Appendix_A_-_Specification.pdf

PDF 3 MB Posted

Attached to
Replace HVAC System in Building 33010 Federal contract opportunity
Solicitation number
W91151-17-B-0012
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

Appendix A - Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Replace HVAC System in Building 33010, newest first.
File Type Posted
Abstract_of_Bids_17-B-0012_FH_8Aug2017.pdf PDF
Approved_Amendment_1.pdf PDF
Technical_Exhibit_B_-_Drawings-_Revision_1.pdf PDF
Site_Visit_Sign-in_Roster.pdf PDF
Technical_Exhibit_B_-_Drawings.pdf PDF
Technical_Exhibit_A_-_Specifications.pdf PDF
Approved_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Headquarters III Corps, Fort Hood Directorate of Public Works (DPW)

Attachment 1

SPECIFICATIONS

Appendix A 4 August 2016

Directorate of Public Works Engineering Division

US Army, III Corps 4612 Engineer Dr.

Fort Hood, TX 76544

APPENDIX “A” TABLE OF CONTENTS

SECTION 1 - GENERAL

PAGE NUMBER DESCRIPTION

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Sample Submittal Register ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Form 4025, Transmittal Sheet ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Contract Bi-Weekly Progress Report Form 1 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Refrigeration Equipment Service Log ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Refrigeration Recovery Form ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Emissions Inventory Sheet ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Contractor Hazardous Materials Log ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Landfill permit ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Customer Service Inspection Certificate

(CSI)

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Coordination for Land Excavation (Dig permit) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Landscaping on Fort Hood ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Accident Investigation Report ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Sample Contractor Quality Control Report 139 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Preparatory Phase Checklist ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Initial Phase Checklist ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Operation and Maintenance Instructions

Receipt ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐Fort Hood Key SOP

SECTION 2 – NEC

PAGE NUMBER DESCRIPTION

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐NEC Installation Guidelines

SECTION 3 – AW

PAGE NUMBER DESCRIPTION

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐American Water Design Guide

S U

B M

IT

TA

L

FO

R M

,J an

P R

E V

IO

U

S E

D

IT

IO

N

IS

O

B S

O

LE

TE

P

A G

E

O F

P

A G

E S

JO

C

M as te r S pe ci fic at io ns

.0

S

D -0

P re co ns tru ct io n S ub m itt al s 3.

P ro je ct S ch ed ul e

SU

B

M

IT

TA

L

R

EG

IS

TE

R C

O N

TR

A

C T

N O

TI

TL

E A

N D

L O

C A

TI

O

N C

O N

TR

A

C

TO

R

C O

N

TR

A C

TO

R

S

C H

E D

U

LE

D A

TE

S

C O

N

TR

A C

TO

R

A C

TI

O

N A

P P

R O

V

IN

G A

U

TH

O R

IT

Y

A C T I V I T Y N O

T R A N S M I T T A L N O

S P E C S E C T

D E

S C

R

IP

TI

O

N

IT

E

M S

U B

M

IT

TE

D

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T O R A / E R E V W R S

U B

M

IT

A P

P R

O V

A L

N E

E D

E D

B Y

M A

TE

R

IA

L

N E

E D

E D

B Y

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

D A

TE

F

W D

TO

A

P P

R A

U

TH

D A

TE

R

C D

FR

O

M C

O N

TR

D A

TE

F

W D

TO

O

TH

E

R R

E V

IE

W

E R

D A

TE

R

C D

FR

O

M O

TH

R

E V

IE

W

E R

A C T I O N C O D E

D A

TE

O

F A

C

TI

O N

M A

IL

E

D

TO

C O

N

TR

D A

TE

R

C D

FR

M

A P

P R

A U

TH

R

E M

A R

K S

(a

(b

(c

(d

(e

(f) (g

(h

(i)

(j) (k

(l)

(m

(n

(o

(p

(q

(r

D P

W M

A

IN

TE

N

A N

C E

S H

O P

R ef rig er at io n Eq ui pm en t S er vi ce L og

D oe s se rv ic ed u ni t c on ta in m or e th an lb s.

re fr ig er an t?

Y es

N o D at e

Is th e un it us ed fo r c om fo rt c oo lin g?

Y es

N o

Se rv ic e

O rd er N um be r (

SO

If no , w ha t i s it us ed fo r?

C om m er ci al

In du st ria l/P ro ce ss

Se rv ic ed

U ni t:

C er tif ie d

Te ch ni ci an N am e

M ak e B ui ld in g

N um be r o r L oc at io n M od el

N um be r

S er ia l N um be r R em ov ed U ni t:

R ef rig er an t T yp e

C om pr es so r S er ia l N um be r

Lo ca tio n of L ea k on E qu ip m en t M ak e

U ni t R ef rig er an t C ha rg e er C irc ui t

M od el N um be r R ef rig er an t R ec ov er ed (l bs .o z)

C irc ui t

S er ia l N um be r

R ef rig er an t A dd ed

(l bs

C irc ui t

R ef rig er an t T yp e

V ac uu m

L ev el A ch ie ve d

(in ch es H

g) V ac uu m L ev el

A ch ie ve d (in ch es

H g)

*N et

L ea ka ge

(l bs

.o z)

R ef rig er an t A dd ed

(l bs

.o z)

*N et

L ea ka ge re fri ge ra nt a dd ed re fri ge ra nt re co ve re d

- a cc id en ta l l os s

R ef rig er an t R em ov ed (l bs

D et ai le d

D es cr ip tio n of R ep ai rs

N ot es

N U it N ew U ni t:

I iti lL k

V ifi ti In iti al

L ea k Ve rif ic at io n M ak e

M et ho d us ed fo r v er ifi ca tio n M od el

N um be r

Le ak re pa ire d

Y es

N o D at e:

S er ia l N um be r If no , a ct io n ta ke n

R ef rig er an t T yp e

Fo llo w -u p Le ak V er ifi ca tio n R ef rig er an t A dd ed (l bs .o

z) M et ho d us ed fo r v er ifi ca tio n

R ef rig er an t R em ov ed (l bs .o

z) Le ak re pa ire d Y es

N o

D at e:

R ef rig er an t C ap ac ity

(l bs

.o z)

If no

, a ct io n ta ke n (T ec h w ill a dv is e

R ea l P ro pe rty

IN

C O

M

PL

IA

N

C E

W

IT

H T

H E

R

EQ

U

IR

EM

EN

TS

O

F

TH

E C

LE

A

N A

IR

A

C T

R ef rig er an t C ha rg e pe r C irc ui t

A M

EN

D

M

EN

TS

O

F

, S

EC

TI

O N

, I C

ER

TI

FY

T

H A

T

TH

E R

EF

R

IG

ER

A N

T H

A S

N ot es

B

EE

N H

A N

D

LE

D

IN

A C

C O

R D

A N

C E

W

IT

H U

.S . E

PA

R

EG

U

LA

TI

O N

S A

T

C

FR

2.

6.

S ig na tu re o f C er tif ie d Te ch ni ci an

R ef rig er an t R ec ei pt Tu rn (I

N ) o r D at e

R /M

H /D

Y Sc al e

W R ef rig er an t Ty pe (C irc le

C he ck

(O U

T) Y

T

- C yl T

.W (lb s.

oz

R

C yl

S er ia l #

P rin t N am e (E

C O

S ig na tu re

(E C

O

V irg in /R ec yc le d/

R ec ov er ed V irg in

/R ec yc le d/ R ec ov er ed

V irg in /R ec yc le d/

R ec ov er ed V irg in

/R ec yc le d/ R ec ov er ed

Form Approved OMB No. 2060-0256

ENVIRONMENTAL PROTECTION AGENCY

REFRIGERANT RECOVERY OR RECYCLING DEVICE

ACQUISITION CERTIFICATION FORM

EPA regulations require establishments that service or dispose of refrigeration or air-conditioning equipment to certify that they have acquired recovery or recycling devices that meet EPA standards for such devices. To certify that you have acquired equipment, please complete this form according to the instructions and mail it to the appropriate EPA Regional Office. BOTH THE INSTRUCTIONS AND MAILING ADDRESSES CAN BE FOUND ON THE

REVERSE SIDE OF THIS FORM.

PART 1: ESTABLISHMENT INFORMATION

Name of Establishment Street

(Area Code) Telephone Number City State Zip Code

Number of Service Vehicles Based at Establishment County

PART 2: REGULATORY CLASSIFICATION

Identify the type of work performed by the establishment. Check all boxes that apply.

9 Type A - Service small appliances 9 Type B - Service refrigeration or air-conditioning equipment other that small appliances 9 Type C- Dispose of small appliances 9 Type D - Dispose of refrigeration or air-conditioning equipment other than small appliances

PART 3: DEVICE IDENTIFICATION

Name of Device(s) Manufacturer Model Number Year Serial Number (if any) Check Box if Self-Contained

1. G

2. G

3. G

4. G

5. G

PART 4: CERTIFICATION SIGNATURE

I certify that the establishment in Part 1 has acquired the refrigerant recovery or recycling device(s) listed in Part 2, that the establishment is complying with Section 608 regulations, and that the information gives is true and correct.

Signature of Owner/Responsible Officer Date Name (Please Print) Title

INSTRUCTIONS

Part 1: Please provide the name, address, and telephone number of the establishment where the refrigerant recovery or recycling device(s) is (are) located. Please complete one form for each location.

State the number of vehicles based at this location that are used to transport technicians and equipment to and from service sites.

Part 2: Check the appropriate boxes for the type of work performed by technicians who are employees of the establishment. The term “small appliance” refers to any of the following products tat are fully manufactured, charged, and hermetically sealed in a factory with five pounds or less of refrigerant:

refrigerators, and freezers designed for home use, room air conditioners (including window air conditioners and packaged terminal air conditioners), packaged terminal heat pumps, dehumidifiers, under-the-counter ice makers, vending machines, and drinking water coolers.

Part 3: For each recovery or recycling device acquired, please list the name of the manufacturer of the device, and (if applicable) its model number and serial number.

If more that seven devices have been acquired, please fill out an additional form and attach it to this one. Recovery devices that are self-contained should be listed first and should be identified by checking the box in the last column on the right. Self-contained recovery equipment means refrigerant recovery or recycling equipment that is capable of removing te refrigerant from an appliance without the assistance of components contained in the appliance. On the other hand, system-dependent recovery equipment means refrigerant recovery equipment that requires the assistance of components contained in an appliance to remove the refrigerant from the appliance.

If the establishment has been listed as Type B and/or Type D in Part 2, then the first device listed in Part # must be a self-contained device and identifies as such by checking the box in the last column on the right.

If any of the devices are homemade, they should be identified by writing “homemade” in the column provided for listing the name of the device manufacturer. Type A or Type B establishments can use homemade devices manufactured before November 15, 1993. Type C or Type D establishments can use homemade manufactured anytime. If, however, a Type C or Type D establishment is using homemade equipment manufactured after November 15, 1993, then it must not use these devices for service jobs.

EPA REGIONAL OFFICES

Send your form to the EPA office listed under the state or territory in which the establishment is located.

Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont

CAA 608 Enforcement Contact: EPA Region I; Mail Code SEA; JFK Federal Building; One Congress Street, Suite 1100; Boston, MA 02114-2023

Arkansas, Louisiana, New Mexico, Oklahoma, Texas

CAA 608 Enforcement Contact: EPA Region VI; Mail Code 6EN-AA; 1445 Ross Ave., Suite 1200; Dallas, TX 75202

New York, New Jersey, Puerto Rico, Virgin Islands

CAA 608 Enforcement Contact: EPA Region II; Mail Code 2DECA-AC; 290 Broadway; New York, NY 10007-1866

Iowa, Kansas, Missouri, Nebraska

CAA 608 Enforcement Contact: EPA Region VII; Mail Code APCOARTD; 901 North Fifth Street; Kansas City, KS 66101

Delaware, District of Columbia, Maryland, Pennsylvania, Virginia, West Virginia

CAA 608 Enforcement Contact: EPA Region III-Wheeling Office; Mail Code 3AP12; 303 Methodist Building; 11th and Chapline Streets; Wheeling, WV 26003

Colorado, Montana, North Dakota, South Dakota, Utah, Wyoming

CAA 608 Enforcement Contact: EPA Region VIII; Mail Code 8ENF-T; 999 18th

Street, Suite 500; Denver, CO 80202

Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, South Carolina, Tennessee

CAA 608 Enforcement Contact: EPA Region IV; Mail Code APT-AE; 61 Forsyth Street, SW; Atlanta, GA 30303-8960

American Samoa, Arizona, California, Guam, Hawaii, Nevada

CAA 608 Enforcement Contact: EPA Region IX; Mail Code AIR-5; 75 Hawthorne Street; San Francisco, CA 94105

Illinois, Indiana, Michigan, Minnesota, Ohio, Wisconsin

CAA 608 Enforcement Contact: EPA Region V; Mail Code AE-17J; 77 West Jackson Blvd.; Chicago, IL 60604

Alaska, Idaho, Oregon, Washington

CAA 608 Enforcement Contact: EPA Region X; Mail Code OAQ-107; 1200 Sixth Ave.; Seattle, WA 98101

BOB.MILLENBACH

Typewritten Text

Proposed Project Emissions Inventory Questionnaire for New Sources

TCEQ Title V Operating Permit Decision Support System

The Decision Support System provides several documents linked together to aid in the Title V application and review process. These documents include Rule Text, Relationship Entry Screens, Flowcharts and Historic Rule Opinions (when applicable). Most of these documents and their subparts are available in Portable Document Format(PDF). To view the documents in this format, a free copy of Adobe Acrobat Reader will have to be installed on your computer. For best results, install the most current version of Adobe Reader.

For information on installing or configuring the Adobe Acrobat Reader click here. Even if you have the Adobe Acrobat Reader installed, you may need to configure it to work as required (The hyperlinking capability will not work unless the reader opens up within the browser window).

Guidance for using the Decision Support System Decision Support System for:

40 CFR Part 59 - National Volatile Organic Compound Emission Standards for Consumer and Commercial Products 40 CFR Part 60 - Standard of Performance for New Stationary Sources(NSPS) 40 CFR Part 61 - National Emission Standards for Hazardous Air Pollutants (NESHAPS) 40 CFR Part 63 - National Emission Standards for Hazardous Air Pollutants for Source Categories(a.k.a. Maximum Achievable Control Technology (MACT)) 40 CFR Part 82 - Protection of Stratospheric Ozone 30 TAC Chapters 39, 101-122 - Control of Air Pollution

Applicability Determination Index (ADI)

The EPA also has a database available online that contains memoranda issued by the the agency on applicability and compliance issues associated with NSPS, NESHAP and MACT Standards

Requestor: ____________________________ Date: _____________ Phone: _____________ Project # _____________________________ Facility Name / Building Number: ____________________________ Descriptive Name of Facility: ______________________________________________ Location of Facility: UTM Zone: 14 Horizontal Coordinate _____________________E Vertical Coordinate ____________________N

Indicate proposed emission source type and complete all applicable fields for each process.

Complete questionnaire sheet for each process type in this facility.

http://www.tnrcc.state.tx.us/link.html http://www.tnrcc.state.tx.us/link.html http://www.adobe.com/ http://www.adobe.com/ http://www.tnrcc.state.tx.us/permitting/airperm/opd/pdfhelp.htm http://www.tnrcc.state.tx.us/permitting/airperm/opd/pdfhelp.htm http://www.tnrcc.state.tx.us/permitting/airperm/opd/dssgui.htm http://www.tnrcc.state.tx.us/permitting/airperm/opd/dssgui.htm http://www.tnrcc.state.tx.us/permitting/airperm/opd/59/59hmpg.htm http://www.tnrcc.state.tx.us/permitting/airperm/opd/59/59hmpg.htm http://www.tnrcc.state.tx.us/permitting/airperm/opd/60/60hmpg.htm http://www.tnrcc.state.tx.us/permitting/airperm/opd/60/60hmpg.htm http://www.tnrcc.state.tx.us/permitting/airperm/opd/61/61hmpg.htm http://www.tnrcc.state.tx.us/permitting/airperm/opd/61/61hmpg.htm http://www.tnrcc.state.tx.us/permitting/airperm/opd/63/63hmpg.htm http://www.tnrcc.state.tx.us/permitting/airperm/opd/63/63hmpg.htm http://www.tnrcc.state.tx.us/permitting/airperm/opd/82/82hmpg.htm http://www.tnrcc.state.tx.us/permitting/airperm/opd/82/82hmpg.htm http://www.tnrcc.state.tx.us/permitting/airperm/opd/state/statehp.htm http://www.tnrcc.state.tx.us/permitting/airperm/opd/state/statehp.htm http://www.epa.gov/compliance/planning/data/air/adi.html http://www.epa.gov/compliance/planning/data/air/adi.html

INTERNAL COMBUSTION UNITS (I.E. GENERATORS, ENGINE TEST CELLS)

(Covered by 30 TAC 106.511 and 30 TAC 106.261)

Make_________________ Model_____________ Serial #________________ Power Rating: ____kw; Horsepower: ___ HP Fuel Type: ________________ MUR/JP8/Diesel; Integrated Fuel Tank Capacity: __________gallons Make_________________ Model_____________ Serial #________________ Power Rating: ____kw; Horsepower: ___ HP Fuel Type: ________________ MUR/JP8/Diesel; Integrated Fuel Tank Capacity: __________gallons Make_________________ Model_____________ Serial #________________ Power Rating: ____kw; Horsepower: ___ HP Fuel Type: ________________ MUR/JP8/Diesel; Integrated Fuel Tank Capacity: __________gallons Make_________________ Model_____________ Serial #________________ Power Rating: ____kw; Horsepower: ___ HP Fuel Type: ________________ MUR/JP8/Diesel; Integrated Fuel Tank Capacity: __________gallons Make_________________ Model_____________ Serial #________________ Power Rating: ____kw; Horsepower: ___ HP Fuel Type: ________________ MUR/JP8/Diesel; Integrated Fuel Tank Capacity: __________gallons

Separate Fuel Tank(s): YES / NO (circle one) Complete Separate Questionnaire for Each Tank Seasonal Operating Percentage for This Emission Point:

Spring _____% Summer _____% Fall _____% Winter _____% Note: Total Must Equal 100% Normal Operating Schedule: Start Time_____ hours/day _____days/week _____ weeks/year____ Normal Operating Rate: _______________gallons or CuFt/ year

FUEL STORAGE TANKS (Covered by 30 TAC 115.473 , 30 TAC 106.478 and 30 TAC Chap 115)

Make__________________Model_________________Serial #______________ Fuel Type: _____________ Tank Volume: __________gals;Tank Dimensions (ft): Diameter _______Length_______ Height________ Make__________________Model_________________Serial #______________ Fuel Type: _____________ Tank Volume: __________gals;Tank Dimensions (ft): Diameter _______Length_______ Height________ Make__________________Model_________________Serial #______________ Fuel Type: _____________ Tank Volume: __________gals;Tank Dimensions (ft): Diameter _______Length_______ Height________ Make__________________Model_________________Serial #______________ Fuel Type: _____________ Tank Volume: __________gals;Tank Dimensions (ft): Diameter _______Length_______ Height________ Make__________________Model_________________Serial #______________ Fuel Type: _____________ Tank Volume: __________gals;Tank Dimensions (ft): Diameter _______Length_______ Height________

Tank Type: Aboveground / Underground (circle one); Vapor Control Equipped: YES / NO (circle one) Roof Type: Horizontal Fixed Roof / Vertical Fixed Roof / Internal Floating Roof / Pressure Tank External Floating Roof

Seasonal Operating Percentage for This Emission Point:

Spring _____% Summer _____% Fall _____% Winter _____% Note: Total Must Equal 100% Normal Operating Schedule: Start Time_____hours/day _____days/week _____weeks/year_____ Normal Operating Rate: _______________gallons/year Maximum Operating Rate: _______________gallons/hour

EXTERNAL COMBUSTION UNITS (Boilers, Hot Water Heaters, Process Heaters) (Covered by 30 TAC 106.102 and 30 TAC 106.183) Fuel Type: Natural Gas / Diesel Make__________________Model_________________Serial #___________________ Input Rating: __________ MMBTUH Height of Stack: __________ ft ; Diameter of Stack: __________ ft; Stack Exhaust Velocity: ______________ft / sec Make__________________Model_________________Serial #___________________ Input Rating: __________ MMBTUH Height of Stack: __________ ft ; Diameter of Stack: __________ ft; Stack Exhaust Velocity: ______________ft / sec Make__________________Model_________________Serial #___________________ Input Rating: __________ MMBTUH Height of Stack: __________ ft ; Diameter of Stack: __________ ft; Stack Exhaust Velocity: ______________ft / sec Make__________________Model_________________Serial #___________________ Input Rating: __________ MMBTUH Height of Stack: __________ ft ; Diameter of Stack: __________ ft; Stack Exhaust Velocity: ______________ft / sec

Seasonal Operating Percentage for These Emission Points:

Spring _____% Summer _____% Fall _____% Winter _____% Note: Total Must Equal 100% Normal Operating Schedule: Start Time_____ hours/day _____days/week _____ weeks/year____ Normal Operating Rate:

_______________gallons/year

FUEL DISPENSING UNITS (Covered by 30 TAC 106.412) Make__________________Model_________________Serial #___________________ Make__________________Model_________________Serial #___________________ Make__________________Model_________________Serial #___________________ Make__________________Model_________________Serial #___________________ Make__________________Model_________________Serial #___________________ Make__________________Model_________________Serial #___________________

Fuel Type: MUR / Diesel / JP-8 / Other ______________ (circle one) Dispensing Type: Retail / Bulk (circle one) Vapor Control Equipped : YES / NO (circle one) Dispenser Pump rate: __________ gallons/minute Seasonal Operating Percentage for This Emission Point:

Spring _____% Summer _____% Fall _____% Winter _____% Note: Total Must Equal 100% Normal Operating Schedule: Start Time_____ hours/day _____days/week _____ weeks/year____ Normal Operating Rate: _______________gallons/year http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=511 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=511 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=263 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=263 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=473 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=473 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=478 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=478 http://info.sos.state.tx.us/pls/pub/readtac$ext.ViewTAC?tac_view=5&ti=30&pt=1&ch=115&sch=C http://info.sos.state.tx.us/pls/pub/readtac$ext.ViewTAC?tac_view=5&ti=30&pt=1&ch=115&sch=C http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=102 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=102 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=183 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=183 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=412 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=412

SURFACE COATING OPERATIONS (Covered by 30 TAC 106.433 , 30 TAC 106.436 or 30 TAC 116.110)

Attach approved MSDS of each coating and solvent used in process Particulate Matter Control Efficiency of Booth: __________% Booth Air Flow Rate:___________scfm Transfer Efficiency of Paint Gun: __________% Number of Paint Guns: __________ Associated Heater: YES / NO (circle one) Complete Separate Questionnaire for Each Heater Associated Gun Cleaner: YES / NO (circle one) Complete Separate Questionnaire for Each Cleaner Seasonal Operating Percentage for This Emission Point:

Spring _____% Summer _____% Fall _____% Winter _____% Note: Total Must Equal 100% Normal Operating Schedule: Start Time_____hours/day _____days/week _____weeks/year____ Normal Operating Rate: _______________gallons/year (each coating and solvent)

REFRIGERATION EQUIPMENT (AIR CONDITIONING SYSTEM, FREEZER) (Covered by 30 TAC 106.103)

Make__________________ Model____________Serial#___________________ No. of compressors: ______ Refrigerant Type: __________ Amount of Charge:______lbs; Initial Charge Date:_____/_____/_____ Make__________________ Model____________Serial#___________________ No. of compressors: ______ Refrigerant Type: __________ Amount of Charge:______lbs; Initial Charge Date:_____/_____/_____ Make__________________ Model____________Serial#___________________ No. of compressors: ______ Refrigerant Type: __________ Amount of Charge:______lbs; Initial Charge Date:_____/_____/_____ Make__________________ Model____________Serial#___________________ No. of compressors: ______ Refrigerant Type: __________ Amount of Charge:______lbs; Initial Charge Date:_____/_____/_____ Make__________________ Model____________Serial#___________________ No. of compressors: ______ Refrigerant Type: __________ Amount of Charge:______lbs; Initial Charge Date:_____/_____/_____

Seasonal Operating Percentage for This Emission Point:

Spring _____% Summer _____% Fall _____% Winter _____% Note: Total Must Equal 100% Normal Operating Schedule: Start Time_____hours/day _____days/week _____weeks/year_____

WELDING OPERATIONS (Covered by 30 TAC 106.227)

Attach approved MSDS of each welding rod type used in process Make__________________Model_________________Serial #___________________ Make__________________Model_________________Serial #___________________ Make__________________Model_________________Serial #___________________

Particulate Matter Control Efficiency of hood (if available): __________% Exhaust Fan Ventilation Rate :___________scfm Acetylene on hand: __________lbs of gas Oxygen on hand: __________ lbs of gas Seasonal Operating Percentage for This Emission Point:

Spring _____% Summer _____% Fall _____% Winter _____% Note: Total Must Equal 100%

Normal Operating Rate: _______________# of rods/year

BRAKE REPAIR OPERATIONS (Covered by 30 TAC 106.261 and 30 TAC 106.262)

Attach approved MSDS of each brake pad type used in process Make__________________Model_________________Serial #___________________ Make__________________Model_________________Serial #___________________ Make__________________Model_________________Serial #___________________

Particulate Matter Control Efficiency of hood (if available): 1st Stage ________%; 2nd Stage_____% Exhaust Fan Ventilation Rate :___________scfm Seasonal Operating Percentage for This Emission Point:

Spring _____% Summer _____% Fall _____% Winter _____% Note: Total Must Equal 100%

Normal Operating Rate: _______________# of Brakes Repaired/year http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=433 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=433 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=436 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=436 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=116&rl=110 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=116&rl=110 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=103 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=103 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=227 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=227 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=261 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=261 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=262 http://info.sos.state.tx.us/pls/pub/readtac$ext.TacPage?sl=R&app=9&p_dir=&p_rloc=&p_tloc=&p_ploc=&pg=1&p_tac=&ti=30&pt=1&ch=106&rl=262

ENV Use Only FIN, EPN and CIN determination comes from Emissions Inventory Guidelines

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN # _________________ EPN #_________________ CIN #__________________

FIN- Facility Identification Number; EPN- Emission Point Number; CIN- Control Identification Number

ENV Use Only Received on __________ for submittal in _________ Permit

AUTHORIZATION TO PROCEED WITH CHANGE

Authorized by: ____________________ Title: ______________________ Signature: ________________________ Date: ______________________

AUTHORIZATION FOR STARTUP

Authorized by: ____________________ Title: ______________________

Proposed Project Emissions Inventory Questionnaire for New Sources http://www.tnrcc.state.tx.us/air/aqp/psei.html http://www.tnrcc.state.tx.us/air/aqp/psei.html

BOB.MILLENBACH

Typewritten Text

PRIME COMPANY NAME: _______________________________ CONTRACT NO: _______________________

PROJECT TITLE/LOCATION: ___________________________________________________________________

Material Name Manufacturer MSDS State Number

Average Max Daily Daily

*Contractor(s) certifies that the hazardous material(s) removed from installation will be used/reused for its intended purpose.

Submitted By: Phone: Fax:_______ Date:

Printed Name

Contracting Officer Phone: Fax:_______ or Representative Page____of____

CONTRACTOR HAZARDOUS MATERIAL INVENTORY & CONSUMPTION LOG

(EPCRA/E.O. 13423)

(container size-quantity of) Storage Quantity Quantity (lbs/gals) used in CY [ ](i.e. Liquid, Solid, Gas)

Company Using Material Listed Above Company Representative's Signature

PRIME COMPANY NAME: _______________________________ CONTRACT NO: _______________________

PROJECT TITLE/LOCATION: ___________________________________________________________________

Material Name Manufacturer MSDS State Number

Average Max Daily Daily

Page____of____

(container size-quantity of) Storage Quantity Quantity (lbs/gals) used in CY [ ](i.e. Liquid, Solid, Gas)

Continuation Sheet

CONTRACTOR HAZARDOUS MATERIAL INVENTORY & CONSUMPTION LOG

(EPCRA/E.O. 13423)

LANDFILL PERMIT

DPW COR POC and telephone phone number: _______________________________________ Contract Name: ________________________________________________________________ Contract Number: _______________________________________________________________ Contract completion date or end of authorization date: __________________________________ Building or areas affected (i.e., Soldier's Development Center):

Prime Contractor's Name: ________________________________________________________ Contractor POC and phone (i.e. someone on site that can get immediate action):

Appendix D: Customer Service Inspection Certificate (30 TAC §290.47(d))

Customer Service Inspection Certificate Name of PWS _______________________________________PWS I.D.# ______________ Location of Service ______________________________________________________ Reason for Inspection:

New construction. __ Existing service where contaminant hazards are suspected __ Major renovation or expansion of distribution facilities __

I _____________________________, upon inspection of the private water distribution facilities connected to the aforementioned public water supply do hereby certify that, to the best of my knowledge:

(1) No direct connection between the Compliance Non-Compliance public drinking water supply and a potential source of contamination exists. Potential sources of contamination are isolated from the public water system by an air gap or an appropriate backflow prevention assembly in accordance with Commission regulations.

(2) No cross-connection between the public drinking water supply and a private water system exists. Where an actual air gap is not maintained between the public water supply and a private water supply, an approved reduced pressure-zone backflow prevention assembly is properly installed and a service agreement exists for annual inspection and testing by a certified backflow prevention assembly tester.

(3) No connection exists which would allow the return of water used for condensing, cooling or industrial processes back to the public water supply.

(4) No pipe or pipe fitting which contains more than 8.0% lead exists in private water distribution facilities installed on or after July 1, 1988.

(5) No solder or flux which contains more than 0.2% lead exists in private water distribution facilities installed on or after July 1, 1988.

I further certify that the following materials were used in the installation of the private water distribution facilities:

Service lines Lead __ Copper __ PVC __ Other __ �Solder Lead __ Lead Free __ Solvent Weld __ Other __

I recognize that this document shall become a permanent record of the aforementioned Public Water System and that I am legally responsible for the validity of the information I have provided.

Remarks:

Signature of Inspector

Registration Number

Title

Type of Registration

Date

FHT Form 200-X10, April 2004 (DPW) Replaces FHT Form 420-X10

COORDINATION FOR LAND EXCAVATION & WATER USE

(III Corps and FH Reg 200-1)

CONTROL NUMBER

TELEPHONE

NAME, RANK, TITLE, AND ORGANIZATION OF REQUESTER

PROJECTED DATES OF EXCAVATION OR WATER USE

PURPOSE AND DESCRIPTION OF EXCAVATION OR WATER USE (PROJECT NO./CONTRACT NO./TITLE, ETC.)

AREA OF LAND DISTURBANCE = _________ ACRES DPW Point Of Contact:_______________________________________ Note: Permit Expires After 30 Days of Approved Start Date

EXCAVATION

I propose to dig at the locations depicted in the attached map, sketch, or overlay (For military operations, plot digging locations on transparent overlays that include two grid register marks using standard 1:50,000 topographic maps).

I understand that the proposed digging or excavation is a requirement within the scope of work to be accomplished. I will not dig or excavate before receiving written approval from the Directorate of Public Works (DPW). I understand my responsibilities and obligations pursuant to safety, property damage, personal injury, and life-threatening hazards associated with digging in the vicinity of underground utilities (including utilities such as electrical cables and pipes containing natural gas, water, sewer, liquefied fuels, and refrigerants). Severe injuries, death, and extensive property damage may occur as a result of digging through underground utilities. I am responsible for damages caused to persons or property as a result of my fault or negligence. If the exact locations of underground utilities are unknown, I will perform whatever work is necessary to determine exact locations and avoid damaging utilities.

Unless otherwise permitted, I will not excavate within 50 meters of streams, natural drains, roads, and tank trails. I will not dig or deposit excavated spoil within 10 meters of trees.

If archaeological resources (arrowheads, charcoal, bones, etc.) are discovered during excavation, I or my representative will notify DPW, 287- 1092, and suspend disturbance of the finding until DPW issues guidance.

Upon completion, I will restore the excavation site including backfilling, reshaping, and seeding to conform to surrounding topography.

For construction activities that will result in land disturbance (clearing, grading or excavating) of one acre or more, or that are part of a larger common plan of development that will ultimately disturb one or more acres of land, I will comply with the provisions of the TPDES General Permit, TXR150000, to discharge storm water from construction sites, and I will coordinate with DPW-Environmental Division, 287-6499.

WATER USE

I propose to take surface water from the location depicted in the attached map, sketch, or overlay. Include dates and amounts of proposed water use.

I understand that the proposed water supply point is a requirement within the scope of work to be accomplished. I will not divert or draw any water before receiving written approval from the Directorate of Public Works (DPW).

I understand that in addition to this permit, a Temporary Water Use Permit may be required from TCEQ, depending on the proposed water use.

SIGNATURE OF REQUESTER DATE

REVIEWED OR INSPECTED BY

(All blocks must be signed for Excavation permit. Natural Resources & Environmental Mgmt only for Water Use permit.)

NATURAL RESOURCES Sprint ELECTRIC GAS RANGE DIVISION

ENVIRONMENTAL MGMT CULTURAL RESOURCES DOIM TV CABLE WATER & SEWER

Approved under the following conditions Disapproved for the following reasons

APPROVED BY (Range Division for Training Activities, Range Safety for Live Fire Activities, DPW for all other Activities)

DATE

FHT Form 200-X10

DEP ARTMENT OF THE ARMY

HEADQUARTERS, U.S. ARMY GARRISON

BUILDING 1001 ROOM W321

FORT HOOD, TEXAS 76544-5000

REPLY TO

ATfENTION OF

MAY 1 O 200~AFZF-PW-ENV

MEMORANDUM FOR SEE DISTRIBUTION

SUBJECT: Memorandum of Instruction (MOl) Landscaping on Fort Hood

1. Purpose. To establish procedures which allow units and other Fort Hood areas to landscape with vegetation that is native to the Fort Hood region.

2. Applicability. This MOl applies to all units, Directorates, and Family Housing on Fort Hood.

3, Responsibilities

a. Draw plans of the landscape area to facilitate plant placement by type and height or growth characteristics and estimate cost.

b. Layout beds or planting sites on the ground

c. Obtain an approved excavation permit (FH 420-X10), d Plant and water,

e. Develop long-term maintenance schedule and apply.

4, POC for excavation permits is DPW, Services Division, 287 -9735.

FOR THE COMMANDER'

Encl

DISTRIBUTION:

IAW FH FORM 1853: A

Planting and Care of Trees and Shrubs

1. Locate and mark planting sites and apply for an approved excavation permit (FH 420-X10). A permit is required prior to any digging on Fort Hood and necessary to prevent damage to the underground utility systems.

2. Select the right plants for the right locations. Consider future plant size in relation to conflict with sidewalks, drives, buildings, streets, and overhead utility lines. See the Approved Plant List for guidance on plant heights.

3. Locate and dig holes so that the hole is two to three times the diameter of the container and no deeper than the container. Keep all original topsoil for backfilling. Be certain that hole has rough and uneven edges and is irregular in size, as this will encourage the new roots to spread and not become root-bound within the hole. Plant only as deep as the level of the dirt in the original pot; planting too deeply may kill the plant. See attached diagram.

4. Always handle plants by the container or the ball, never by the stems, as this will damage the plant. If the plant is root-bound, make two cuts across the bottom layer of roots and several cuts along the sides to loosen the roots.

5. Set the plant in the hole vertically and remove the container or the burlap and wire.

Backfill only with the original soil. Do not backfill with compost, peat moss, or other materials. Add one third of backfill soil at a time; tamp very lightly and use slow-running water to settle the soil and help secure the plant. Repeat this process until the hole is full and thoroughly watered.

6. It is recommended that you install a landscape fabric. Place fabric beneath edging such that it covers the entire surface of the bed. Use a fabric, which allows air and water to penetrate and restricts weeds, but do NOT use a solid plastic film.

7. If desired, you may install edging. Metal edging, installed 4 inches below the surface and 2 inches above, is preferred because it will help to keep grass from invading into the planting area. However, stone edging, installed no more than one high, may be installed around individual trees or around shrub beds.

8. Place a 3- to 4-inch-thick layer of mulch around all plants to keep them free of weeds and grass. Use only shredded hardwood mulch, hardwood chips, or cedar mulch. Do not use pine bark mulch. Do not use rock of any type instead of mulch. For planting beds, mulch the entire bed. For individual plantings of trees or shrubs, mulch 2 to 3 feet around the trunk in every direction.

9. For trees, do not use tree stakes or guy wires of any kind. These actually weaken trees. Also, do not wrap any material around the base of the trunk. These encourage problems with insects and diseases. Do not prune trees and shrubs at planting time. Do not paint trees. The only exception to the no staking rule is for very large (greater than 4 inch trunk) balled and burlapped trees. These trees may be staked for a period not to exceed 2 years; after which time, all stakes and guy wires must be removed.

10. Do not plant trees and shrubs without a commitment to care for them. Trees and shrubs will need to be watered when rainfall is not sufficient; a rain of at least 1 inch per week is sufficient. When rainfall is less than 1 inch, each tree and shrub will need to be watered once per week during the summer months and every other week during the fall, winter, and spring months for 1 to 2 years. A slow trickle of water from a water hose for one hour is the preferred method of watering. Sprinkling, especially during the summer months, is very wasteful. More water is lost to evaporation rather than soaking into the soil.

Plant List for Landscaping on Fort Hood

* indicates plants native to Fort Hood

Large Trees Big-tooth maple* Acer grandidentatum interesting leaves; grows 20-50 feet;

needs very little water; golden to red fall color

Bur oak* Quercus macrocarpa very large shade tree; grows 60-80 feet tall and 50 feet spread; needs deep, rich soil; very large leaves; large interesting acorns

Cedar elm* Ulmus crassifolia grows up to 70 feet; upright growth form that is good for narrow spaces; yellow-golden fall color

Chinkapin oak* Quercus muehlenbergii grows up to 50 feet; prefers deeper soil, but will grow in dry soil; large leaves;

yellow to brown fall color

Escarpment black cherry

Prunus serotina var.

eximia grows up to 25 feet; white flower clusters followed by small black cherries; yellow fall color; needs moist soil

Lacey oak Quercus laceyi (or Q. glaucoides) grows up to 20 feet; slow growth rate;

interesting blue-green leaf color; not susceptible to oak wilt

Monterrey oak, or Mexican white oak

Quercus polymorpha grows up to 40 feet; deciduous to evergreen; prefers well-drained soil; the young leaves are bronze in color; not susceptible to oak wilt

Pecan* Carya illinoenensis grows up to 90 feet; large shade tree;

needs deep, rich soil; birds and people eat the nuts

Plateau live oak* Quercus fusiformis (or Q. virginiana) grows up to 30 feet; evergreen; large shade tree; needs very little water;

susceptible to oak wilt

Texas white ash* (NOT Arizona ash, or Fan Tex ash)

Fraxinus texensis (NOT Fraxinus velutinus) grows 40-50 feet; grows fairly fast; yellow to orange fall color; needs very little water

Small Trees Blanco crabapple Pyrus ioensis var.

texana (Malus ioensis var.

texana) sun; grows up to 12 feet; pink flowers in the spring and interesting fruits in the fall

Carolina buckthorn* Rhamnus caroliniana (Frangula caroliniana) sun or shade; grows up to 15 feet; large glossy leaves; small purple fruits in late fall

Desert willow Chilopsis linearis sun or part shade; grows up to 15 feet;

large showy pink flowers; does not like to be over watered

Eve’s necklace* Sophora affinis sun or shade; grows up to 20 feet;

delicate pink flowers in spring; smooth green bark; interesting bead-like fruit

Mexican plum* Prunus mexicana sun or part shade; grows up to 20 feet;

one of the first to flower in the spring;

beautiful white, fragrant flowers;

interesting flaky bark

Prairie flame-leaf sumac*

Rhus lanceolata prefers full sun; grows 10-20 feet; small white flowers in the summer; birds will love the red berries; brilliant red color in the fall; will spread to become several small trees, needs room to expand

Rusty blackhaw viburnum*

Viburnum rufidulum sun or shade; grows 10-20 feet; large white flower clusters in spring; red fall color

Smoketree Cotinus obovatus sun or part shade; grows 12-20 feet;

prefers dry soil; interesting flowers/fruit, looks like smoke; orange fall color

Texas redbud* Cercis canadensis var.

texensis sun or part shade; grows 20-30 feet; one of the first to flower in spring; beautiful pink flowers

Tall Shrubs Deciduous holly* Ilex decidua sun or part shade; grows 12-20 feet;

deciduous; striking red berries on females in fall that persist into winter

Dwarf wax myrtle Myrica pusilla sun or part shade; evergreen; grows 8-12 feet; golden yellow flowers; small blue fruits are eaten by many different birds

Evergreen sumac* Rhus virens prefers full sun; thick evergreen foliage, but will turn bronze after a freeze; grows 4-12 feet tall and 6-8 feet wide; red berries in late fall; does not like to be over watered

Golden-ball lead tree

Leucaena retusa sun or part shade; prefers dry soil and does not like to be over watered; grows up to 12 feet; flowers are yellow puffs in spring, summer, and fall

False indigo* Amorpha fruticosa plant this one where your soil stays wet;

grows up to 12 feet; beautiful dark purple tiny flowers in spring

Mexican buckeye* Ungnadia speciosa sun or shade; grows 12-20 feet tall and 12-20 feet wide; pink flowers in early spring; brilliant yellow fall color;

interesting seed pods are left behind after the leaves fall

Prickly ash*, toothache tree, or tickle-tongue

Zanthoxylum hirsutum sun or part shade; grows up to 15 feet;

interesting fragrant foliage; has many sharp spines (do not plant this one too near sidewalks); swallowtail butterfly larvae use this plant

Silktassel Garrya ovata var.

lindheimeri (Garrya lindheimeri) evergreen; full sun; prefers dry soil; grows 3-12 feet; silvery-grey leaves

Texas mock orange Philadelphus texensis sun or part shade; grows up to 12 feet;

white flowers in late spring and early summer

Texas mountain laurel*, or Mescal bean

Sophora secundiflora sun or part shade; evergreen; grows 10- 20 feet; beautiful fragrant purple flowers;

seeds are poisonous if eaten; be patient with this plant, it grows very slowly

Texas pistache (not Chinese pistache)

Pistacia texana (not Pistacia chinensis) sun; evergreen; grows 12-30 feet tall and 15-20 feet wide; prefers dry soil; leaves are small and glossy

Wafer-ash*, or hop tree

Ptelea trifoliata sun or shade; grows 3-12 feet; interesting fragrant foliage and fruit; swallowtail butterfly larvae use this plant

Wax myrtle Myrica cerifera sun or part shade; evergreen; grows up to 15 feet; golden yellow flowers; small blue fruits are eaten by many different birds

Witch hazel Hamamelis virginiana prefers shade, but can take sun; grows up to 30 feet; golden yellow fall color;

interesting yellow flowers in the late fall after the leaves drop

Low Shrubs Agarita*, or agarito, or algaritas

Berberis trifoliolata sun or shade; evergreen; spiny leaves (do not plant this one too near sidewalks);

grows 3-6 feet tall and 3-6 feet wide; one of the first to flower in the spring;

fragrant yellow flowers followed by small red berries

Black dalea* Dalea frutescens sun; grows 1-3 feet tall and 3-4 feet wide;

very small, delicate leaves; purple flowers in the summer and fall

Butterfly bush Buddleja marrubiifolia sun or part shade; semi-evergreen; grows 4-6 feet tall and 4-6 feet wide; silvery-grey leaves; orange flowers summer and fall that attract butterflies

Chili piquin Capsicum annuum prefers shade; grows 2-3 feet; small white flowers in summer and fall; small red fruits following the flowers attract birds

Flame acanthus Anisacanthus quadrifidus var.

wrightii full sun or part shade; grows 3-4 feet;

flowers are red or orange from summer to fall and attract hummingbirds and butterflies

Fragrant mimosa*, or pink mimosa

Mimosa borealis prefers sun; prefers dry soil; has many sharp hooked spines (do not plant this one too near sidewalks); grows 3-7 feet tall; many beautiful pink flowers in early spring

Gregg dalea Dalea greggii prefers full sun; grows up to 1 foot tall and 2-4 feet wide; works as a ground cover;

prefers dry soil; flowers summer and fall

Gregg sage, or cherry sage

Salvia greggii full sun; evergreen; grows up to 3 feet tall;

flowers range in color from red to pink to white; attracts hummingbirds; spring, summer, and fall

Mexican oregano Poliomentha longiflora prefers sun; evergreen; grows up to 3 feet tall and up to 3 feet wide; pink flowers spring, summer, and fall that attract hummingbirds

Mountain sage Salvia regla prefers part shade; grows 3-6 feet tall and 3-4 feet wide; plant this one where your soil stays damp; red flowers in the fall that attract hummingbirds

Shrubby blue sage, or mejorana

Salvia ballotiflora prefers sun; grows up to 6 feet tall;

flowers spring, summer, and fall;

fragrant (minty) leaves

Shrubby boneset*, fragrant white mistflower, or thorouthwort

Eupatorium havanense needs some shade; grows 3-5 feet tall and 3-5 feet wide; white flowers in the late summer and fall that attract butterflies

Skunkbush*, or aromatic sumac

Rhus trilobata (Rhus aromatica) sun or part shade; usually grows less than 3 feet tall, and 3-5 feet wide;

delicate small leaves; red berries in the fall; leaves turn brilliant red in the fall

Turk’s cap* Malvaviscus arboreus var. drummondii prefers shade; grows 2-6 feet tall and 3-5 feet wide; red flowers summer and fall that attract butterflies and hummingbirds

Yaupon holly Ilex vomitoria sun or shade; evergreen; grows 12-20 feet tall and 10-15 feet wide (dwarf varieties available that grow 2-4 feet tall and 2-4 feet wide); red berries on females

Vines Coral honeysuckle Lonicera sempervirens full sun; evergreen; elongate red flowers in early spring and some flowers in summer; attracts butterflies and hummingbirds

Crossvine Bignonia capreolata sun or part shade; evergreen;…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .