AD014784P - Technical Exhibit D - Bldg 12005 Asbestos Survey.pdf
PDF 369 KB Posted
- Attached to
- Renovation of Building
- Solicitation number
- W91151-21-B-0005
About this file
This solicitation is for the renovation of Building at Fort Hood, Texas. The solicitation is a 100% small business set aside with an estimated value between $1,000,000 to $5,000,000. The NAICS code is 238990 for All Other Specialty Trade Contractors. A bid bond and performance/payment bonds are required. The awardee must provide a superintendent through project completion. Project manager, quality control, and superintendent positions cannot be subcontracted and must be filled by prime contractor staff. Bids are due at the specified Fort Hood location by the date listed in the solicitation. Bidders must provide a CAGE code, point of contact, email, and submit bids electronically on a CD.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS SURVEY REPORT
BUILDING 12005
FORT HOOD, TEXAS
Submitted to:
U.S. Army Corps of Engineers, Fort Worth District
For:
U.S. Army Corps of Engineers, Tulsa District
Prepared by:
Radian International LLC
8501 N. Mopac Blvd.
P.O. Box 201088
Austin, Texas 78720-1088
September 1997
Asbestos Survey, Fort Hood, Texas ii September 1997
Building 12005 f_12005.doc
Table of Contents
1.0 INTRODUCTION
1.1 Physical Inspections
1.2 Bulk Sampling and Analysis
1.3 Sample Numbering Scheme
2.0 FACILITY DESCRIPTION
3.0 DISCUSSION OF RESULTS
4.0 RISK ASSESSMENT
5.0 ABATEMENT COST ESTIMATES
APPENDIX A: HOMOGENEOUS AREAS AND DETAILED ANALYTICAL RESULTS
FOR BUILDING 12005 SURVEY
APPENDIX B: BUILDING 12005 FLOOR PLAN
APPENDIX C: REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN
BUILDING 12005
APPENDIX D: RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING
12005
List of Figures
B-1 Building 12005 Floor Plan--First Floor ..................................................................... B-1
B-2 Building 12005 Floor Plan--Second Floor ................................................................. B-2
B-3 Building 12005 Roof Plan ......................................................................................... B-3
List of Tables
3-1 Summary of ACM and PACM in Building 12005
4-1 Priority Rating Table for Recommended Response Actions
4-2 Building 12005 Risk Assessment Results
5-1 Building 12005 Abatement and Replacement Cost Estimates
5-2 Building 12005 Repair Cost Estimates
A-1 Building 12005 Homogeneous Areas ........................................................................ A-1
A-2 Building 12005 Asbestos Survey Analytical Results ................................................. A-2
B-1 Inspector, Risk Assessor, and Laboratory Licenses for Building 12005 ................... B-4
D-1 Damage/Risk Values for Inspection Observations .................................................... D-2
D-2 Exposure Values for Inspection Observations ........................................................... D-2
Asbestos Survey, Fort Hood, Texas iii September 1997
List of Tables (cont.)
D-3 Summary of Damage/Risk Observations for ACM and PACM in
Bldg. 12005 ................................................................................................................ D-3
D-4 Summary of Exposure Observations for ACM and PACM in Bldg. 12005 .............. D-3
List of Photographs (Appendix C)
Photo 12005-1-A: Building caulkings and putties; throughout facility
Asbestos Survey, Fort Hood, Texas iv September 1997
Acronyms and Abbreviations
ACM Asbestos-containing material
Act. Actinolite
Am. Amosite
Anth. Anthophyllite
Cell. Cellulose
Chry. Chrysotile
COR Contracting Officer’s Representative
Croc. Crocidolite
D Damage/risk factor
DS Dispersion staining
E Exposure factor
EPA United States Environmental Protection Agency
Fib. Fiberglass
GRADE Air Force Guidance for Rating Damage and Exposure
ID Identification
LLC Limited liability company m Meter m2 Square meter
M.W. Mineral wool
N/A Not analyzed
NA Not applicable
ND Not detected
O&M Operations and maintenance
PACM Presumed asbestos-containing material
PLM Polarized light microscopy
QA Quality assurance
QC Quality control
R Risk rating
RPD Relative percent difference
SACM Suspect asbestos-containing material
SWD Southwest Division (Laboratory)
Syn. Synthetics
T Total
TDH Texas Department of Health
Trem. Tremolite
TSI Thermal systems insulation
USACE United States Army Corps of Engineers
Asbestos Survey, Fort Hood, Texas September 1997
1.0 INTRODUCTION
Radian International LLC, under contract with the United States Army Corps of Engineers
(USACE), Contract DACA56-94-D-0015, performed a facility-wide asbestos survey at Fort
Hood, Texas, to meet the following project objectives:
Identify and locate, to the extent possible, all friable and non-friable suspect asbestos-containing materials (SACM);
Evaluate the condition of the SACM, collecting sufficient data to perform a risk assessment and to prioritize materials for appropriate response actions;
Collect and analyze bulk material samples in order to quantify, in metric units, SACM which contain greater than 1% asbestos;
Identify and quantify material which is presumed to contain asbestos;
Conduct risk assessments for all asbestos-containing materials (ACM) and presumed
ACM (PACM);
Conduct air monitoring where necessary according to risk assessment models; and
Prepare an Operations and Maintenance (O&M) program (under separate cover) for all
ACM and PACM.
The survey included base buildings and approximately 10% of the family housing buildings at
Fort Hood. Mr. Emmet Gray, Directorate of Public Works, is the post contact for this project.
This report presents the findings from the asbestos survey at Building 12005.
1.1 Physical Inspections
Survey teams visually inspected the accessible areas of the interior and exterior of each building, including interior and exterior rooms, mechanical spaces, storage areas, crawl spaces, attics, and roofs, to identify appropriate homogeneous areas (i.e., unique SACM or PACM). A reasonable effort was made by the survey team to gain access to inaccessible areas. If access could not be gained, the survey team made assumptions regarding the presence and quantity of SACM based on the visual inspection of the remainder of the building and interviews with the building occupants.
The following steps were taken to complete physical inspections.
1. Obtain a copy of the building floor plan.
2. Perform an initial building walk-through.
a) Note fire doors/walls on the floor plan.
b) Identify homogeneous areas.
c) Identify locations of friable and non-friable SACM and PACM. PACM is defined as SACM which could be visually identified but which were inaccessible for sampling, or were not sampled at the client’s request.
d) Note the type, estimated quantity, description, friability, and physical damage of each SACM and PACM. Mark location(s) of SACM and PACM on the floor plan and take one color photograph of each homogeneous area to show materials and conditions present at the time of the survey.
e) Define the bulk sample locations.
1.2 Bulk Sampling and Analysis
Homogeneous materials were categorized by the survey teams as surfacing materials, thermal systems insulation (TSI), or miscellaneous materials. Building age, use, and size were taken into consideration, along with building materials, when determining sample locations. Three bulk samples were obtained from each SACM within each building surveyed. Homogeneous areas categorized as PACM were not sampled. Where applicable, bulk samples were collected from all material layers (e.g., roofing and flooring materials). Samples were collected by cutting, scraping, and/or coring. The following procedures were used during bulk sample collection:
1. Mark sample locations on the floor plan using a unique identification number.
2. Record SACM sample information on a field data sheet, including:
a) Building number and room number/area description;
b) Typical occupancy and population;
c) SACM description (e.g., pipe insulation, 9x9 brown floor tile, etc.);
d) Estimated quantity of SACM (i.e., area or length);
e) Friability;
f) Physical damage;
g) Potential for damage or disturbance during maintenance;
h) Potential cause of damage or disturbance; and
i) Unique sample identification number.
3. Take one color photograph from each homogeneous area to show materials and conditions present at the time of the survey.
4. Repair any damage caused by sampling using sealants and methods approved by the
Contracting Officer’s Representative (COR).
Samples were analyzed by RJ Lee Group, Inc. laboratory in Houston, Texas, using polarized light microscopy (PLM) coupled with dispersion staining (DS) in accordance with the Environmental
Protection Agency (EPA)-approved method USEPA 600/R-93/116: “Method for Determination of Asbestos in Bulk Building Samples.” In accordance with the Scope of Work dated 20 August
1996, point-counting was not performed. In order to meet quality assurance/quality control
(QA/QC) requirements, triplicate samples were collected from 5% of the sample locations for the overall project. Two of the samples, the normal and duplicate samples, were analyzed by the RJ
Lee Group laboratory. The third sample is the QA sample that was sent to the USACE
Southwestern Division Laboratory (SWD) in Dallas, Texas.
1.3 Sample Numbering Scheme
Unique identification numbers were assigned to each sample using the following numbering scheme:
aaaaa-b-c-xd, where:
aaaaa identifies the five-digit building number;
b identifies the subdivision within that building;
c identifies the homogeneous area;
x identifies the sample type, where:
0 = normal sample
8 = field duplicate (QC sample)
9 = QA sample d identifies the sample number (1,2, or 3)
[Note: “b-c” represents the unique homogeneous area identification (ID) for a particular building. When necessary, “e” is used by the laboratory to identify additional layers of material not separated in the field (e.g., tile and mastic associated with flooring materials)].
2.0 FACILITY DESCRIPTION
Building 12005, encompassing an area of 11949 sq ft, is an Enlisted Personnel Dining Facility built in 1964. A building floor plan is presented in Appendix B.
3.0 DISCUSSION OF RESULTS
Building 12005 was inspected during December 1996, and was reinspected during March 1997 for additional mastic samples. During these inspections, 8 homogeneous areas were identified and 24 normal samples were collected. Table 3-1 presents a summary of ACM and PACM identified during the survey of Building 12005. Appendix A contains a detailed table of homogeneous area descriptions for all SACM and PACM, and PLM analytical results for samples collected in Building 12005. Sample and photograph locations are presented in the
Building 12005 floor plan (see Appendix B). Table B-1 contains information regarding inspector, risk assessor, and laboratory licenses for this building survey. Appendix C contains representative photographs of each ACM and PACM identified in Building 12005.
Table 3-1
Summary of ACM and PACM in Building 120051
Homogeneous Area Area/Length Physical ACM
ID Description & Location Estimate Units Damage Friability Type
1-A Building caulkings and putties; throughout facility
1.11 m2 None None PACM
1 A complete list of homogeneous areas and detailed analytical results are presented in Appendix A. Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs are shown in Appendix C.
m2 = Square meter
Homogeneous area 1-A was identified as PACM. No ACM was identified in this building. The risk assessment and abatement cost estimates for these materials are further discussed in Sections
4 and 5. All areas of this building were accessible to the inspection team. Interior and incoming electrical wiring appeared to be non-ACM.
A field duplicate (QC) sample was collected at location 12005-1-C-01. The results of analysis for the QC sample indicated asbestos levels less than 1% (non-detect). These results are consistent with the normal sample, which also indicated that asbestos was not measured above 1 percent.
4.0 RISK ASSESSMENT
A risk assessment was conducted for each homogeneous area containing ACM or PACM identified within the building using a modified version of the Air Force Guidance for Rating and
Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk factors (D) and exposure factors (E). These factors are summed and placed in the following equation:
R = 12.0324 - [(0.1683 x D) + (0.1693 x E)].
Table 4-1 was used to establish a priority rating for each homogeneous area, based on the risk rating or “R” value.
Table 4-1
Priority Rating Table for Recommended Response Actions
Risk Rating (R) Priority Recommended Response Action
R < 6 1 Immediate removal/repair
6 R < 8 2 Planned removal/repair; place in O&M program in interim 1
8 R < 10 3 Place in O&M program
R 10 4 No action required; place in O&M program as a precaution 1 If material is repaired, it will remain in the O&M program until it is removed.
O&M = Operations and maintenance
R = Risk Rating
Risk assessments for the homogeneous areas identified as ACM or PACM in Building 12005 are provided in Table 4-2. Appendix D contains a summary of field observations used to determine damage/risk factors (D) and exposure factors (E). The methodology used to determine these factors is also provided in Appendix D. No air sampling was required in this building based on risk assessment models.
Table 4-2
Building 12005 Risk Assessment Results
Homogeneous Area ACM Risk
ID Description & Location Type Rating (R) Priority
1-A Building caulkings and putties; throughout facility PACM 10 4a a Priority rating is 4 because material is not friable.
5.0 ABATEMENT COST ESTIMATES
Abatement cost estimates are based on professional experience and costs from 1996 Fort Hood asbestos abatement contracts. Cost estimates were developed using the unit costs for abatement of the general category of material and the estimated area of identified ACM and/or PACM determined during the survey. Unit rates for abatement include labor, materials, equipment, overhead, insurance, and profit. Abatement unit rates do not include costs for design, air sampling, materials replacement, or off-site disposal. Total costs do not include contract administration costs.
Cost estimates were developed using the assumption that all materials within a building would be abated concurrently. In addition, costs are based on the assumption that all ACM and/or PACM which is friable or which has the potential to become friable during demolition will require removal. Detailed cost estimates for abatement, replacement, and repair of ACM and/or PACM in Building 12005 are presented in Tables 5-1 and 5-2.
Table 5-1
Building 12005 Abatement and Replacement Cost Estimates
Homogeneous Area Area/Length Unit Cost for Total Cost
ID Description & Location Estimate Units Abatement ($)
1-A Building caulkings and putties; throughout facility 1.11 m2 $107.60/m2 $119
Subtotal $119
Design Fee (6%) $7
Air Monitoring Cost (10%) $12
Materials Replacement $25
Off-site Disposal Cost $1
TOTAL ESTIMATED ABATEMENT COST $165
Table 5-2
Building 12005 Repair Cost Estimates
Homogeneous Area
Approximate
Damaged
Area/Length
Unit Cost for
Total Cost
ID Description & Location Estimate Units Repair ($)
1-A Building caulkings and putties; throughout facility 1.11 m2 $107.60/m2 $119
Subtotal $119
Design Fee (6%) $7
Air Monitoring Cost (10%) $12
Materials Replacement $25
Off-site Disposal Cost $1
TOTAL ESTIMATED REPAIR COST $165
APPENDIX A
HOMOGENEOUS AREAS AND DETAILED ANALYTICAL RESULTS FOR
BUILDING 12005 SURVEY
A-1
Table A-1
Building 12005 Homogeneous Areas 1
Homogeneous Area ACM
ID Description & Location Type 2
1-A Building caulkings and putties; throughout facility PACM
1-B 12x12 floor tile (tan specks) None
1-C 2x2 pinhole ceiling tile None
1-D Wallboard; walls and ceilings None
1-E Cove molding glue None
1-F Non-skid tape; freezer entries None
R-A Built-up roofing materials None
R-B Roof penetration mastics None 1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of PACM and
ACM are shown in Appendix C.
2 ACM types include:
ACM = Materials containing >1% asbestos;
None = Materials containing 1% asbestos; and
PACM = Materials presumed to contain >1% asbestos.
ACM = Asbestos-containing material
ID = Identification
PACM = Presumed asbestos-containing material
Table A-2
Building 12005 Asbestos Survey Analytical Results1
Homogeneous Area Asbestos Results (%) Other Fibrous Materials Results (%)
Area
ID
Sample ID
Layer
Layer Description
(from Laboratory)
Total
Act
Am
Anth
Chry
Croc
Trem
Cell
Fib
M.W.
Synth
ACM
Type
1-B 12005-1-B-01 a Pink Floor Tile ND ND ND ND ND ND ND ND ND ND ND None
12005-1-B-01 b Blk Mastic ND ND ND ND ND ND ND ND ND 5 ND None
12005-1-B-01 NA Total ND None
12005-1-B-02 NA Pink Floor Tile ND ND ND ND ND ND ND ND ND ND ND None
12005-1-B-03 NA Pink Floor Tile ND ND ND ND ND ND ND ND ND ND ND None
1-C 12005-1-C-01 NA Wht Ceiling Tile/Silver Foil ND ND ND ND ND ND ND ND ND 75 ND None
12005-1-C-02 NA Wht Ceiling Tile/Silver Foil ND ND ND ND ND ND ND ND ND 80 ND None
12005-1-C-03 NA Wht Ceiliing Tile/Silver Foil ND ND ND ND ND ND ND ND ND 80 ND None
12005-1-C-81 NA Wht Ceiling Tile/Silver Foil ND ND ND ND ND ND ND ND ND 75 ND None
1-D 12005-1-D-01 a Wht Plaster ND ND ND ND ND ND ND ND ND ND ND None
12005-1-D-01 b Tan Paint ND ND ND ND ND ND ND 1 ND ND ND None
12005-1-D-01 NA Total ND None
12005-1-D-02 a Wht Plaster ND ND ND ND ND ND ND 3 ND ND ND None
12005-1-D-02 b Tan Paint ND ND ND ND ND ND ND ND ND ND ND None
12005-1-D-02 NA Total ND None
12005-1-D-03 a Wht Plaster ND ND ND ND ND ND ND 3 ND 2 ND None
12005-1-D-03 b Tan Paint ND ND ND ND ND ND ND ND ND ND ND None
12005-1-D-03 NA Total ND None
1-E 12005-1-E-01 NA Wht Mesh ND ND ND ND ND ND ND ND ND ND ND None
12005-1-E-02 NA Wht Mesh ND ND ND ND ND ND ND ND ND ND ND None
12005-1-E-03 NA Wht Mesh ND ND ND ND ND ND ND ND ND ND ND None
12005-1-E-04 NA Wht Tan Mastic ND ND ND ND ND ND ND 1 ND ND ND None
12005-1-E-05 NA Wht Tan Mastic ND ND ND ND ND ND ND 1 ND ND ND None
12005-1-E-06 NA Wht Tan Mastic ND ND ND ND ND ND ND 1 ND ND ND None
1-F 12005-1-F-01 NA Blk Mastic ND ND ND ND ND ND ND 3 ND 15 ND None
12005-1-F-02 NA Blk Mastic ND ND ND ND ND ND ND 2 ND 5 ND None
12005-1-F-03 NA Blk Mastic ND ND ND ND ND ND ND 2 ND ND ND None
R-A 12005-R-A-01 a Blk Tar/Brn Fibr Backing ND ND ND ND ND ND ND 20 2 ND ND None
12005-R-A-01 NA Total ND None
12005-R-A-02 NA Blk Tar/Brn Fibr Backing ND ND ND ND ND ND ND 20 15 ND ND None
12005-R-A-03 NA Blk Tar ND ND ND ND ND ND ND 5 20 ND ND None
R-B 12005-R-B-01 NA Blk Tar ND ND ND ND ND ND ND 5 10 ND ND None
12005-R-B-02 NA Blk Tar ND ND ND ND ND ND ND ND 20 ND ND None
12005-R-B-03 NA Blk Tar/Brn Fibr Backing ND ND ND ND ND ND ND 30 15 ND ND None 1 Sample and photograph locations are shown on the building floor plan in Appendix B. Photographs of ACM and PACM are shown in Appendix C. If a sample contained multiple layers, all layers were analyzed separately. If any layer of a sample from a homogeneous area contained >1% asbestos, then that homogeneous area was classified as ACM. Totals (weighted composite average percent asbestos) are provided for samples with all layers containing >1% asbestos.
Act. = Actinolite
Am. = Amosite
Anth. = Anthophyllite
Cell. = Cellulose
Chry. = Chrysotile
Croc. = Crocidolite
Fib. = Fiberglass
ID = Identification
M.W. = Mineral wool
NA = Not applicable (sample contained single layer)
ND = Not detected (<1% asbestos)
Synth. = Synthetics
T = Total
Trem. = Tremolite
APPENDIX B
BUILDING 12005 FLOOR PLAN
Asbestos Survey, Fort Hood, Texas B-4 September 1997
Table B-1
Inspector, Risk Assessor, and Laboratory Licenses for Building 12005
Building and Analytical Laboratory Building Inspector/Risk Assessor Date
Homogeneous
Area ID1
Name
TDH
License #
License
Exp. Date
Name
TDH
License #
License
Exp. Date
Inspected/
Sampled
12005-1-A NA NA NA Dan Young 60-1095 10/09/97 12/10/96
12005-1-B RJ Lee Group 30-0051 02/26/98 Dan Young 60-1095 10/09/97 12/10/96
12005-1-C RJ Lee Group 30-0051 02/26/98 Dan Young 60-1095 10/09/97 12/10/96
12005-1-D RJ Lee Group 30-0051 02/26/98 Dan Young 60-1095 10/09/97 12/10/96
12005-1-E
RJ Lee Group 30-0051 02/26/98 Dan Young
Richard Sturgeon
60-1095
60-1109
10/09/97
10/16/97
12/10/96
3/25/97
12005-1-F RJ Lee Group 30-0051 02/26/98 Dan Young 60-1095 10/09/97 12/10/96
12005-R-A RJ Lee Group 30-0051 02/26/98 Dan Young 60-1095 10/09/97 12/10/96
12005-R-B RJ Lee Group 30-0051 02/26/98 Dan Young 60-1095 10/09/97 12/10/96 1 The sampling information (including laboratory, inspector, risk assessor, and sample date) is the same for all samples associated with a particular homogeneous area. Unique sample identification numbers were assigned to each sample using the following sample numbering scheme:
aaaaa-b-c-xd, where:
aaaaa identifies the five-digit building number;
b identifies the subdivision within that building;
c identifies the homogeneous area;
x identifies the sample type, where:
0 = normal bulk material sample
6 = normal personnel air monitoring sample
7 = normal environmental air monitoring sample
8 = field duplicate bulk material (QC sample)
9 = QA bulk material sample d identifies the sample number (1, 2, or 3);
[Note: “b-c” represents the unique homogeneous area ID for a particular building.]
ID = Identification
NA = Not applicable. (PACM was not sampled.)
PACM = Presumed asbestos-containing material
QA = Quality assurance
QC = Quality control
TDH = Texas Department of Health
APPENDIX C
REPRESENTATIVE PHOTOGRAPHS OF ACM AND PACM IN BUILDING
12005
APPENDIX D
RISK ASSESSMENT METHODOLOGY AND DATA FOR BUILDING 12005
Asbestos Survey, Fort Hood, Texas D-1 September 1997
Appendix D
Risk Assessment Methodology and Data
A risk assessment was conducted for each homogeneous area containing ACM or PACM identified within the building using a modified version of the Air Force Guideline for
Rating and Assessing Damage and Exposure (GRADE) evaluation system. This system employs an algorithm that assists the risk assessor in assigning priorities to various situations identified during the inspection. The GRADE system divides the risk into two categories: damage/risk factors (D), and exposure factors (E). These factors are summed and used in the following equation:
R = 12.0324 - [(0.1683 x D) + (0.1693 x E)];
Where D = the sum of the values for the following damage/risk observations:
Material type
Potential for contact
Physical damage
Water damage
Potential for damage by repair/maintenance activities
Asbestos content;
And E = the sum of the values for the following exposure observations:
Area of damaged material
Material friability
Population
Activity/vibration
Ventilation
Air movement
Floors
Walls
Barriers
A further breakdown of the values for the subunits under each category is provided in
Tables D-1 and D-2. Summaries of the inspection observations for damage/risk and exposure for the ACM and PACM in Building 12005 are presented in Tables D-3 and D-
4.
Table D-1
Damage/Risk Values for Inspection Observations 1
Material Type
Potential for Contact
Physical
Damage
Water Damage
Potential for Damage by
Repair/Maintenance Activities
Asbestos Content
Surfacing (4) <10 ft, Low (2) None (0) No (0) None (0) >1-30% (1)
TSI, Ventilation (3) <10 ft, Medium (5) Minimal (2) Yes (3) Low (1) >30-50% (3)
TSI, Other (1) <10 ft, High (8) Low (3) Moderate (2) >50% (5)
Misc., Damaged (1) >10 ft, Low (0) Moderate (4) High (3)
Misc., Undamaged (0) >10 ft, Medium (3) High (5)
>10 ft, High (5) 1 The value assigned to each category is shown in italics.
TSI = Thermal systems insulation
Table D-2
Exposure Values for Inspection Observations 1
Area of
Damaged
Material
(m or m2)
Friability
Population
Activity/
Vibration
Interior
Ventilation
Air
Movement
Floors
<3 (0) None (0) None (0) Low (0) None (0) None (0) Smooth (1) Smooth (1) Permanent (1)
3-30 (1) Low (0) 1-9 (1) Occasional (2) Return Only (2) Perceptible (2) Rough, Seamed (2) Moderate (2) Semipermanent (2)
31-300 (2) Moderate (2) 10-200 (2) Constant (5) Supply Only (5) Turbulent (5) Carpet (4) Pitted (3) Minimal (3)
>300 (3) High (5) 201-500 (3) Supply & Return (7) Rough (4) None (4)
501-1,000 (4)
>1,000 (5) 1 The value assigned to each category is shown in italics.
Table D-3
Summary of Damage/Risk Observations for ACM and PACM in Building 12005
Material Type
Potential for
Contact
Physical Damage
Water
Damage
Potential for Damage by
Repair/Maintenance Activities
Asbestos
Content
12005-1-A Misc., Undamaged (0) <10 ft, Low (2) None (0) No (0) None (0) PACM (1)
Table D-4
Summary of Exposure Observations for ACM and PACM in Building 12005
Area of
Damaged
(m or m2)
Friability
Population
Activity
Ventilation
Air
Movement
Floors
12005-1-A < 3 (0) None (0) None (0) Low (0) None (0) None (0) Smooth (1) Rough (4) None (4)
| 20180307091932 |
| AB-1 Asbestos & Lead Based Paint Samples |