This document contains an amendment to a solicitation for a firm fixed-price construction contract and responses to industry questions. The solicitation is to replace three water-cooled heat pump chillers at Building 56059 at Fort Hood, Texas with one non-reversible chiller to serve two existing air handlers. Additional work includes installing new hot water heating coils in each air handler, running new piping from an existing boiler, installing two new hot water pumps, a new chilled water buffer tank, and modifying existing HVAC controls. The estimated value is between $250,000 and $500,000. The amendment changes the bid opening date to June 29, 2020 at 10:00 AM CST and provides DoD SAFE instructions for electronic bid submission. It also includes responses to 29 industry questions on technical requirements. Bidders must meet experience, licensing, and certification requirements and submit documentation with their bids.
The solicitation is 100% set aside for SDVOSB and issued by the Mission and Installation Contracting Command at Fort Hood, Texas under NAICS 238220. The prevailing wage determination is TX20200007. The bid guarantee is 20% of the bid price up to $3 million, and performance and payment bonds must equal 100% of the contract price. A site visit was held on May 20, 2020.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011414112-0001 AMD900418P
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to include responses to industry questions, add three additional exhibits, and change the bid opening date.
The opening bid date has changed to 29 June 2020 at 1000am CST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9115120B0011
X 9B. DATED (SEE ITEM 11)
11-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Jun-2020
CODE
MICC - FORT HOOD
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5025
W91151 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9115120B0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 11-Jun-2020 10:00 AM to 29-Jun-2020 10:00 AM.
The Issued By organization has changed from
MICC - FORT HOOD
MISSION CONTRACTING OFFICE (MCO)
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5025
to
MICC - FORT HOOD
MISSION CONTRACTING OFFICE (MCO)
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5095
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A Technical Exhibit A
Specifications
3173 25-MAR-2019
Exhibit B Technical Exhibit B Drawings
14 06-SEP-2019
Exhibit C Technical Exhibit C As Builts
16 03-DEC-2010
Attachment 1 Appendix A 139 27-JUL-2018 Attachment 2 DoD SAFE User Guide 27 04-SEP-2019 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Exhibit A Technical Exhibit A
Specifications
3173 25-MAR-2019
Exhibit B Technical Exhibit B Drawings
14 06-SEP-2019
Exhibit C Technical Exhibit C As Builts
16 03-DEC-2010
Attachment 1 Appendix A 139 27-JUL-2018 Attachment 2 DoD SAFE User Guide 27 04-SEP-2019 Attachment 3 Attachment 5 Temporary
AC Plan
1 03-JUN-2020
Attachment 4 Attachment 4 Electrical Panels
18 03-JUN-2020
Attachment 5 Attachment 3 DDC Control Panels
8 03-JUN-2020
The following have been added by full text:
RESPONSES TO INDUSTRY QUESTION
SOLICITATION REQUESTS FOR INFORMATION
W91151-20-B-0011
B56059 REPLACE CHILLERS
1. No manufacturer can meet the maximum footprint size for the chiller as scheduled with shell and tube style heat exchanger. Will plate and frame style heat exchanger be acceptable in order to meet desired footprint?
Answer: I have confirmed that there is at least one product available with a shell‐and‐tube condenser and a footprint smaller than 36” x 66”, so these two requirements shall remain. However, in order to compensate for a lower‐efficiency condenser, the minimum EER shall be reduced to 15.75 FL.
2. What location will the temporary HVAC units be placed at on the building exterior, they will require power run so we will need to know an approximate location?
Answer: Both temporary AC units shall be located behind B56059. They shall receive power from electrical panels located approximately 200 feet away in room 120 (Elec). A drawing will be provided for clarification.
3. Will the building be occupied during construction?
Answer: Yes, the building will be occupied during construction.
4. Does the government want DALT testing?
Answer: DALT shall not be required for this project. No existing ductwork shall be affected by this project unless it interferes with other required work, as noted in MD‐101A and 101B.
5. Can we use the facilities on site or do we have to provide our own toilets.
Answer: Contractor shall provide toilets to be used by its employees and subcontracted employees. See Technical Exhibit A (01 35 13, 1.4.5) for more information.
6. Does the Government require concrete testing on pads?
Answer: All concrete equipment pads shall be installed per Technical Exhibit A (23 00 00). No additional tests shall be required.
7. Does the Government require density testing?
Answer: See question 6.
8. The plans state that the existing system is LAN. Could we get confirmation? This is supposed to be LON.
Answer: I don’t see a reference to LAN anywhere in Technical Exhibit B. Please provide a drawing number.
9. What is the opening dimension of the mechanical room doors?
Answer: Rooms 121 and 213 (Mech) have door opening dimensions of 70” x 84” and 44” x 84”, respectively.
10. Are rooms 134 and 123 hard ceiling or drop ceiling?
Answer: Room 123 (Storage) has an exposed‐structure ceiling and room 134 (Vending) has a drop‐tile ceiling.
11. In order to get the correct size of hot water coil, could you please provide the model and serial numbers to both air handling units?
Answer: Below is the nameplate data for the two existing air handlers.
Unit Tag #: AHU‐101
Model #: XTI‐063X099‐JAKA046A Serial #/Date Code: AGAM XT0203 Unit Tag #: AHU‐201 Model #: XTI‐048X054‐FAHA046A Serial #/Date Code: AGAM XT0205
12. Will factory commissioning suffice for newly installed equipment or will the Government want 3rd party commissioning?
Answer: Third‐party commissioning shall not be required for this project.
13. Will 3rd party test and balance be required on this installation? If so, is it restricted to the newly installed equipment or the entire HVAC system?
Answer: Independent TAB shall only be required for new or modified equipment, not the entire HVAC system.
14. What is the name of the current controls programming?
Answer: All HVAC equipment in this building is LonWorks‐compatible.
15. Are the controls proprietary? If so, what is the name of the control company in charge of the controls?
Answer: The Government owns the HVAC control database for this building and will provide it when necessary.
16. Does the existing controller have enough points or does the controller need to be upgraded?
Answer: Yes, the existing controllers can handle all new data points. Pictures will be provided for reference.
17. What is the voltage, amperage and wire size currently going to the current heat pump chillers?
Answer: Below is the electrical data for HPC‐101, 102, and 103. Existing wire sizes could not be determined through conduit. See Technical Exhibit C for more information.
Voltage: 460 V
FLA: 38.4 A
MCA: 43.2 A
Circuit Breaker: 60 A
18. What room is the electrical panel located in?
Answer: Electrical panels are located in rooms 120 and 215 (Elec). Pictures will be provided for reference.
19. Are all of the new units (pumps, air handlers, etc.) that are replacing existing going to be the same voltage and amperage as the existing equipment?
Answer: Not necessarily. Since the new chiller is replacing three smaller chillers, it will require more power, however, the total current should be less. Only the face‐and‐bypass section of AHU‐101 and 201 shall be replaced as part of this project. Additional power shall be supplied to CHWP‐102, HWP‐101, and HWP‐201, which are not part of the existing HVAC system.
20. Are we to install a bypass on the chilled-water coil of each air handler?
Answer: Yes.
21. Can you identify the pumps to be reused and verify which pumps that will be new?
Answer: The existing HVAC system contains four pumps, CNDWP‐101, CNDWP‐102, CHWP‐101, and CHWP‐201, which shall be preserved and reused for the modified design. The three new pumps are CHWP‐102, HWP‐101, and HWP‐201.
22. Will the existing duct detectors be reused? Or will new detectors be required?
Answer: As long as the existing detectors are able to function as described in M‐701, they may be reused.
23. Will new ductwork require DALT testing? Will any existing ductwork require DALT?
Answer: See question 4.
24. Will grille to grille balancing be required? If yes, will a CFM chart be provided?
Answer: No air devices shall require balancing as part of this project.
25. Will new equipment pads require concrete testing? If yes, which types of testing? Please be specific.
Answer: See question 6.
26. Please confirm that temporary Heating/Cooling will be required for this project?
Answer: Temporary cooling shall be required for this project, as described in M‐001.
27. Will this project require any type of phasing while work is in progress?
Answer: Temporary cooling shall be provided as soon as possible after the NPC date. Also, contractor shall schedule the demolition of HPC‐101 and 102 so that they operate for as long as possible without delaying any work along the critical path.
28. Mechanical Room 213, is there sufficient room to remove and replace the coil from the AHU per page MD‐102B, general note #2? Will it be necessary to remove/replace sections of the wall to replace the coil?
Answer: Yes, there is sufficient space in room 213 (Mechanical) to perform the work described in MD‐ 102B. The same work was recently performed in B56060 without any walls being affected. B56059 and 56060 have the exact same floor plan.
29. Will the Test and Balance need to be done by a first tier T & B Subcontractor, or can it be provided through the mechanical subcontractor?
Answer: All TAB work shall be performed by a first‐tier subcontractor. See Technical Exhibit A (23 05 93, 1.5.1) for more information.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
INSTRUCTION TO BIDDERS
INSTRUCTIONS TO BIDDERS
Any bids received in response to this solicitation SHALL carry a 120 day acceptance period before prices need to be verified, extended or re-negotiated.
1. Submission of Bids The priced bid shall be supported by a draft progress schedule that demonstrates the offeror's understanding of the work requirements, phasing of work between buildings, and estimated time frames for ordering and installing equipment.
2. Electronic Bid Opening
Bid Opening will be held by telephone conference call. Bidders shall submit their bids through the Department of Defense Safe Access File Exchange (DoD SAFE) website:
https://safe.apps.mil
If you would like to submit a bid for W91151-20-B-0011, submit an email with the subject line “Intent to bid for W91151-20-B-0011” to Jermain.m.compton.civ@mail.mil and Alison.schuman.civ@mail.mil by 17 June 2020 at
04:00 PM CST.
By 04:00 PM CST, 18 June 2020, you will receive an email from DoD Safe to create a drop-off (please see pages 10-12 of attached DoD SAFE user guide).
Bidders shall submit their bids via DoD SAFE no later than 29 June 2020 at 09:00 AM CST, late submittals may not be accepted. Bidders should include bid number W91151-20-B-0011 in their short note to recipient on DoD SAFE.
No hard copies or CDs will be accepted.
The Bidder can upload up to a maximum of 25 files, (total size cannot exceed 8GB). The Bidder shall place a Description of each file uploaded located in the "Description of File(s)" box located on the right. It is the Bidder's responsibility to ensure the proposal is uploaded acceptably.
PUBLIC BID
PUBLIC BID OPENING will be held via telephone conference on 29 June 2020 at 10:00 AM CST. The call in number will be: 978-990-5000, Pin 304649
3. Pre-requisites for Speciality Trade Licensure and Certification Mechanical HVAC license class A (with minimum 5 years of experience), Master Electrician, Licensed
In responding to this solicitation for bids, the bidder shall provide copies of certifications/training identified aboveand below as a part of the bid. Failure to provide this documentation will render the bid non- responsive and no further consideration will be given to that bidder for award of this contract. No substitution of the individual possessing the required pre-qualifications will be authorized without the written approval of the Contracting Officer, and no time will be allowed for the contractor to acquire the required training/certification after the contract is awarded.
4. Work Experience The prime contractor shall demonstrate that it possesses general construction contract management by providing at least three examples of relevant work experience within the last 5 years in an awarded contract similar to the requirements stated in this solicitation. Documentation shall be submitted with the bid and include the contract number, the date of contract award, the customer's name and contact information, the awarded dollar value, the value of the contract at completion, a description of all work elements included in the contract, the number and type of specialty trades needed to complete the contract, the period of time allocated for completion of the work and actual time required to complete the work (include reasons for time extensions).
Federal work experience is preferred; however, the Government will accept work experience from both State and institutional and commercial contracts as well. No residential work experience will be considered appropriate for this purpose. Failure to provide this documentation will render the bid/offer non-responsive and no furtherconsideration will be given to that bidder for award of this contract.
Bidders shall submit with their bid one (1) Key Personnel name per position (Project Manager, Quality Control Manager, and Superintendent). Bidders shall include with their Key Personnel nominations quailifications/requirements as required per Section 01 45 01.00 20 of Technical Exhibit A Specifications. Non submittal shall result in a nonresponsive bid.
5. Pre-Bid and Pre-Construction Conferences The Contracting Officer will conduct a pre-bid/pre-proposal conference in conjunction with the site visit. All potential bidders/offerors attending the site visit are highly encouraged to attend the pre-bid/pre-proposal conference. Information on the scheduled Site Visit is located in FAR 52.236-3 SITE VISIT (CONSTRUCTION) (FEB 1995) of this solicitation. Space limitations dictate that no more than two representatives from each company attend. The Contracting Officer will review solicitation submittal requirements, and other administrative matters critical for successful and timely performance of the work.
The Contractor shall attend a Government coordinated preconstruction conference within 10 calendar days of contract award. As a minimum, the conference shall be attended by the contractor’s appointed project manager, the superintendent, the QCM, and administrative personnel responsible for preparation of contract documents, certified payroll records and invoices. The contractor shall deliver letter appointments of its key personnel that include each individual’s duties, roles and responsibilities.
6. Subcontractor List Offerors shall submit a list of proposed subcontractors as an attachment to their bid. If offeror does not intend on utilizing subcontractors (self-perform), offeror shall state so in their bid. Failure to provide this listing or statement will render the quote nonresponsive and eliminate the offer from further consideration for award.
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
Amendment 01:
The purpose of this amendment is to include responses to industry questions, add three additional exhibits, and change the bid opening date. The opening bid date has changed to 29 June 2020 at 1000am CST.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .