Attachment 2 - QASP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF_30_Amendment_0002.pdf | ||
| SF_30_Amendment_0001.pdf | ||
| Attachment_1_-_PWS__Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| SF_1449_solicitation_package.pdf | ||
| A03_Attachment_1_-_PWS.pdf | ||
| A03_Attachment_3_-_Pricing_Sheet.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT #2
QUALITY ASSURANCE SURVEILLANCE PLAN
WALTER REED ARMY INSTITUTE OF RESEARCH (WRAIR)
1 Vision
Our vision is to be the premier DoD biomedical research organization, constantly relevant, integrating basic research and advanced technology that protects, projects, and sustains the Warfighter today, invents global medical solutions for the future, and keeps the Warfighter on point for the Nation
The Contractor shall provide the support services necessary to execute all FileMaker management services in support of the Veterinary Services Program (VSP) Pathology within Walter Reed Army Institute of Research (WRAIR).
2 Mission
The WRAIR aims to conduct biomedical research that is responsive to Department of Defense (DoD) and US Army requirements and delivers life-saving products including knowledge, technology and medical material that sustain the combat effectiveness of the Warfighter
3 Purpose
3.1. This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor's performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:
3.1.1. Delivery of all items IAW the delivery schedule outlined in the PWS will be monitored, as well as Contractor technical performance on all assigned tasks.
3.1.2. Monitoring will take place on a monthly basis.
3.1.3. All surveillance activities will be conducted by the COR or his/her designated appointee.
3.1.4. Surveillance results will be documented in memorandum format or by using the attached document templates.
All deviations will be shared with the Contractor and the Contractor shall provide a written corrective action plan to the COR within seven (7) calendar days of notice.
3.2. The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the government's surveillance of the contractor's performance to assure that it meets contract standards. It is the government's responsibility to be objective, fair, and consistent in evaluating contractor performance.
3.3. The QASP is not intended to duplicate the contractor's quality control plan. This QASP is a living document.
Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
3.4. The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor.
Bottom line, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.
4 Authority
Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation (FAR), Inspection of Services clauses, which provide for inspection, acceptance and documentation of the service called for in the contract. This acceptance is to be executed by the Contracting Officer or a duly authorized representative.
5 Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
5.1 Contracting Officer (KO)
The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine and document the final assessment of the contractor's performance in the governments past performance tracking system.
Assigned KO: TBD
Organization or Agency: U.S. Army Medical Research Acquisition Activity (USAMRAA)
Telephone: TBD
Email: TBD
5.2 Contracting Officer's Representative (COR)
The COR is responsible for providing continuous technical oversight of the contractor's performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor's actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government's behalf.
Assigned COR: TBD
Organization: Walter Reed Army Institute of Research (WRAIR)
Telephone: TBD
Email: TBD
5.3 Other Key Government Personnel
This may include performance monitors, inspectors, technical experts, or others who provide information that helps the COR monitor contractor performance.
The designated technical quality assurance personnel are:
Name: TBD
Organization: U.S. Army Medical Research Acquisition Activity (USAMRAA)
Telephone: TBD
Email: TBD
5.4 Contractor Representatives
The following employees of the contractor serve as the contractor's Program Manager and Task Manager for this contract.
5.4.1. Contractor Program Manager
Name: TBD
Telephone: TBD
Email: TBD
5.4.2. Contractor Task Manager
Name: TBD
Telephone: TBD
Email: TBD
5.4.3. Other Key Contract Personnel (Project Manager)
Name: TBD
Telephone: TBD
Email: TBD
6 Performance Requirements and Method of Surveillance
This section describes the special requirements for this effort. The following sub-sections provide details of various considerations on this effort.
6.1 Contract Surveillance
The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR's contribution is their professional, non-adversarial relationships with the KO, PM and the contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor's performance. Additionally, this QASP is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.
6.2 Surveillance Matrix
6.2.1. The Surveillance Matrix Table 1 is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
6.2.3. Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor's performance as it relates to the performance element standards.
The matrix should be used to form the foundation of the COR's inspection checklist. In evaluating the quality of contractor’s performance, the following performance ratings may be used.
Performance Rating
Criteria
Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Table 1 - Surveillance Matrix
Performance Requirement Performance Standard
Acceptable Quality Level
Method of Surveillance
Incentive
Deliverable 1 Training Certifications
Initial: 30 days after contract award
Subsequent: annual therefore
100% Complete
90 - 100% Inspection
Past Performance
Deliverable 2 Monthly Report
Initial: 30 days after contract award
Subsequent:
Monthly
90 - 100% Inspection
Past Performance
Deliverable 3 Quality Control Plan
Initial: 15 calendars after contract start date
Subsequent: as needed
100% Inspection Past Performance
Deliverable 4 Contractor Manpower Reporting
Initial: by 31 Oct annually
Subsequent: by 31 Oct annually
100% Complete
90 - 100% Inspection
Past Performance
Deliverable 6 Contractor shall provide a Plan of Action/Mitigation with Milestones POA&M, when a FileMaker vulnerability cannot be mitigated within 30 calendar days
Initial: N/A required in accordance with the PWS
90% -100% Complete
90 - 100% Inspection
Past Performance
Contractor shall apply all applicable patches compatible with or required by WRAIR systems.
required in accordance with the PWS
90% -100%
90 - 100%
Contractor shall make all repairs or resolutions within five (5) business days from the date of incident report required in accordance with the PWS
90 - 100%
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6.
CONTROL
NUMBER
7. DEFICIENCY MAJOR MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT
RECURRENCE
11. COR DETERMINATION
ACCEPTED REJECTED
12. CLOSE DATE
CUSTOMER COMPLAINT RECORD
DATE/TIME OF
COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION BUILDING
NUMBER
INDIVIDUAL PHONE
NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACT/TASK ORDER
NUMBER
2. CONTRACTOR 3. TYPE OF SERVICES
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND
DATE
5. COR PHONE 6.
SUSPENSE
DATE
I. PERFORMANCE
7. DEFICIENCY (CHECK ALL BOXES THAT
APPLY)
NEW
REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS
PARAGRAPH ITEM REVIEWED
9. BRIEF DESCRIPTION OF DEFICIENCY (IF
DEFICIENCY BOX WAS CHECKED)
10. DETAILED PERFORMANCE
ASSESSMENT
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE CONCUR
NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED
COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE
OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. CONCUR NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
16. CONTRACTOR REPRESENTATIVE REMARKS