W56HZV19R0096.pdf
PDF 160 KB Posted
- Attached to
- LOCB Training Assets
- Solicitation number
- W56HZV19R0096
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA_W56HZV-19-C-0124_Redaction_LOCB.pdf | ||
| W56HZV19R0096-0003.pdf | ||
| W56HZV19R0096-0002.pdf | ||
| W56HZV19R0096_0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
W56HZV-19-R-0096
JENNIFER SCHNEIDER (586)282-8396
JENNIFER.A.SCHNEIDER17.CIV@MAIL.MIL
W56HZV
U.S. ARMY CONTRACTING COMMAND
WARREN, MICHIGAN 48397-5000
332312
X DOA4
X
SEE SCHEDULE
SEE SCHEDULE
X X
X 1
1 58
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: JENNIFER SCHNEIDER
Buyer Office Symbol/Telephone Number: CCTA-HCP-B/(586)282-8396
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A.1 ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON
Information regarding the Ombudsperson for this contract is located at the following website:
http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html
A.2 ELECTRONIC CONTRACTING
(a) All Army Contracting Command Warren solicitations will be publicized on the Federal Business Opportunities website
(https://www.fbo.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via the Federal Business Opportunities (FBO) system. Proposals or quotes submitted after this date using any other mechanism, including the Army Single Face to Industry Bid Response System (ASFI BRS) may be deemed non-responsive.
(c) Requirements for the online FBO bid submission:
(1) Vendors must log into the FBO System to be able to submit electronic responses for opportunities.
(2) Vendors must be registered in the System for Award Management (SAM) at "../../../../Documents/SharePoint%20Drafts/www.sam.gov"
(a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).
(3) Once logged into the FBO System, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.
(4) FBO will send an email to vendors registered email address confirming the electronic submission.
(5) For additional information on submitting electronic bid responses via the FBO system see the FBO Vendor Guide Section 4.3.1
Submitting an Electronic Response (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf ).
Note to offerors:
(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the
Government infrastructure (in this case, received through FBO) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(f) Solicitations may remain posted on the FBO after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the
2 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
A.3 ALL OR NONE-COMMERCIAL ITEM ACQUISITION
(a) This provision serves as an addendum that modifies paragraph (h) of FAR 52.212-1, entitled INSTRUCTIONS TO OFFERORS--COMMERCIAL
ITEMS. Paragraph (h) is modified to say that the proposal or quote must offer to provide the total quantity of the items in this solicitation.
(b) Only one award will be made as a result of this solicitation. Offers submitted for less than the total quantities of all the items in this solicitation will NOT be considered for award.
A.4 NOTICE OF ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION (FPCON)
Contractor is hereby notified that there is a potential impact on contractor performance on during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.
A.5 NOTICE OF RANDOM ANTITERRORISM MEASURES PROGRAM (RAMP)
In accordance with AR 525-13, Contractor personnel working on an Army installation, arsenal, base or other DoD facility (owned or leased by DoD/Department of the Army), are subject to participation in Installation RAMP security program (e.g. vehicles searches, wearing of
ID badges, etc).
A.6 ACKNOWLEDGEMENT OF AMENDMENTS
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date: __________________ _____
*** END OF NARRATIVE A0001 ***
3 58
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 120W/150T 50M DRY GAP LOCB
2 EA Dry Gap LOCB System in accordance with Section
C.2.1 of the Scope of Work.
(End of narrative A001)
0001AA 120W/150T 50M DRY GAP LINE OF COMMUNICATION ____________________________________________
BRIDGE 2 EA $ $ ______ ______________ __________________
COMMODITY NAME: 120W/150T 50M DRY GAP LOCB
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE SECTION D FOR PACKAGING INSTRUCTIONS
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 2 0120
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
Delivery will be to Wiesbaden, Germany. Specific location information will be provided at contract award.
(End of narrative F001)
4 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002 120W/150T 130M CONV KIT
1 EA Wet Gap Conversion Kit Set in accordance with
Section C.2.2 of the Scope of Work.
(End of narrative A001)
0002AA 120W/150T 130M WET GAP CONVERSION KIT 1 EA $ $ _____________________________________ ______________ __________________
COMMODITY NAME: 120W/150T 130M CONV KIT
CLIN CONTRACT TYPE:
Firm Fixed Price
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE SECTION D FOR PACKAGING INSTRUCTIONS
LEVEL PRESERVATION: Commercial
LEVEL PACKING: Commercial
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0120
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
Delivery will be to Wiesbaden, Germany. Specific location information will be provided at contract award.
(End of narrative F001)
5 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0003 FSR SUPPORT OPTION
OCONUS United States European Command (USEUCOM) mission support will be required if the Option is exercised. The contractor shall furnish all supplies and services to accomplish the tasks specified in
Section C.3 of the Scope of Work.
If the Option is exercised the Government will require up to 180 calendar days of FSR support. The option may be exercised in one or more increments on a per 30-day basis. The contractor will invoice for the actual amount of calendar days worked.
1 LO = 180 calendar days of FSR Support Services.
1 calendar day is defined as one day of FSR Support
Services for one person.
The dates for FSR performance will be provided to the contractor at the time the Option is exercised.
(End of narrative A001)
0003AA FSR SUPPORT UNEXERCISED OPTION 1 LO $ ______________________________ __________________
SERVICE REQUESTED: FSR SUPPORT OPTION
CLIN CONTRACT TYPE:
Firm Fixed Price
OPTION QUANTITY, PURSUANT TO THE CLAUSE
ENTITLED OPTION FOR INCREASED QUANTITY---
SEPARATELY PRICED LINE ITEM (FAR 52.217-7).
The quantity stated for the option CLIN DOES
NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the
Government.
The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the
Government, at the basic contract unit price, and the offer will be evaluated for award accordingly.
(End of narrative B001)
Inspection and Acceptance _________________________
6 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 UNDEFINITIZED
Place of performance in Section C.3.2. The
Performance Completion date will be definitized after contract award if the Government exercises this option.
(End of narrative F001)
7 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0004 TRAVEL OPTION
OCONUS USEUCOM FSR Travel in support of CLIN 0003AA as specified in Section C.3.5 of the Scope of Work.
FSR round trip travel costs associated with travel to and from the USEUCOM destination will be provided under this CLIN in accordance with Section C.3.5.
(End of narrative A001)
0004AA FSR TRAVEL UNEXERCISED OPTION 1 LO $ _____________________________ __________________
SERVICE REQUESTED: TRAVEL OPTION
CLIN CONTRACT TYPE:
Firm Fixed Price
OPTION QUANTITY, PURSUANT TO THE CLAUSE
ENTITLED OPTION FOR INCREASED QUANTITY---
SEPARATELY PRICED LINE ITEM (FAR 52.217-7).
The quantity stated for the option CLIN DOES
NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the
Government.
The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the
Government, at the basic contract unit price, and the offer will be evaluated for award accordingly.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 UNDEFINITIZED
Place of performance in Section C.3.2. The
Performance Completion date will be definitized after contract award if the Government exercises this
8 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
option.
(End of narrative F001)
9 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0005 CONTRACT MANPOWER REPORTING
Contractor shall submit data for itself and its subcontractors in accordance with Section C.4 of the
Scope of Work.
(End of narrative A001)
0005AA CONTRACT MANPOWER REPORTING $ ** NSP ** ____________________________ __________________
SERVICE REQUESTED: CONTRACT MANPOWER REPORTING
CLIN CONTRACT TYPE:
Firm Fixed Price
10 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
1000 CONTRACT DATA REQUIREMENT LIST (CDRL) _____________________________________
Contractor shall provide the data deliverables set forth in Section J, Exhibit A.
(End of narrative A001)
A001 AS-BUILT CONFIGURATION BILL OF MATERIAL LIST $ ** NSP ** ____________________________________________ __________________
SERVICE REQUESTED: BILL OF MATERIALS
CDRL IAW Sections C.2.1, C.2.2 and C.2.2.1 and CDRL
A001.
(End of narrative B001)
Deliveries or Performance _________________________
A002 OPERATOR, MAINTENANCE AND TRAINING INSTRUCTIONS $ ** NSP ** _______________________________________________ __________________
SERVICE REQUESTED: COMMERCIAL PUBLICATIONS
CDRL A002 IAW with Section C.2.4 and CDRL A002.
(End of narrative B001)
Deliveries or Performance _________________________
A003 WEEKLY STATUS REPORT $ ** NSP ** ____________________ __________________
SERVICE REQUESTED: FSR
CDRL A003 IAW Section C.3.5 and CDRL A003.
(End of narrative B001)
Deliveries or Performance _________________________
11 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A004 PRESENTATION MATERIAL $ ** NSP ** _____________________ __________________
SERVICE REQUESTED: CONSTRUCTION TRAINING
CDRL IAW with Section C.3.6 and CDRL A004.
(End of narrative B001)
Deliveries or Performance _________________________
A005 PACKAGING REQUIREMENTS $ ** NSP ** ______________________ __________________
SERVICE REQUESTED: CONTAINER PACKING LIST
CDRL IAW Section C.2.5 and CDRL A005.
(End of narrative B001)
Deliveries or Performance _________________________
A006 CONFIGURATION AND ILLUSTRATION FOR DRY GAP SYSTEMS $ ** NSP ** __________________________________________________ __________________
SERVICE REQUESTED: TECHNICAL DATA
CDRL IAW Section C.2.6 and CDRL A006.
(End of narrative B001)
Deliveries or Performance _________________________
A007 CONFIGURATION & ILLUSTRATION FOR WET GAP SYSTEMS $ ** NSP ** ________________________________________________ __________________
SERVICE REQUESTED: EQUIPMENT INSTALLATION INST
CDRL IAW Section C.2.7 and CDRL A007.
(End of narrative B001)
12 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Deliveries or Performance _________________________
13 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1. DESCRIPTION. This acquisition is for procurement and delivery of 120 Tracked / 150 Wheeled (120T/150W) Military Load Class (MLC)
Line of Communication Bridge (LOCB) 50 meter (m) Dry Gap systems, a 130m Wet Gap conversion kit, and includes an option for Outside of the Continental United States (OCONUS) Field Service Representative (FSR) training support. The LOCB shall meet vehicle crossing test requirements of the Trilateral Design and Test Code (TDTC) for Military Gap Crossing Equipment and NATO STANAG 2021 MLC of Bridges, Ferries, Rafts and Vehicles.
C.2 HARDWARE REQUIREMENTS. The contractor shall manufacture and deliver LOCB Dry and Wet Gap Systems. All structural components of the bridge and pier assembly shall be manufactured and delivered new. Bridge components shall be fabricated from hot dip galvanized steel.
Small components (i.e. pins, clips, bolts, fasteners) that cannot be hot dip galvanized, shall be spun galvanized or plated. Each LOCB system shall include the manufacturer's recommended quantity of common consumable parts for the initial build and installation of the bridge.
C.2.1 Dry Gap LOCB System. Contractor shall provide two 120T/150W MLC 50m Dry Gap LOCB systems. Each 50m system shall include the
120T/150W rated Bridge Span, ramps (two per 50m Dry Gap LOCB system), a 10m support pier, a launch and erection set, any multi-span components necessary for connecting the two bridge systems, bearing components, jacking equipment, pier and abutment grillages, and hand or special tools necessary to construct, launch, and emplace a multi-span bridge for dry gap crossings. The LOCB Fixed Panel Dry Gap
Bridge system shall be able to span a 50m gap with a 120T/150W MLC without intermediate supports and have the ability to connect additional bridge systems using the support piers every 50 meters and multi-span components. Dry Gap LOCB systems shall be capable of operating without restriction in worldwide climatic conditions, per Army Regulation (AR) 70-38. The usable roadway width of the bridge shall be at least 5.0m between curbs. The length of a LOCB Ramp Set shall be at least 12 meters to allow for access/egress of military vehicles on the bridge. The contractor shall provide a Bill of Materials of all parts for the 50m Dry Gap bridge (CDRL A001). The contractor shall annotate if parts are for Wet Gap bridges, Dry Gap bridges, or both in the CDRL (A001) delivery.
C.2.1.1 Common Ramps. Two ramps (one for each end of the bridge, making a ramp set) shall be included with Dry Gap LOCB system. Ramps shall be a minimum of 12m approach. Ramps shall be compatible with both Dry and Wet Gap bridging (i.e., the ramps are not application specific), and shall include grillage necessary for ramp stability and support.
C.2.2 Wet Gap LOCB System. Contractor shall provide one 120T/150W 130m Wet Gap LOCB Conversion Kit. The contractor shall provide all components necessary for launch and erection, and to assemble a 120T/150W 130m Wet Gap bridge based on the two 50m bridge sections and ramps of its 120T/150W dry gap bridge (Ref: C.2.1). The contractor shall provide a Bill of Materials of all parts of a 130m Wet Gap bridge (CDRL A001).
C.2.2.1 Wet Gap Conversion Kit Hardware Requirements. The Wet Gap Conversion Kit shall include, but is not limited to: additional
120T/150W Bridge Hardware to complete a 130m Wet Gap bridge assembly, Landing Piers, Intermediate Piers, Pier to Bridge Grillage, Span
Junctions, Wet Gap Launch and Erection components, multi-span components, bearing components, jacking equipment, abutment grillages, anchorage and winch assemblies, and hand or special tools necessary to construct, launch, and emplace a 130 meter bridge for wet gap crossings supported on floating barge pier structures when using the two 50m Dry Gap bridges (Ref: C.2.1). The contractor shall provide a Bill of Materials of all parts for the 130m Wet Gap Conversion Kit (CDRL A001).
C.2.2.2 Floating Barge Pier Structure. The Floating Barge Piers shall be comprised of steel sectional barges and pin connectors. As wet gap bridges do not have a minimum clear single span (gap length), the contractor shall ensure float piers are a consistent size to limit logistic footprint. The Floating Barge Piers shall be capable of supporting employment and operational use of the 120T/150W MLC
Wet Gap LOCB systems in water with directional flow rates up to 2.5 meters per second.
C.2.3 The contractor shall provide current commercial publications (in English) for the each Dry and Wet Gap LOCB System (CDRL A002).
C.2.4 The contractor shall provide packaging in accordance with Section D requirements. The contractor shall submit CDRL A005, Packaging
Requirements.
C.2.5 The contractor shall provide drawings and other documentation necessary to illustrate configuration of Dry Gap bridges for any length Dry Gap bridge from 40 meters to 130 meters, in 10 meter increments, built using 120T/150W Dry Gap sections, IAW CDRL A006, Configuration and Illustration for Dry Gap systems.
C.2.6 The contractor shall provide, at a minimum, drawings necessary to illustrate configuration of Wet Gap bridges for any length Wet
Gap bridge from 80 meters to 130 meters, in 10 meter increments, built using the 130m Dry and Wet Gap hardware (Ref: C.2.1 and C.2.2), IAW CDRL A007, Equipment Installation Instructions. Contractor may provide other documentation that supplements the configuration drawings.
C.3 FIELD SERVICE REPRESENTATIVE (FSR) TRAINING SUPPORT (OPTION)
Section C.3 of this contract only applies if the Government exercises the FSR Training Support Option. The FSR shall provide technical instruction supplying Soldiers with the knowledge and capability to build and launch the contractors LOCB systems.
C.3.1 Period of Performance. The contractor shall provide up to six months OCONUS FSR training support if the Government exercises the
OCONUS FSR training support option. Options for training are monthly performance, with up to six months of training.
14 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
C.3.2 Place of Performance. The FSR shall provide all technical instruction at US Army European Command, Wiesbaden, Germany.
C.3.3 FSR Schedule.
C.3.3.1 The FSR is not required to work the following recognized U.S. Federal Holidays:
New Years Day
Martin Luther King, Jr
Presidents Day
Memorial Day
Independence Day
Labor Day
Columbus Day
Veterans Day
Thanksgiving Day
Christmas Day
C.3.3.2 The FSR work schedule shall match the schedule for unit training. Normal schedule per week is five days, 40 hours, with two days off (not working). The two days off may not be Saturday and Sunday. With written notice by the Contracting Officers
Representative (COR), hours per day may be adjusted to account for training schedule, but not to exceed 40 hours in the scheduled week.
C.3.3.3 Vacation time for the FSR must be coordinated with the COR, and must be between exercised Option periods. Contractor shall notify the Government of any FSR vacation time at least one month in advance of Option expiration (for the Option that would follow the vacation time), and shall not impact a pre-existing training schedule.
C.3.4 Field Service Representative (FSR) duties. The FSR shall provide operator training to units responsible for constructing and emplacing LOCBs. The contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this
Performance Work Statement (PWS) throughout an Option period.
C.3.5 Contractor Travel. Travel expenses for the FSR shall be included in the monthly Option price. Travel to the same location on multiple occasions may be necessary. The Contractor may be required to ship training aids to these locations in support of this SOW at no additional cost to the Government. The Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract.
C.3.6 Reporting: The contractor shall provide a weekly status report of FSR training services (CDRL A003).
C.3.7 Contractor shall develop training (including presentations if necessary) for dry and wet gap bridge system construction (CDRL
A004).
C.4 CONTRACTOR MANPOWER REPORTING (CMR)
(a) The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via secure data collection site. The contractor is required to completely fill in all required data fields in the format using the following web address: <"https://armycmra.dmdc.osd.mil ">. The required information includes the following:
(1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative;
(2) Contract number, including task and delivery order number;
(3) Beginning and ending dates covered by reporting period;
(4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;
(5) Direct labor hours (including sub-contractors);
(6) Direct labor dollars paid this reporting period (including sub-contractors);
(7) Total payments (including sub-contractors);
(8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different);
(9) Data collection cost;
15 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring
Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);
(11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);
(12) Presence of deployment or contingency contract language; and
(13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country).
(b) Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs
October 1 through September30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at:
<"https://armycmra.dmdc.osd.mil/default.aspx?ReturnUrl=%2f "> and clicking on the Send an Email link which is located under the Help
Resources ribbon on the right hand side of the login page.
C.5 ANTI-TERRORISM (AT) LEVEL I TRAINING REQUIREMENT
All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 60 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each contractor employee and subcontractor employee requiring access to Army installations, facilities, or controlled access areas to the COR (or to the contracting officer, if a COR is not assigned) within 60 calendar days after completion of training. AT Level I awareness training is available at https://jkodirect.jten.mil Course #JS-US007-14.
C.6 ANTI-TERRORISM (AT) AWARENESS TRAINING REQUIREMENT FOR CONTRACTOR PERSONNEL TRAVELING OVERSEAS
Contractor employees and associated subcontractor employees shall receive government-provided Anti-Terrorism (AT) awareness training specific to the area of responsibility (AOR) as directed by AR 525-13. Specific AOR training content is to be directed by the combatant commander, with the unit Anti-Terrorism Officer (ATO) being the local point of contact.
C.7 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
(a) The contractor and all associated subcontractors employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 Personal Identity Verification of Contractor Personnel) as directed by
DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force
Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
(b) For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army
Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal
Management.
(c) For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate
Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures elsewhere in Section C; Non-disclosure Statement; for OCONUS locations, refer to the Status of Forces Agreement and other theater regulations.
C.8 TRUSTED ASSOCIATE SPONSORSHIP SYSTEM (TASS) PROGRAM
(a) The contractor is responsible for processing applications for Common Access Cards (CAC) for every contractor employee who deploys with the military force, OR who has need to access any government computer network in accordance with FAR 52.204-9, Personal Identity
Verification of Contractor Personnel.
(b) The contractor is responsible for managing requests for new or renewal CAC cards in sufficient time to ensure that all contractor employees have them when needed to perform work under this contract. The norm is at least ten calendar days advance notice to the
Trusted Agent* (TA), unless there are extenuating circumstances approved by the Contracting Officers Representative (COR) or
Contracting Officer. *The COR will be the TA for this contract.
16 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(c) The contractor shall obtain an Army Knowledge Online (AKO) email address for each applicant, including subcontractors, who may be deployed or require logical access to a government computer network. This can be done by going to http://www.us.army.mil and register as an Army Guest with the sponsor being the COR. Note: If a contractor employee loses the privilege to access AKO, they lose the ability to renew their CAC. Therefore, it is critical that contractor employees maintain their AKO accounts.
(d) It is recommended that a Corporate Facility Security Officer (FSO) be established to serve as the firms single point of contact for
Trusted Associate Sponsorship System (TASS). If a FSO is not established, each contractor employee requiring a CAC card will be required to process their own applications.
(e) CAC applications must be processed through the DODs TASS. The contractors FSO or contractor employee shall submit requests for a
CAC via email to the TASS Trusted Agent (TA) at -TBD- before accessing the TASS website.
(f) The government will establish a TASS application account for each CAC request and will provide each contractor employee a USER ID and Password via email to the FSO. The FSO or contractor employee shall access the TASS account and complete the CAC application
(entering/editing contractor information as applicable) at https://www.dmdc.osd.mil/tass/operator/consent?continueToUrl=%2Ftass%2Findex.jsp .
(g) The FSO or contractor employee will submit completed applications in TASS, and will follow up to ensure that the TA is processing the request.
(h) The government will inform the contractors applicant via email of one of the following:
- Approved*. Upon approval, the information is transferred to the Defense Enrollment Eligibility Reporting System
(DEERS) database and an email notification is sent to the contractor with instructions on obtaining their CAC. The contractor proceeds to a Real-Time Automated Personnel Identification System (RAPIDS) station (https://www.dmdc.osd.mil/rsl/ provides RAPIDS locations).
- Rejected*. Government in separate correspondence will provide reason(s) for rejection.
- Returned. Additional information, or correction to the application, required by the contractor employee.
*The contractor will maintain records of all approved and rejected applications.
(i) At the RAPIDS station, the RAPIDS Verification Officer will verify the contractor by SSN, and two forms of identification, one of which must be a picture ID. The Verification Officer will capture primary and alternate fingerprints and picture, and updates to DEERS and will then issue a CAC.
(j) Issued CACs shall be for a period of performance not longer than three (3) years or the individuals contract end date (inclusive of any options) whichever is earlier.
(k) The contractor shall return issued CACs to the DEERS office upon return from deployment, departure or dismissal of each contractor employee. A receipt for each card must be obtained and provided to the TA/COR.
(l) A CAC cannot be issued without evidence that a National Agency Check with Written Inquires (NACI) has at least been initiated by the FSO. TASS will be linked to the Joint Personnel Adjudication System (JPAS) in the near future. The TA will have to verify via JPAS that the NACI has been initiated by the FSO before he/she can approve a contractor request for a CAC.
(m) Details and training on TASS are available on AKO at https://www.us.army.mil/suite/portal/index.jsp or by contacting the CAC helpdesk at cacsupport@mail.mil or 866-738-3222.
C.9 ACCESS TO THE DETROIT ARSENAL; IDENTIFYING CONTRACTOR EMPLOYEES; NON-DISCLOSURE STATEMENT
(a) APPLICABILITY. This requirement is only applicable to contractor employees working at, or visiting, Detroit Arsenal. The term contractor employee includes employees, agents, or representatives and all employees, agents, or representatives and all employees, agents or representatives of all subcontractors, suppliers and consultants.
(1) DETROIT ARSENAL ACCESS.
All contractor personnel entering the installation and requiring unescorted access must have a valid purpose to enter and be sponsored by a U.S. government organization or a contractor providing support on the installation. They must have their identity proofed and vetted through the National Crime Information Center (NCIC) database, and be issued, or in possession of an authorized and valid access credential from the Detroit Arsenal installation. At the discretion of the Senior Commander, U.S. Army Garrison Detroit
Arsenal, any individual known to have a criminal background involving violence or meets the disqualifying standards in the Final
Credentialing Standards for Issuing Personal Identity Verification Cards under HSPD-12 (31 Jul 2008), may be denied access to the
Detroit Arsenal. Fingerprinting of employees and any other security procedures deemed necessary for the security of Detroit Arsenal
(vehicle searches or x-raying packages, bags, briefcases) may be required based on the Force Protection Condition level at the time of
17 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
access and whether the installation or building location is identified as a Restricted Area or Mission Essential Vulnerable Area (MEVA).
(2) BADGES/PASSES.
(a) Contractor employees entering the Detroit Arsenal are responsible for obtaining, and then returning, security identification badges/passes and vehicle registration decals/passes. Badges are valid only for the date spans indicated, by the government, on each badge application form (STA Form 17).
(i) Obtaining Badges. Government sponsor must prepare and submit a properly completed STA Form 17 (Visitor
Notification and/or Temporary Security Identification Badge Application) to the Detroit Arsenal Visitor Control Center not less than 96 hours prior to scheduled visit.
(ii) Returning Badges. The government sponsor is responsible to ensure the security identification badges are returned to the Visitor Control Center, Bldg 232, upon expiration or termination of the contract relationship with the contract employee.
Failure to comply with the requirements in this paragraph may be grounds for withholding any funds due the contractor until completion of the requirement, notwithstanding any other clause or requirements in the contract. Failure to comply may also be taken into account by the government in evaluating the contractors past performance on future acquisitions.
Badge Guidance.
(b) All contractor employees, while on the premises at the Detroit Arsenal, shall continually wear the badge, which shall be visible at all times between the neck and waist of the individual. Badges will be secured from public view when off post and will not be left in privately owned or contractor vehicles unattended. Stolen or lost badges will be promptly reported to DES, USAG Detroit.
(c) The identification badge or pass issued to contractor employee(s) is for their own use only. Misuse of badge or pass, such as permitting others to use it can result in criminal charges under Title 18 USC 499 and 701, and barring the employee from the
Detroit Arsenal property.
(d) If the contractor obtains a new or follow-on contract that again requires physical access to the Detroit Arsenal property, he shall obtain new badges for his employees, indicating the new or follow-on contract number. The security policies described in this clause apply to any contractor employee on base in connection with any contract with TACOM-Warren.
(3) MEETING ATTENDANCE. Any contractor employee attending meetings with Government employees within or outside the Detroit
Arsenal boundaries, shall, at the beginning of the meeting, announce that he/she is a contractor employee. He/she must state the
Contractor's name and address, and state the name of all other companies or persons that (a) currently employ him, or (b) that he currently represents. In addition, for the duration of the meetings, the contractor employee shall wear a second visible badge that displays the contractor's company name.
(4) CLASSIFIED ACCESS. If a visiting contractor is working on a classified contract, his/her visit request, with security clearance information, must be sent to the G2, TACOM LCMC (SMO Code W4GGAA* or W4GGAA5, AMSTA-CSS, Office Phone 586-282-6262, Fax 586-
282-6362) and their sponsoring activity. Government employees hosting meetings will verify contractor employees security clearance information with their supporting Security Coordinator or G2, TACOM LCMC using JPAS or the TACOM LCMC Access Roster prior to providing contractor access to classified information based on the approved DD254.
(5) REGULATORY COMPLIANCE. All contractor employees working on the U.S. Army installation, Detroit Arsenal, in the State of
Michigan, in connection with this contract, shall conform to all applicable federal or state laws, and published rules and regulations of the Departments of Defense and Army. Also, they must comply with any existing applicable regulations promulgated by Detroit Arsenal, TACOM LCMC, or the Senior Commander. Additionally, all contractor employees working on classified contracts shall comply with the requirements of the National Industrial Security Program (NISPOM) and Army Regulation 380-5, Department of the Army Information Security
Program and their approved DD254.
(6) NON-DISCLOSURE AGREEMENT. Each contractor employee working at the Detroit Arsenal property under this contract shall sign a
Non-disclosure Agreement on their company's letterhead prior to commencing work under the contract or obtaining the badges permitting access to the property. There will be one Non-disclosure Agreement for each employee. The Non-disclosure Agreement shall be in the format indicated below. A copy of the agreement will be made a part of the contract file.
FORMAT FOR
NON-DISCLOSURE AGREEMENT
I, ____________________, an employee of __________________________________________, a Contractor providing support services/supplies to Detroit Arsenal, TACOM LCMC, or other tenant organizations (hereinafter Detroit Arsenal), and likely to have access to nonpublic information (hereinafter RECIPIENT), under contract number ______________________, agree to and promise the following:
WHEREAS RECEIPIENT is engaged in delivery support services to Detroit Arsenal under contract; and
WHEREAS, It is the intention of Detroit Arsenal to protect and prevent unauthorized access to and disclosure of nonpublic information to anyone other than employees of the United States Government who have a need to know; and, WHEREAS, Detroit
18 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Arsenal acknowledges that RECIPIENT will from time to time have or require access to such nonpublic information in the course of delivering the contract services; and, WHEREAS, RECIPIENT may be given or other have access to nonpublic information while providing such services; and, WHEREAS, "nonpublic information" includes, but is not limited to such information as:
Proprietary information (e.g., information submitted by a contractor marked as proprietary. However please note: THIS NON-DISCLOSURE
STATEMENT IS NOT SUFFICIENT TO ALLOW CONTRACTORS ACCESS TO ANOTHER CONTRACTORS PROPRIETARY INFORMATION. FOR THAT, A SEPARATE CONTRACTOR
TO CONTRACTOR AGREEMENT IS REQUIRED.);
Advanced procurement information (e.g., future requirements, statements of work, and acquisition strategies);
Source selection information (SSI) (e.g., bids before made public, source selection plans, and rankings of proposals) (PLEASE NOTE: THIS
AGREEMENT ALONE DOES NOT AUTHORIZE ACCESS TO SSI--ONLY PCO OR SOURCE SELECTION AUTHORITY CAN AUTHORIZE SUCH ACCESS.);
Trade secrets and other confidential business information (e.g., confidential business information submitted by the contractor);
Attorney work product;
Information protected by the Privacy Act (e.g., social security numbers, home addresses and telephone numbers); and
Other sensitive information that would not be released by Detroit Arsenal under the Freedom of Information Act (e.g., program, planning and budgeting system information);
NOW THEREFORE, RECIPIENT agrees to and promises as follows:
RECIPIENT shall not seek access to nonpublic information beyond what is required for the performance of the support services contract;
RECIPIENT will ensure that his or her status as a contractor employee is known when seeking access to and receiving such nonpublic information of Government employees;
As to any nonpublic information to which RECIPIENT has or is given access, RECIPIENT shall not use or disclose such information for any purpose other than providing the contract support services, and will not use or disclose the information to any unauthorized person or entity for personal, commercial, or any unauthorized purposes; and
If RECIPIENT becomes aware of any improper release or disclosure of such nonpublic information, RECIPIENT will advise the contracting officer verbally within two business days, followed up in writing within five business days.
The RECIPIENT agrees to return any nonpublic information given to him or her pursuant to this agreement, including any transcriptions by
RECIPIENT of nonpublic information to which RECIPIENT was given access, if not already destroyed, when RECIPIENT no longer performs work under the contract.
RECIPIENT understands that any unauthorized use, release or disclosure of nonpublic information in violation of this Agreement will subject the RECIPIENT and the RECIPIENT's employer to administrative, civil or criminal remedies as may be authorized by law.
RECIPIENT: _____________________________ (signature)
PRINTED NAME: _________________________
TITLE: __________________________________
EMPLOYER: __________________
C.10 iWATCH TRAINING
The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Anti-Terrorism Officer (ATO)). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR, if assigned, or the Contracting Officer. This training shall be completed within 60 calendar days of contract award and within 60 calendar days of new employees commencing performance, with the results reported to the COR, or Contracting Officer, no later than 60 calendar days after contract award.
Training may be obtained at http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx .
C.11 INFORMATION ASSURANCE (IA)/INFORMATION TECHNOLOGY (IT) TRAINING
All contractor employees and associated subcontractor employees…