Approved_Amendment_1.pdf

PDF 65 KB Posted

Attached to
Upgrade Pedestrian Crossing Federal contract opportunity
Solicitation number
W91151-17-B-0024
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

Approved Amendment 1

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Pedestrian Crossing, newest first.
File Type Posted
Abstract_of_Bids_17-B-0024_FH_15Aug2017.pdf PDF
Sign-in_Roster.pdf PDF
Attachment_1_-_Appendix_A.pdf PDF
Technical_Exhibit_A_-_Specifications.pdf PDF
Approved_Solicitation.pdf PDF
Technical_Exhibit_B_-_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0011023576 AD001126P

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

a) This amendment is issued to answ er Request for Information (RFI) questions from industry.

b) All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91151-17-B-0024

X 9B. DATED (SEE ITEM 11)

12-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Aug-2017

CODE

MISSION AND INSTALLATION CONTRACTING

MISSION CONTRACTING OFFICE (MCO)

36000 DARNALL LOOP, ROOM 1300B

FORT HOOD TX 76544-5095

W91151 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91151-17-B-0024

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Technicial Exhibit A -

Specifications

3313 11-APR-2016

Attachment 2 Technicial Exhibit B - Drawings

59 03-APR-2017

Attachment 3 Appendix A - Specifications

120 04-AUG-2016

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A Technicial Exhibit A -

Specifications

3313 11-APR-2016

Exhibit B Technicial Exhibit B - Drawings

59 03-APR-2017

Attachment 1 Appendix A - Specifications

120 04-AUG-2016

The following have been added by full text:

RFI RESPONSES

RFI Responses

(1) Sheet ES101:Conduit crossings 4,7,10,13 are labeled as Duct bank Crossings that are directional bored according to General Note 2 on sheet ES101 Which one is it? Duct bank crossing or Directional Bore?

A: Directional Bore

(2) If Directional bore, is external casing required to house the signal conduits? If so, what material, diameter and wall thickness is required for casing?

A: Casing conduit per Specification 33 71 01 – 2.1.5 ‐ HDPE Electrical Conduit for Directional Boring

– minimum Schedule 80.

(3) If casing is required, are bore spacers required? If so what separation and how often?

A: Spacers per Specification 33 71 01 – 3.4.5 Multiple Circuits. Multiple conduits a minimum of 3 inches is required. Between power and signal. a minimum of 12 inches is required.

(4) If casing is required, is pressure grouting required?

A: Pressure grouting is not specifically called out in the specifications.

(5) If the conduit street crossings are duct bank, what is the material make‐up of the road from top of road to 60 inches below road surface?

A: Street crossings should be via directional boring.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by reference:

52.252-3 Alterations in Solicitation APR 1984

The following have been modified:

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Amendment 0001 – Response to questions from industry post site visit.

SECTION 00700 - CONTRACT CLAUSES

The following have been added by reference:

52.252-4 Alterations in Contract APR 1984

The following have been added by full text:

52.000-4132 AMC-LEVEL PROTEST PROGRAM (NOV 2008)

If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible contracting officer. However, you can also protest to Headquarters, AMC. The HQ, AMC- Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.10. If you want to file a protest under the AMC- Level Protest Program, the protest must request resolution under that program and be sent to the address below. All other agency-level protests should be sent to the contracting officer for resolution.

HQ Army Material Command Office of Command Counsel 9301 Chapek Rd, Room 2-1SE3401 Ft. Belvoir, VA 22060-5527 Facsimile number (703) 806-8866 or 8875

Packages sent by FedEx or UPS should be addressed to:

HQ Army Material Command Office of Command Counsel Room 2-1SE3401 1412 Jackson Loop Ft. Belvoir, VA 22060-5527

The AMC-Level Protest procedures are found at:

http://www.amc.army.mil/pa/COMMANDCOUNSEL.asp.

If internet access is not available, contact the contracting officer or HQ, AMC to obtain the AMC-Level Protest Procedures.

(End of Provision)

(End of Summary of Changes)