Performance Work Statement Attachment 2 Building and Equipment Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Question_and_Answers.pdf | ||
| A.09.03Combined_Synopsis_and_Solicitation_Cath_Lab_Amendment_1.docx.pdf | ||
| A.01.02_Performance_Workstatement_Attchment_1.docx | DOCX document | |
| Directions_to_Site_Visit_Location_from_Airport.pdf | ||
| A.09.03_Combined_Synopsis_and_Solicitation_Cath_Lab_Final.docx | DOCX document | |
| A.09.03_Individuals_Authorized_to_Bind_Company_Attachment_3.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2: Building and Equipment Specifications Description of Equipment:
· GE Innova 2000 Other Requirements:
· After installation and inspection of unit and it is approved for use by WBAMC. Vendor will provide 1 day of training.
· Modular Medical Building shall be certified by as a Certified Health Physicist. Certificate shall be from the American Board of Health Physics.
Description of Exterior Building:
· Dependent on route into WBAMC campus it may require trailer with modular unit on it to be no higher than 13’ 7”
· Modular Structure: Minimum 14’ x 46’ Maximum: 20’ x 49’
· Ground level patient entry with no hydraulic patient lift; height from ground level to the door entrance should not exceed two feet
· Entrance to the unit will face the north wall of the hospital
· Four foot entrance for patients into procedure room required
· Staff entrance into monitor room required
· All entrances need a key lock with the same key to open all doors; vendor to supply 6 keys
· Unit must remain level (at 0 degrees) from highest point of the ground the unit sits on to the farthest point of the unit. Appropriate support must be used in compliance with OSHA
· Removal of unit at the end of the lease
· Must be equipped with a 10LB type ABC dry chemical fire extinguisher, properly tagged and up to date
· Provide sump pump to lift waste drainage into mechanical room at a higher elevation Description of Interior Building:
· Scrub sink with on/off foot pedal
· Provide printer to support printing of images and reports
· Must be supplied with at least one phone line jack
· Must be supplied with at least five Ethernet ports
· Vendor must supply a continuous Uninterruptable Power System (UPS) for computer system in the monitoring room (hemodynamic, X-ray CPU). A separate continuous UPS of at least 25KVP must support the X-ray system.
· Must include an intercom and stereo system to communicate between procedure room and monitoring room
· Procedure room shall be at least 420 sq. feet
· Monitor room shall be at least 120 sq. feet
· Smooth washable, nonporous material throughout the unit
· Must have sheet vinyl flooring throughout unit
· Must come with an auto contrast injector
· Procedure room walls need to be lead lined according to National guidelines for X-Ray Imaging Facilities
· Window in monitoring room, that allows viewing into procedure room needs to be lead lined
· Door and frame leading from monitor room to procedure room needs to be lead lined
· Monitor boom must have at least 3 monitors for hemodynamic vitals, live image, and review with the capability of adding more monitors
· Must coordinate with Volcano Company to transport and connect all the IVUS equipment and hardware from the WBAMC facility into the cardiac catheterization lab. IVUS monitor must be connected to the vendor supplied monitor boom
· Unit must be in compliance with UFC 4-510-01 guidelines for HVAC
· Oxygen and suctioning capabilities or allow the oxygen and suctioning lines to be inserted
· Unit must be furnished with lockable medical refrigerator
· A/C unit shall maintain an interior temperature of 65 degrees F when at all outside temperatures Government Furnished Utilities Connections:
· 1 - 480V, 3-phase, 200A Power to a column-mounted Disconnect Panel located close to ambulance bay curb
· 1 - 480V, 3-phase, 200A Russell Stoll Receptacle, Female fed from Disconnect Panel
· Power is fed from Hospital Emergency Power System, if normal power is lost. Normal power switch to emergency power occurs in about 7 seconds
· 1 - 3/4 potable water supply line connected to standard 3/4" Hose Bibb; mounted on adjacent side of column above
· Hospital Fire Alarm infrastructure has been modified in adjacent Mechanical Room at ER Ambulance Bay entrance to accommodate alarm activation/notification to the Fort Bliss Fire Department
· Waste drainage - Provisions have already been made to accommodate waste drainage from modular Cath lab unit into the adjacent mechanical/electrical room waist drain system