Questions.docx
DOCX document 12 KB Posted
- Solicitation number
- W56JSR-21-R-0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions.docx | DOCX document | |
| Questions.docx | DOCX document | |
| Questions.docx | DOCX document | |
| FINAL SOLICITATION.pdf | ||
| Final W56JSR-20-P-0010 P00003 2.5.21.pdf | ||
| CDRL B001 Alternator Electrical Test DPGDS.pdf | ||
| C08 BOE Sheet.xlsx | XLSX spreadsheet | |
| CDRL C001 Break-in Load Test DPGDS.pdf | ||
| CDRL D001 GFM Consumption Report DPGDS.pdf | ||
| CDRL D002 Inventory Report DPGDS.pdf | ||
| CDRL A001 Pre-Shop DPGDS.pdf | ||
| JA - BRAND NAME FINAL.pdf | ||
| FINAL PWS.DOCX | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question received 2/23/2021 About the 3456/SR4B packages. Are the units in an enclosure? Do the units have fuel tanks with them? I am trying to accurately determine the size and material needed for the storage containers and also know shipping weight and dimensions.
Answer 2/24/2021 The 3456/SR4B Packages do not come in an enclosure. They are mated together on a skid. The units will not come with any sort of fuel tank. The rough dimensions of the actual skid assembly are 123”L x 45”W x 57”H and about 10,000lbs and there is no specific way to store aside from the obvious keep away from the elements.
Question received 2/24/2021 Regarding freight. After the first engine is completed and delivered will we be able to pick up an engine each time we deliver an engine? Also, is it possible to pick up more than one engine per trip?
Answer 2/24/2021 As per section 3.1 of the PWS, the contractor shall be notified by ILSC PED for pick up within 7 business days of a power pack identified for overhaul and refurbishment. If the timeline lines up with the delivery of a completed overhaul it is possible to pick up more than one power pack depending on demand from ILSC provided the logistical channel has the equipment to move.