Attachment_0003_-_MO_Plan_Guidance.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
GENERATOR ALTERNATING
Solicitation number
W58RGZ19R0248
Issued by

About this file

ATT 0003 M & O PLAN GUIDANCE

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OPSHEET

Rev: REV 3
21 June 2010(Current Rev and Rev date)Company Name
Full address, CAGE code, and plan number.OPERATION SHOP TRAVELER

WORK ORDER NO:

Date: ACFT: AH-64, OH-58, ETC SUBMITTED BY

Incoming Part Number: Outgoing Part Numbers:

AUTHORIZATION:

Date:

Approved by:

Outgoing NSN:
S/N -
REFERENCES: 1. All references that are not referenced in the Depot Maintenance Work Requirements (DMWR, Usually Appendix A) will be annotated on the cover page, this includes Maintenance Engineering Orders (MEO's). MEO's will also be annotated in the affected step. 2. The current DMWR with date and changes will also be referenced on the cover page .
REMARKS:

CRITICAL SAFETY ITEM: This must be on the cover page and the following statement: “All CCs are 100% inspected, the part is repaired and overhauled in accordance with QE-STD-2.” This statement must also be on subsequent pages of plan.

STEPS#PROCEDURES/OPERATIONSREFERENCEACTION TAKENMECH PIDTI STAMP
1RECEIPT AND INITIAL INSPECTION

QC: A. Record and/or verify serial number on tags are the same as on the component it is attached to.

B. Verify that all forms, records, tags, and other documents accompanying the Forward Longitudinal Bellcrank Assembly follow procedures prescribed by DA PAM 738-751.

CC (CSI). Perform external inspection of Part for obvious damage.LOCAL SHOP PRACTICES
2Pre-Shop analysis, this will be conducted per chapter 3 in the DMWR. All form must be completed including a component data form. MEO C4659D removes the Pre-Shop analysis, however, the component data form is still a requirement. Check MEO to see which is relevant.Paragraph's 3-1 thru 3-7.1 pages 3-1 and 3-2Sign off for mechanic when applicableSign off for QA when applicable
REMOVAL OF Major Assemblies
3Control of parts, and inspect for damage.Para. 3-8 through 3-10.1, page 3-5
4Removal of Linkage Assembly, figure 3-2 item 1. Remove Linkage assembly. NOTE: Do not remove Name plate (28) unless required. (notes in DMWR will be adhered to)Para. 3-11.1 a., thru k. pages 3-5 through 3-13
5Removal of Rod end Assembly, figure 3-7 item 1. Caution: To prevent damage to glands, pistons must be positioned at mid-stroke.Para. 3-11.2 a. thru d. page 3-13
6Removal of Piston. Figure 3-7 item 15.Para. 3-11.3, a - j, pages 3-13 and 3-14.
7If there is a tolerance, shim measurement or anything that should be singled out that will require use later in the M&O that should be written as a write up of it's own.
8Removal of Actuator assembly, Figure 3-2 item 29.Para. 3-11.4, a. thru n. page 3-14
9Pressure switch removal, figure 3-2 item 26.Para. 3-11.5, a thru d. page 3-14
10Screen removal, figure 3-2 item 42.Para 3-11.6, a. thru c. page 3-14
11Self cleaning Coupling, Figure 3-2 item 43.Para 3-11.7, a. and b. page 3-14
12Bypass Lap Assembly removal, figure 3-2 item 49.Para 3-11.7, a thru i. page 3-14 and 3-15
13Input Crank Assembly removal, figure 3-2 item 68.Para 3-11.9, a. thru k. page 3-15
14Relief Valve Assembly, figure 3-2 item 73.Para 3-11.10, a. thru f. page 3-15
15Jam Simulation Button, figure 3-2 item 78Para 3-11.11, a. thru e. page 3-15 an 3-16
DISASSAMBLEY GENERAL
16Control of parts.Para. 3-13, page 3-17
17Inspect for damage.Para. 3-14.1, page 3-17
DISSAMBLEY PROCSDURES
18Servo Assembly procedures: Notes and Cautions WILL BE ADHEARDED to through this procedure.Para 3-15.1, a. thru f. page 3-17
19NOTE: Lap assembly (8) consisting of lap assembly (9), lap assembly (12) and manifold (15) is a matched set. Do not exchange similar parts with other sets. ● Do not disassemble manifold (15) unless required. (This must be a separate write up to ensure these parts are kept together)Note page 3-17
20Servo Assembly procedures continued: Notes and Cautions WILL BE ADHEARDED to through this procedure.Para. 3-15 g. and h. page 3-17
21Actuator Assembly. Install actuator assembly (Figure 3-7) in actuator assembly holding fixture (274040AT1) (Figure 3-8) using four 1/4-20 X 2-1/2 inch SCHS with four washers and four nuts.Para. 3-15.2 page3-21
22Feedback Link Assembly Disassembly.Para. 3-15.3.1 Page 3-21
23Feedback Lever Assembly and Summing lever assembly, Disassembly.Para. 3-15.3.2, a thru l. page 3-21
24Bracket disassembly.Para. 3-15.3.3, page 3-24
25Clevis Disassembly.Para. 3-15.3.4, page 3-24
26Feedback Lever Assembly and Summing Lever Assembly, Disassembly. Feedback lever assembly (Figure 3-11, 12) consists of lever (14) and bearing (13). Summing lever assembly (15) consists of lever (17) and bearing (16). Do not remove bearings unless necessary.Para 3-15.3.5, a. and b. page 3-24
27Relief Valve Assembly, disassembly.Para. 3-15.4 a. thru c. page 3-31
CLEANING
28General Cleaning. All cleaning will be completed I/A/W DMWR. (Note, if specific cleaning of parts is mentioned, these parts should have separate entries)Para 3-16, page 3-31
In-Process Inspections
29In process inspection will be completed I/A/W DMWR, all notes and warnings will be complied with through out these inspections.Para. 3-17 thru 3-17.5 pages 3-32 and 3-33
Overhaul Inspection Procedures (OIPs), All OIPs must be written individually.
OIP 1, Linkage Assembly, PN 274060-103 or 107
30Serviceability, Visual inspectionPage 3-34, NO 1Inspection results hereMech. SignQA as needed
31Boost assembly condition (2 places), Visual, no cracks allowed.Page 3-34, NO 2A
32Bearing Condition, (2 places), Manual, bearing should turn smoothlyPage 3-34, NO 3B
33Clevis threads (2 places), Visual, No stripped, crossed, flattened or missing threads allowed.Page 3-34, NO 4C
OIP 2, Rod Assembly, PN 274086-1
34Serviceability, Visual, Examine for corrosion, burrs or gouges.Page 3-35, No. 1Inspection results hereMech. SignQA as needed
35Thread condition (Left hand thread), Visual, No stripped, crossed, flattened or missing threads allowed.Page 3-35, No. 2A
36Thread Condition, Visual, No stripped, crossed, flattened or missing threads allowed.Page 3-35, No. 3B
37Fractures and cracks, Visual inspect per Para 3-17.2. When cracks are suspected Fluorescent Penetrant per Para. 3-17.5Page 3-35, No. 4Visual, pass___ or Fail_____ If failed, FPI will be completed, see appendix (?) for results
38All OIPs should follow the examples as above, they can vary, but must contain the information.
Below are example's of OIP's with different Critical Characteristic (CC). These examples may or may not pertain to this particular DMWR.
39******WARNING, Spring measurement is a CC.****** Measure 0.745 - 0.780. The following information MUST be provided. Serial Number___________ Calibration Due____________________ Actual measurement _______________ The Serial Number, Calibration Due date, and the actual measurement must be in the step being completed. CC's must stand out and be noticeable to ensure this is completed.Page 3-60Results will be hereMechanic signatureQA are required for CC's
40***Warning, Fluorescent Penetrant inspection is a CC***Page 3-60Pass_____ Fail ______ Technique sheets are found in appendix (?)Mechanic signatureQA are required for CC's
41Repair procedure will be I/A/W DMWR, the page and paragraph of the repair can be put in the task and should have a pass or fail block. Repairs do not need to be as detailed as OIP's, however, if TMDE is involved , the serial number, Calibration due date, and actual measurement will be in that step.
Assembly procedures
42General Assembly, ALL warning and note will be adhered to through out the assemblyPara. 3-20.1 page 3-99
43Assemble Relief ValvePara 3-21.1a. thru d. page 3-99 - 3-100results here (completed)Mech sig.QA if needed
44Linkage AssemblyPara. 3-21.2, a and b. page 3-100results here (completed)Mech sig.QA if needed
45Linkage Assembly, continuedPara. 3-21.2, c. thru e. page 3-101
Warning CSI, Verification of swagging of pin (28) and collar (27) is a critical characteristic.
46Install new collar (figure 3-11, 27) on pin (28).Para 3-21.2 c, page 3-101results here (completed)Mech sig.QA for CC
47Install bracket (23) on other feedback lever assembly (12). Orient bracket similar to opposite bracket.Para 3-21.2 d, page 3-101results here (completed)Mech sig.QA for CC
48Install new pin (25) through bracket (23) and feedback lever assembly (12).Para 3-21.2 e, page 3-101results here (completed)Mech sig.QA for CC
Warning CSI, Verification of proper swaging of pins (25 and

31) and collars (24 and 30) is a critical characteristic.

49Linkage Assembly, continuedPara. 3-21.2, f. thru k., page 3-101
50Install new collar (Figure 3-11, 24) on pin (25).
NOTE: Pin head must face out toward summing lever.Para. 3-21.2 f, page 3-101
51Install one clevis (29) on summing lever assembly (15) with one new pin (31) and new collar (30).Para. 3-21.2 g, page 3-101
52Install second clevis (29) on other summing lever assembly (15) with new pin (31) and new collar (30).Para. 3-21.2 h, page 3-101
53Install bushing (36) into summing lever assembly (15) as shown in Figure 3-11.Para. 3-21.2 I, page 3-101
54Install new pin (33) through feedback lever assembly (12), washer (35), and through bushing (36).Para. 3-21.2 j, page 3-101
55Install washer (35) on pin (33).Para. 3-21.2 k, page 3-101
56Warning CSI, Verification of proper swaging of pins (33) and

(32) is a critical characteristic.

57NOTE: See Figure 3-17 and 3-18 for proper installation and verification procedures. Use pin/collar gage, (HG77-14A) for swage verification.
58Install one new collar (Figure 3-11, 32) on pin (33).Para. 3-21.2 l, page 3-102
59Install second new pin (33) through second feedback lever assembly (12) and through second summing lever assembly (15).Para. 3-21.2 m, page 3-102
60Install bushing (34) over pin (33) and into summing lever assembly (15).Para. 3-21.2 n, page 3-102
Warning CSI,

Verification of proper swaging of pin (33) collar (32) is a critical characteristic. NOTE See Figure 3-17 and 3-18 for proper installation and verification procedures. Use pin/collar gage (HG77-14A) for swage verification.

61Install new collar (Figure 3-11, 32) on pin (33).Para. 3-21.2 o, page 3-102
WARNING If hydraulic fluid is decomposed by heat, toxic gases are released. Prolonged contact with liquid or mist can cause dermatitis and irritation. If there is any prolonged contact with skin, wash contacted area with soap and water. If liquid contacts eyes, flush eyes with water immediately for 15 minutes. Remove saturated clothing. If fluid is swallowed, do not induce vomiting.

Get immediate medical attention. When handling liquid, wear rubber gloves. Inhalation of vapors should be avoided.

62Linkage Assembly, continuedPara 3-21.2, p. thru t. page 3-105
63Warning CSI, Verification of Installation of input linkage spacer is a CC
64Linkage Assembly, continued
65Install one input linkage spacer (18) on outer

stop bolt (22) next to summing lever assembly

(15).Para 3-21.2 u. Page 3-105
66Install input link assembly (19) on outer stop
bolt (22) next to input linkage spacer (18).Para 3-21.2 v. Page 3-105
67Warning CSI, Verification of Installation of input linkage spacer is a CC
68Install second input linkage spacer (18) and second summing lever assembly (15) on outer stop bolt (22).Para 3-21.2 w, page 3-105
69Install nut (11) on outer stop bolt (22).Para 3-21.2 x, page 3-105
70Torque nut using linkage assembly tool (274060AT2) (Figure 3-12) to 70-80 inch pounds. Actual Torque____________ Serial number__________________ Calibration DUE date __________ This is required even though this is not a CC.Para 3-21.2 y, page 3-105
71Linkage Assembly, continuedPara. 3-21.2 z thru an. pages 3-105 thru 3-107
72Install nut (3) on linkage retaining bolt. Torque nut to 20-25 inch-pounds. Actual Torque_______________ Serial number__________________ Calibration DUE date ______________Para 3-21.2 ao., page 3-107
73Linkage Assembly, continuedPara 3-21.2, ap thru aq page 108
74Warning CSI, Verification of proper swaging of pin (2) and collar (1) is a CC.
75NOTE:

● See Figure 3-17 and 3-18 for proper installation and verification procedures. Use pin/collar gage (HG77-13A) for swage verification.

● Swage pin head must be on same side as bolt heads.

76Install new collar (Figure 3-11, 1) on swage pin (2).Para 3-21.2, ar. page 108
77Linkage Assembly, continuedPara 3-21.2, as and at. page 108
78Testing procedures (if applicable) should closely follow the assembly procedures. All testing producers must be incorporated, if a table for recording parameters is in the DMWR, that table's information must be incorporated in the plan. Testing equipment must also have the Serial number and calibration due date.
79Final Testing and Assembly
80Make sure all parts are clean and that corrosion preventive materials have been removed.Para 4-1.1 a, page 4-1
81Replace all parts listed in App. B, Table B-3.Para 4-1.1 b, page 4-1
82NOTE:
Torque values given are in addition to rundown torque. Torques must be within specified limits. If part is to be safety tied, tighten to lowest recommended torque, then advance to line up for safety tying. Never go above highest recommended torque. Unless specified, do not drill a second cotter pin or lockwire hole in any part previously drilled. Replace part if holes cannot be lined up.Para 4-1.1 c, page 4-1
83Install cotter pins and lockwire per NASM33540.Para 4-1.1d, page 4-1
Final Assembly
90General AssemblyPara. 4-2.1
84General Assembly continuedPara. 4-2.1, a, (1) - (6)
85Shipping will be I/A/W the DMWR and follow the guideline above.
Further instructions: The plan must follow a logical order, initial receiving, Pre-shop analysis/component data form, disassembly, cleaning, OIP's, repair, assembly, testing, and shipping.
The plan should be written to the flow of your shop, if you do all your visual inspection first, the plan can be written like this, but a paragraph explaining this should be added.
Magnetic Particle Inspection and Fluorescent Penetrant Inspection: These inspection must have technique sheets and process sheets that accompany the plan, this is for ALL parts, not just parts that have the CC.
When a part is out outsourced, there MUST be a receiving inspection to ensure the part was completed and no damage to the part occurred while at the outsourced company. The outsourced companies name, address, and CAGE code must also be in that step.
Revision and revision date must be on every page. QE-STD-2 statement must be on every page “All CCs are 100% inspected, the part is repaired and overhauled in accordance with QE-STD-2.”
If shotpeen is to be preformed, a shotpeen plan must accompany the plan. The shotpeen company can submit their plan directly to the Aviation Engineering Directorate if the shotpeen company does not want to release their plan directly to the company.
This is just a template to show what the AED is looking for in a Maintenance & Overhaul plan. How you format a plan is up to the company, but must contain the above content. This is just for an M&O plan, all other documents that are required on the CMO web page must also received.
All, OIP's must be incorporated.
Serial Number, Calibration DUE date, and actual torque/tolerance must be in that step requiring Test, Measurement, and Diagnostic Equipment (TMDE). TMDE is defined as, anything that is calibrated, torque wrench, I.D. and O.D. micrometers, electrical test equipment, gauges (electric or pneumatic), to name a few.
Tooling Certification: A written statement certifying possession of, or access to any required special tooling and inspection equipment, and/or special test equipment current to latest DMWR revision must be provided. If “equivalent” tooling will be utilized instead of the tooling specified in the DMWR, a complete technical description of the tooling is required, and must be sufficient to determine equivalency. Specify availability of in house test equipment, whether it has to be purchased, or built. If no special tooling or inspection equipment is required, state this fact.

01-242-1495 Repair Procedure I Removal and Installation Of Damaged or Worn Basic (production) Bushing/Bearing &"Arial,Bold"&12(PVA) WON_________ Critical Safety Item QE-ST-2 does apply

Rev. 3 dated 21 June 2010 Critical Safety Item QE-STD-2 does apply

&"Arial,Bold"&12PVA Page &P &"Arial,Bold"&12PVA

&"Arial,Bold"&12 Page &P &"Arial,Bold"&12

File details come from the government source that posted it.