W56HZV19R0096-0002.pdf

PDF 19 KB Posted

Attached to
LOCB Training Assets
Solicitation number
W56HZV19R0096
Issued by

About this file

Amendmend 0002

View the file

Other files

File Type Posted
JA_W56HZV-19-C-0124_Redaction_LOCB.pdf PDF
W56HZV19R0096-0003.pdf PDF
W56HZV19R0096_0001.pdf PDF
W56HZV19R0096.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0002 2019MAY09

W56HZV

U.S. ARMY CONTRACTING COMMAND

WARREN, MICHIGAN 48397-5000

JENNIFER SCHNEIDER

EMAIL: JENNIFER.A.SCHNEIDER17.CIV@MAIL.MIL

W56HZV-19-R-0096

2019APR24

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 6

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: JENNIFER SCHNEIDER

Buyer Office Symbol/Telephone Number: CCTA-HCP-B/(586)282-8396

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

The purpose of Amendment 0002 to Solicitation W56HZV-19-R-0096 is to change the following:

Section B

1. Change SLIN 0004AA, Travel Option

FROM: FSR Travel Unexercised Option

TO: FSR Travel Unexercised Option - Germany

2. Add SLIN Number 0004AB, FSR Travel Unexercised Option - Poland

Section D

3. D.1

FROM: Commercial Packaging: The contractor shall containerize and deliver all components of the LOCB Dry and Wet Gap system (except for the barges/pontoons) in 20 foot long seaworthy Convention for Safe Containers (CSC) certified used ISO containers, each weighing no more than 20 metric tons. A container packing list shall be included within each container in accordance with (IAW) Packaging Requirements

(CDRL A005).

TO: Commercial Packaging: The contractor shall containerize and deliver all components of the LOCB Dry and Wet Gap system (except for the barges/pontoons) in seaworthy Convention for Safe Containers (CSC) certified used ISO containers. To the maximum extent possible, the Contractor shall ship in 20 foot long containers. The Contractor shall use the minimum amount of 40 foot long containers required to ship the components. Each container may weigh no more than 20 metric tons. A container packing list shall be included within each container in accordance with (IAW) Packaging Requirements (CDRL A005).

All other terms and conditions except those in this Amendment 0002 remain in full force and effect.

*** END OF NARRATIVE A0003 ***

2 6

W56HZV-19-R-0096

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0004 TRAVEL OPTION

OCONUS USEUCOM FSR Travel in support of CLIN 0003AA as specified in Section C.3.5 of the Scope of Work.

FSR round trip travel costs associated with travel to and from the USEUCOM destination will be provided under this CLIN in accordance with Section C.3.5.

(End of narrative A001)

0004AA FSR TRAVEL UNEXERCISED OPTION - GERMANY 1 LO $ _______________________________________ __________________

SERVICE REQUESTED: TRAVEL OPTION

CLIN CONTRACT TYPE:

Firm Fixed Price

OPTION QUANTITY, PURSUANT TO THE CLAUSE

ENTITLED OPTION FOR INCREASED QUANTITY---

SEPARATELY PRICED LINE ITEM (FAR 52.217-7).

The quantity stated for the option CLIN DOES

NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the

Government.

The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the

Government, at the basic contract unit price, and the offer will be evaluated for award accordingly.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Place of performance in Section C.3.2. The

Performance Completion date will be definitized after contract award if the Government exercises this option.

(End of narrative F001)

3 6

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0004AB FSR TRAVEL UNEXERCISED OPTION - POLAND 1 LO $ ______________________________________ __________________

SERVICE REQUESTED: TRAVEL OPTION

CLIN CONTRACT TYPE:

Firm Fixed Price

OPTION QUANTITY, PURSUANT TO THE CLAUSE

ENTITLED OPTION FOR INCREASED QUANTITY---

SEPARATELY PRICED LINE ITEM (FAR 52.217-7).

The quantity stated for the option CLIN DOES

NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the

Government.

The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the

Government, at the basic contract unit price, and the offer will be evaluated for award accordingly.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 UNDEFINITIZED

Place of performance in Section C.3.2. The

Performance Completion date will be definitized after contract award if the Government exercises this option.

(End of narrative F001)

4 6

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

5 6

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D.1 Commercial Packaging: The contractor shall containerize and deliver all components of the LOCB Dry and Wet Gap system (except for the barges/pontoons) in seaworthy Convention for Safe Containers (CSC) certified used ISO containers. To the maximum extent possible, the Contractor shall ship in 20 foot long containers. The Contractor shall use the minimum amount of 40 foot long containers required to ship the components. Each container may weigh no more than 20 metric tons. A container packing list shall be included within each container in accordance with (IAW) Packaging Requirements (CDRL A005).

D.2 HEAT TREATMENT AND MARKING OF WOOD PACKAGING MATERIALS

(a) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging

Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.

(b) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging

Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:

http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.

(c) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The

ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

*** END OF NARRATIVE D0001 ***

6 6

SECTION A
SECTION B
SECTION D

File details come from the government source that posted it.