TECH_EXHIBIT_B_-_Drawings.pdf

PDF 32 MB Posted

Attached to
Replace HVAC System in Building 1937 Federal contract opportunity
Solicitation number
W91151-17-B-0006
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

View the file

Other files for this federal contract opportunity

Other files attached to Replace HVAC System in Building 1937, newest first.
File Type Posted
Abstract_of_Bids-17-B-0006_(IFB).pdf PDF
C-103_Revised_Drawings.pdf PDF
Asbestos_Survey.doc DOC document
Approved_Amendment_2.pdf PDF
Approved_Amendment_1.pdf PDF
Site_Visit_Sign_in_Sheet.pdf PDF
TECH_EXHIBIT_A_-_Specifications.pdf PDF
Approved_Solicitation.pdf PDF
Attachment_1-_Specifications_Appendix_A_04-Aug-2016.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

·v;

" 0 ,,,1 c:

~3 u::

G I ,._ "' "' <ii cl.

" e 0..

6 z ti'.

w w z (3 z w G

~I z 4

N

A

OKLAHOMA

SANTA FE

MEXICO

VICINITY MAP

100 200

SCALE IN MILES

B

GULF OF

MEXICO

HWY190

FORT HOOD AREA MAP

SCALE IN MILES

TURKEYRUN

FORT HOOD MILITARY RESERVATION

MAIN CANTONMENT AREA

SCALE IN MILES

REPLACE HVAC SYSTEM

FORT HOOD,TEXAS

PROJECT NO: CA093390P

E

BUILDING LEGEND (POINTS OF INTEREST\

CD Ill CORPS HEADQUARTERS

@ DARNALL ARMY HOSPITAL

@ BUILDING 4612 (DIRECTORATE OF PUBLIC WORKS)

@) PROJECT SITE

BLDG 1937

FORT HOOD DIRECTORATE OF PUBLIC WORKS-ENGINEERING DIVISION

SHEET

G-101 C-101 D-101A D-101 B D-102 M-101A M-101 B M-102 M-501 M-502 M-503 M-601 M-602 M-701 M-702 M-703

F

INDEX OF DRAWINGS

SHEET DESCRIPTION

COVER SHEET

SITE PLAN - UTILITIES

DEMOLITION PLAN - MECHANICAL - AREA A

DEMOLITION PLAN - MECHANICAL - AREA B

DEMOLITION PLAN - ENLARGED MECHANICAL

MECHANICAL PLAN - AREA A

MECHANICAL PLAN - AREA B

ENLARGED MECHANICAL PLAN

CHILLED WATER PIPING DIAGRAM

HOT WATER PIPING DIAGRAM

MECHANICAL DETAILS

MECHANICAL SCHEDULE-1

MECHANICAL SCHEDULE-2

BOILER I CHILLER CONTROLS

AHU CONTROLS

MECHANICAL CONTROLS

GENERAL SYMBOLS

DETAIL NUMBER

-----~ REFERENCE TO

NORTH SYMBOL & REVISION NUMBER

NOTE BY SYMBOL ---0 WALL TYPE MARK

WINDOW MARK [QQQJ DOOR MARK s...., ..... ________________________________________________________________________________________________________________________ .,.. ________________________________________________________________________________ ...., ________________________________________ ...

w I C/)

Cf)

I w

::s a_ w 0:::

1-w w I

0:::

w u

Bldg. No.

CA093390P

Project No.

SHEET

REFERENCE

NUMBER

G-101

"' 0

·v;

" 0

,,,' c:

~3 u::

G I ,._ "' "' <ii cl.

" e 0..

6 z ti'.

w w z (3 z w G

~I z 4

A B

---- UGE-----UGE ' I

I I

19035

----9 __

''c.,s -

I

I I r-

19041 /

I I

_ 1

' -"'c,, I I

I I

I

I

,f ss '

'°'>s -

I I

I I

I r-ss -

'°'>s'

I I I I I

I

-"'c,,, I

-"1o I

',f

'Ss

'::._ Ss ..._

- - - ':::· .::::.:-: "::: '. ': Ss \

............ --"'l.. --..., \

'°'>s' -- '°'>s' --

I c

20 40 80

SCALE (FEET)

I I

,f

I I

I

I

D

I I

I I

I

I

J?

I I

I

I

I I

I

I

SS -------~

I I

I I

I

J?

I I

I

J?

I

I I

I I

I

E

----- OHC -----

----- OHE -----·

-----UOE-----UGE- - - - ·

·-----GAS-----

----- SS -----·

SD -----

T -----

------w------w------w----

--41----+---+--

F

LEGEND:

EXISTING OVERHEAD COMMUNICATIONS LINE

EXISTING OVERHEAD ELECTRIC LINE

EXISTING UNDERGROUND ELECTRIC LINE

EXISTING GAS LINE

EXISTING SANITARY SEWER LINE

EXISTING STORM DRAIN LINE

EXISTING TELECOMMUNICATION DUCTBANK

EXISTING WATER LINE

EXISTING FENCE LINE

EXISTING TRAFFIC SIGNAL

EXISTING LIGHT POLE

EXISTING POWER POLE

EXISTING TRANSFORMER - POLE MOUNTED

EXISTING RISER

EXISTING ELECTRIC METER

EXISTING COMMUNICATIONS PEDESTAL

EXISTING GAS REGULATOR

EXISTING GAS VALVE

EXISTING WATER METER

EXISTING WATER VALVE

EXISTING FIRE HYDRANT

EXISTING SANITARY SEWER EQUIPMENT

EXISTING WASTEWATER CLEANOUT

EXISTING WASTEWATER MANHOLE

EXISTING WASTEWATER VALVE

EXISTING TELECOMMUNICATION MANHOLE

s tt::============:::c============::::I:========~~---r~~~~~~---.~~~~~~---,r--~~~~~__J

"' f- >-ii5c:>_J I~B XO en wow ;;;1mgs ()D:'.o._ zOc:t:

Iu_::J () 0..

w f-en ~en~ w:.'.w f-D:'.f- <(O • c:t:S;O

8'28 ()-'I wO'.lf-

Q;i5:~ 0 u.

w I-

(f)

I w ....J a_ w 0::::

"' 0

-t z it'. 27 "'"' w o~ z f- I "O I () <(

~~ Wc:t:

....,O'.l .Q> Ill 0 <( "' <( D:'. . " . 0.. <( 0 <( o<S en ci x 0 w

N f- ~a::w6 ~tl1u.o 0~f"'.O.,.

oc:>zI"'!t ....1Z<(j.-'.~ c:JW(l)LL......_ w I- ....J

I-z ....J a..

w I-

Bldg. No.

CA093390P

Project No.

SHEET

REFERENCE

NUMBER

C-101

"O

6 c ·v;

" 0

,,,' c:

~3 u::

G I ,._ "' "' <ii cl.

" e 0..

6 z ti'.

w w z (3 z w G

~I z 4 lJd

A

•11•11•11•11• I

B

D D 101A 102 c D

: EXISTING )

CONDENSING ~

UNIT ~

~------- l I

•-GAS - - - - GAS - - - - - - - - GAS -

~----1

WALK

IN

COOLER

KITCHEN

02D

I I

EXISTING I

COMPRESSOR 1

1 I

PAD I

I I

L----

EF

FD ILEJ - SNACK BAR FD

~~ ~-~ ~ 1@1 -~ t>\J-- - - - - - t>-z.r~ ---r-z.J---

DINING

OQD

Ml•••••••••••• ll'ff'• • • • • • • • • .n• • • • • • • • • • • • ~ MATCHLINE - SEE D-1018

FD~

MECH ROOM

I I I I

I I

GD

I .- ~-;r - - - - - - - - ~-~ tit¥ _____ -: _ J>\J S~E ~1 ~

• --~r--

1 I II

I I._ __

I I

SALES

OQD

I I I

I I .(---l

~ I I I I ,.

I I I I I I I I

STORAGE

<f> ~;L~~4~~;.10N PLAN - MECHANICAL - AREA A 0--~4 ~~aiiiiiiiiiiiiiiiiiiil12 \fl7 SCALE (FEET)

Ill

E F

NOTES:

1. DEMO ALL EXISTING SUPPLY AIR DIFFUSERS, RETURN AIR GRILLES

AND EXHAUST GRILLES .

2. DEMO EXISTING EXHAUST FANS (EF-4 AND EF-5) AND ASSOCIATED

EXHAUST DUCTS AND GRILLES.

3. DEMO GYPSUM BOARD CEILING IN MEN AND WOMEN RESTROOMS.

(FOR ACCESS TO REMOVE AND REPLACE THE EXHAUST FANS AND

ASSOCIATED ACCESSORIES)

KEY NOTES:

G EXHAUST FAN TO BE DEMO'D

0 EXISTING THERMOSTAT TO BE DEMO'D

0 DEMO THE WALL INSIDE THE MECH ROOM (APPROX 11 ' W IDE X 12' HIGH)

CWR

cws

HWR

HWS

NO.

EF-1

EF-2

EF-3

EF-4

EF-5

SF-1

EQUIPMENT LIST

DESCRIPTION

EXHAUST FAN

EXHAUST FAN

EXHAUST FAN

EXHAUST FAN

EXHAUST FAN

SUPPLY FAN

LEGEND:

EXISTING CONDENSER WATER RETURN LINE

EXISTING CONDENSER WATER SUPPLY LINE

EXISTING HEATING WATER RETURN LINE

·---CD---- --CD---

___ GAS ---

EXISTING HEATING WATER SUPPLY LINE

EXISTING CONDENSATE DRAIN LINE

EXISTING GAS LINE

EXISTING ABANDON GAS LINE

EXISTING 2' X 2' SUPPLY AIR DIFFUSER

EXISTING 2' X 2' RETURN AIR DIFFUSER

AIR FLOW DIRECTION

EXISTING THERMOSTAT

EXISTING ELECTRICAL PANEL WITH 3' CLEARANCE

SPACE - FRONT OF PANEL

EXISTING EXHAUST FAN

EXISTING 18" VENT- OUTSIDE AIR INTAKE

EXISTING FLOOR DRAIN

~KEYPLAN

w I C/)

Cf)

I w

::s a..

w 0::::

Bldg. No.

CA093390P

Project No.

SHEET

REFERENCE

NUMBER

D 101A

"O

Ill

9 c "' " 0

I

"' c

~3 u::

G I ,._ O")

"' <ii 0..

"' O") O")

"' 0 y u·

0..

I

6 z ti'.

w w z (3 z w G

I z lJd

N

" N s

A I B I c I D I

· · ·- .. - .. -.............. ,.. .. - .. - .. - .. -· i-:::__·_ :__~ ~"_ - - _~/~A- -I -------,.-

: - - - - - - - - - - =--74-~ I

• • • • • 1 •••••• ..... H •••••• Ji1-..c.~11.1-mw•~i~•~·1• ~!11 · • • · · • · · • · · • · · • · ··-"' • • • • • •t. ; 1----~" ~ n •11•11•11•11•11•11•1fi:"'

DINING

UP- -up tt __ j

I I I I I ~

I ~ "-;pi~ dFE~~J

I

UP

I I I I I t>~ I I I I I I I I

G(ME:Ot 1 8

1 1 1 I I ~-;;p

\ >I ~

<f> ~;L~~4~~;.10N PLAN - MECHANICAL - AREA B 0--~4 ~~aiiiiiiiiiiiiiiiiiiil12 \fl7 SCALE (FEET)

I I I I

E

-t:J

I F

NOTES:

1. DEMO ALL EXISTING SUPPLY AIR DIFFUSERS, RETURN AIR GRILLES

AND EXHAUST GRILLES.

2. DEMO EXISTING THERMOSTAT TO INCLUDE WIRING AND CONDUIT.

KEY NOTES:

0 DEMO THERMOSTAT

- CWR -

- cws -

- - HWR -

- - HWS - -

----CD------CD----

___ GAS ---

ll ____ J

~:=<1 ~-J

D

FD~

LEGEND:

EXISTING CONDENSER WATER RETURN LINE

EXISTING CONDENSER WATER SUPPLY LINE

EXISTING HEATING WATER RETURN LINE

EXISTING HEATING WATER SUPPLY LINE

EXISTING CONDENSATE DRAIN LINE

EXISTING GAS LINE

EXISTING ABANDON GAS LINE

EXISTING 2' X 2' SUPPLY AIR DIFFUSER

EXISTING 2' X 2' RETURN AIR DIFFUSER

AIR FLOW DIRECTION

EXISTING THERMOSTAT

EXISTING ELECTRICAL PANEL WITH 3' CLEARANCE

SPACE - FRONT OF PANEL

EXISTING EXHAUST FAN

EXISTING 18" VENT- OUTSIDE AIR INTAKE

EXISTING FLOOR DRAIN

,,.-··--· .. - ·-··-··-··-"!II J

I )

~KEYPLAN

I w I- Cf)

Cf)

I w ...J a..

w 0:::

it'.

w

~ z f--I

WQ:'.

., Ill 0 <( D:'. .

0.. <(

"' 0 z

"'"' o~ - "O I

.Q> Ill "' <( " . 0 <(

IIl z<C <(W ...J 0:::

a.. <( z I

0 ...J 1-() ...J -oz

WI

o~

Bldg. No.

CA093390P

Project No.

SHEET

REFERENCE

NUMBER

D

A c::

c 'O N

9 c::

"' " 0

I

"' c::

~3 u::

G I ,._ "' "' <ii 0..

"' "' "' "' 0 y u·

0..

I

6 z ti'.

w w z (3 z w G

I z lJd

"' "' N s

I B I c I

_______ T _______ _ , I ! I ! I ! I

8 ! I r---- GAS --- - -- S --- f-~:-~~AS~-1 : I r-1;~1 -· __,I -,-~~~ I ,- nw~ J- S - ( 2 \-1 : I IT] ~~~1 /---w---~ -!I

,- \I7 I I i- \ 1 I J

~ 6 l.J ; - - - - -1= =:::: .L - '1- 1 Ul ~ - --: 0 / MECH ROOM I 11 -

~ "' 1 Y c'i ~ I , ~ I~~ ,,,..,.D I 1 1 '-v-co..m -.-co-----ce~::... __ -!-! / ~ - - -i : L '--~H i---"-£Er~-~-----:$ ! I //

-i 1\'r11 --i ~iv ~~~r;:; ----- -~ I: : ~ )\ l:1'- l"=--~-

:t I 1\...1../AHUI I HC I _u ---, 1 I, 4 I

HC I' ,

: 1 : 16 11 11 I~) l ~1 Fl'(jf'.IS--i :y 11 i I\.:'.

1 _~J - - - - - I I ' I

I Ula: I 16 a:Ul 11

IH !-,-.---",------\Y H'

I I I IL '-~D------CD---\ J I

STORAGE

O}D

1 11 ~ ~ ---=-~-=--~r-=---=---=-'-fr _'.j r--

~ ~ I I \... _ I ' ' / STORAGE

~ v ~ ~~~~(J-=t_M.-,= ~~~ ~' / GD

I "{ L HC .L HC ' ' I ---- - 2 - 1 3 1--1-------1----

: 10:--1--:-iji--r---1-©i-1 I L I I I I I I - I I I I I I I

., --+-- I s I c:o I ±:::+=± ±::-===+===± I

D I E I F

NOTES:

1. DEMO EXISTING AIR COOLED CONDENSING UNIT (ACC-1) AND ALL ASSOCIATED REFRIGERANT PIPING.

2. DEMO AIR HANDLING UNIT (AHU-1), ALL ASSOCIATED DUCTWORK IN MECH. ROOM, CONTROL AND REFRIGERANT PIPING.

3. DEMO HOT WATER HEATING COILS (HC-1 , 2, 3 &4) IN THE DUCTS AND ALL ASSOCIATED ACCESSORIES.

4. DEMO ALL HOT WATER SUPPLY AND RETURN PIPING FROM COILS TO BOILER. EXISTING BOILER (B-1) AND ASSOCIATED

CIRCULATING PUMP TO REMAIN.

5. DEMO HOT WATER EXPANSION TANK (ET-1).

6. EACH ITEM OF EQUIPMENT SHOWN TO BE DEMOLISHED SHALL HAVE ITS ASSOCIATED ELECTRICAL CIRCUITRY REMOVED BACK TO THE PROTECTIVE DEVICE IN THE PANEL. THE PROTECTIVE DEVICE SHALL REMAIN AS AN INTEGRAL PART OF THE EXISTING PANEL AN D SHALL BE RE-LABELED TO ITS NEW FUNCTION OR LABELED AS SPARE IF IT IS NOT RE-USED.

7. DEMO THE EXISTING HVAC CONTROL SYSTEM IN THE MECH. ROOM AND ALL ASSOCIATED CONTROL COMPONENTS (RELAYS, CURRENT SENSORS, TEMP. SENSORS, ETC ... ).

8. DEMO EXISTING MAKE-UP WATER STATION AND EXISTING BACKFLOW PREVENTER SYSTEM .

9. DEMO THE WALL INSIDE THE MECHAN ICAL ROOM AS SHOWN. DEMO THE RETURN DUCT INSIDE THE WALL.

KEY NOTES:

G

DOMESTIC WATER HEATER TO REMAIN

HW BOILER DISCONNECT TO REMAIN

AIR HANDLER DISCONNECT TO BE DEMO'D

CONDENSER DISCONNECT TO BE DEMO'D

I-LON 600 AND CONTROL PANEL TO REMAIN

DEMO EXISTING THERMOSTAT AND HVAC

CONTROL SWITCH IN OFFICE AREA

DEMO WALL APPROX. 11' WIDE X 12' HIGH.

MAKE-UP WATER & BACKFLOW PREVENTER

SYSTEM TO BE DEMO'D

DEMO THE RETURN DUCT INSIDE THE WALL.

EQUIPMENT LIST

NO. DESCRIPTION

ACC-1 AIR COLD CONDENSER

AH U-1 AIR CONDITIONING UNIT

B-1 BOILER

ET-1 EXPANSION TANK

HC-1 HEATING COIL

HC-2 HEATING COIL

HC-3 HEATING COIL

HC-4 HEATING COIL

WH-1 WATER HEATER

- - HWR -

- - HWS - -

·---CD---- --CD--- ·

--- GAS ---

ll ____ J

FD~

LEGEND:

EXISTING CONDENSER RETURN LINE

EXISTING CONDENSER SUPPLY LINE

EXISTING HEATING WATER RETURN LINE

EXISTING HEATING WATER SUPPLY LINE

EXISTING CONDENSATE DRAIN LINE

EXISTING GAS LINE

EXISTING ABANDON GAS LINE

AIR FLOW DIRECTION

EXISTING THERMOSTAT

EXISTING ELECTRICAL PANEL WITH 3' CLEARANCE

SPACE - FRONT OF PANEL

EXISTING FLOOR DRAIN

- ·-··-··-··-"' J

I )

~ ~;L~~2~~;.10N PLAN - ENLARGED MECHANICAL 0--~2 ~~4--6

L .7 '-!.!./ SCALE (FEET)

~KEYPLAN

I I I I I w I C/)

Cf)

I w

::s a_ w 0::::

it'.

w

~ z f- I

WQ:'.

....,O'.l 0 <( D:'. .

0.. <(

Bldg. No.

"' 0 z

"'"' o~ - 'O I

.Q> Ill "' <( " . 0 <(

CA093390P

Project No.

SHEET

REFERENCE

NUMBER

D

" 0

,,,' c:

~3 u::

G I ,._ "' "' <ii cl.

" e 0..

6 z ti'.

w w z (3 z w G

~I z 4

A

•11•11•11•11• I

~----1

I I

EXISTING I

COMPRESSOR 1

I

PAD I

I I L----

[ff]

B

AC

KITCHEN

02D

FD

~--~--~--~~-~~r I

~ '© WALK II 1 1 I

IN LJ

COOLER ----i [JD I ffi[J

~--- DOD ,, I 1 ' / ________ I \ I

FD '\JJ SNACK BAR FD

13~0 I~=~ - - 1-;~~ 1-~-(-10_1 :J - - -~1 ;M

DINING

OQD

M M 101A 102

..... Ml•••••••••••• ll'ff'• • • • • • • • • .n• • • • • • • • • • • • ~ MATCHLINE - SEE M-101B c D

: EXISTING )

CONDENSING ~

UNIT ~

~------- l I

•-GAS - - - - GAS - - - - - - - - GAS -

I . DU DU

FD~

MECH ROOM

I IJ]QJ 1]§2]

~•~ ~- ~ -~~~~~~S~E

I I I I

I I

GD _,;1.12 1 ~

• --~r-- 1 :1

I I

I I ,.

SALES ii

OQD 111

I I I I I I I I

STORAGE

<f> ~~f:~t=~ ·ICAL PLAN - AREA A 0---4~~S8 iiiiiiiiiiiiiiiiiiil12 \fl7 SCALE (FEET)

E F

GENERAL NOTES:

1. INSTALL NEW SUPPLY AIR DIFFUSSERS I REGISTERS AND RETURN AIR

GRILLES WITH BALANCING DAMPERS.

2. INSTALL NEW EXHAUST FANS (EF-4 &5), DUCTWORK AND EXHAUST

GRILLES. SEE EXHAUST FAN SCHEDULE FOR DETAILS.

3. UTILIZE EXISTING ROOF OPENING FOR INSTALLATION OF NEW ROOF

MOUNTED EXHAUST FANS. (EF-4 &EF5)

4. INSTALL NEW THERMOSTAT FOR EACH ZONE AS SHOWN (PROVIDE

NEW CONDUIT AND W IRING).

5. PROVIDE NEW MOISTURE RESISTANT GYPSUM BOARD AT RESTROOMS CEILINGS.

6. UPON COMPLETION OF INSTALLATION, PROVIDE TAB FOR AIR FLOW AS SHOWN.

KEY NOTES:

NEW THERMOSTAT (LABEL AST-ZONE 1)

NEW THERMOSTAT (LABEL AST-ZONE 3)

NEW C02 SENSOR

HWR

HWS

-- --CD---- --CD---

___ GAS ---

ll ____ J

~-J

D

FD~

EQUIPMENT LIST

NO. DESCRIPTION

AC-1 AIR CONDITION

AC-2 AIR CONDITION

EF-1 EXHAUST FAN

EF-2 EXHAUST FAN

EF-3 EXHAUST FAN

EF-4 NEW EXHAUST FAN

EF-5 NEW EXHAUST FAN

SF-1 SUPPLY FAN

LEGEND:

EXISTING CONDENSER RETURN LINE

EXISTING CONDENSER SUPPLY LINE

EXISTING HEATING WATER RETURN LINE

EXISTING HEATING WATER SUPPLY LINE

EXISTING CONDENSATE DRAIN LINE

EXISTING GAS LINE

EXISTING ABANDON GAS LINE

NEW 2' X 2' SUPPLY AIR DIFFUSER

NEW 2' X 2' RETURN AIR DIFFUSER

AI R FLOW DIRECTION

NEW THERMOSTAT

EXISTING ELECTRICAL PANEL WITH 3' CLEARANCE

SPAC E - FRONT OF PANEL

EXISTING EXHAUST FAN

EXISTING 18" VENT - OUTSIDE AIR INTAKE

EXISTING FLOOR DRAIN

~KEYPLAN

s1-1,__ ........................................................................................................................................................................................ ...., ............................................................................................................................................................................................. ...., w I C/)

Cf)

I w

::s a_ w 0::::

z ....J a_ ....J <( Ow zo::::

I w

Bldg. No.

CA093390P

Project No.

SHEET

REFERENCE

NUMBER

M 101A

"O

"' 0

~ c "' " 0

I

"' c

~3 u::

G I ,._ O")

"' <ii 0..

"' O") O")

"' 0 y u·

0..

I

6 z ti'.

w w z (3 z w G

I z lJd

O") s

A I B I c I D I

· · ·- .. - .. -.............. ,.. .. - .. - .. - .. -· i-:::__·_ :__~ ~"_ - - _~/~A- -I -------,.-

: - - - - - - - - - - =--7 4-~ I

• • • • • 1 • • • • • • •.u•u •..•..• "111H1~1•\tiii'i.~i~~:.1• ~!11 • • • • • • • • • • • • • • • • •··"' • • • • • •t. ;

1----~" ~ n •11•11•11•11•11•11•1fi:"'

DINING

I I I I o;:J

I I l1fili] ~

JF~\

~ I "--= I I I

~ 14~01 14~01 '----~-~:--------'

..L 6 __,---- [~] _______ DWJ_ _ I J H_ _ ,----,,--~- ----,I .

l ____ ~_J_Q _[_J._ __ -:-_____ _J~g ____ :-________ ::: _.__~

I I I I I

I I I I I I I I

G(ME:Ot 1 8

1 1 1 I I

-t:J

1 3~0 1 ~ ' ~--~------~-~~ II ..-'~"'-..----------t:.1 -:.-:.-:.-:.-:.-:.-:.-:.-:.-:.-:.-:.-:.-:.~:~1: ---~

''-., HALL 1

NJQD

t I

UP

UP- -up tt __ j

<f> ~~f:~t=~ ·ICAL PLAN - AREA B 0---4~~S8 iiiiiiiiiiiiiiiiiiil12 \fl7 SCALE (FEET)

I I I I

E I F

GENERAL NOTES:

1. INSTALL NEW SUPPLY AIR DIFFUSSERS/REGISTERS AND RETURN AIR GRILLES

WITH BALANCING DAMPERS.

2. UPON COMPLETION OF INSTALLATION, PROVIDE TAB (TEST AIR AND BALANCE)

FOR AIRFLOW AS SHOWN.

KEY NOTES:

0 NEW THERMOSTAT (LABEL AST-ZONE 2)

0 NEW C02 SENSOR

- - HWR -

- - HWS - -

·---CD------CD---

___ GAS ---

ll ____ J

~:=<1 ~-J

D

FD~

LEGEND:

EXISTING CONDENSER WATER RETURN LINE

EXISTING CONDENSER WATER SUPPLY LINE

EXISTING HEATING WATER RETURN LINE

EXISTING HEATING WATER SUPPLY LINE

EXISTING CONDENSATE DRAIN LINE

EXISTING GAS LINE

EXISTING ABAN DON GAS LINE

NEW 2' X 2' SUPPLY AIR DIFFUSER

NEW 2' X 2' RETURN AI R DIFFUSER

AIR FLOW DIRECTION

NEW THERMOSTAT

EXISTING ELECTRICAL PANEL WITH 3' CLEARANCE

SPACE - FRONT OF PAN EL

EXISTING EXHAUST FAN

EXISTING 18" VENT- OUTSIDE AIR INTAKE

EXISTING FLOOR DRAIN

,,.-··--· .. - ·-··-··-··-"!II J

I )

~KEYPLAN

I w I- Cf)

Cf)

I w ...J a..

w 0:::

it'.

w

~ z f- I

WQ:'.

., "' 0 <( D:'. .

0.. <( z ...J a..

"' 0 z

"'"' o~ - "O I

.Q> Ill "' <( " . 0 <(

...J ca Ow z 0:::

I w

Bldg. No.

CA093390P

Project No.

SHEET

REFERENCE

NUMBER

M

A I

N

~ c "' " 0

I

"' c

~3 u::

G I ,.._

"' "' <ii 0..

"' "' "' "' 0 y u·

0..

I

6 z ti'.

w w z (3 z w G

I z lJd

"' N s

I

B I c I

~ I

~7 lC15J

- t

STORAGE

O}D ~i--r=-=rn~:;J--,, ~ ~,_) __ ] U i----- ~I ' . ; --

.....-------' ~ : I I -

IHW1 ~I ~ WECH ROOM -

~ ~ - ~ 1<2> / /~ IV r\11 r\11 M I 1~/ -_ I _ -

II\ ~ ~ 1/\1 26"X 12"-

f--- 8 x 12" 1

-! I -x +n x I._ __ ~--ri----r--__,I I I I j I

W-1 t I~~

,, t;)

··---rm~i.-- ----

H--t'T"

'\})Q

~~t-----

STORAGE

~E GD

I I I I I 'I '----+-----~1-----:::::::;fl:::::ic::±t====::::F=====±-------i

I .

2 4 6 ~ ENLARGED MECHANICAL PLAN °

'°~•~SCALE: 1/2" = 1' ·--·S·C~A~L~E~(F~E~E~Tm)iiiiiiiiiiiiiiiiiijj

I I

D I E I F

NOTES:

1.

2.

2.

3.

4.

5.

6.

7.

8.

FIELD VERIFY EXISTING SITE CONDITIONS PRIOR TO CONSTRUCTION AND BEFORE ORDERING EQUIPMENT.

INSTALL NEW MULTI ZONE AIR HAN DLING UNIT (AHU-1) WITH VFD AN D H-0-F SWITCH. AH U-1 SHALL BE PLACED

ON NEW CONCRETE PAD.

INSTALL NEW SUPPLY, RETURN AND OUTSIDE AI R DUCTS IN THE MECH. ROOM AND CONNECT TO EXISTING

DUCTWORK AS SHOWN. ALL DUCTWORK SHALL BE INSULATED AS PER SPECS.

INSTALL NEW CHILLED WATER SYSTEM TO INCLUDE NEW AIR COOLED CHILLER WITH PUMP AND CHILLED WATER EXPANSION TANK AS FACTORY ASSEMBLED PACKAGE. PROVIDE PUMP WITH ELECTRIC HEATER AND

INSULATED EXPANSION TANK .

INSTALL NEW CHILLED WATER PIPING, AIR SEPARATOR , CHILLED WATER FEEDER, BUFFER TANK AND ALL ASSOCIATED ACCESSORIES AS SHOW ON M-501. ALL CHILLED WATER PIPING SHALL BE INSULATED PER SPECS.

EXTERIOR CHILLED WATER PIPING SHALL BE PROVIDED WITH HEAT TRACE WIRING, INSULATION AND ALUMINUM

JACKETING.

INSTALL NEW HEATING HOT WATER SYSTEM AND CONNECT TO THE EXISTING HOT WATER BOILER. INSTALL

NEW HOT WATER PIPING AS SHOWN ON M-502 AND INSULATE PER SPECS.

INSTALL NEW HOT WATER PUMP (HWP-1) WITH VFD AND H-0-F SWITCH.

INSTALL NEW HOT WATER FEEDER, EXPANSION TANK AND HYDRONIC SEPARATOR.

UPON COMPLETION OF INSTALLATION, PROVIDE TAB FOR AIR FLOW AN D WATER FLOW OF NEW EQUIPMENT.

KEY NOTES:

NEW 24" X 12" OUTSIDE AIR INTAKE DUCT WITH HOOD AND

BIRD SCREEN. (SAW CUT THE EXISTING ROOF FOR DUCT PENETRATION)

POINT OF CONNECTION TO THE MAIN COLD WATER LINE.

AHU-1 VFD AN D H-0-F SWITCH.

NEW DOC CONTROL PAN EL WITH DISPLAY

EXISTING I-LON 600 W/ PAN EL TO REMAIN

NEW CHILLER DISCONNECT SWITCH.

DICONNECT AND RECONNECT BOILER TO EXISTING GAS

LINE AN D TO EXISTING FLUE STACK.

BUILD BACK THE RETURN DUCT TO MATCH EXISTING .

EQUIPMENT LIST

NO. DESCRIPTION

ACC-1 AIR COOLED CHILLER

AHU-1 AIR HANDLING UNIT

B-1 BOILER

ET-1 EXPANSION TANK-BOILER

ET-2 EXPANSION TANK-CHILLER

HWP-1 HOT WATER PUMP

CWP-1 CHILLED WATER PUMP

BT-1 CHILLED WATER BUFFER TANK

WH-1 WATER HEATER

HS-1 HYDRONIC SEPARATOR- HOT WATER

AS-1 CHILLED WATER AIR SEPARATOR

F-1 HOT WATER FEEDER

F-2 CHILLED WATER FEEDER

I

--- GAS ---

ll ____ J

FD~

LEGEND:

EXISTING DUCTWORK

NEW DUCTWORK

EXISTING ITEM I EQUIPMENT

NEW ITEM I EQUIPMENT

EXISTING GAS LINE

EXISTING ABANDON GAS LINE

AIR FLOW DIRECTION

EXISTING THERMOSTAT

EXISTING ELECTRICAL PANEL WITH 3' CLEARANCE

SPACE - FRONT OF PANEL

EXISTING FLOOR DRAIN

- ·-··-··-··-"' J

I )

~KEYPLAN

I w I- Cf)

Cf)

I w ....J a..

w 0::

it'.

w

~ z f--I

WQ:'.

....,O'.l 0 <( D:'. .

0.. <(

"' 0 z

"'"' o~ - ,, I

.Q> Ill "' <( " . 0 <( z ....J oa..

W....J (.9 <( 0::0 ....Jz z<C wI w

Bldg. No.

CA093390P

Project No.

SHEET

REFERENCE

NUMBER

M

"O

~ c "' Q)

I

"' c

~3 u::

G I O") a>

<ii Q_ a> O") O") a> y u·

Q_ I

6 z ti'.

w w z (3 z w G

I z lJd

"' O")

O")

"' a> s

A I

NEW CHILLER

B

MECHANICAL ROOM\

EXTERIOR WALL \

FACTORY SUPPLIED\

t ! ~A I - I I ~I

I c

-- :c 'u~-_. ~7 'i' :

~ ! ~ -~I I f 2 1/2" 121 - ~ I I ~ I G',:1/2"1211

I D I E I F

GENERAL NOTES:

1. PROVIDE HEAT-TRACE WIRING, INSULATION, AND ALUMINUM JACKETING ON ALL EXTERIOR CHILLED-WATER PIPING.

2. THIS DRAWING IS DIAGRAMMATICAL. CONTRACTOR SHALL INSTALL ALL NEW EQUIPMENT AND PIPING SO AS TO

MAINTAIN CLEARANCES AROUND ELECTRICAL EQUIPMENT, FIRE ALARMS, ETC.

3. INSULATE ALL NEW PIPING AND ACCESSORIES PER SPECS.

4. ISOLATION VALVES SIZE 2" AND UP SHALL BE INSTALLED WITH BUTTERFLY VALVES, ISOLATION VALVES SIZE UNDER 2"

SHALL BE INSTALLED WITH GATE OR BALL VALVES.

KEY NOTES:

G

NEW AIR SEPARATOR, SUSPENDED FROM STRUCTURE.

NEW CHW BUFFER TANK

NEW CHW CHEMICAL FEEDER

NEW MAKE-UP WATER LINE (INCLUDING PRESSURE RELIEF VALVE, PRESSURE REDUCING VALVE AND ISOLATION VALVES)

NEW BACKFLOW PREVENTER, 3/4" SIZE FOR CHILLED WATER SYSTEM (INSTALL PER SPECS)

NEW AIR COOLED CHILLER WITH FACTORY INSTALLED HYDRONIC PACKAGE (INCLUDING NEW CHW PUMP W/ VSD, EXPANSION TANK, STRAINER W/ BLOW DOWN VALVE, AIR VENT VALVES, PIT PLUGS, FLOW SWITCH, BALANCING VALVE W/

DRAIN PLUG, CHECK VALVE)

PROVIDE NEW CHW PUMP WITH ELECTRIC HEATER

RUN TO NEAREST FLOOR DRAIN.

LEGEND

[><] ISOLATION VALVE

N CHECK VALVE

~ STRAINER

IXXI BALANCING VALVE

!i PRESSURE RELIEF VALVE c::J<J PRESSURE REDUCING VALVE

1' AIR VENT

i PIT PLUG

NEWAHU-1 ' THERMOMETER

<? PRESSURE GAUGE

-1lr UNION L

0 AUTOMATIC AIR VENT

' ' - FLEXIBLE CONNECTOR

r:::::.ivi RPZ W/ AIR GAP ' ':8

I-t*:i 2-WAY CONTROL VALVE c!:i 3-WAY CONTROL VALVE l.__~~~--~--111--< ___ ~---~---~---~---~---+-~~~~~~-t~~~t:::l-~--L'~~~.~f---2-1_12_"121~~~~~~--1~ ~~~~-+---o~--+-~~----< rT '----~--r.L~-.. L.: __ r:C><l-1---~-----'

~IH

I . .. . . . . . . I I • . • • . • I

NEW 6" HIGH CONCRETE PAD_/ PIPING THROUGH

_/ ~W 4" HIGH CONCRETE PAD_/ NEW 6" HIGH CONCRETE PAD_/

SEAL AND PATCH WALL

f1\ CHILLED WATER PIPING DIAGRAM

~ NOT TO SCALE

I I I I I w I C/)

Cf)

I w

::s a..

w 0::::

it'.

w

~ z f- I

WQ:'.

"""'O'.l 0 <( D:'. .

Q_ <(

(.9 z a..

"' 0 z

"' a> o~ - "O I

.Q> Ill "' <( Q) • 0 <( a..

o::::~ W<( I- c::

<((_9 S<( oo w _J _J

I

Bldg. No.

CA093390P

Project No.

SHEET

REFERENCE

M-501

"O N

~ c "' " 0

I

"' c

~3 u::

G I ,._ O")

"' <ii 0..

"' O") O")

"' 0 y u·

0..

I

6 z ti'.

w w z (3 z w G

I z lJd

" O") s

I

B

NEW HYDRONIC SEPARATOR

WI AUTOMATIC AIR VENT

SUSPENDED FROM

STRUCTURE

I c r314"0 I

I D t '

ET-1

I E I F

GENERAL NOTES:

1. ALL PIPING SHALL BE FULL SIZE UNLESS OTHERWISE NOTED.

2. THIS DRAWING IS DIAGRAMMATICAL. CONTRACTOR SHALL INSTALL ALL NEW EQUIPMENT AND PIPING SO AS TO

MAINTAIN CLEARANCES AROUND ELECTRICAL EQUIPMENT, FIRE ALARMS , ETC.

3. INSTALL NEW HW HYDONIC PIPING AND EQUIPMENT AS SHOWN. INSULATE ALL NEW PIPING AND EQUIPMENT PER SPECS.

4. ISOLATION VALVES SIZE 2" AND UP SHALL BE INSTALLED WITH BUTTERFLY VALVES, ISOLATION VALVES SIZE UNDER 2"

SHALL BE INSTALLED WITH GATE OR BALL VALVES.

314"0 LEGEND

l t><l ISOLATION VALVE

'N CHECK VALVE

----~'-+---+---------;It- -11r--~-_, (I l)l

~ NEW HW EXPANSION

TANK SUSPENDED FROM

STRUCTURE

~ STRAINER

IXXl BALANCING VALVE

NEWHW

FEEDER

+ii .r::::::J

LJ

NEW HW PUMP--». , \

HWP-1 cr

NEW 4" HIGH CONRETE _j

PAD

I

F-1 '1----11

Ir

\_SUCTION DIFFUSER WI

STRAINER VALVE,

NIPPLE AND CAP

I

2"0\ r2"0

[I I I 9...,10

\ 11

' 11

EXISTING BOILER

() B-1 r:,11

EXISTING CIRC.

PUMP

I I

TO NEAREST _j EXIST. CONCRETE _j

FLOOR DRAIN PAD TO REMAIN

f1\ HOT WATER PIPING DIAGRAM

~ NOT TO SCALE

I r NEW 314" BACKFLOW

PREVENTER FOR HOT

WATER SYSTEM

TIE-IN POINT

r EXISTING GAS LINE

\_ NEW FLEX GAS LINE

WI SHUT OFF VALVE

CONNECT TO EXIST.

GAS LINE

I

!i cKJ

'f 'j'

--111-

0 -

Di<J

I

PRESSURE RELIEF VALVE

PRESSURE REDUCING VALVE

AIR VENT

PIT PLUG

THERMOMETER

PRESSURE GAUGE

UNION

AUTOMATIC AIR VENT

FLEXIBLE CONNECTOR

RPZ WI AIR GAP

2-WAY CONTROL VALVE

3-WAY CONTROL VALVE

w I- Cf)

Cf)

I w _J

0...

w n::

it'.

w

~ z I- I

WQ:'.

--,0'.l 0 <( D:'. .

0.. <(

(,9 z -0...

"' 0 z

"'"' o~ - "O I

.Q> Ill "' <( " . 0 <(

0... ~ n:: <( wll'.:'.

1-<.9 <(<( so I- I

Bldg. No.

CA093390P

Project No.

SHEET

REFERENCE

M-502

Q) c

~3 u::

G I "' a>

<ii cl.

a>

"' "' a>

Q) e Q_

6 z ti'.

w w z (3 z w G

~I z 4 lJd

M M 503 503

M M

503 503

A

OFFSET

NOTE:

USE SCREWED TYPE CONNECTION FOR

PIPE FITTINGS.

CONDENSATE DRAIN DETAIL TYP.

NOTTO SCALE

EQUIPMENT DIMENSIONS

AN D BOLT-HOLE LOCATIONS

2"

B

VARIES

CONCRETE EQUIPMENT PAD. W/

#4 BAR AT 12" 0.C. BOTH WAYS

CONCRETE PAD DETAIL

NOTTO SCALE

c

SECURE FAN TO ROOF CURB

USING SHEETMETAL SCREWS,

MINI. 2 SCREWS PER SIDE,

MAX. SPACING 24" O.C.

BUil T UP ROOF

FLASHING AN D COUNTER

FLASHING

DUCT SIZE AS INDICATED

D

DISCONNECTSWITCH

GALVANIZED BIRD SCREEN

RUBBER MOUNTING

2" X 4" CONTINUOUS BLOCKING

FACTORY FABRICATED

INSULATED ROOF CURB

ROOF DECK

FLEXIBLE CONNECTION

AUTOMATIC (BAROMETRIC) BACKDRAFT DAM PER

2 TYP. ROOF EXHAUST FAN DETAIL EF-3 & 4

I

M M

01 503 NOTTO SCALE

P/TPLUG1 L '"""00"~""

• ~ C-H~ CONTROL VALVE

v; ~ ...... v

L l:OLATION VA

'!.:. BALANCING VALVE

c;::i ~ x

.. THERMOMETER _j As:AINER wt DRAIN

VALVE&CAP

5 TYP. CHILLED WATER COIL PIPING DETAILS

M M

503 503 NOTTO SCALE

c;::i

Q z .rm 2-WAY MODULATING

- • ~ H~ ~ONTROL VALVE

~ :x v ...... - v ....., ~ I I -v" s TYP. HOT WATER COIL PIPING DETAILS s~J dtJ NOT TO SCALE

HWR

LVE

HWS

HWR

HWS

E

EXIST. BRANCH DUCT

(REFER TO PLAN FOR

SIZE)

T-BAR

CLG. TILE

SUPPLY AIR DIFFUSER/ GRILLE

EXHAUST W/ ADJUSTABLE

MANUAL VOLUME DAM PER

F

FLEXIBLE DUCT (INSTALL IF NEEDED

TO RECONNECT NEW DIFFUSER/

GRILLES)

S.S. SCREW CLAMP (TYP.)

3 TYPICAL DIFFUSER/GRILLE CONNECTION

M M

503 503 NOTTO SCALE

S.A.

R.A.

M M

102 503

30" X 48"RETURN

AIR PLENUM

FLEX

36" X 24"GALVANIZED

O.A. HOOD WI BIRD

SCREEN

FLASHING & COUNTER

FLASHING

16" x 28"

FLEX

CONNECTION

16" x 18"

CONNECTION 4" CONG. PAD

AHU-1 SIDE VIEW DETAIL

NOTTO SCALE

w I C/)

Cf)

I w

::s a_ w 0::::

it'.

w

~ z

"' 0 z

"' a> o~ f--I

WQ:'.

....,O'.l 0 <( D:'. .

Q_ <(

'O I Q) <( c D:'.

.Q> a::i "' <( Q) • 0 <(

Cf) ....J w ....J z I w

Bldg. No.

CA093390P

Project No .

SHEET

REFERENCE

M-503

6 z ti'.

w w z (3 z w G in

I z 4 lJd a>

A I B I c I D I E I F

NEW AIR HANDLING UNIT SCHEDULE (AHU-1)

MARK

AHU-1

NOTES:

TYPE

MULTI-ZONE

TOTAL AIRFLOW

(CFM)

FAN DATA

OUTSIDE "XT. STATIC

AIRFLOW PRESSURE

(CFM) (IN W.C.)

1750 1.5

MIN

FAN HP

ELEC. DATA

V/PH/HZ

208-230 I 3 I 60

TOTAL

CAPACITY

(MBH)

1. VERIFY UNIT IS COMPATABLE WITH EXISTING MECHANICAL ROOM SPACE AND CONDITIONS PRIOR TO ORDERING.

2. VERIFY AND MAKE SURE THAT AIR HANDLER HEATING COIL IS COMPATABLE WITH THE EXISTING BOILER.

3. PROVIDE UNIT WITH VARIABLE-FREQUENCY DRIVE AND H-0-A SWITCH.

EAT

(oF)

AIR

HEATING COIL DATA

LAT

(oF)

EWT

(oF)

4. PROVIDE UNIT WITH 2" DOUBLE-WALL, R-13 INJECTED FOAM ISULATION, GALVANIZED STEEL CONTRUCTION WITH HINGED ACCESS DOORS.

5. PROVIDE FILTER SECTION WITH HINGED ACCESS DOOR.

6. COOLING COIL SHALL HAVE A STAINLESS STEEL COIL CASING AND A DRAIN PAN.

MARK

CH-1

NOTES:

NEW AIR-COOLED CHILLER SCHEDULE

CAPACITY AMBIENT MIN. NUMBER

(TONS) AIR TEMP OF

(°F) COMPRESSORS

26 95 2

GPM

WATER

EWT

(oF)

LWT

(oF)

ELEC. DATA

VI PH / HZ

208-230 I 3 I 60

MIN EER

1.

2.

3.

4.

5.

6.

7.

PROVIDE UNIT WITH FACTORY MOUNTED FLOW SWITCH, CHILLED WATER PUMP AND EXPANSION TANK AS SHOWN ON M-501.

PROVIDE UNIT WITH HOT GAS BYPASS.

PROVIDE UNIT WITH LONWORKS INTERFACE CARD

PROVIDE UNIT WITH FULL HAIL GUARDS.

PROVIDE UNIT WITH A SINGLE-POINT POWER CONNECTION.

MINIMUM EER LISTED IS AT AHRI CONDITIONS.

PROVIDE UNIT EQUIVALENT TO CARRIER -AQUASNAP MODELE 30RAP CHILLER.

WATER

LWT

(oF)

GPM

MARK

CWP-1

HWP-1

NOTES:

CAPACITY

(MBH)

TOTAL SENSIBLE

320 230

SYSTEM

COOLING COIL

HEATING COIL

COOLING COIL DATA

EAT

(oF)

AIR

DB I WB

82 I 67

GPM

LAT

(oF)

DB I WB

EWT

(oF)

WATER

LWT

(oF)

NEW PUMP SCHEDULE

HEAD

(FT)

RPM

MOTOR

HP

1/2

1. PROVIDE UNIT WITH PREMIUM, HIGH-EFFICIENCY MOTOR.

GPM

FILTER DATA

TYPE

2" PLEATED (MERV 8)

ELEC. DATA

V / PH I HZ

208-230 I 3 I 60

208-230 I 3 I 60

2. PROVIDE UNIT WITH HAND-OFF-AUTO SWITCH AND MOUNT ON THE WALL INSIDE THE MECH. ROOM.

3. PROVIDE UNIT WITH VARIABLE-FREQUENCY DRIVE AND HAND-OFF-AUTO SWITCH.

NOTES

1, 2

1, 3

EXISTING HOT WATER BOILER SCHEDULE FOR REFERENCE ONLY NEW EXPANSION TANK SCHEDULE NEW CHILLED WATER BUFFER TANK SCHEDULE

MARK

B-1

NOTES:

CAPACITY

OUTPUT

(MBH)

MIN

EFFICIENCY

(%) GPM

1. BOILER'S IN-LINE CIRCULATING PUMP TO REMAIN.

WATER

EWT

(°F)

LWT

(°F)

ELEC. DATA

V/ PH / HZ

208-230 I 3 I 60

SYMBOL SYSTEM

ET-1 HEATING

ET-2 COOLING

NOTES:

TYPE

BLADDER

FACTORY

SUPPLIED

MAX

PRESSURE

(PSI)

VOLUME

(GAL)

1. INSTALL TANK IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

NOTES

1, 2, 3

1, 2, 3

MARK SYSTEM TYPE

BT-1 CHILLED-WATER BLADDER

MAX

PRESSURE

(PSI)

VOLUME

(GAL)

NOTES:

1.

2.

3.

INSTALL TANK IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

INSTALL TANK WITH INTERNAL BAFFLES, AIR VENT VALVE, AND DRAIN.

INSTALL TANK WITH INSULATION AND WRAP WITH ALUMINUM JACKET.

2. BOILER SHALL BE RE-INSTALLED WITH HYDRONIC PIPING AND EQUIPMENT AS SHOWN ON M-502. 2. INSTALL TANK WITH INSULATION AND WRAP WITH ALUMINUM JACKET.

3. TANK SHALL BE PRE-CHARGED TO 30 PSI.

MARK

AS-1

AIR SEPARATOR SCHEDULE

SYSTEM GPM

CHILLED WATER 64

MAX

PRESSURE

(PSI)

INLET/

OUTLET

SIZE

21/2"

NOTES:

1.

2.

INSTALL UNIT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

INSTALL UNIT WITH INSULATION AND WRAP WITH ALUMINUM JACKET.

NOTES

1, 2, 3

MARK

HS-1

HYDRONIC SEPARATOR SCHEDULE

SYSTEM GPM

HOT WATER 24

MAX

PRESSURE

(PSI)

INLET/

OUTLET

SIZE

2"

NOTES:

1.

2.

INSTALL UNIT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

INSTALL UNIT WITH INSULATION AN D WRAP WITH ALUMINUM JACKET.

NOTES

1, 2, 3 s...., ..... _______________________________________ .....-----------------------------------------.---------------------------------------...... ----------------------------------------.----------------------------------------~.-----------------------------------------1 w 1- (j)

(j)

I w

::s a_ w 0::::

"' 0 z it'.

w

"' a> o~ -z f- I

WQ:'.

....,O'.l 0 <( D:'. .

Q_ <(

'O I

.Q> Ill "' <( Q) • 0 <(

"I"""" I w

...J w I u (j)

...J u z I u w

Bldg. No.

CA093390P

Project No.

SHEET

REFERENCE

M-601 c

N 'I' c g

"' Q)

I

"' c

~3 u::

G I "' a>

<ii cl.

u· a.

I

6 z ti'.

w w z (3 z w G in l'J z lJd l'J

I

A I B I

NEW EXHAUST FAN SCHEDULE

STATIC

MARK CFM PRESSURE RPM

MOTOR ELEC. DATA

NOTES

(INW.C.)

HP VI PH I HZ

EF-3 150 0.125 1200 1/100 115 / 1 /60 1, 2, 3

EF-4 300 0.15 1750 1/30 115 / 1 /60 1, 2, 3

NOTES:

1. PROVIDE UNIT WITH DIRECT-DRIVE, ROOF-MOUNTED FAN AND HIGH-EFFICIENCY MOTOR.

2. PROVIDE UNIT WITH BACKDRAFT DAMPER, BIRD SCREEN AN D FACTORY MOUNTED SAFETY

DISCONNECT SWITCH.

3. PROVIDE UNIT WITH A SPEED CONTROLLER AN D INTERLOCK WITH THE DOC CONTROL SYSTEM

TO OPERATE CONTINOUSLY DURING OCCUPIED MODE.

-. I c I D I

AIR DEVICE SCHEDULE

~- MARK (SEE SCHEDULE BELOW)

- CFM

SIZE (IN)

MARK CFM RANGE DESCRIPTION

FACE NECK

A 0-300 24x24 10 4-WAY SUPPLY DIFFUSER

B 301 -450 24 x24 12 4-WAY SUPPLY DIFFUSER c 0-200 12 X 12 6 4-WAY SUPPLY DIFFUSER

D 0-450 24 x 12 SIDE WALLS.A. DIFFUSER

E 0-1500 24x24 RETURN AIR GRILLE

F 0-100 12 x 8 RETURN AIR GRILLE

NOTES:

1. PROVIDE UNIT SUITABLE FOR LAY-IN INSTALLATION.

2. PROVIDE SUPPLY DIFFUSER WITH ADJUSTABLE BALANCING DAM PER.

3. PROVIDE SUPPLY DIFFUSER WITH INSULATED BACKPAN. THE INSULATION SHALL

CONSIST OF 1/2" MINI. FIBERGLASS AND FOIL VAPOR BARRIER.

4. PROVIDE SUPPLY, RETURN AND EXHAUST AIR DEVICES IN GYPSUM BOARD CEILING WITH

MOUNTING FRAME SO THAT THEY CAN BE LIFTED OUT FOR ABOVE CEILING ACCESS.

I I

E I F

' '} ~ t ci1

"' 0 c 0 a ·5 "' "' 0

-t

THROW REFERENCE

NOTES "' 0 (FT) MANUFACTURER f- >- ~ ii5c:>_J z I~B

8 1, 2, 3, 4 TITUS-TMSA-AA it'. 27 XO en "' a> wow w o~ l'J ----8 1, 2, 3, 4 TITUS-TMSA-AA ;;;1mgs <( ()Ct'.a_ z

6 2, 3, 4 TITUS-TMSA-AA zOc:t: <( ::;:

~~ Iu_::J ::;: <(

() a. f- I -o I 10 2, 3, 4 w () <(

~~ f- Wet:

....,O'.l .Q> Ill

- 1, 4 TITUS-355RL

0 <( "' <( Ct'. . Q) •

a. <( 0 <(

- 1, 4 - en ~en~ o<S en w:.'.w <( f-Ct'.f- ci x - <(O - 0 w c:t:$:0 N f-

8'28 ~a::w6 ~tl1u.o ()-'I 0~f"'.O.,. wO'.lf-

Q;i5:~ oc:>zI"'!t ....1Z<(j.-'. ~ 0 u_ c:JW(l)LL......_

N I

~ w w _J

I- ::> Cf) 0 >- w Cf) I <( Cf)

> _J I <( w () <( z

- _J <( a_ I w () 0:::: w

Bldg. No.

CA093390P

Project No.

SHEET

REFERENCE

NUMBER

M-602

'O

~ c <I) Q)

I <I) c

~3 u::

G I "' a>

<ii Q_ a>

"' "' a> y u·

Q_ I

6 z ti'.

w w z (3 z w G

I z lJd

"' "' a> s

I B I c

REMOTE TEMPERATURE~

SENSOR CONNECTED r;:;;:;;::i

TO BOILER'S CONTROLS 1- - - - - - - ~ - - - - - - - - - - -I

r----,-------- I .-~------------1 I I I r _Ir -1 I I

~ - $ IVFol [fil ~ ctJ II I I I HWS --1 : i IL- HW PUMP ,-~ - - - - - - - - - -, : ~1-----r-~--il-1-'-+-~~~~~~~~~~~cti~~-I HWR---1

I I ';\___ EXI;;::-CIRC. PUMP

I L ______ _J ENABLED BY BOILER

I CONTROLS

L----------------------------~----------

(1\HEATING HOT WATER SYS. CONTROL DIAGRAM

~N.T.S .

I

EXISTING I-LON 60011

(IN MECH. ROOM) NEW O.A.

0 REMAIN SENSOR

!;1-160 f-z w

I I

[):'.1 50 w

NEW DOC CONTROL

PANEL W/ DISPLAY

(LONWORK

CONTROLLERS) i b I

20 30 40 50 60 70

OUTSIDE AIR TEMPERATURE °F

@HN~~. WATER RESET SCHEDULE

I

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1oocl- - - - - - - - - 1

FLOW SWITCH- TO CHILLER

----------- CONTROL PAN EL ~ - - - - - - 1 DOC I- - - - - - - - -

I ) I

AIR COOLED

CHILLER

FS r*1

CHWS~~~~~~~+-~~~~~~---·

nCH~'u-+r,.,_1P__ ~ ~7 CHWR•~~~~~-ir-~~~~~~---1, T

[fil ~ I n

LI _J L - - - - - - 1 DOC I- - - - - - - - - I

I I

L - - - - - - - - - - - - - - - - - - - 1oocl- - - - - - - - - _J

{3\CHILLED WATER SYS. CONTROL DIAGRAM

~ N.T.S.

I I

I D

[IJ TEMPERATURE SENSOR

[fil EQUIPMENT ENABLE

~ EQUIPMENT STATUS

§] SAFETY FLOW SWITCH

I DOC I DIRECT DIGITAL CONTROL SYS.

0 EQUIPMENT ALARM

@J DAMPER ACTUATOR

0 PRESSURE SENSOR

I VFD I VERIABLE FREQUENCY DRIVE

I

I E I F

GENERA! NOTES·

1. DEMO AND REPLACE THE EXISTING BUILDING CONTROL SYSTEM WITH NEW DOC CONTROL SYSTEM.

ALL SENSORS, RELAYS, CONTROL PANELS, ACTUATORS, CONTROL DAMPERS AND CONTROL VALVES

SHALL BE REPLACED UNLESS OTHERWISE NOTED.

2. FURNISH AN D INSTALL NEW LONWORKS CONTROLLER PROGRAMMED TO ACCOM PLISH THE SEQUENCE OF OPERATIONS. (NEW CONTROLLERS SHALL HAVE THE CAPABILITIES TO MANUALLY OVERRIDE ALL

CONTROLS POINTS)

3. FURNISH AND INSTALL A NEW CONTROL PANEL WITH LONWORKS DISPLAY AND PLACE IN THE MECHANICAL ROOM.

4. EXISTING I-LON 600 ROUTER TO REMAIN , INSTALL A LON TRUNK CONNECTING THE NEW DOC SYSTEM TO THE l-LON600 ROUTER.

5. PROVIDE ALL SENSORS, RELAYS AND OTHER DEVICES THAT ARE NECESSARY TO ACCOMPLISH THE SPECIFIED SEQUENCE OF OPERATION. ALL COMPONENTS OF THE CONTROL SYS. SHALL BE LONWORKS COMPLIANT.

SEO! !ENCE OF OPERATION FOR HEATING AND COOi ING SYSTEMS-

THE DOC SHALL START THE CHILLED WATER AN D HOT WATER SYSTEMS AUTOMATICALLY.

THE SYSTEMS WILL BE STARTED BASED ON THE FOLLOWING SCHEDULE:

INITIAL SCHEDULE:

MONDAY - FRIDAY 0600 TO 1800

SATURDAY OFF

SUNDAY OFF

HOLIDAY OFF

HOT WATER SYSTEM SEQUENCE OF OPERATION

1. THE HOT WATER SYSTEM WILL BE ENABLED WHENEVER THE SCHEDULE IS IN THE

OCCUPIED MODE AND THE OUTSIDE AIR TEMPERATURE IS BELOW 65°F (ADJ). THE SYSTEM

WI LL BE DISABLED WHENEVER THE OUTSIDE AIR TEMPERATURE IS 3°F ABOVE THE HOT

WATER SYSTEM ENABLE SETPOINT. ONCE THE SYSTEM IS ENABLED, THE HOT WATER PUMP

IS STARTED. AFTER THE HOT WATER PUMP CURRENT SENSING RELAY VERIFIES PUMP, THE

BOILER WILL BE ENABLED. BOTH PUMP AND BOILER OPERATE CONTINUOUSLY UNTIL THE

SYSTEM IS DISABLED. ONCE DISABLED THE BOILER WI LL BE DISABLED FIRST AND AFTER

A 5 MINUTE DELAY THE PUMP WILL BE STOPPED.

2. THE BOILER SHALL MAINTAIN BUILDING HOT WATER SUPPLY TEMPERATURE SETPOINT

BASED ON ITS INTERNAL CONTROLS. THE CONTRACTOR SHALL PROVI DE A REMOTE TEMP.

SENSOR TO BE INSTALLED IN THE SUPPLY HOT WATER PIPING. THE SETPOINT IS

DETERMINED BY THE HOT WATER RESET SCHEDULE.

3. VFD SHALL MODULATE THE HW PUMP TO MAINTAIN THE HOT WATER FLOW.

BOILER'S INTERNAL CONTROLS SHALL CONTROL BOILER CIRCULATING PUMP

OPERATION TO MAINTAIN MINIMUM FLOW TO BOILER.

4) NIGHT SETBACK - WHILE IN UNOCCUPIED MODE, THE HOT WATER SYSTEM SHALL BE

ENABLED IF ANY SPACE SENSOR FALLS BELOW 50°F (ADJ.). WHEN TEMPERATURES

INCREASE TO 5°F ABOVE LOW LIMIT SETPOINT, SYSTEM SHALL BE DISABLED.

CHILLED WATER SYSTEM SEQUENCE OF OPERATION

1. THE CHILLED WATER SYSTEM WILL BE ENABLED WHENEVER THE SCHEDULE IS IN THE

OCCUPIED MODE AND THE OUTSIDE AIR TEMPERATURE IS ABOVE 65°F (ADJ). THE SYSTEM

WILL BE DISABLED WHENEVER THE OUTSIDE AIR TEMPERATURE IS 3°F BELOW THE CHILLED

WATER SYSTEM ENABLE SETPOINT. ONCE THE SYSTEM IS ENABLED, THE CHILLED WATER

PUMP IS STARTED. AFTER THE CHILLED WATER PUMP CURRENT SENSING RELAY VERIFIES

PUMP , THE CHILLER WILL BE ENABLED. THE CHILLER MAINTAINS BUILDING CHILLED

WATER SUPPLY TEMPERATURE BASED ON ITS INTERNAL CONTROLS. BOTH PUMP AND CHILLER

OPERATE CONTINUOUSLY UNTIL THE SYSTEM IS DISABLED BY THE SCHEDULE OR THE

OUTSIDE AIR TEMPERATURE IS BELOW THE SETPOINT. ONCE DISABLED THE CHILLER WILL

BE DISABLED FIRST AND AFTER A 5 MINUTE DELAY THE PUMP WILL BE STOPPED.

2. SAFETY- THE CHILLER SHALL BE PROVIDED WITH FLOW SWITCH IN ITS CHILLED WATER

LOOP. THE CHILLER SHALL OPERATE ONLY IF FLOW IS ESTABLISHED.

3) NIGHT SETBACK - WHILE IN UNOCCUPIED MODE, THE CHILLED WATER SYSTEM SHALL

BE ENABLED IF ANY SPACE SENSOR RISES ABOVE 90°F (ADJ .). WHEN TEMPERATURES

DECREASE BACK TO 5°F BELOW HIGH LIMIT SETPOINT, SYSTEM SHALL BE DISABLED.

I I w I C/)

Cf)

I w

::s a..

w 0::

it'.

w

~ z

"' 0 z

"' a> o~ -f- I

WQ:'.

....,O'.l 0 <( D:'. .

Q_ <(

-oI Q) <( co:'.

.Q>CO

<I)<( Q).

0 <(

Cf) ....J 0::

1-z

0::

w ....J ....J

I () -0::

w ....J

Ill

Bldg. No.

CA093390P

Project No.

SHEET

REFERENCE

M-701

"O N I'-

~ c "' " 0

I

"' c

~3 u::

G I I'- O")

"' <ii 0..

"' O") O")

"' 0 y u·

0..

I

6 z ti'.

w w z (3 z w G

I z lJd

" O")

I'-s

A I

SEOl IENCE OF OPERATION ·

1) THE DOC SHALL START THE AHU-1 AUTOMATICALLY.

THE SYSTEMS WILL BE STARTED BASED ON THE FOLLOWING SCHEDULE:

INITIAL SCHEDULE:

MONDAY - FRIDAY 0600 TO 1800

SATURDAY OFF

SUNDAY OFF

HOLIDAY OFF

AHll-1 SFOllFNCF OF OPERATION

B

THE AHU SHALL BE CONTROLLED THRU ITS ON-OFF-AUTOMATIC CONTROL LOCATED ON THE UNIT AND

SHALL BE INTERLOCKED WITH THE DOC CONTROL SYSTEM IN THE BLDG VIA LONWORKS TRUNK.

UNOCCUPIED MODE

1) THE FAN IS STOPPED.

2) THE OUTSIDE AIR DAM PER IS CLOSED

3) THE RETURN AIR DAMPER IS OPEN

4) THE HOT AND CHILLED WATER VALVES ARE CLOSED.

OCCUPIED MODE

1) THE OUTSIDE AND RETURN AIR DAMPERS ARE PLACED IN AUTOMATIC CONTROL.

2) THE SUPPLY FAN IS PLACED IN AUTOMATIC CONTROL.

3) THE HOT WATER VALVE AND THE CHILLED WATER VALVE ARE PLACED IN AUTOMATIC CONTROL.

SUPPLY FAN CONTROL

I

WHEN THE SUPPLY FAN STARTER IS IN THE AUTO POSITION, THE FAN SHALL STOP WHEN THE DOC IS IN THE UNOCCUPIED MODE AND SHALL START WHEN IT IS IN THE OCCUPIED OR NIGHT LOW LIMIT MODES.

WHILE THE SUPPLY FAN IS OFF, AS DETERMINED BY THE SUPPLY FAN STATUS, THE COOLING COIL VALVE AN D THE OUTSIDE AIR DAM PER ARE CLOSED. THE RETURN AIR DAMPER IS OPEN. THE HEATING COIL VALVE IS MODULATED UNDER THE HOT DECK TEMPERATURE CONTROLLER. ZONE DAM PERS SHALL BE UNDER

THE CONTROL OF THEIR ZONE SENSORS.

WHEN THE DOC RECEIVES AN INPUT PROVING THAT THE SUPPLY FAN IS ON, THE CONTROL DAMPERS ARE POSITIONED FOR FULL RECIRCULATION OF AIR. POSITIONED TO INTRODUCE MINIMUM OUTSIDE AIR, OR MODULATED TO MAINTAIN MIXED AIR TEMPERATURE. THE CHILLED AN D HOT WATER VALVES SHALL BE MODULATED UNDER AUTOMATIC CONTROL TO MAINTAIN HOT DECK AND COLD DECK SETPOINTS.ZONE DAMPERS SHALL BE UNDER

THE CONTROL OF THEIR ZONE SENSORS.

THE VFD SHALL MODULATE THE FAN'S SPEED BASED ON DIFF. PRESSURE SENSOR LOCATED IN THE SUPPLY AIR DUCT TO MAINTAIN THE AIR FLOW REQUIRED. THE VFD SHALL BE CONFIGURED SO AS TO PREVENT THE FAN FROM

OPERATING OUTSIDE OF THE MANUFACTURER'S RECOMMENDATED LI MITS.

SAFETIES

1) FREEZE PROTECTION: WHEN THE MIXED AIR TEMPERATURE FALLS BELOW THE SETPOINT OF 38°F (ADJ .) A SET OF NORMALLY CLOSED FREEZE STAT CONTACTS IN THE AHU FAN STARTER SAFETY CIRCUIT WILL OPEN, PREVENTING THE AHU FAN FROM OPERATING. AN ADDITIONAL SET OF NORMALLY OPEN CONTACTS IN THE FREEZE STAT SHALL CLOSE PROVIDING AN ALARM TO THE DOC. A MANUAL RESET AT THE FREEZE STAT IS REQUIRED

TO RESTART THE FAN AND CLEAR THE ALARM.

c I

CONTROi S I EGEND

Ci] TEMPERATURE SENSOR

I DOC I DIRECT DIGITAL CONTROL SYSTEM

0 EQUIPMENT ENABLE

0 EQUIPMENT STATUS

@] FLOW SWITCH

~ DAMPER ACTUATOR

0 FREEZESTAT

@] STATIC PRESSURE SENSOR

I VFD I VARIABLE FREQUENCY DRIVE

0 EQUIPMENT ALARM

I co2 I CARBON DIOXI DE SENSOR

I DOC I I DOC I

~ D

2) SMOKE DETECTOR: WHEN SMOKE IS SENSED IN THE SUPPLY AIR OR RETURN DUCTS BY THE SMOKE DETECTOR(S), A SET OF NORMALLY CLOSED CONTACTS IN THE AHU FAN STARTER CONTROL CIRCUIT WILL OPEN, PREVENTING RETURN ~)I I

NC

THE AHU FAN FROM OPERATING. THE DOC SYSTEM SHALL ALSO SEND AN ALARM SIGNAL TO THE FIRE ALARM SYSTEM

IN THE BUILDING.

INDOOR AIR QUALITY (IAQ):

CONTRACTOR SHALL INSTALL A CARBON DIOXISE SENSOR IN THE OUTSIDE AIR TO ESTABLISH THE BASELINE C02 LEVEL FOR THE IAQ ALERT. CONTRACTOR SHALL ALSO INSTALL C02 SENSORS AND SHALL PLACE ONE IN THE KITCKEN AREA, ONE IN THE DINNING AREA AND ONE IN THE SALES AREA. WHENEVER THE C02 LEVEL IN THE SPACES EXC EEDS THE BASELINE BY 400 PPM AN ALARM SHALL BE INITIATED. THE ALARM SHALL INDICATE WHICH OF THE C02 SENSORS

INDICATED THE ALARM.

NIGHT SETBACK

WHILE IN UNOCCUPIED MODE, IF ANY SPACE SENSOR FALLS BELOW 60 °F(ADJ .) OR ABOVE 90 °F(ADJ.) THE AHU SHALL BE ENABLE. THE AHU SHALL PLACED IN AUTOMATIC CONTROL UNTIL THE SPACE SENSOR REACHES 65°F OR 85°F

RESPECTIVELY.

I I

AIR

I

OUTSIDE

AIR

z

I ctJ I D~C I

D I E I

GENERAi NOTES·

1. DEMO AND REPLACE EXISTING CONTROLS OF THE EXISTING AHU IN THE MECH. ROOM WITH NEW DOC

CONTROL SYSTEM AS SHOWN.

F

2. PROVIDE NEW CONTROLLERS, SENSORS, ACTUATORS, RELAYS AN D OTHER DEVICES THAT ARE NECESSARY TO ACCOMPLISH

THE SPECIFIED SEQUENCE OF OPERATION.

3. ALL COMPONENTS OF THE CONTROL SYSTEM SHALL BE LONWORKS COMPLIANT.

4. INSTALL NEW CHW CONTROL VALVE WITH 3-WAY MODULATING VALVE AND NEW HW CONTROL VALVE WITH 2-WAY MODULATING

VALVE.

5. INSTALL NEW DOC TEMPERATURE SENSORS, ONE FOR EACH ZONE (TOTAL OF 3 ZONES).

6. CONTRACTOR SHALL INSTALL NEW SMOKE DETECTORS ON SUPPLY AND RETURN DUCTS.

7. CONTRACTOR SHALL INSTALL C02 SENSORS FOR MONITORING C02 LEVEL IN THE SPACES AND CONNECT TO THE DOC SYSTEM.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR TA&B. WORK SHALL INCLUDE BALANCING HYDRONIC FLOWS AND AIR FLOWS

FOR THE NEW AHU.

I D~C I

NEW CONTROL PAN EL

WI DISPLAY AND NEW

DOC CONTROLLERS

EXISTING l-LON-600 @J-D D O.A. SENSOR clJ

TT~ TYPICAL ZONE

(/) a::

s s I I DOC I I I DOC

NO 1

E-fr-1

~ I D~C I ~ D

00 I V~D I SP I NO'

H ["'

HOT ,v

1(@~1 ) c n c z SUPPLY FAN c

I DOC I

<fJ a::NC 1 s s I I I

II~

I

SUPPLY

COLD

I

SUPPLY

I D~C I

,v ' r-- ' r--

}"NC

I

TYPICAL ZONE SPACE

TEMPERATURE SENSOR

I

~TOZONE

w I- Cf)

Cf)

I w _J a..

w 0::

it'.

w

~ z f- I Wa::

....,O'.l 0 <( a:: .

0.. <(

"' 0

I'-z

"'"' o~ - "O I " <( ca::

.Q> a::i "' <( " . 0 <(

Cf) _J

0::

I-z u I

Bldg. No.

CA093390P

Project No.

SHEET

REFERENCE

M-702

A I B I c I D

PANEL

TOGGLE SWITCH---, BASE

~ STD NETWORK I ,,,.- SEE NOTE 7

N- SURGE ...- CAT-6 120 {H-a 120 VAC ~ ~· 'DUPLEX VV VAC G- PROTECTOR ~ c:i CABLE

FUSE-~'~~~~-'

TERM-1( \_L.QN_C6_Bh_E~ - -\ \

/ - - - - --._ \\ /- - - - ~(- - - - -,\ I ~RM-2

ILON I I

II 600 ',1 ',1 '1 '1

(BPOC) I LON NODE I I LON NODE I I '°' ',ooe I I '°'' ,oo' I

(SEE NOTE 8) (SEE NOTES

9 AND 10)

LOCATION OF ILON600 SHALL BE WITHIN

120 VAC ?

THE VICINITY OF THE LAN SWITCH

TYPICAL LON BUS - RISER DIAGRAM 1

NODE NODE NODE

f- f- f- f- f- f-w w w w w w z z z z z z

A <;>.... A <;>.... A <;>.... .. I I I I ( I I I ( I I I 0 0 " " 0 0 " " 0 0 " " w w _J _J w w _J _J w w _J _J

D:'. D:'. O'.l O'.l D:'. D:'. O'.l O'.l D:'. D:'. O'.l O'.l

"' 0

~ RED~-- •• ··••···· .. ···· ...• ) [ 1 1 - ..... ···.,···· .. ···-,) [ 1 1 - ..... ···.,···· .. ····,.) [ 1 1 - .. ._. ···.,···· .. ··~ RED ~@ BLK ~ .. .-••.• ·' .. ........ '-..... ::::____=.i-c:x:::x-... · ............... ::::____=.i-c:x:::x-................... ::::____=.i-c:x:::x-................. ~ BLK ~ 4

CD®@

©I TERM

~ c "' " 0

I c

~3

TYPICAL LON BUS - RISER DIAGRAM 2

u::

G I "' a>

<ii Q_ a>

"' "' a> y u·

Q_ I

6 z ti'.

w w z (3 z w G

I z lJd

"' "' "' a> s

I I I

I

I

E I F

GENERAL NOTES:

1. THIS DIAGRAM IS SHOWN AS A "TYPICAL" LON TRUNK TOPOLOGY IN ACCORDANCE WITH

SPECIFICATION 23 09 23.

2. ALL BUILDINGS SHALL BE EQUIPPED WITH ONE LON TRUNK AN D ONE BUILDING POINT OF

CONNECTION (BPOC).

3. END-OF-LINE (EOL) TERMINATORS SHALL BE LOCATED AT THE BUILDING POINT OF

CONNECTION (BPOC), TYPICALLY AN ILON 600, AND AT THE LAST NODE ON THE BUS, AS SHOWN

ON THIS DRAWING.

4. CONTRACTOR SHALL INSTALL AN ILON 600 (BPOC) WITHIN

THE COMM CLOSET OR WITHIN THE VICINITY OF THE LAN SWITCH IN ACCORDANCE WITH

SPECIFICATION 23 09 23. CONTRACTOR SHALL INSTALL ILON 600 (BPOC) (PER SPECIFICATION 23 09 23) MOUNTED IN A LOCKABLE BOX EQUIPPED WITH A CH751 KEY. INSTALL POWER WIRING

TO THE BPOC. THE BPOC SHALL CONNECT TO THE DOC CONTROLS AN D SERVICE METERS.

PROVIDE CAT-6 CABLE FOR FUTURE CONNECTION TO BUILDING LAN SWITCH.

5. THE CONTRACTOR SHALL PROVIDE AN AS-BUILT RISER DIAGRAM THAT INCLUDES

DESCRIPTION OF DEVICES/NODES ALONG WITH THEIR ORDER ON THE LON TRUNK.

6. THE LON TRUNK IS A DOUBLE TERMINATED TP/FT-10 BUS TOPOLOGY.

7. A CAT-6 CABLE SHALL BE PROVIDED FOR CONNECTION OF THE BPOC WHICH NEEDS TO BE

WITHIN THE BUILDING LAN SWITCH. THE CAT-6 SHALL BE LONG ENOUGH TO REACH

THE SWITCH WITH 3 M TO SPARE. THE CABLE SHALL BE CLEARLY LABELED UMCS AT BOTH ENDS.

THE INSTALLER SHALL NOT PLUG THE CAT-6 INTO THE LAN SWITCH.

8. LON NODES (PER SPECIFICATION 23 09 23) ARE DEVICES THAT COMMUNICATE USING THE

CEA-709.1 B PROTOCOL AND ARE CONNECTED TO A CEA-709.1 B NETWORK. LON NODES VARY

DESCRIBED AS DOC CONTROLS AN D SERVICE METERS.

9. DOC LON NODES ARE DEPICTED IN THE MECHANICAL DESIGN DRAWINGS. DOC CONTROLS AND LON CARDS ON EQUIPMENT SUCH AS, BUT NOT LIMITED TO: CHILLERS, BOILERS, COOLING TOWERS, AND THEIR ASSOCIATED PUMPS, VARIOUS HVAC SYSTEM EQUIPMENT (AHUS, FCUS, SENSORS, VAVS, ETC.), AND CONTROL VALVES.

NOTES:

G) DO NOT ROUTE COMMUNICATION WIRE IN CONDUITS CARRYING AC VOLTAGE LINES. DEDICATED

COMMUNICATION RACEWAY IS REQUIRED IN EMT.

@ COMMUNICATION WIRE MUST BE UNSHIELDED EQUAL TO BELDEN 8461 #18 STRANDED SINGLE

TWISTED PAIR AND BE CONSTANT THROUGHOUT LOOP.

@ DOUBLY TERMINATED TOPOLOGY. LON MAXIMUM DISTANCE 2700 M. ILON 600 CONFIGURED AS

REPEATER REQUIRED AFTER 64 NODES.

@ TERMINATORS DEFINE THE PHYSICAL ENDS OF THE LON. THE TERMINATORS ARE 105 OHM

RESISTORS FOR SUPPORTED BUS ARCHITECTURE.

I w I C/)

Cf)

I w

::s a_ w c:::

"' 0 z it'.

w

"' a> o~ -z f- I

WQ:'.

....,O'.l 0 <( D:'. .

Q_ <(

Cf) _J c:::

1-z _J z I w

Bldg. No.

CA093390P

Project No.

SHEET

REFERENCE

M-703

G-101 Cover Sheet
C-101
D-101A
D-101B
D-102
M-101A
M-101B
M-102
M-501
M-502
M-503
M-601
M-602
M-701
M-702
M-703

File details come from the government source that posted it. Updated .