seeders, dual axle; Vacuum Trucks, Truck Vacuum
Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver;
Combination Truck-fuel and grease; Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield);
Ready Mix, up to and including 7 yards;
GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type
Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;
Gear/Supply Truck; Bus Operator, Up to 30 Passengers;
Rigger/Swamper
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be
July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
AMENDMENT 0004
Pre-Proposal Conference Meeting Minutes
Solicitation W911KB-12-R-0028
Coastal Erosion Control, Phase II Unalakleet
Unalakleet, Alaska
July 12, 2012
A pre-proposal conference was held at USACE, 2204 3rd Street, JBER AK 99506 on July 12, 2012 at 1:00p.m. The following people attended:
Name Company/Organization
Christine Dale USACE, Alaska District
Yolanda M. Ikner USACE, Alaska District
David P. Williams USACE, Alaska District
Alan Jeffries USACE, Alaska District
John Rajek USACE, Alaska District
Contractors Via Telephone
Scott Vandergrift J.E. McAmis
Craig Chartrand J.E. McAmis
Richard Downer J.E. McAmis
Dan Young Bering Pacific
Mike Brasier Bering Pacific
Bryce Erickson West Construction Co
Mark Leick West Construction Co
Bill Mendenhall Bering Straight
Tammy Taylor Bering Straight
Mike Wasgatt Phillips & Jordan
Ronnie Jordan Phillips & Jordan
Bobby McAllan Phillips & Jordan
Mike Wheatley Bryce Incorporated
Beverly Beshter Bryce Incorporated
The purpose of the meeting was the pre-proposal conference for Coastal Erosion Control, Unalakleet Alaska Phase II. A review of the requirements of solicitation was provided. Then the Contractors were invited to provide any comments or questions on the solicitation, specifications and drawings that were issued on www.fbo.gov on June 19, 2012.
The following are the minutes and Questions and Answers based on the questions asked during the meeting and sent to me via email:
1. Introductions were conducted for Coastal Erosion Control, Phase II. Unalakleet, Alaska.
2. Contractors were reminded this solicitation is going to be a firm-fixed price construction contract. Proposals are due
August 7, 2012 at 2:00p.m. AST at the USACE District. This is going to be a “Technically Acceptable, Lowest Price” selection process.
3. Proposal submission was covered. Contractors asked to please read sections 00 21 00 and 00 22 11.
4. Covered mandatory requirements for enter JBER to deliver proposals to contracting.
5. Contractors need to ensure ORCA and CCR websites are current http://www.fbo.gov/
Solicitation W911KB-12-R-0028
Coastal Erosion Control, Phase II Unalakleet
Unalakleet, Alaska
QUESTIONS AND ANSWERS
QUESTION 301: In reference to page 39 of 68 of the solicitation - Please confirm that Canadian rock is acceptable for this solicitation.
ANSWER 301: Yes
QUESTION 302: In reference to page 15 of 68 of the solicitation - Please clarify what documents will count against the 10 page maximum technical proposal length. Paragraph 6 contradicts itself.
ANSWER 302: See SECTION 0021 00 AND 00 22 11, Part III: Proposal Submittal Requirements, Para 6. This is amended to state the following
Provide an original and five copies of Volume I. Up to 10 pages will be acceptable for Volume I AM #3. (excluding …AM # 3 table of contents, charts, resumes, other tables and the summary). Care should be taken to ensure no pricing information is included in Volume I. A single-sided, 8 ½ by 11-inch sheet is considered one page. Double-sided sheets will count as two pages.
Over-sized sheets (up to 11 by 17-inch) will count as two pages. Double-sided, over-sized sheets will count as four pages. Font size shall be no less than 10 point. Resumes, Certificates, and Past Performance Questionnaires are not part of the page count.
QUESTION 303: In reference to CLIN 0002 – Is Mobilization a true lump sum item, paid in full regardless of whether or not mobilization is required for one or two seasons?
If it is the government’s intent to only pay half of the total Mobilization line item if only one season of work is required, then we recommend that Mobilization be split into two line items, “Mobilization Season One” and “Mobilization Season Two.”
ANSWER 303: REFERENCE DFAR Clause 252.236-7004. If the contractor plans on both Mobilizing and Demobilizing the first year, they will receive half of the 60 and 40 percent of the cost in the clause. Meaning they will receive 30 percent for mobilization in year one and 20 percent for demobilizing. Leaving 30 percent for mobilization the second year and 20 percent for demobilization at the end of the second year.
Or the contractor can mobilize with the intent of staying on site through the second season. If this is the case then the contractor gets the full 60 percent when he mobilizes and will receive the remaining 40 percent at the end of the second year.
QUESTION 304: In reference to Section 01 35 26 - Paragraphs 1.3(7)(n) and 1.6.1.1 are contradictory. Please confirm whether or not the QC and SSHO can be the same person.
ANSWER 304: See Attachment 2. The Quality Control (QC) person can be the SSHO on this project.
QUESTION 305: Based on the following, will the government consider adjusting the advertised range of the Phase II project upwards to $10-$25M:
305a. Price discussions with quarries and barge delivery companies;
305b. Phase II project requires more difficult placement than Phase I required (longer reaches);
305c. Phase II is more difficult to access than Phase I (completion of Phase I cut-off economical access to Phase II);
305d. Phase II requires the use of paved roads and highway trucks as opposed to the off-highway trucks used in Phase I;
305e. Cost inflation considerations since Phase I was bid.
ANSWER 305: No
305a. No
305b. No
305c. No
305d. No
305e. No
QUESTION 306:
Section 35 31 19 Page 3: "No permits, easements, and/or rock quality testing are required for use of this furnished rock."
Is the contractor able to contact the material site owner about either providing the balance of the "Core" Rock for a fee, or about mining the balance and paying a royalty?
If either of the above is true, will quality tests be required on the balance of the "Core" rock?
I would assume that gradation testing would be required on any remaining material produced from this material site.
Is that statement true?
ANSWER 306:
Yes, the Contractor may contact the owner of the local quarry known as "Pit #2" about providing the balance of the "Core" Rock for a fee, or about mining the balance and paying a royalty.
If the local quarry known as "Pit #2" is selected as a source for the balance of the Core rock, the rock quality tests (a. thru g.)
listed in specification 35 31 19 subpart 2.2.1.1 are not required. However, the first paragraph of subpart 2.2.1.1 with regard to visual geological examinations for the Core rock applies; i.e. visual geologic examinations shall be made to determine acceptability of materials. Rock shall be composed of hard, strong, durable materials that will not slake or deteriorate upon exposure to the action of water or atmosphere; shall not contain cracks, joints, faults, seams, laminations, or bands of minerals or deleterious materials which would result in breakage during or after placement in the revetment(s); and shall be free of expansive or other materials which would cause accelerated deterioration by exposure to project conditions.
Yes, gradation testing would be required on any remaining material produced from this material site.
QUESTION 307: Maximum page count for Volume 1 is 10 pages. Page 15 Part III, Item 6.indicates that the page count is all inclusive.
Page 17 Tab B Past Performance stipulates that other performance recognition documents can be included within the last 5 years.
It is also stated that Past Performance Questionnaires can be sent back to the Offeror and included in the proposal.
ANSWER 307: Refer to answer in 302