Questions_17-R-0033_lapt_27_Dec.xlsx
XLSX spreadsheet 31 KB Posted
- Attached to
- US Military HIV Research Program (MHRP)
- Solicitation number
- W81XWH-17-R-0033
- Issued by
-
Department of the Army Medical Command
About this file
Answers to questions
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question # | Reference | Question | Government Response |
| 1 | RFP Section B, Pgs. 5, 6, and 7 | It appears that 4.17 Short Suspense Specified Protocols is merely a heading and that there are not any specific tasks associated with it. Would the Government please clarify the relationship among CLIN 0011 (PWS 4.17), CLIN0015 (PWS 4.17.2) and CLIN0017 (PWS 4.17.4)? | There are four optional CLINS identified as Short Suspense Specific Protocol [CLINS 0011,0012, 0014, 0015] which are explained with the example language in Attachment A01 Attachment PWS-P12 Description of Surge Clin Estimates and reference back to PWS para 4.2. Plug amounts are provided for these CLINS. Attachment PWS- P12 is revised and attached for clarity. |
| 2 | RFP Section B, Pgs. 5, 6, and 7 | It appears that 4.17 Short Suspense Specified Protocols is just a heading and there are not any specific tasks associated with it. Could the government clarify the relationship among CLIN 0012 (PWS 4.17), CLIN0014 (PWS 4.17.1) and CLIN0016 (PWS 4.17.3)? | There are four optional CLINS identified as Short Suspense Specific Protocol [CLINS 0011,0012, 0014, 0015) which are explained with the example language in Attachment A01 Attachment PWS-P12 Description of Surge Clin Estimates and reference back to PWS para 4.2. Plug amounts are provided for these CLINS. Attachment PWS- P12 is revised and attached for clarity. |
| 3 | RFP, Section B, CLIN 0008, Pg. 4 / Section B CLIN 0020, Pg. 8 | Both CLINs state that the cost for the CLIN is for all labor required to perform surge services in support of DETA as outlined in the PWS paragraph 4.13 - 4.15. However, there is a plug number ($350,000/year) provided for CLIN 0020 on page 95 of the RFP and an estimated LOE of an additional 8 FTESs per year given for CLIN 0008 on the attachment-PWS-P12. Would the Government please clarify the relationship between CLIN 0008 and CLIN 0020? | Firstly, CLIN 0020 has been deleted. The DETA Surge CLIN 0008 is described A01 Attachment PWS-P12 Description of Surge CLIN Estimates and in the revised A01 Attachment PWS-P10 Level of Effort and CLIN Structure. |
| 4 | RFP, Section B, Pg. 9 | • Item No. 1001 option refers to PWS paragraph 4.3, which cannot be found. |
• Item No. 1002 option refers to PWS paragraphs 4.8 – 4.10, which cannot be found
• Item No. 1003 option refers to PWS paragraph 4.2, which cannot be found Question: Would the Government please provide the apparently missing information?
| The FEDBIZOPS upload for the subject solicitation contains the complete PWS inclusive of para. 4.3, 4.8-4.10, and 4.2. Suggest downloading again from FEDBIZOPS. | ||
| 5 | RFP, Section B, Pg. 11 | • Item No. 1007 options refers to PWS paragraphs 4.4 – 4.7, which cannot be found |
• Item No. 1009, Admin DLDM Services, refers to support for DETA, which we assume is an error.
• Item No. 1010 option refers to PWS paragraph 4.9, which cannot be found
| Question: Would the Government please provide the apparently missing information and clarify Item No. 1009? | The FEDBIZOPS upload for the subject solicitation contains the complete PWS inclusive of para. 4.4 -4.7, and 4.9. Suggest downloading again from FEDBIZOPS. CLIN 1009 is corrected to refer to DLDM. | ||
| 6 | RFP Section J, Pg. 82 of the RFP | There are four attachments listed but not provided in the RFP, as follows: |
• Attachment S2 – Cost Schedule
• Attachment S3 – Standard Form 1408 (Preaward Survey of Prospective Contractor Accounting System)
• Attachment S5 – Small Business Participation Plan Evaluation Form
• Attachment S6 – Wage Determination
| The amendment #0001 provides the missing Attachments S2, S3, S5, and S6. | |||
| 7 | RFP, Section L, Format, Pg. 87 | Would the Government please confirm that there are no line spacing requirements? | No line spacing requirements. |
| 8 | RFP, Section L, Volume II | Non-Cost/Price Technical – Title Page, Contractor POC Cover Page, Pg. 88 |
May the Offeror combine these two pages?
| Yes, it may be combined. | ||
| 9 | RFP, Section L, Incumbent Personnel, Pg. 88 | • We understand this provision to mean that offerors should not reach out to incumbent personnel – will the Government please confirm this understanding? |
• Further, will the Government please clarify when offerors should provide the CS the offeror’s point of contact to receive inquiries of interest from incumbent personnel; i.e. should that contact information be provided with the proposal response or in advance of submission?
| Please refer to 29 CFR section 541 for the professional employees definition. Please see revised instructions. | ||
| 10 | RFP, Section L, Content Requirement, Pg. 88 | “Each file of the proposal shall consist of a Table of Contents, Summary Section, and the Narrative discussion.” |
Would the Government please clarify what is meant by the word “file” in this provision? Specifically, is a Summary Section and Narrative Discussion required for all three volumes?
| No a summary section is not required for all three volumes. | ||
| 11 | RFP, Section L, Volume III – Past Performance, Pg. 89 | “Offeror shall submit a listing of no more than three (3) references for Government and/or commercial contracts for the prime Offeror” / RFP, Section L, Factor 5, Pg. 92, “The Offeror (Prime Contractor) shall submit no more than two (2) references of relevant contracts within the past 3 years for its own performance.” |
Would the Government please clarify the number of Past Performance references that may be submitted?
| The number of Past Performance references is three (3). The solicitation is corrected to state three (3) references. | |||
| 12 | RFP, Section L, Volume III – Past Performance, Pg. 89 / RFP, Section L, Factor 5, Pg. 92 | Would the Government please clarify whether Factor 5 and Volume III–Past Performance are the same – or does Volume II–Non-Cost/Price Technical Proposal require the inclusion of Factor 5? | Factor 5 should be included with Volume III past performance. Please see revised section L. |
| 13 | RFP, Section L, Past Performance Questionnaire, Pg. 90 | “The Offeror shall e-mail to the Contract Specialist a list of all the POC’s who were sent a questionnaire. The Government must receive this list no later than the proposal due date.” |
Will the Government please clarify whether this list should be submitted with the Offeror’s proposal or sent directly to the Contract Specialist before?
| The past performance questionnaire must be received before the proposal due date and sent to the contract specialist. | ||
| 14 | RFP, Section L, Factor 1: Technical/Scientific Approach, Pgs. 90-91 | “This description should specifically address the Offeror’s approach for (a – i)” / PWS, 2.7 Conduct translational research, Pg. 5 |
The RFP does not include Translational Research. Can the Government please clarify if/how this topic is to be addressed?
| The term "translational research" is removed from the PWS and evaluation factor terminology. | |||
| 15 | RFP Section L, Factor 6: Small Business Participation Plan, Pgs. 93-94 | Should Factor 6 be included with Volume I: Business Proposal? | Factor 6 should be included with Volume III past performance. Please see revised section L. |
| 16 | RFP, Section L, Factor 7: Cost/Price Factor, Other Direct Costs (ODCs), Pg. 94 | May ODCs be included as part of the minimum required goal percentage for small business? | Yes ( please see revised PWS Objective 2.11 potential move of facilities DLDM assets. This objective may be used for consideration for goal percentage for small business). |
| 17 | RFF, Section L, Factor 7: Cost/Price Factor, Pg. 94 | The solicitation states that Offerors that do not have DCAA approved accounting systems should submit the Defense Contract Audit Agency (DCAA) Pre-award Survey of Prospective Contractor Accounting System Checklist and the Standard Form 1408 (Pre-award Survey of Prospective Contractor Accounting System) (Solicitation Section J S3). |
We assume that this requirement does not apply to subcontractors; would the Government please confirm this understanding?
| This depends upon how the prime contractor proposes their subcontractors. If proposed as a cost relationship, the sub must have a DCAA approved accounting system. | |||
| 18 | RFP, Section L, Volume III, Factor 7: Cost/Price Factor, Other Direct Costs (ODCs), Pg. 94 | If subcontractors are unwilling to submit their direct labor rates directly to the prime contractor, may they submit their rates directly to the Government (utilizing the same proposal submission instructions and due date and time located in the solicitation)? | Yes |
| 19 | RFP Section L, Factor 2: Quality Management Approach (QMA), Pgs. 104-105 / PWS, 4.10 Quality assurance/Control Management Support Services, Pgs. 15-17 | As the Quality Management Plan does not count towards the page limits, may the Offeror include it as an appendix? | yes |
| 20 | PWS Sections 4.1.9 (Pg. 7), 4.2.18 (Pg. 10), 4.11.8 (Pg. 18), and 4.12.17 (Pg. 21), | “The Contractor shall assist in….preparation of reports, abstracts, manuscripts, and posters for national and international conferences; and, present findings at national and international conferences as required.” |
Will the contractor be responsible for production and duplication of associated reports, abstracts, manuscripts, and posters?
| Yes, ODCs are revised to include production and duplication costs. | ||||
| 21 | PWS, 4.1.22, Pgs. 8-9 | Will the contractor be required to bear the cost to upgrade software systems used in DLDM and DETA or only provide recommendations for what upgrades are needed and oversee the upgrades and implementation of upgrades and installation of new software systems? | No, the contractor will only be responsible for software upgrade recommendations. | |
| 22 | PWS, 5.11 | The final sentence of this paragraph is incomplete (“All applicable regulations are listed in…”). Would the Government please provide the missing information? | The PWS is corrected to include "PWS Section 9.0 Applicable Documents and References". | |
| 23 | PWS, 5.20 Level of Effort (LOE) Table by CLIN Structure: attachment PWS-P10, Pg. 34 / PWS, Exhibit/Attachment Table of Contents for PWS, Attachment PWS-P10: Level of Effort Table (LOE) by CLIN Structure, Pg. 50 | There is not a complete list of LOE by CLIN Structure attached. Would the Government please provide a complete level of effort table by CLIN Structure? | PWS-P10 Level of Effort Table is revised and attached to this solicitation. | |
| 24 | PWS, 7.2.5, Pg. 41 | Is the inventory referred to in section 7.2.5 2nd paragraph in addition to the Government hand receipt inventory kept by government? | Currently there is no GFE associated with this solicitation. | |
| 25 | L. page 87 of 110 | Proposal Due Date – The RFP states that the proposal is due no later than 12 January 2017 EST. Please confirm the due date year should be 2018. Also, the submission time is missing. | ||
| Due to the holiday and the complexity of the program, we request an extension to 31 January 2018. | The solicitation is corrected to state the proposal due date of 18 January 2018 at 2pm ET. | |||
| 26 | L. page 88 of 110 | Incumbent Personnel – The RFP did not state the due date or time for submitting company contact information to the CS | The solicitation is corrected to state the proposal due date of 18 January 2018 at 2pm ET. | |
| 27 | L. page 88 of 110 | Volume I – Business Proposal Inclusive of Cost Proposal – Please confirm that there is not a page requirement for this volume | Please review the sections that are not subject to page limits located on page 88 /89 of the solicitation. | |
| 28 | L. page 94 of 110 | Under section “Non-Cost/Price Proposal Content Instructions,” Factor 7 Cost/Price Factor is listed. This seems out of place for the Non-Cost/Price Proposal section. | Factor 7 Cost/Price is located where it should be located in this solicitation. | |
| 29 | K. 52.204-8 | The solicitation states that the small business size standard for 541714 is $32,500,00. However NAICS states that it is 1,000 employees which is also stated in section L. Can you clarify? | 541714 is now 1,000 employees. Please see revised solicitation documents | |
| 30 | Attachment PWS-P14 | For positions listed as two separate levels (e.g., Medical Technologist II/III [Serology 1; Molecular 1), do these represent 2 separate FTEs? If so, which is the level II and which is the III? | PWS-P10 Level of Effort Table, PWS-P2 DLDM Organization charts, and PWS-P15 Suggested Personnel in Addition to Key Personnel are revised and attached to provide clarity to the noted positions. | |
| 31 | Attachment PWS-P15 | For positions listed as two separate levels, do these represent 2 separate FTEs (e.g., ? | PWS-P10 Level of Effort Table, PWS-P2 DLDM Organization charts, and PWS-P15 Suggested Personnel in Addition to Key Personnel are revised and attached to provide clarity to the noted positions. This response is provided for questions 32 through 62. | |
| 32 | Attachment PWS-P15 | 5.21.2 is missing work location information. | See response for question 31. | |
| 33 | Attachment PWS-P15 | 5.21.3 is missing duties, required licenses, and work location. | See response for question 31. | |
| 34 | Attachment PWS-P15 | 5.21.4 is missing required licenses | See response for question 31. | |
| 35 | Attachment PWS-P15 | 5.21.5 is missing required licenses | See response for question 31. | |
| 36 | Attachment PWS-P15 | 5.21.6 is missing required licenses and work location | See response for question 31. | |
| 37 | Attachment PWS-P15 | 5.21.7 is missing required licenses and work location | See response for question 31. | |
| 38 | Attachment PWS-P15 | 5.21.8 is missing work location | See response for question 31. | |
| 39 | Attachment PWS-P15 | 5.21.9 is missing required licenses | See response for question 31. | |
| 40 | Attachment PWS-P15 | 5.21.10 is listed twice. Once for the Administrative Assistant and once for the LIS Programmer and Software Analyst I/II) | See response for question 31. | |
| 41 | Attachment PWS-P15 | 5.21.10 (for both positions) is missing required licenses and work location. | See response for question 31. | |
| 42 | Attachment PWS-P15 | 5.21.12 is missing required licenses | See response for question 31. | |
| 43 | Attachment PWS-P15 | 5.21.13 is missing required licenses | See response for question 31. | |
| 44 | Attachment PWS-P15 | 5.21.14 is missing required licenses | See response for question 31. | |
| 45 | Attachment PWS-P15 | 5.21.15 and 5.21.16 are missing from the list | See response for question 31. | |
| 46 | Attachment PWS-P15 | 5.21.17 is missing work location. | See response for question 31. | |
| 47 | Attachment PWS-P15 | 5.21.18 is missing work location | See response for question 31. | |
| 48 | Attachment PWS-P15 | 5.21.19 is missing required licenses and work location | See response for question 31. | |
| 49 | Attachment PWS-P15 | 5.21.20 is missing required licenses and work location | See response for question 31. | |
| 50 | Attachment PWS-P15 | 5.21.21 is missing required licenses | See response for question 31. | |
| 51 | Attachment PWS-P15 | 5.21.22 is missing duties, required licenses, and work location | See response for question 31. | |
| 52 | Attachment PWS-P15 | 5.21.23 is missing duties, required licenses, and work location | See response for question 31. | |
| 53 | Attachment PWS-P15 | 5.21.25 is missing required licenses and work location | See response for question 31. | |
| 54 | Attachment PWS-P15 | 5.21.26 is missing required licenses | See response for question 31. | |
| 55 | Attachment PWS-P15 | 5.21.27 is missing required licenses and work location | See response for question 31. | |
| 56 | Attachment PWS-P15 | 5.21.28 is missing required licenses and work location | See response for question 31. | |
| 57 | Attachment PWS-P15 | 5.21.29 is missing required licenses and work location | See response for question 31. | |
| 58 | Attachment PWS-P15 | 5.21.30 is missing required licenses and work location | See response for question 31. | |
| 59 | Attachment PWS-P15 | 5.21.31 is missing required licenses and work location | See response for question 31. | |
| 60 | Attachment PWS-P15 | 5.21.32 is missing required licenses and work location | See response for question 31. | |
| 61 | Attachment PWS-P15 | 5.21.33 is missing required licenses and work location | See response for question 31. | |
| 62 | Attachment PWS-P15 | 5.21.34 is missing required licenses and work location | See response for question 31. | |
| 63 | Section M Factor 7 | Solicitation states: “Service Contract Act (SCA) applies as appropriate. Wage determination shall be included in the solicitation (see attachment 13). | ||
| Attachment 13 appears to be the QASP and does not contain the wage determination. In addition, please identify which of the positions are covered under SCA. | Wage Determination is added to the solicitation documents. It is up to the offeror to determine which of their proposed positions are covered by the SCA. | |||
| 64 | Attachment S1 PWS | 4.11.18 and 4.11.19 appear to be duplicates. Please clarify | Para 4.11.19 is a duplicate of 4.11.18. Para 4.11.19 has been removed. | |
| 65 | Attachment PWS-P14 and Attachment PWS-P15 | What security clearances are required to work in the WRAIR BSL-2 laboratory | No security clearances are required. | |
| 66 | Attachment PWS-P14 and Attachment PWS-P15 | What security clearances are required for the labor categories | No security clearances are required. | |
| 67 | General | The MHRP program has historically been executed via a Cooperative Agreement which has provided the incumbent access to the overall financial aspects of the program. In order to create a fair full and open competition, and not a perceived bias toward the incumbent, we suggest the Government provide historical financial execution information via a reading room or an addendum sent to all perspective offerors. |
Will the Government provide the suggested information?
| The Government has provided a very detailed solicitation in effort to level the playing field as much as possible. Examples of information provided are key personnel; suggested support personnel; detailed listing of software, and equipment used in day to day operations; the mission overview; organization charts; test menus with approximate numbers of annual testing; an understanding of how DLDM and DETA integrate; as well as a narrative of the surge CLINs for cost proposal estimates. The Government cannot provide another contractors' proprietary information. | |||
| 68 | PWS Section 7.1.2 | Can the government please confirm that if bidders expect the government to reimburse the cost of shift differential and weekend work, then bidder's must detail the application of those costs in their cost narratives and include those costs in the submitted detail of the estimated cost build up at time of proposal submission? | Currently there are no work schedules that require shift differential. The Government is not asking the offeror to propose a shift differential. |
| 69 | PWS Paragraph 4.1.3 and 4.1.23 | Under 4.1.3 and 4.1.12 the contractor is responsible for routine maintenance and calibration activities covered by manufacturer and DOD guidelines. Does this potentially include subcontracting with the manufacturers and third parties for calibration and maintenance activities that can only be performed by the manufacturer or manufacturer certified agents? | The requirement is only for routine user level maintenance. No subcontracting for maintenance is required. |
| 70 | PWS Paragraph 4.1.7 | Under 4.1.7: If the government opts to replace equipment, with different models and makes, will (re) training and certification be paid for by the government? | Yes |
| 71 | PWS Paragraph 4.10.3 | Under 4.10.3 we are responsible for tracking and reporting on non-conforming events. What system is being used to track this? Is this done in the Master Control software (we don’t see that the NCE module is specified in the software list)? | An Excel spreadsheet is being used to locally track events. |
| 72 | PWS Paragraph 7.6 | Based on Paragraph 7.6, can we assume that the Occupational Health Program costs as specified under paragraph 6.6.3.3 are covered as a consumable ODC and the provided Plug Number? | Yes |
| 73 | Attachment PWS –P2 and DLDM Org Final Section J, Attachments | The Government has provided two separate sets of org charts dated March and April that are not consistent for DLDM. They are (1) PWS-P2_DLDM_Org Chart and (2) DLDM_Org_Chart Final. Please provide the correct Org Chart for DLDM for pricing purposes. | PWS-P2 DLDM and P4 DETA are revised and provided. |
| 74 | Attachment PWS –P4 and DETA Org Final Section J, Attachments | The Government has provided two separate sets of org charts both undated that are not consistent for DETA. They are (1) PWS-P4_DETA_Org Chart; (2) DETAQ_Org_Chart_Final. Please provide the correct Org Chart for DETA for pricing purposes. | PWS-P2 DLDM and P4 DETA are revised and provided. |
| 75 | Attachment PWS-8b Organizational Conflict of Interest | The Solicitation states “The offeror shall provide a listing of all contracts performed for WRAIR and any enterprise laboratories (United States Armed Forces Research Unit – Europe (USAMRU-E), USAMRU-G, USAMRU-K, and AFRIMS) as well as with other MRMC laboratories (i.e. U.S. Army Medical Research Institute of Infectious Diseases (USAMRIID), U.S. Army Medical Materiel Development Activity (USAMMDA), the Telemedicine and Advanced Technology Research Center (TATRC) or MRMC) in the last three (3) years.” |
(1) Is this information required even if the Offeror certifies that there is no known OCI?
| (2) If so, where does this go in the proposal submission? | If the Offeror is attesting that no OCI exists then the past contract history is not necessary. Offerors are required to certify that no Organizational Conflicts of Interest are noted. Attachment PWS-P8b is provided for signature. If a mitigation plan is required it should be provided under volume I. | |||
| 76 | CLIN 00153 | Would the Government please confirm this should be CLIN 0015, not 00153? | This was incorrectly marked in the old PWS-P10 document which has since been revised and corrected. Thereby eliminating this issue. | |
| 77 | Attachment PWS-10, |
The PWS refers to Level of Effort (LOE) Table by CLIN Structure as attachment PWS-P10; however Attachment PWS-P10 only provides information for CLINs 0014, 0015, 0016 and 0017. PWS-P10 does not provide the LOE for CLINS 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011, and 0012.
Will the Government please provide the entire LOE by CLIN structure?
| PWS-10 Level of Effort by CLIN is revised, thereby correcting this issue. | ||
| 78 | PWS-P12 Surge CLINs 0004, 0005, 0006 and 0008 | The Government has provided FTEs for each Surge CLIN in Attachment PWS-P12: CLIN 0004, 0005, 0006, and 0008. |
(1) Will the Government provide annually estimated plug-in amounts for these CLINs?
(2) If not, will the Government provide specific detail regarding the labor categories and hours that make up the FTE count per year? This will ensure we have the data necessary to support pricing these CLINS.
(3) If the government does not provide plug numbers, please confirm that all offerors are required to price these surge tasks?
(4) Please confirm that the Government’s evaluation on pricing will include all labor categories and surge requirements.
| Plug in amounts will not be provided. Revised Attachments A01 Attachment PWS-P10 and PWS-P12 are provided to give parameters for suggested support. All surge and optional CLINS shall be included in your cost proposal. | |||
| 79 | Attachment PWS-P12, Last paragraph | Will the Government please advise if this paragraph relates to CLIN 0011 and 0012? If not, what CLIN does it apply to? | Attachment PWS -P12 is revised to identify the CLINs to which the last paragraph applies. |
| 80 | DLDM and DETA Key Personnel 5.19.2.5 | Regarding Attachment 14, key position 5.19.2.5 Medical Technologist II/III (Technical Supervisors: Serology [1]; Molecular [1]) |
(1) Please clarify what the “II/III” designation means.
(2) Are the supervisors for serology and molecular both the same level or is one a II and one a III? If one of each level, please provide which position is a II and which is a III?
| 1) Levels are identified as I, II, III; levels indicate experience within the designated discipline; Level I being entry level; level II is mid-level; and Level III is senior level. 2) This is a Performance based requirement. The offeror is to provide their solution to the requirement. PWS-P14 para. 5.19.2.5 provides the minimum requirement for these positions. See PWS-P10. | ||
| 81 | DLDM and DETA Key Personnel 5.19.2.6 | Regarding Attachment 14, key positions 5.19.2.6 Medical Technologist (Team Lead, Level II/III [Serology [1]; Molecular [1]) |
(1) Please clarify what the “II/III” designation means.
(2) Are the team leads for serology and molecular both the same level or is one a II and one a III? If one of each level, please provide which position is a II and which is a III?
| 1) Levels are identified as I, II, III; levels indicate experience within the designated discipline; Level I being entry level; level II is mid-level; and Level III is senior level. 2) This is a Performance based requirement. The offeror is to provide their solution to the requirement. PWS-P14 para. 5.19.2.6 provides the minimum requirement for these positions. See PWS-P10. | ||
| 82 | DLDM and DETA Key Personnel 5.19.2.9 | Regarding Attachment 14, key position 5.19.2.9 Laboratory Information Systems (LIS) Programmer and Software Analyst II/III |
(1) Please clarify what the “II/III” designation means.
(2) Are these two different positions (one level II and one level III) or one position that could either be a II or a III?
| (3) If one of each level, please provide which position is a II and which is a III? | 1) Levels are identified as I, II, III; levels indicate experience within the designated discipline; Level I being entry level; level II is mid-level; and Level III is senior level. 2) Attachment PWS-P14 para 5.19.2.9 describes the minimum requirements of key personnel positions. See PWS-P10. | ||
| 83 | PWS-P14: DLDM and DETA Key Personnel | There are labor categories that are marked Key on the org chart that are not included in Attachments 14 or 15– Microbiology Diagnostic Tech II, LDL and Research Assistant III in TAL. |
Please confirm if the Microbiology Diagnostic Tech II and the Research Assistant III are key personnel and should be included in the LOE?
| PWS- P2 DLDM Organization chart and PWS-P4 DETA Organization chart, PWS-P10 Level of Effort, PWS-P14 Key Personnel and PWS-P15 are revised and correctly map to each other. | ||
| 84 | PWS P15 Suggested Personnel 5.21.1 | Regarding Attachment 15, suggested personnel 5.21.1 Medical Technologist II/III (Molecular) |
(1) Please clarify what the “II/III” designation means.
(2) Are these two different positions (one level II and one level III) or one position that could either be a II or a III
| 1) Levels are identified as I, II, III; levels indicate experience within the designated discipline; Level I being entry level; level II is mid-level; and Level III is senior level. 2) This is a Performance based requirement. The offeror is to provide their solution to the requirement. See PWS-P10. | ||
| 85 | P15 Suggested Personnel 5.21.2 | Regarding Attachment 15, suggested personnel 5.21.2 Medical Technologist (Serology; Molecular) I/II) |
(1) Please clarify what the “I/II” designation means.
(2) Are these two different med techs – one serology and one molecular?
(3) Are these two different positions (one level I medical technologist and one level II) or one position that could either be a I or a II?
(4) If one of each level, please provide which position is a II and which is a III?
| 1) Levels are identified as I, II, III; levels indicate experience within the designated discipline; Level I being entry level; level II is mid-level; and Level III is senior level. 2) 3) 4) See PWS-P10 Level of Effort Table which has been revised. | ||
| 86 | P15 Suggested Personnel 5.21.10 | Regarding Attachment 15, key position 5.21.10 Laboratory Information Systems (LIS) Programmer and Software Analyst II/III |
(1) Please clarify what the “II/III” designation means.
(2) Are these two different positions (one level II and one level III) or one position that could either be a II or a III?
(3) If one of each level, please provide which position is a II and which is a III?
| 1) Levels are identified as I, II, III; levels indicate experience within the designated discipline; Level I being entry level; level II is mid-level; and Level III is senior level. 2) 3) See PWS-P10. | ||
| 87 | P15 Section J, Attachment PWS-15 Suggested Personnel in Addition to Key Personnel, Section 5.2.1.3, pg. 1 | There are no duties provided for 5.21.3 Clinical Specimen Processor |
Would the Government please provide a description of the duties?
| PWS-P15 is revised and provided to include the detailed information | |||
| 88 | Frap Section I Contract Clauses, Page 59 | The Solicitation includes FAR 52.222-41 Service Contract Labor Standards. Would the Government provide the applicable wage determination schedule and revision numbers? | The Wage Determination is now included. |
| 89 | RFP Section L, Non-Cost/Price Proposal Content Instructions Factor 6 Small Business Participation Plan, Page 93 | Are large businesses also required to submit a Small Business Subcontracting Plan in accordance with FAR 52.219-9 with their proposal, or will it be submitted after contract award? If the Small Business Subcontracting Plan is required with proposals, should it also be submitted in the Non-Cost/Price Proposal volume along with the Small Business Participation Plan? | The sub-contracting plan can be submitted post award. |
| 90 | Section E Inspection and Acceptance, Pages 39-40 | Section E Inspection and Acceptance clauses incorporated by reference should also include FAR 52.246- 5 Inspection of Services Cost-Reimbursement and FAR 52.246-9 Inspection of Research and Development (Short Form), which are already in the Section I contract clauses. Would the Government incorporate the other applicable clauses in Section E? | Please see revised solicitation. |
| 91 | Proposal Adequacy Checklist, Page 97 | The Government has requested offerors to complete the Proposal Adequacy Checklist (RFP pages 96-102). Section L Instructions does not provide this requirement. |
(1) Would the Government consider removing this requirement?
(2) If this is to be submitted with the proposal, in which Volume should it be submitted and at what location?
| Proposal Adequacy Checklist is required and should be submitted with the offeror cost proposal, and will not be counted towards the proposal page limits since it is submitted under the cost proposal. | ||
| 92 | Section L Factor 7, Page 94 | A supplement pricing sheet with detailed breakdown of proposed hours, labor rates, overhead, G&A, and profit or fee is required from the prime and subcontractors. |
(1) Will the Government please clarify that this requirement is for CPFF CLINs only?
(2) Will the Government please confirm there is no supplemental pricing sheet required for FFP CLINs?
(3) Please advise if each subcontractor may submit their proprietary cost and pricing data directly to the Contracting Officer via email with a reference to the Prime Contractor’s proposal submission?
| 1). Yes CPFF CLIN's require the build ups of proposed rates. 2). No, FFP CLIN's only require a breakdown of proposed fully burdened labor. 3). Yes, subcontractors may provide proprietary cost and pricing data directly to the named contract specialist via email. | ||
| 93 | Section I FAR clause 52.215-12 and 52.215-21 Cert of cost or pricing date are included in the contract clauses, Page 58 | Section I provides the Certification of cost or pricing data FAR clause. |
Since this is a competitive bid, please confirm that Certificate of Cost or Pricing Data is not required?
| Yes, certified cost and pricing date is not required. Please see revised solicitation. | ||
| 94 | CLIN Structure Pages 5-7 and PWS Paragraph 4.17, 4.17.1-4.17.4, Pages 23-24 | There appears to be redundancy in the following CLIN structure for they all relate to PWS Task 4.17: |
- CLIN 0011 – Optional Lab Support Suspense Requirement, O&M, PWS Paragraph 4.17
- CLIN 0012 – Optional Lab Support Suspense Requirement, RDT&E, PWS Paragraph 4.17
- CLIN 0014 – Short Suspense Specific Protocol DLDM, RDT&E, PWS Paragraph 4.17.1
- CLIN 0015 – Short Suspense Specific Protocol DLDM, O&M, PWS Paragraph 4.17.2
- CLIN 0016 – Short Suspense Specific Protocol DETA, RDT&E, PWS Paragraph 4.17.3
- CLIN 0017 – Short Suspense Specific Protocol – DETA, O&M, PWS Paragraph 4.17.4
1) Will the Government please clarify what CLIN 0011 and CLIN 0012 cover in PWS Paragraph 4.17 that are not covered in CLINs 0014-0017, for subtasks 4.17.1 – 4.17.4, respectively?
2) Since the breakout by subtasks are for DLDM and DETA by type of funding, is CLIN 0011 and CLIN 0012 necessary? If so, for what efforts?
| The CLINS are corrected and properly described. | |
| 95 | Section L Instructions To Offerors Proposal Submission |
Proposal Due Date, Page 87
| Specific time of submission is missing from Proposal Due Date information. What time is the proposal due on January 12? | Proposals are due 18 January 2018 at 2PM ET. |
| 96 | Section L Instructions To Offerors Proposal Submission |
Proposal Due Date, Page 87 The RFP does not include submission requirements for Volume III, Past Performance.
Can offerors assume the submission requirements for Past Performance are the same as those provided for the Volume II Non-Cost/Price Technical?
| Content and format instructions are located on PG 87 for volume III. | |
| 97 | Section L Instructions To Offerors Proposal Submission |
Content Requirement, Volume II, Pages 88 - 89 Would the government please confirm that offerors can submit the following sections, not subject to page limits, as attachments to the Non-Cost/Price Proposal?
• Staffing Plan
• Government Furnished Equipment/Information/Property
• Resumes and letters of intent for Key Personnel
| yes, confirm. | |
| 98 | Section L Instructions To Offerors Proposal Submission |
Content Requirement, Volume II, Page 89
| Would the government please specify what information should be included in the Contractor POC Cover Page (e.g., which company POCs and contact details)? | Company name, offeror/proposal point of contact name, email, and Phone number |
| 99 | Section L Instructions To Offerors Proposal Submission |
Content Requirement, Volume II, Page 89 Government Furnished Equipment/Information/Property is included in the list of items not subject to page limits, however there is no RFP instruction associated with this item.
Would the government please revise the RFP to include the related instructions or remove this item from the RFP?
| removed, please see revised solicitation. | |
| 100 | Section L, |
Non-Cost/Price Proposal Content Instructions Factor 4: Staffing Approach, Page 92
PWS 6.0, Deliverables 6.6.3, Page 35 PWS Paragraph 6.6.3 Management Plan and Deliverable 5 in the Deliverables Table specifies that the Management Plan includes the Staffing Approach, Mission Essential Contract Plan, and Occupational Health and Safety Plan and should be included with the proposal submission. Section L Instructions states Factor 4 is a Staffing Approach.
(1) Should Factor 4 be renamed “Management Approach” to account for the PWS Deliverable 5 Management Plan requirement to be submitted with the Proposal? Or are offerors required to submit a management plan in addition to a Staffing Approach and Staffing Plan?
(2) If a separate Management Plan is required, would the Government please revise the RFP to include instructions and evaluation criteria for a Management Plan?
(3) The instructions on page 88 state that the Staffing Plan is not subject to page limits which conflicts with the Factor 4 instructions on page 92 which state that the “Staffing Plan” shall not exceed 5 single-sided pages. Based on the details on page 92 of what is required to be included in the Staffing Plan, specifically, items a) – d), 5 pages would not be sufficient to address each factor. Should this be corrected to remove the 5 page limit?
(4) Would the Government please clarify what is the difference between a Staffing Approach and a Staffing Plan as outlined on page 92 of the instructions in the opening paragraph and then in Item b).
(5) Would the Government please clarify whether the requirement for item c) Mission Essential Contractor services approach (details for contents contained in PWS Paragraph 6.6.3.2) and item d) Occupational Health and Safety approach (details for contents contained in PWS Paragraph 6.6.3.2) are included in the page 5 limit allotted for the Staffing Plan or the 65 page limit or without page limits?
| 1) PWS 6.6.3 and Deliverable 5 are changed to Staffing Plan (please see revised solicitation). 2). Please see above response. 3) Page limit for factor 4 has been increased to 25 single sided pages, please see revised solicitation. 4) Staffing Approach is the overall methodology for all the components for staffing. The Staffing Plan is the written information that addresses the components (little a -d). 5) The limit has been increased to 25 pages please see item 3 above. | |
| 101 | Section L, |
Non-Cost/Price Proposal Content Instructions Factor 4: Staffing Approach, Page 92
The last bullet of PWS Section 6.6.2.1, Transition-In, lists a requirement for Mission Essential Contractor Plan. Factor 4, Staffing Approach also requires a Mission Essential Contractor Plan.
1) Would the government please clarify whether offerors should address this requirement in the Transition In AND Factor 4 Staffing Approach?
2) If this requirement is redundant, would the Government please clarify where the requirement should be addressed and revise the RFP accordingly.
| 1). Mission Essential Contractor Plan has been removed from 6.6.2.1 transition in. | |
| 102 | Section L, |
Non-Cost/Price Proposal Content Instructions, Factor 5, Pages 92-93
Volume II – Non-Cost/Price Technical, Volume III Past Performance, Page 88-89
Section M Evaluation Criteria for Award, Factor 5, Page 106 Factor 5 RFP instructions conflict with the instructions for Volume III Past Performance. Instructions for Volume III state the following:
• This volume shall not exceed 15 pages for the prime contractor and five (5) additional pages for each subcontractor (5 pages per sub).
• “Offeror shall submit a listing of no more than three (3) references for Government and/or commercial contracts for the prime Offeror and one (1) reference for each subcontractor.”
• This volume shall be organized in the following sections:
o Section 1 – Contract Descriptions o Section 2 – Performance o Section 3 – Subcontracts
• Volume III includes a requirement to submit PPQs, Instructions for Factor 5 state, the following:
• “The Offeror (Prime Contractor) shall submit no more than two (2) references of relevant contracts within the past 3 years for its own performance.
• The Offeror shall also submit no more than one (1) reference for each Subcontractor.”
• Factor 5 requires Reference Content to be included with the response.
1) Would the Government please clarify whether offers are to comply with instructions for Factor 5, Volume III or both?
2) If offerors are to comply with Volume III, would the Government please clarify whether the Factor 5 evaluation criteria are applicable to Volume III?
3) If not, would the Government provided revised evaluation criteria specific to Volume III?
| 1) Factor 5 has been changed to state that the prime contractor shall submit no more than three (3) references, see revised solicitation. 2) Volume III and factor 5 are the same (past performance). 3) Volume III is an explanation of how the Government wants your proposal to be separated. Factor 5 & 6 is what should be inside of Volume III | |
| 103 | Section L, |
Non-Cost/Price Proposal Content Instructions Volume III, Page 89 Section 2 – Contract Descriptions states, “Letters of commitment shall be included for all subcontractors for their past performance to be considered.” Section 3 – Subcontracts states, “This section will further include written consent of subcontractors to allow the disclosure of their subcontractor’s past performance information to the Offeror.
1) How does the letter of commitment differ from the written consent of subcontractors?
2) Are offerors required to submit both on behalf of subcontractors?
| 1). These are the same letters. 2) No, the letters of commitment statement is found under Volume III past performance not in Section 2 and is informing you what is required and section 3 is informing you where that letter should be included in your proposal. | |
| 104 | Section L Instructions To Offerors Proposal Submission, Page 91 |
Attachment S-1, 6.6.2.1 Incoming Transition Plan – Deliverable 3, Considering the number of requirements in PWS 6.6.2.1 for the Transition Plan, would the government consider excluding the Transition In plan from page count?
Can offerors include the Transition In plan as an attachment to Vol II?
| NO, the transition In plan will not be exempt from the page count. Offeror's may include the transition In plan an an attachment to Volume II. | |
| 105 | Section J |
List of Documents, Exhibits and Other Attachments, Page 82 Would the government please remove the 2nd list of the Exhibit/Attachments from the RFP as it duplicates and conflicts the heading above, specifically with PWS and QASP attachments listed under the 1st heading. Second listing is removed, please see revised solicitation.