Attachment_02_-_Q A.docx

DOCX document 12 KB Posted

Attached to
Parts Washer Maintenance
Solicitation number
W56HZV16R0078
Issued by

View the file

Other files

File Type Posted
W56HZV16R0078-0002.pdf PDF
Attachment_03_-_Q A.docx DOCX document
Attachment_01_-_Q A.docx DOCX document
W56HZV16R0078-0001.pdf PDF
W56HZV16R0078.pdf PDF
Wage_Determination_PartsW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 02 - Q&A

1. I am assuming drums to be picked up for solids disposal are the same drums used by the contractor to supply fresh or virgin solvent, right?

Answer: No, The drums RRAD Environmental will furnish for Solid Waste are Metal 55 Gallon with a closed top.

2. Using a reuse program, Can Contractor up to pump into his truck leaving drums as future storage to be pumped out instead of supplying and removing drums?

Answer: No, Drums need to be removed by contractor. RRAD does not have a storage facility for empty drums.

3. You stated that the government previously was responsible for disposing the solid drums. Can you break down monthly or quarterly cost incurred by the government in disposal?

Answer: Contractor will be responsible for Spent Solvent. RRAD will still be responsible for Solid Waste (Hazardous Waste).

4. Were the solids disposed as non-hazardous or hazardous; and if so which landfill is currently used as destination?

Answer: No, the solid waste is a hazardous by-product and RRAD purchases the barrels and Pays a vendor to remove this Hazardous waste from our Depot.