W56HZV-17-R-L533,_RFQ.pdf
PDF 676 KB Posted
- Attached to
- Fort Stewart Museum Fabrication
- Solicitation number
- W56HZV-17-R-L533
About this file
RFQ
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ft_stewart_colors.pdf | ||
| 2.12.pdf | ||
| floorplan_gallery_d_permanent.pdf | ||
| RAILING_-_for_example_only.pdf | ||
| artifact_railing.pdf | ||
| 5.16case.pdf | ||
| campgreentext.pdf | ||
| 2.19case.pdf | ||
| 8.1a_railing.pdf | ||
| 3_ID_Daubert_Artifact_List.xlsx | XLSX spreadsheet | |
| W56HZV-17-R-L533_Answers_to_Questions.docx | DOCX document | |
| Attachment_C,_Gallery_D_Design.pdf | ||
| Attachment_B,_Gallery_C_Design.pdf | ||
| Attachment_A,_Past_Performance_Questionnaire_W56HZV-17-R-L533.doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMBINED SYNOPSIS AND
SOLICITATION
W56HZV‐17‐R‐L533
I. INTRODUCTION
A. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation.
B. This request for quote is for 3rd Infantry Division Museum Exhibit Fabrication and Installation at Fort Stewart, GA..
C. The combined synopsis and Request for Quotation (RFQ) number is W56HZV-17-R-L533.
D. This solicitation documents and incorporate provisions and clauses in effect through Federal Acquisition Circular (FAC) 2005-95, effective 19 January 2017.
E. Small Business Set-Aside: 100% Small Business
F. Posting Date: 31 May 2017
G. Response Date: 20 June 2017, no later than 12:00 p.m. EST
H. The contracting office is Army Contracting Command (ACC – WRN) 6501 East Eleven Mile Road, Warren, MI 48397-5000.
I. The NAICS code applicable to this acquisition is 712110.
J. This Combined Synopsis and Solicitation contains clauses and provisions requiring a fill-in or representation. Offerors shall submit a copy of this Combined Synopsis and Solicitation with their response to clauses and provisions accordingly. A failure to complete fill-in may cause your offer to be determined ineligible for award.
K. Basis for award: The Government intends to award one (1) firm, fixed price contract as a result of this solicitation. Award of these contracts shall be based on the best value quotes received in response to this solicitation. Refer to provisions 52.212-1, 52.212-1 Addendum and 52.212-2 for offer requirements and evaluation of offers.
L. See provision at 52.209-4011 – Contractor Responsibility and Eligibility for Award for further details.
M. All quotations must be received by the Army Contracting Command - Warren no later than 12:00 PM Local Warren, Michigan time. Contractors must be registered in the System for Award Management (SAM) prior to receiving an award. Refer to website https://www.sam.gov/portal/public/SAM/.for registration information.
N. The Offeror shall submit an electronic quote. All quotation information must be in the English language and priced in U.S. dollars.
O. Army Contracting Command Warren (ACC-WRN) reserves the right to seek clarification on any aspect of your quote.
P. Quotation Submission Procedures. Quotations shall be submitted in accordance with Army Contracting Command – Warren’s Local Clause 52.204-4016 page of the solicitation. No hard copies will be accepted.
Q. Questions are requested via email, addressed to Jenna McGinnis at jenna.n.mcginnis.civ@mail.mil. All questions must be submitted by 12:00 p.m. on 9 June 2017.
R. This action is pursuant to FAR 52.232-18- Availability of Funds. All quotes provided in response to this Request for Quotes shall have an expiration date of a minimum of 30 days.
Please provide the duration of validity for your quote.
II. CONFLICTS OF INTEREST
A. Written Identification of Potential Organization Conflicts Of Interest.
a. The term “Organizational Conflicts of Interest” (OCI) is defined in part 2.1 of the Federal Acquisition Regulation (FAR): see also FAR 9.502 (c). For this solicitation, “OCI” exists when a Contractor would face an actual or potential conflict of interest if it worked on the planned contract, due either to its other business interests or to the nature of the effort to be performed. However, organizational conflicts of interest are more likely to occur in contracts involving:
(1) Management support services;
(2) ) Consultant or other professional services;
(3) Contractor performance of or assistance in technical evaluations; or
(4) Systems engineering and technical direction work performed by a Contractor that does not have overall contractual responsibility for development or production.
b. The Contracting Officer has reviewed and analyzed the procurement under this solicitation and has not identified any OCI issue, potential or otherwise.
However, Offerors are encouraged to make a preliminary disclosure to the Contracting Officer, prior to the due date for receipt of proposals, of any OCI issues the Offeror has identified. Such preliminary disclosure will allow the Contracting Officer more time to assess both the potential OCI and the Offeror’s proposed strategy to negate or mitigate the OCI. This assessment may be crucial, since per FAR 9.504(e) the Contracting Officer may not award the contract to a Contractor with an OCI that cannot be negated or mitigated.
c. If the Contractor demonstrates to the Contracting Officer that there may be a possible conflict of interest arising out of an existing contract, the Contracting Officer shall take the necessary action to delete that requirement from this contract and/or mitigate any conflict of interest that may be present. The Contractor agrees that the Government or an authorized representative may, up to three years after acceptance of all programmatic documentation to be delivered under this contract, restrict the Contractor’s future participation in any resulting program managed system acquisition action(s).
SEE ADDENDUM
(No Collect Calls)
W56HZV-17-R-L533
b. TELEPHONE NUMBER
586-282-7644
8. OFFER DUE DATE/LOCAL TIME
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W56HZV9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JENNA N. MCGINNIS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE: UNRESTRICTED OR
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ARMY CONTRACTING COMMAND - WARREN (DTA)
6501 E. 11 MILE RD
WARREN MI 48397-500
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$27,500,000
NAICS:
712110
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
x x 100 x x
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF49
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W56HZV-17-R-L533
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Fabricate and Install Museum Exhibit
FFP
Fabricate and Install Museum Exhibit in accordance with the Performance Work Statement and Design Specifications FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Job
Contractor Manpower Reporting
FFP
Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website.
FOB: Destination
NET AMT
PERFORMANCE WORK STATEMENT
Performance Work Statement (PWS)
For Exhibit Fabrication and Installation
PART 1
GENERAL INFORMATION
1.1 Description of Services/Introduction:
The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and non-personal services necessary to perform Fabrication and Installation as defined in this Performance Work Statement except as Specified in section C-3 as government furnished property and services at gallery’s C and D Fort Stewart, Georgia. The contractor shall perform to the standards in this contract.
Not Separately Priced
1.2 Background:
The effort is in support of the US Army Center of Military History (CMH) mission to collect, preserve, interpret, and display historical military material, culture, or artifacts.
1.3 Objectives:
1.3.1 Fabricate the exhibit components to the standards set forth in the design packaged provided by CMH (attachment A)
1.3.2 Transport and install the exhibit components into the exhibit space prepared by the US Army to house the exhibit.
1.3.3 Install historic objects into the exhibition fixtures fabricated by the contractor.
1.3.4 Do final focusing of lighting.
1.4 Scope:
CMH requires services necessary for the fabrication and installation of a new exhibit space at Fort Stewart, Georgia.
Work shall include creation of shop drawings and fabrication of all exhibit components. The contractor shall pack, ship and install exhibit fixtures, in the exhibit area and the installation of historic objects into those fixtures. Perform final focusing of lighting.
1.5 Period of Performance: Work shall be completed no later than 1 November 2017.
1.6 General Information
1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. As a minimum, the contractor shall develop quality control procedures that address the areas identified in Technical Exhibit 1, “Performance Requirements Summary”. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day
1.6.4 Hours of Operation: The contractor is responsible for conducting delivery between the hours of 8am to 5pm, Monday-Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. An onsite storage space will be provided for the exhibit fixtures and tools.
1.6.5 Place of performance is the Fort Stewart Museum, gallery’s C and D at Fort Stewart, Georgia.
1.6.6 Security Requirements: N/A
1.6.6.1 Access and General Protection/Security Policy and Procedures. This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility or area.
Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by COR). The contractor shall also provide the full name, birth date, place of birth and social security number necessary to meet installation access requirements enforced by the Provost Marshal Office, Director of Emergency Services or Security Office.
Contractor workforce must comply with all personal identity verification requirements as directed by DOD, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6. 6.2 PHYSICAL Security. The contractor shall be responsible for safeguarding all government property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.6.3 Conservation of Utilities. The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
1.6.7 Special Qualifications: Each of the contractor personnel performing the delivery and installation of the exhibit components are required to possess a valid government issued photo Identification for entry onto Ft Stewart, Georgia. The contractor shall be prepared to provide information on personnel making the delivery to the Fort Stewart Museum at Fort Stewart, Georgia.
1.6.8 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.9 Contract Manager: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.6.10 Identification of Contractor Employees: All contract personnel attending meetings, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Personnel will be required to obtain required documentation for entry onto the base each day.
PART 2
DEFINITIONS & ACRONYMS
PWS – Performance Work Statement
Contracting Officer’s Representative (COR): A representative from the requiring activity assigned by the Contracting Officer to perform surveillance and to act as liaison to the contractor
Defective Service. A service output that does not meet the standard of performance associated with it in the Performance Work Statement.
Quality Assurance Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
Quality Control. Those actions taken by a contractor to control the performance of services so that they meet the requirements of the PWS.
Quality Assurance. Those actions taken by the government to assure services meet the requirements of the Performance Work Statement.
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3.1 The government shall provide exhibit design and production ready graphic files at the contract kick off meeting.
3.2 The Contractor shall provide all equipment needed for the completion of this contract.
3.3 Services:
3.3.1 Utilities. All utilities in the facility will be available for the contractor’s use in performance of duties outlined in this PWS. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities.
3.4 The Government will furnish the necessary workspace for the contractor staff to provide the support outlined in this PWS.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4.1 General: Except for those items specifically stated to be government furnished in Part 3, the contractor shall furnish everything required to perform this PWS.
PART 5
SPECIFIC TASKS
5.1 BASIC SERVICES. The contractor shall provide services for:
5.1.1 Project Schedule. Contractor shall prepare and present to COR a proposed project schedule complete with meeting and milestone dates for COR approval (IAW CDRL A001). Contractor shall, during the course of the project, track the project to see that the project remains on schedule.
5.1.2. The contractor shall provide shop drawings (IAW CDRL A002), necessary for the fabrication of the exhibit.
5.1.3 Status Report: contractor shall submit to the COR for review and approval information relevant to the current level of project progress (IAW CDRL A003). Information is defined as drawings, files, and any other material relevant to the project at that given moment.
5.1.4 Provide samples of all materials, colors and finishes to be used in the project prior to the start of fabrication.
Acceptance or rejection of the samples shall be submitted to the contractor by the COR. (IAW CDRL A004). If needed fabricate prototypes and mockups prior to the start of fabrication. Acceptance or rejection shall be submitted to the contractor by the COR.
5.1.5 Provide PDF copies of the final graphic production files (IAW CDRL A005) for final review and approval by CMH prior to the fabrication of graphics.
5.1.6 Fabricate all components of the exhibit as specified in the CMH design package.
5.1.7 The contractor shall provide the opportunity for two field visits of Army personnel to the fabricator’s shop by (costs to be incurred by the CMH). Date TBD.
5.1.8 Fabricator shall be responsible for packing, transporting, unloading and unpacking all of the fixtures either produced by the fabricator or purchased by the contractor. The contractor is responsible for all items during transportation. Coordinate delivery of fixtures, unloading, unpacking of fixtures
5.1.9 Contractor shall be responsible for installation of all exhibit components into the exhibit space.
5.1.10 Contractor shall be responsible for maintaining the exhibit space for cleanliness for the duration of the installation.
5.1.11 Contractor shall install all objects contained within the exhibit space under the supervision of Army personnel.
5.1.12 Contractor shall be responsible for final focusing of lighting.
PART 6
APPLICABLE PUBLICATIONS
6.1 None
TECHNICAL EXHIBIT 1
Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective Standard Performance Threshold Method of Surveillance
PRS # 1. Contractor shall track the project progress.
IAW paragraph 5.1.1,
5.1.3 of the PWS.
Contractor shall track project status using agreed upon schedule.
Zero deviation from standard
100% inspection
PRS #2. Contractor personnel shall produce shop drawings
IAW paragraph 5.1.2 of the PWS.
Contractor shall produce detail drawing for the fabrication of the exhibit.
Zero deviation from standard
100% inspection
PRS# 3 Contractor shall provide satisfactory exhibit component for the project.
IAW paragraph 5.1.4, 5.1.5, 5.1.6, 5.1.7 of the
PWS
Contractor shall fabricate exhibits based on design plans.
Zero deviation from standard
100% inspection
PRS #4. Contractor personnel shall provide satisfactory exhibit installation for the project.
IAW paragraph 5.1.9, 5.1.10, 5.1.12 of the
PWS
Contractor shall meet all installation. All exhibits shall match designs. Contractor shall leave building in a clean condition.
No more than 5 % deviation from standard.
Deviations must be reported to and approved by the COR
100% inspection
PRS #5 Contractor personnel shall provide satisfactory object installation for the project.
IAW paragraph 5.1.11 of the PWS
Contractor shall meet all installation deadlines. All installations shall match designs as shown in the CMH design package.
Zero deviation from standard
100% inspection
PRS #6 Packing and transporting of fabricated exhibit.
IAW paragraph 5.1.8 of the PWS
Contractor shall meets all delivery deadlines
Contractor shall meet 95% of the delivery deadlines, any deviation from this must be any deviation greater than 5% must be reported to the COR.
100% inspection
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To Contractor shall provide document-showing the proposed schedule for the project.
IAW paragraph of 5.1.3 of the
1 1 Word document supplied as electronic file.
COR
Deliverable Frequency # of Copies Medium/Format Submit To PWS and CDRL A001 Contractor shall provide shop drawings for the fabrication of the project.
IAW paragraph of 5.1.1 of the PWS and CDRL A002.
1 1 PDF document.
COR
Contractor shall provide document showing project progress for the project.
IAW paragraph of 5.1.4 of the PWS and CDRL A003.
Bi monthly, first day of the month.
1 Word document supplied as electronic file.
COR
Contractor shall provide samples.
IAW paragraph of 5.1.5 of the PWS and CDRL A004.
1 1 Word document supplied as electronic file.
COR
Contractor shall provide hardcopies of the final graphic production files.
IAW paragraph of 5.1.5 of the PWS and CDRL A005.
1 1 Electronic PDF files.
COR
Fabrication and Install all Exhibit components into the exhibit galleries.
IAW paragraph 5.1.6, 5.1.7, 5.1.8, 5.1.9, 5.1.10, 5.1.13 of the PWS
1 1 Product as specified in the exhibit design package.
COR
Install Historic Objects into the exhibit space.
IAW paragraph 5.1.15 of the
PWS
1 1 Product as specified in the exhibit design package.
COR
52.212-1 ADDENDUM
52.212-1 – Addendum – Offeror Quote Instructions
1. Past Performance:
1.1 For the Past Performance Factor, provide information for a total of up to three (3) recent and relevant contracts/purchase orders performed by the Offeror. These may include foreign, federal, state, local and private industry contracts. The Government will not consider the past performance of subcontractors or any individuals or key personnel; only corporate past performance will be considered. Recent contracts are those performed within three years of the date of issuance of this RFQ. Relevant Past Performance will consider the extent to which the submitted contract efforts are comparable in scope and magnitude of effort and complexity to the Museum Exhibit Fabrication and Installation Work described in this RFQ statement of work.
1.2. Contract Information: For each of the up to three (3) recent and relevant contracts/purchase orders submitted, provide the following information:
(a) Contract/Purchase Order Number (and delivery order number if applicable);
(b) Delivery or Performance Schedule;
(c) Government Contracting Officer or commercial contracting point of contact address, telephone number and email;
(d) A description of work performed by the Offeror, describing the relevance to the Museum Exhibit Fabrication and Installation Work described in this RFQ statement of work; and
(e) Copies of the Statements of Work from each of the submitted contracts/purchase orders to establish the relevance.
1.3. Past Performance Questionnaire. A past performance questionnaire is provided in Attachment A. For each of the contracts/purchase orders submitted by the Offeror, the Offeror shall send a copy of the past performance questionnaire directly to the appropriate PCO and/or COR or other appropriate technical and contracting individuals. The Offeror shall request that these individuals complete the questionnaire and forward it electronically directly to the Government at jenna.n.mcginnis.civ@mail.mil and Justin.d.stoner.civ@mail.mil as soon as possible and prior to the RFQ closing date with the subject heading “PAST PERFORMANCE INFORMATION FOR [Offeror name].
1.4. Past Performance Information.
1.4.1 The Government does not assume the duty to search for data to cure problems it finds in the Offeror’s quote. The burden of providing thorough and complete past performance information remains with the Offeror. It is the Offeror's responsibility to submit detailed and complete information as required so the Government may evaluate its past performance. The above instructions are provided to advise Offerors as to the information required by the Government to assess the contractor’s recent and relevant past performance. Since this information constitutes a basis of the Government's review, it is imperative that the Offeror present its past performance in a clear and complete manner. Failure to provide the information requested in this addendum may result in an assessment that the referenced past performance record lacks recency or relevance.
1.4.2 Offerors are advised that the Government may contact any of the references the Offeror provides, may contact internal or external sources regarding past contract performance information, and reserves the right to use any information received as part of our evaluation that may include the Past Performance Information Retrieval System (PPIRS) to search for past contract performance information. While the Government may elect to consider data obtained from internal and external sources other than the proposal, the burden on providing thorough and complete past performance information rests with the Offeror.
2. Price
2.1. The price volume shall include the Offeror's total proposed Firm-Fixed-Price to perform Exhibit Fabrication and Installation services. The Offeror shall enter its proposed price in Section B of the RFQ (CLIN 0001).
2.2. The Government reserves the right to request additional information as necessary to validate the reasonableness of an offer.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
CLAUSES INCORPORATED BY REFERENCE
52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-11 Certification And Disclosure Regarding Payments To
Influence Certain Federal Transactions
SEP 2007
52.203-12 Limitation On Payments To Influence Certain Federal Transactions
OCT 2010
52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009
JUN 2010
52.203-16 Preventing Personal Conflicts of Interest DEC 2011 52.204-2 Security Requirements AUG 1996 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-5 Women-Owned Business (Other Than Small Business) OCT 2014 52.204-6 Data Universal Numbering System Number JUL 2013 52.204-8 Annual Representations and Certifications APR 2016 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2015
52.204-12 Data Universal Numbering System Number Maintenance DEC 2012 52.204-13 System for Award Management Maintenance JUL 2013 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.207-4 Economic Purchase Quantity-Supplies AUG 1987 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
JUL 2013
52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns OCT 2014 52.219-9 (Dev) Small Business Subcontracting Plan (Deviation 2016-O0009) AUG 2016 52.219-16 Liquidated Damages-Subcontracting Plan JAN 1999 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-19 Child Labor -- Cooperation with Authorities and Remedies FEB 2016 52.222-38 Compliance With Veterans' Employment Reporting
Requirements
FEB 2016
52.223-6 Drug-Free Workplace MAY 2001 52.223-11 Ozone-Depleting Substances and High Global Warming
Potential Hydrofluorocarbons.
JUN 2016
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.223-20 Aerosols JUN 2016 52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.225-20 Prohibition on Conducting Restricted Business Operations in
Sudan--Certification
AUG 2009
52.227-1 Authorization and Consent DEC 2007 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-11 Extras APR 1984 52.232-17 Interest MAY 2014 52.232-23 Alt I Assignment of Claims (May 2014) - Alternate I APR 1984 52.232-25 Prompt Payment JUL 2013 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.242-13 Bankruptcy JUL 1995 52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.243-1 Changes--Fixed Price AUG 1987 52.253-1 Computer Generated Forms JAN 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7997 (Dev) Prohibition on Contracting with Entities that Require Certain
Internal Confidentiality Agreements (Deviation 2016-O0003)
OCT 2015
252.204-7000 Disclosure Of Information AUG 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7006 Billing Instructions OCT 2005 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
DEC 2015
252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information
DEC 2015
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
DEC 2015
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism
OCT 2015
252.209-7999 (Dev) Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction under any Federal Law (Deviation)
JAN 2012
252.215-7007 Notice of Intent to Resolicit JUN 2012 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010 252.225-7001 Buy American And Balance Of Payments Program-- Basic
(Aug 2016)
AUG 2016
252.225-7002 Qualifying Country Sources As Subcontractors AUG 2016 252.225-7012 Preference For Certain Domestic Commodities AUG 2016 252.225-7013 Duty-Free Entry--Basic (May 2016) MAY 2016 252.226-7001 Utilization of Indian Organizations and Indian-Owned
Economic Enterprises, and Native Hawaiian Small Business Concerns
SEP 2004
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
JUN 2012
252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.246-7000 Material Inspection And Receiving Report MAR 2008 252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.201-4000 (TACOM)
ARMY CONTRACTING COMMAND – WARREN (DTA) OMBUDSPERSON (APR
2011)
Information regarding the Ombudsperson for this contract is located at the following website:
http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html
[End of Provision]
52.204-4016 (Warren) Electronic Contracting (AUG 2015)
(a) All Army Contracting Command – Warren (DTA) solicitations will be publicized on the Federal Business Opportunities website (https://www.fbo.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal via the Federal Business Opportunities (FBO) system. Proposals or quotes submitted after this date using any other mechanism, including the Army Single Face to Industry Bid Response System (ASFI BRS) may be deemed non-responsive.
(c) Requirements for the online FBO bid submission:
1. Vendors must log into the FBO System to be able to submit electronic responses for opportunities.
2. Vendors must be registered in the System for Award Management (SAM) at www.sam.gov (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).
3. Once logged into the FBO System, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.
4. FBO will send an email to vendor’s registered email address confirming the electronic submission.
5. For additional information on submitting electronic bid responses via the FBO system see the FBO
Vendor Guide – Section 4.3.1 “Submitting an Electronic Response” (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf).
(d) Note to offerors:
Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time for the Army contracting Command - Warren, (DTA), Michigan. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure (in this case, received through FBO) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
Solicitations may remain posted on the FBO after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(e) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(f) Questions pertaining to this solicitation should be directed to the Contract Specialist identified in Block 10 on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
[End of Notice]
52.204-4020 (TACOM)
ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES (MAR 2015)
a. The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 “Personal Identity Verification of Contractor Personnel”) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
b. For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal Management (see clause 52.204-4600 “Trusted Associate Sponsorship System (TASS) Program”).
c. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (see provision (TACOM) 52.215-4405 “Access to the Detroit Arsenal; Identifying Contractor Employees; Non-disclosure Statement”), or at OCONUS locations, in accordance with Status of Forces Agreement and other theater regulations.
(End of Clause)
52.209-4011 (TACOM)
CONTRACTOR RESPONSIBILITY AND ELIGIBILITY FOR AWARD (JUL 2016)
(a) The Government will award a contract to the offeror that:
(1) submits the lowest evaluated offer if award is based on price only, or the offer that provides the best value to the Government if factors in addition to price are identified elsewhere in this solicitation, and
(2) submits a bid or proposal that meets all the material requirements of this solicitation, and
(3) meets all the responsibility criteria at FAR 9.104.
(b) To make sure that an offeror meets the responsibility criteria at FAR 9.104 the Government may:
(1) arrange a visit to the offeror’s plant and perform a preaward survey;
(2) ask the offeror to provide financial, technical, production, or managerial background information.
(c) If the offeror does not provide the Government with the data requested within 7 days from the date the requested is received, or if the offeror refuses to have an onsite visit to the offeror’s facility, the Government may determine the offeror to be nonresponsible.
(d) If the Government visits the offeror’s facility, please make sure that current certified financial statements and other data relevant to the bid or proposal available for Government personnel to review.
(End of Provision)
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (OCT 2015)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) "Remit to" address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions or commercial items for satisfying the requirements of this solicitation. Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers:
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers.
Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.
(g) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.
(h)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .