SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W56HZV-19-R-0085
X
2019APR16
2019MAY21
DOA4
2019APR16 SEE SCHEDULE
W56HZV
U.S. ARMY CONTRACTING COMMAND
WARREN, MICHIGAN 48397-5000
KERI SKROBOT
(586)282-8301
CCTA-HCS-A
KERI.L.SKROBOT.CIV@MAIL.MIL
1 58
X 1
X 5 X 13
X 15 X 18 X 22
X 28
X 30
X 42
X 43
X 51
X 55
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
THE FOLLOWING AMENDMENTS HAVE BEEN INCORPORATED
Buyer Name: KERI SKROBOT
Buyer Office Symbol/Telephone Number: CCTA-HCS-A/(586)282-8301
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
SOLICITATION NARRATIVE
This procurement is for:
Noun: Cargo Release Assembly, Cargo Parachute, Airdrop, M-2
NSN: 1670-01-097-8817
P/N: 11-1-565-2
5 Year Long Term Contract (LTC)
Type of Contract: Firm fixed price (FFP)
Indefinite Delivery Indefinite Quantity (IDIQ)
Guaranteed Minimum Quantity: 09
Max 5 year quantity: 295
Anticipated first delivery order quantity: 110
Procurement is 100% Small Business Set-aside
Technical Data Package (TDP):
Distribution Level: A
A link to the TDP is available in FBO. Use the TDP uploaded with this solicitation. The TDP was approved on 19 November 2018.
Federal Acquisition Regulation (FAR) Clause 52.246-11 Higher Level Contract Quality System is required. Contractor must be ISO
9001:2008 compliant.
First Article Test (FAT) is required. Request for a FAT waiver may be approved. FAT waiver must be submitted with your proposal in accordance with Section L, LS7304, Provision for Waiver of Required First Article Approval. Use Attachment 0002 FAT Waiver Worksheet with your request.
MIL-STD 1916 is required, see Section E, ES6019.
All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically via FBO.
SECTION A PROVISIONS
Electronic Contracting AS6311
(a) All Army Contracting Command Warren solicitations will be publicized on the Federal Business Opportunities website
(https://www.fbo.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
2 58
W56HZV-19-R-0085 REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via the Federal Business Opportunities (FBO) system. Proposals or quotes submitted after this date using any other mechanism, including the Army Single Face to Industry Bid Response System (ASFI BRS) may be deemed non-responsive.
(c) Requirements for the online FBO bid submission:
(1) Vendors must log into the FBO System to be able to submit electronic responses for opportunities.
(2) Vendors must be registered in the System for Award Management (SAM) at www.sam.gov (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).
(3) Once logged into the FBO System, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.
(4) FBO will send an email to vendor's registered email address confirming the electronic submission.
(5) For additional information on submitting electronic bid responses via the FBO system see the FBO Vendor Guide Section 4.3.1
Submitting an Electronic Response (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf ).
Note to offerors:
(d) Please pay close attention to the "Issued By" block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the
Government infrastructure (in this case, received through FBO) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(f) Solicitations may remain posted on the FBO after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the
Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
ACKNOWLEDGEMENT OF AMENDMENTS AS7001
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:
Amendment Number: Date:
3 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ARMY CONTRACTING COMMAND WARREN (DTA) OMBUDSPERSON AS7040
Information regarding the Ombudsperson for this contract is located at the following website:
http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html
ALL OR NONE AS7316
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.
ACCEPTANCE APPENDIX (AS6850)
(a) Contract Number W56HZV- -1- is awarded to -2- .
(b) The contractor, in its proposal, provided data for various solicitation clauses, and that data has been added in this contract.
(c) Any attachments not included within this document will be provided by TACOM-Warren directly to the administrative contracting officer (ACO) via e-mail as required. Technical data packages that are only available on CD-ROM will be mailed by TACOM-Warren to the
ACO. Within one week of this award, any office not able to obtain these attachments from TACOM's website
(https://contracting.tacom.army.mil/ ) and still requiring a copy, can send an e-mail request to the buyer listed on the front page of this contract.
-3-
(d) The following Amendment(s) to the solicitation are incorporated into this contract: -4-
*** END OF NARRATIVE A0001 ***
4 58
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
SUPPLIES OR SERVICES AND PRICES/COSTS:
IN THE FOUR DIGIT ITEM NUMBERS (CLINS) THAT FOLLOW,
THE NUMBERING SYSTEM THAT IS USED IS AS FOLLOWS:
THE FIRST THREE DIGITS SIGNIFY ITEM AND THE FOURTH
DIGIT SIGNIFIES THE APPLICABLE CONTRACT YEAR, i.e., CLIN 0011 IS FOR THE FIRST ITEM - FIRST ORDERING YEAR, CLIN 0012 IS FOR THE FIRST ITEM - SECOND ORDERING YEAR, CLIN 0013 IS FOR THE FIRST ITEM - THIRD ORDERING YEAR, ETC.
THE FINAL LINE ITEM(S) ASSOCIATED WITH EACH PART,
SUCH AS FAT OR DATA ITEMS, WILL BECOME THE LAST ITEM
NUMBER IN NUMERICAL SEQUENCE FOR EACH ITEM, e.g. 0016
(5 YEAR LONG TERM CONTRACT). IF MORE THAN ONE ITEM IS
BEING PROCURED, THE NUMBERS WILL BE 0026 OR 0024
DEPENDING ON THE LENGTH OF THE LONG TERM CONTRACT.
THE FOLLOWING DEFINITIONS APPLY TO THE
ENTIRE SOLICITATION AND RESULTING CONTRACT:
FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE___________________
OF AWARD PLUS 364 DAYS.
SECOND ORDERING YEAR OF THE CONTRACT IS 365 DAYS____________________
THROUGH 729 DAYS AFTER CONTRACT AWARD.
THIRD ORDERING YEAR OF THE CONTRACT IS 730 DAYS___________________
THROUGH 1,094 DAYS AFTER CONTRACT AWARD.
FOURTH ORDERING YEAR OF THE CONTRACT IS 1,095____________________
DAYS THROUGH 1,459 DAYS AFTER CONTRACT AWARD.
FIFTH ORDERING YEAR OF THE CONTRACT IS 1,460___________________
DAYS THROUGH 1,824 DAYS AFTER CONTRACT AWARD.
NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL
ORDER IS THE PRICE FOR THE ORDERING YEAR IN
WHICH THE ORDER IS ISSUED. THE DELIVERY DATE
DOES NOT DETERMINE THE ORDERING YEAR.
The information presented below applies to
Item No. 0011 Through 0015:
Minimum 5-Year Quantity: 09 EACH
It is anticipated that the first delivery order will be a quantity of 110 each.
Maximum 5 Year Quantity: 295 EACH
ONLY THE MINIMUM 5 YEAR QUANTITY IS GUARANTEED.
(End of narrative A001)
5 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0011 FIRST ORDERING YEAR EST 147 EA $ $ ___________________ ______________ __________________
NSN: 1670-01-097-8817
COMMODITY NAME: M-2 CARGO RELEASE ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 81337
Mfr Part Number: 11-1-565-2
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11-1-565
REVISION: Y
DATE: 15-MAY-1997
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W25G1U) SU W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2001 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND,PA,17070-5002
6 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0012 SECOND ORDERING YEAR EST 37 EA $ $ ____________________ ______________ __________________
NSN: 1670-01-097-8817
COMMODITY NAME: M-2 CARGO RELEASE ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 81337
Mfr Part Number: 11-1-565-2
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11-1-565
REVISION: Y
DATE: 15-MAY-1997
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W25G1U) SU W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2001 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND,PA,17070-5002
7 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0013 THIRD ORDERING YEAR EST 37 EA $ $ ___________________ ______________ __________________
NSN: 1670-01-097-8817
COMMODITY NAME: M-2 CARGO RELEASE ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 81337
Mfr Part Number: 11-1-565-2
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11-1-565
REVISION: Y
DATE: 15-MAY-1997
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W25G1U) SU W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2001 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND,PA,17070-5002
8 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0014 FOURTH ORDERING YEAR EST 37 EA $ $ ____________________ ______________ __________________
NSN: 1670-01-097-8817
COMMODITY NAME: M-2 CARGO RELEASE ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 81337
Mfr Part Number: 11-1-565-2
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11-1-565
REVISION: Y
DATE: 15-MAY-1997
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W25G1U) SU W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2001 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND,PA,17070-5002
9 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0015 FIFTH ORDERING YEAR EST 37 EA $ $ ___________________ ______________ __________________
NSN: 1670-01-097-8817
COMMODITY NAME: M-2 CARGO RELEASE ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 81337
Mfr Part Number: 11-1-565-2
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11-1-565
REVISION: Y
DATE: 15-MAY-1997
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(W25G1U) SU W1A8 DLA DISTRIBUTION
DDSP NEW CUMBERLAND FACILITY
2001 NORMANDY DRIVE DOOR 113 TO 134
NEW CUMBERLAND,PA,17070-5002
10 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0017 CONTRACT DATA REQUIREMENTS LIST _______________________________
THE CONTRACTOR WILL PREPARE AND DELIVER THE DATA IN
ACCORDANCE WITH THE REQUIREMENTS, QUANTITIES AND
SCHEDULES SET FORTH IN THE CONTRACT DATA REQUIREMENNTS
LIST (DD FORM 1423), SECTION J, EXHIBIT A, AS REQUIRED.
A DD250 OR WAWF FORM IS NOT REQUIRED.
(End of narrative A001)
A001 DATA ITEM 1 EA $ ** NSP ** $ ** NSP ** _________ ______________ __________________
COMMODITY NAME: FIRST ARTICLE TEST REPORT
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DEL DATE __________ ______________ ___________
001 1 SEE DD FORM 1423
FOB POINT: Destination
SHIP TO:
(Y00006) SEE FIRST ARTICLE TEST CLAUSE
FOR DISTRIBUTION
0018 FIRST ARTICLE TEST & REPORT - SEPARATELY PRI 1 EA $ $ ____________________________________________ ______________ __________________
NSN: 1670-01-097-8817
COMMODITY NAME: M-2 CARGO RELEASE FAT UNIT
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 81337
Mfr Part Number: 11-1-565-2
A FIRST ARTICLE TEST AND REPORT IS REQUIRED IN
ACCORDANCE WITH THE FAR CLAUSE 52.209-3 "FIRST
ARTICLE APPROVAL-- "CONTRACTOR TESTING,". CDRL A001
11 58
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
THE REQUEST FOR FAT WAIVER AND ATTACHMENT 0002 "FAT
WAIVER WORKSEHET" MUST BE SUBMITTED WITH YOUR
PROPOSAL IN ACCORDANCE WITH LS7304. REQUESTS FOR
FAT WAIVER THAT ARE SUBMITTED AFTER THE
SOLICITATION CLOSES, WILL NOT BE ACCEPTED.
THE ACO WILL APPROVE THE FAT & REPORT.
FAT SAMPLE SHALL NOT BE USED AS PART OF PRODUCTION.
(End of narrative B001)
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 11-1-565
REVISION: Y
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Government Approval/Disapproval Days: 30
12 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
SECTION C CLAUSES
DRAWING LIMITATIONS CS7002
(a) The drawings supplied with this contract are not shop or process drawings. The drawings are engineering design drawings, are adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DO NOT cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if all the dimensions and tolerances specified in the engineering design drawing for each individual part are met, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the manufacturing process.
(d) The Contractor agrees that he has obtained all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. The contractor is responsible for having all drawings and specifications. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) Failure to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, will result in the Contractor being responsible for correcting this condition at no additional cost to the
Government and no delivery schedule extension.
TECHNICAL DATA PACKAGE INFORMATION CS6334
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ X ] 2. The TDP for this solicitation resides within FedBizOpps (<"https://www.fbo.gov ">), associated with this solicitation number.
To access the data through FBO:
a. Log on to the FBO web site.
b. Enter Marketing Partner Identification Number (MPIN).
c. Search for the solicitation number.
d. If solicitation is Export Controlled, select Verify MPIN.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
13 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). Currently certified contractors should enter the MPIN which will be verified before proceeding to the next step. To obtain certification, go to <"http://www.dlis.dla.mil/jcp/ ">
Click on documents and follow instructions provided. Processing time is estimated at six (6) to ten (10) weeks after receipt. FBO will allow access to export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.
Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the FBO system administrator at Army Contract Command - Warren (DTA) with all the information needed to grant a contractor access. FBO will subsequently automatically generate an email stating when the requesting contractor has permission to view or download TDP items. Allow
2 3 working days to complete this FBO-TDP access/approval process through the FBO system.
f. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request 3is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.
Those same individuals MUST be registered in Federal Business Opportunities (FBO). Any individuals no longer with the company should be deleted. Questions related to registration in FBO should be directed to <"https://www.fbo.gov/index "> The FBO helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in FBO.
g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and Non-
Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
h. A user guide for FBO can be found at <"https://www.fbo.gov "> - on the right is User Guides - click on Vendor.
USE OF CLASS I and CLASS II OZONE DEPLETING SUBSTANCES CS7151
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at:
http://www.epa.gov/ozone/science/ods/index.html
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that the contractor can meet or produce only by the use of CIODS.
(b) Per Section 326 of Public Law 102-484, the Army cannot award any contract that directly or indirectly requires the use of CIODS without the approval of the Senior Acquisition Official, per current Army Policy the approval authority is the Army Acquisition
Executive. Thus, no CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
*** END OF NARRATIVE C0001 ***
14 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
SECTION D CLAUSES
PACKAGING REQUIREMENTS (SELECTIVE GROUP PACKAGING REQUIREMENTS) DS6516
(a) Military preservation, packing, and marking for this contract shall be accomplished in accordance with the specific requirements identified below and all the applicable requirements of MIL-STD-2073-1
*** SEE SUPPLEMENTAL INSTRUCTIONS BELOW
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: B
(3) QUANTITY PER UNIT PACKAGE: 001
(4) UNIT PACKAGE WEIGHT: 110.0 LBS
(5) UNIT PACKAGE LENGTH: 24.0
(6) UNIT PACKAGE WIDTH: 12.0
(7) UNIT PACKAGE DEPTH: 13.5
(b) MIL-STD-2073-1, Appendix J establishes and defines codes used in describing military packaging methods and materials. The following codes from Appendix J apply:
(1) Preservation Method Code: 10 (Table j.i. and j.ia.)
(2) Cleaning Procedure Code: 1 (Table j.ii)
(3) Preservative Material Code: 00 (zero) (Table j.iii)
(4) Wrapping Material Code: 00 (zero) (Table j.iv)
(5) Cushioning and Dunnage Code: LC (Table j.v)
(6) Thickness of Cushioning or Dunnage Code: F (Table j.vi)
(7) Unit Container Code: ED (Table j.vii)
(8) Intermediate Container Code: 00 (zero) (Table j.vii)
(9) Quantity per Intermediate Container Code: 0 (zero) (Appendix J.4.11)
(10) Packing Code: 2 (Table j.IX and J.IXa)
(11) Special Marking Code: 00 (zero) (Table j.x)
(c) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage
(d) Marking:
(1) All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129,. The contractor is responsible for application of special markings as discussed in the Military
15 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html (best viewed with Internet Explorer 11 or higher) for the current DoD Suppliers Passive RFID Information Guide. When an item is assigned Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at http://dodprocurementtoolbox.com/page/unique-id/tools ) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(e) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15
(ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood
Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
http://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention
Standard. The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens.
Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
(f) These packaging requirements are intended to provide protection against environmentally induced corrosion and deterioration, physical and mechanical damage, and other forms of degradation during storage, multiple handling, and shipment associated with the military distribution system. The Government encourages contractors to submit requests for changes that will result in savings or improve the packaging. Please submit request for changes in accordance with the RFD clause of the contract. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing at contractors expense.
(g) Hazardous Materials (as applicable):
(1) Hazardous Materials is defined as a substance or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) Packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(h) SUPPLEMENTAL INSTRUCTIONS:
16 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SEE ATTACHED "SPECIAL PACKAGING INSTRUCTION" (SPI) NUMBER AB10978817 FOR DETAILED INSTRUCTIONS.
*** END OF NARRATIVE D0001 ***
17 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2008 *Contractors have until September 2019 to become compliant to ISO 9001:2015.
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
SECTION E CLAUSES
INSPECTION AND ACCEPTANCE (FIRST ARTICLE APPROVAL) ES6333
In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:
(a) FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval-Contractor Testing shall be performed in accordance with CLIN
0018.
FAT IAW QAP # 11-1-565-2 and DWG # 11-1-4112
Reference CLIN 0017, CDRL A001, for additional requirements for the First Article Test Report (FATR).
The DCMA ACO is the FAT approver.
(b) The First Article Test Report (FATR) shall be compiled by the contractor to the contractor's own format. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable).
The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contractor to allow the designated
Government representative to determine that the First Article Test was successfully completed.
INSPECTION AND ACCEPTANCE POINTS: ORIGIN ES7001
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
18 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION POINT:
CAGE:
NAME:
ADDRESS:
CITY, STATE, ZIP
ACCEPTANCE POINT:
CAGE:
NAME:
ADDRESS:
CITY, STATE, ZIP
REWORK AND REPAIR OF NONCONFORMING MATERIAL ES7012
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications, or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications, or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the
Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, to the Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for re-inspection which will take precedence over the Technical Data
Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
DRAWINGS FOR INSPECTION ES7042
When requested, the Contractor shall make available to the Government Inspector, the drawings, specifications and any applicable
Engineering Exceptions associated to the drawings, to which the product was manufactured. Upon completion of product inspection and acceptance by the Government Inspector, all drawings, specifications and Engineering Exceptions, will be returned to the Contractor.
19 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
If the contractor is not the actual manufacturer of the item being procured (i.e. dealer, distributor, etc.) the contractor shall ensure that subcontractor drawings are available for review to support the Government's inspection requirements.
NOTICE REGARDING FIRST ARTICLE ES7032
a. Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
b. When any of the conditions above occurs, the contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
c. Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
NOTICE REGARDING FIRST ARTICLE TEST SAMPLE ES6304
a. The approved first article items, as described elsewhere in this contract, consist of a quantity of one that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of zero that successfully passes all specified tests, less the destructive tests, if any, zero serve as a manufacturing standard for the remainder of the contract.
b. A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as:
1) an aid in identifying configuration changes not controlled by the contractual design.
2) as an aid in identifying any process changes, or 3) as the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
c. The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the contractor will notify the contracting officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
USE OF MIL-STD 1916 ES6019
(a) The Government will not accept lots whose samples submitted for acceptance contain non-conformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD 1916, DOD Preferred Methods of Acceptance of Product. The
Verification Level (VL) shall be VL IV for major characteristics and VL II for minor characteristics.
(b) MIL-STD HDBK-1916 provides guidance on the use of MIL-STD 1916. This handbook is not contractually binding.
20 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE E0001 ***
21 58
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
http://farsite.hill.af.mil/ or https://www.acquisition.gov/
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
F-1 52.242-15 STOP-WORK ORDER AUG/1989
F-2 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
F-3 52.247-34 F.O.B. DESTINATION NOV/1991
F-4 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
F-5 52.211-8 TIME OF DELIVERY JUN/1997
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO.________ DESCRIPTION___________ QTY___ # OF DAYS_________
CLIN 0018 FIRST ARTICLE TEST 1 220 Days after Contract Award
CDRL A001 FAT REPORT 1 10 Days after FAT Approval
CLIN 0011 PRODUCTION 15 220 Days after FAT Approval or FAT Waiver and every month thereafter
CLIN 0012 - 0015 PRODUCTION 15 Every 30 Days if no break in Production
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE
ITEM NO.________ DESCRIPTION___________ QTY___ # OF DAYS_________
CLIN 0018 FIRST ARTICLE TEST 1
CDRL A001 FAT REPORT 1
CLIN 0011 PRODUCTION 15
CLIN 0012 - 0015 PRODUCTION 15
ACCELERATED DELIVERY IS ACCEPTABLE AT NO ADDITIONAL COST TO THE GOVERNMENT
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractors date of receipt of the contract or notice of award by adding
(1) five calendar days for delivery of the award through the ordinary mails, or
(2) one working day if the solicitation states that the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.