AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2019JUL10
W56HZV
U.S. ARMY CONTRACTING COMMAND
WARREN, MICHIGAN 48397-5000
DONIELLE Y. WILLIS
EMAIL: DONIELLE.Y.WILLIS.CIV@MAIL.MIL
W56HZV-18-R-0151
2019JUN28
X
X 2019JUL29 05:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 4
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: DONIELLE Y. WILLIS
Buyer Office Symbol/Telephone Number: CCTA-ASM-A/(586)282-9073
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of Amendment 0001 to Solicitation W56HZV-18-R-0151 is to add C.4.2.5.1 to Section C.
As a result of above, the due date for questions is extended until 3:00pm local time 12 July 2019.
The due date for proposals remains 5:00pm local time 29 July 2019.
*** END OF NARRATIVE A0003 ***
2 4
W56HZV-18-R-0151
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
STATEMENT OF WORK _________________
C.1 GENERAL INFORMATION
This Statement of Work (SOW) defines the effort required to provide the Project Manager, Applique and Large Unmanned Ground Systems (PM
ALUGS) with remanufactured Perkins, Model 1106C Series Engine Build List VK38244.
C.2 APPLICABLE DOCUMENTS
Attachment 0001 - TM 9-2360-392-23P 0002 Excerpt
Attachment 0002 - Parts Making up the list VK38244
Attachment 0003 - Perkins Engine Specification 1106C-70TA
Attachment 0004 - Special Packaging Instructions (SPI AK15987019), Revision A, Dated 20 June 2012
Exhibit A - Contract Data Requirements List A001 Test Report Dynamometer Engine Test
C.3 DEFINITIONS
For the purpose of this SOW, the terms used herein are defined as follows:
C.3.1 TEST: Operation of an item to determine its capability to perform the function for which it was designed as stated in applicable technical order.
C.4 REQUIREMENTS:
C.4.1 CORE CREDIT: The Government will deliver the engines to the contractor for core credit. The Contractor shall provide, in writing to the contracting officer, the total amount to be credited. The Government will subsequently issue a modification to the contract for total agreed upon credit of each core to be deducted (de-obligated) from the repair price for each engine.
C.4.2. The contractor shall deliver a remanufactured Perkins, Series 1100, Type 1106C-E60TA, Number VK38244 (Attachment 0001).
C.4.2.1 NEW ITEMS: The remanufactured engine shall have the following new Perkins components: starter, alternator, wire harness, fan drive, injection pump, injectors, high pressure fuel lines, low pressure fuel pump and system, water pump, timing case and covers, oil pan, crank pulley, water outlet housing, intake and exhaust manifolds, turbo, oil lines, air intake temperature sensor, engine coolant temperature sensor, oil pressure sensor, sensor dummy, speed sensor, glow plugs, oil filter, fuel filter and engine oil. All seals and gaskets shall be new Perkins replacement parts.
C.4.2.2 SPECIAL NON-STANDARD COMPONENTS: The contractor shall install the following special non-standard components on each remanufactured engine: Water Pump (DOK-ING Part Number 06-20-04), Intake Manifold (DOK-ING Part Number 06-21-00-31).
C.4.2.3 ENGINE CONTROL MODULE (ECM): The Engine Control Module (ECM) from the Government provided engines (Reference C.4.2) shall be tested for functionality. If the ECM does not pass a functional test, the Government shall provide a new ECM unit (DOK-ING Part Number
06-01-25). Under no circumstances will the ECM be replaced with a Perkins ECM.
C.4.2.4 ENGINE BRACKET: The contractor shall remove the engine hoist bracket (NSN: 2590-01-588-6454 / Part Number 3654W007) from the old engine and install it on the new engine, reference Attachment 0001.
C.4.2.5 DAMAGED/MISSING PARTS: The contractor shall replace the following Perkins components on the remanufactured engine if they are damaged or missing: flywheel, flywheel housing, valve covers, all accessory brackets removed from the engine block and all timing case covers removed during the rebuild.
C.4.2.5.1 The contractor shall replace the Perkins components on the remanufactured engine if they are damaged or missing for the DOK-
ING ECM. (e.g. bracket, fasteners, bushings, etc.)
C.4.3 DYNAMOMETER ENGINE TEST REPORT: Remanufactured engines provided by the contractor shall pass the approved Dynamometer engine test specific to the Perkins Model 1106C Series 2188/2200 Engine specification (Attachment 0003). The test report shall be provided to the
Government in accordance with CDRL A001 (Exhibit A).
C.4.4 PACKAGING: The contractor shall preserve and package the remanufactured engine for shipment to the Government in accordance with the Special Packaging Instructions (SPI AK15987019), Revision A, Dated 20 June 2012 (Attachment 0004) and the Special Packaging
Instructions specified in the contract.
3 4
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*** END OF NARRATIVE C0001 ***