W56HZV15R0009-0005.pdf
PDF 20 KB Posted
- Attached to
- GUNS, THROUGH 30MM
- Solicitation number
- W56HZV15R0009
About this file
Amd 0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56HZV15R0009-0004.pdf | ||
| W56HZV15R0009-0003.pdf | ||
| W56HZV15R0009-0001.pdf | ||
| W56HZV15R0009.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0005 2015SEP15
W56HZV
U.S. ARMY CONTRACTING COMMAND
WARREN, MICHIGAN 48397-5000
ROY CHOW
EMAIL: ROY.CHOW.CIV@MAIL.MIL
W56HZV-15-R-0009
2015MAY19
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 6
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: ROY CHOW
Buyer Office Symbol/Telephone Number: CCTA-ADS-A/(586)282-7623
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Weapon System: Gun, Automatic, 25mm, M242
*** End of Narrative A0000 ***
The purposes of Amendment 0005 to W56HZV15R0009 are as follows:
1. To correct CLIN 0003BB Narrative (a) from "19 each Firing Pin Assemblies (PN 1524510)" to "19 each Firing Pin Assemblies (PN
12524512)"
2. To remove items (a)(3) and (a)(4) from Clause 52.209-4.
3. To correct Clause 52.209-4000 (a) from from "19 each Firing Pin Assemblies (PN 1524510)" to "19 each Firing Pin Assemblies (PN
12524512)"
4. This solicitation is NOT extended and remains 15 Sept 2015, 4PM EST.
5. All other terms and conditions of the solicitation remain unchanged and in full effect.
*** END OF NARRATIVE A0007 ***
2 6
W56HZV-15-R-0009 0005
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0003BB SPRING QUALIFICATION FAT ARTICLES: GOVT TEST 1 LO $ ____________________________________________ __________________
SERVICE REQUESTED: FIRST ARTICLE TEST
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH5V5274EH PRON AMD: 03
AMS CD: SM2B1100000
SPRING QUALIFICATION FIRST ARTICLES shall be delivered pursuant to Clause 52.209-4.
The SPRING QUALIFICATION FIRST ARTICLES consist of the following:
a) 19 each Firing Pin Assemblies (PN 12524512)
b) 5 each Firing Pin Springs (PN 12524510)
The offeror shall insert a unit price for the single lot consisting of the items above plus the cost of shipping and packaging to the address below.
SPRING QUALIFICATION FIRST ARTICLES are due no later_____________________________________________________ than 190 days after contract award.___________________________________
INSPECTION and ACCEPTANCE of SPRING QUALIFICATION
FIRST ARTICLES shall be performed at SOURCE in coordination with DCMA-QAR.
FOB: DESTINATION
SHIP TO:
TBD (Aberdeen Proving Grounds, MD)
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
3 6
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
E-1 CHANGED 52.209-4000 NOTICE REGARDING FIRST ARTICLE TEST SAMPLE MAR/2000
(TACOM)
(a) The first article items lot, as described in CLIN 0003BB, consists of a quantity of 19 each Firing Pin Assemblies (PN
12524512) and an additional 5 each Firing Pin Springs (PN 12524510) that will be consumed or destroyed in testing. Any items consumed ___________________ or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of__________________________________________________________________________________________________________________________ any items that are consumed or destroyed shall be included in the unit price of CLIN 0003BB. Any quantity that successfully passes all specified tests, less the destructive tests, if any, SHALL NOT serve as a manufacturing standard for the remainder of the contract.
(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design. 2) as an aid in identifying any process changes, or 3) as the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the contractor will notify the contracting officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
4 6
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
I-1 CHANGED 52.209-4 FIRST ARTICLE APPROVAL -- GOVERNMENT TESTING (SEP 1989) -- ALTERNATE SEP/1989
I (JAN 1997) AND ALTERNATE II (SEP 1989)
(a) The purpose of this Government-conducted First Article testing is to approve Firing Pin Springs (PN 12524510) from sources other than those previously approved in drawing 12524510 (dated 12 Mar 1990): Bauman Springs or E.N. Santa Barbara. The Contractor shall _____________________ deliver the following no later than 190 calendar days from the date of this contract to the Government at the Aberdeen Proving Grounds,________________________________________________________________________________________________________________________________________
MD. Full address TBD._____________________
1) NINETEEN units of Firing Pin Assembly (PN 12524512) (with PN 12524510 installed).
2) FIVE additional units of Firing Pin Spring (PN 12524510).
The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
(b) Within 120 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in __________________________ writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing.
After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the
Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) The delivered items ARE NOT PART OF THE CONTRACT QUANTITY and will be consumed or destroyed in testing pursuant to Clause 52.209- _________________________________________________________________________________________________________________________________
4000.____
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the Contracting Officer may, by written authorization, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
If first article tests reveal deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in the contract price.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
(j) The Contractor shall produce both the first article and the production quantity at the same facility.
5 6
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(End of Clause)
6 6
| SECTION A |
| SECTION B |
| SECTION E |
| SECTION I |
File details come from the government source that posted it. Updated .