W56HZV15R0009-0003.pdf
PDF 44 KB Posted
- Attached to
- GUNS, THROUGH 30MM
- Solicitation number
- W56HZV15R0009
About this file
W56HZV15R0009 Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56HZV15R0009-0005.pdf | ||
| W56HZV15R0009-0004.pdf | ||
| W56HZV15R0009-0001.pdf | ||
| W56HZV15R0009.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0003 2015SEP02
W56HZV
U.S. ARMY CONTRACTING COMMAND
WARREN, MICHIGAN 48397-5000
ROY CHOW
EMAIL: ROY.CHOW.CIV@MAIL.MIL
W56HZV-15-R-0009
2015MAY19
X
X 2015SEP09 04:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 16
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: ROY CHOW
Buyer Office Symbol/Telephone Number: CCTA-ADS-A/(586)282-7623
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Weapon System: Gun, Automatic, 25mm, M242
*** End of Narrative A0000 ***
The purposes of Amendment 0003 to Solicitation W56HZV15R0009 are as follows:
a. The Government is aware that previously approved sources for Firing Pin Spring (PN 12524510) may no longer be available. If the contractor intends to submit Firing Pin Assemblies (PN 12524512) with Firing Pin Spring (PN 12524510) from a different source, the contractor must submit the following first articles:
CLIN 0003AA, First Article Test Report (FATR), contractor testing (Clause 52.209-3) and
CLIN 0003BB, Spring Qualification Government-conducted FAT Articles (Clause 52.209-4). The Government conducted FAT will consist of live-firing endurance and reliability testing. Contractor delivered articles will not be part of the production quantity in
CLINs 0001 or 0002 (Clause 52.209-4000).
b. If the contractor can meet the entire requirement of CLINS 0001 and 0002 (569 each + 569 each: total 1,138 each) using Firing Pin
Springs from previously approved sources, then CLIN 0003BB is not required and is hereby waived.
c. ELIN A005 has been deleted.
d. CLIN 0001AA delivery schedule has been amended.
e. The following Clauses are added: 52.211-4015, 52.211-4008, 52.211-4010, 52.209-4000, 52.209-4, 52.211-4038, 52.211-4048, 52.211-4049, 52.211-4050, 52.211-4051 and 52.211-4052.
f. Clauses 52.209-3 and 52.242-4022 have been amended.
g. Solicitation W56HZV15R0009 is extended until Wednesday, 09 SEP 2015, 4PM EST.
h. All other terms and conditions of solicitation W56HZV15R0009 remain unchanged and in full effect.
*** END OF NARRATIVE A0005 ***
2 16
W56HZV-15-R-0009 0003
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001AA PRODUCTION QUANTITY 569 EA $ $ ___________________ ______________ __________________
COMMODITY NAME: FIRING PIN ASSEMBLY
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH4V5105EH PRON AMD: 01
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12524512:19200
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE
INTERMEDIATE PACK: 001
LEVEL PRESERVATION: Military
LEVEL PACKING: B
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W56HZV4211V350 W62G2T J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 200 0300
002 200 0330
003 169 0360
FOB POINT: Destination
SHIP TO:
(W62G2T) XU W1BG DLA DISTRIBUTION
25600 S CHRISMAN ROAD
REC WHSE 57
TRACY,CA,95304-5000
0003 FIRST ARTICLE TESTING
0003AA FAT REPORT, CONTRACTOR TESTING 1 LO $ ______________________________ __________________
SERVICE REQUESTED: FIRST ARTICLE TESTING
CLIN CONTRACT TYPE:
Firm Fixed Price
3 16
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
PRON: EH5V5274EH PRON AMD: 03
AMS CD: SM2B1100000
FIRST ARTICLE TEST REPORT shall be delivered pursuant to Clause 52.209-3. The failure of the offeror to insert a unit price applicable to the FATR shall mean that the offeror will supply the FATR at no cost and the offer will be evaluated for award accordingly.
FATR is due no later than 180 days after contract award.
(See Section J, Exhibit A: DD
Form 1423, Sequence Number A005)
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0180
0003BB SPRING QUALIFICATION FAT ARTICLES: GOVT TESTING 1 LO $ _______________________________________________ __________________
SERVICE REQUESTED: FIRST ARTICLE TEST
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH5V5274EH PRON AMD: 03
AMS CD: SM2B1100000
SPRING QUALIFICATION FIRST ARTICLES shall be delivered pursuant to Clause 52.209-4.
The SPRING QUALIFICATION FIRST ARTICLES consist of the following:
a) 19 each Firing Pin Assemblies (PN 12524510)
b) 5 each Firing Pin Springs (PN 12524510)
The offeror shall insert a unit price for the single lot consisting of the items above plus the cost of shipping and packaging to the address below.
SPRING QUALIFICATION FIRST ARTICLES are due no later_____________________________________________________ than 190 days after contract award.___________________________________
INSPECTION and ACCEPTANCE of SPRING QUALIFICATION
FIRST ARTICLES shall be performed at SOURCE in coordination with DCMA-QAR.
FOB: DESTINATION
SHIP TO:
4 16
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
TBD (Aberdeen Proving Grounds, MD)
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0180
9000 CONTRACT DATA ITEMS ___________________
A005 DELETED _______
5 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
C-1 CHANGED 52.211-4015 CONFIGURATION CONTROL - ENGINEERING CHANGES APR/2015
(a) DEFINITIONS:
(1) Engineering Change Proposal (ECP). An ECP is a suggestion that we (the Government) permanently change some requirement of the Technical Data Package (TDP). ECPs can be issued before or during contract performance. NOTE: The current Government Standard allows us ninety days to process routine ECPs. If you (the contractor) need a response in less than ninety days to meet contract requirements, you should consider submitting a deviation along with your ECP.
(2) Notice of Revision (NOR). A NOR describes the proposed changes to a technical document being requested by an ECP.
(3) Value Engineering Change Proposal (VECP). A proposal that --
(i) Requires a change to the instant contract; and
(ii) Results in reducing the overall projected cost to the agency without impairing essential functions or characteristics; provided, that it does not involve a change --
(A) In deliverable end item quantities only;
(B) In research and development (R&D) end items or R&D test quantities that is due solely to results of previous testing under this contract; or
(C) To the contract type only.
(4) Request for Variance (RFV). A RFV is a one-time request to deviate from TDP requirements. You must submit your variance request once you realize that you desire to deviate from the TDP requirements. You can request a variance for a specific number of parts or the entire contract quantity.
(b) When will TACOM start processing change requests? TACOM won't start processing any ECP, VECP, or RFV until we receive the
ACO's comments (see paragraph (e) below) and the ECP, VECP, or RFV documentation.
(c) Contractor Responsibility. ECPs, VECPs, and RFV shall contain information per the instructions outlined on the Data Delivery
Descriptions (DDDs) which can be found at the following website: http://contracting.tacom.army.mil/engr/engrchange.htm. Forms for preparing an ECP, VECP, or a RFV can also be found at this website. You may use other media, as long as you give us all the information outlined in the DDDs.
(1) Identify the two-digit Weapon System Code (WSC) on your submittal. The WSC for this procurement is H8. __
(2) The Contractor shall submit ECPs/VECPs/RFVs to the Government electronically. You must use one of the following electronic mediums: CD ROM, or the SAFE File Exchange at: https://safe.amrdec.army.mil/SAFE/. Identify the software application, and version, that you used to create each file submitted.
(3) ECPs/VECPs/RFVs submitted in paper form are unacceptable and will be returned. You must use one of the following electronic formats:
(i) Files readable using these Microsoft 97 Office Products or later versions: Word, Excel, PowerPoint, or Access.
Spreadsheets must be sent in a file format that includes all formulae, macro and format information. Print image is not acceptable.
(ii) Files in Adobe PDF (Portable Document Format).
(iii) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages. All linked information must be contained within your electronic ECPs/VECPs/RFVs and be accessible offline.
(iv) Other electronic formats. Before preparing your ECPs, VECPs or RFVs in any other electronic format, please e-mail the engineer, copy-furnished to the buyer and ACO, to obtain a decision as to the format's acceptability. Failure to e-mail the engineer to seek an alternate format's acceptability may result in rejection of your submission. All alternate methods must be at no cost to the Government. NOTE: The above formats may be submitted in compressed form using self-extracting files.
(d) Submittal Procedures for ECPs/VECPs/RFVs.
6 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1) Send one copy of the ECP, VECP or RFV in electronic format to your ACO.
(2) Send one copy of the ECP, VECP or RFV in electronic format to the buyer listed on the solicitation/ contract document.
WARNING - Submit complete, legible, virus free packages per paragraphs 1 and 2 above, or we may return your ECP/VECP/RFV without processing them.
(e) ACO Responsibility. Within ten working days from the day you receive the contractor's request, the ACO must prepare Comments on the ECP, VECP, or RFV in electronic format, and forward it as follows:
Email a copy of the contractor's request and ACO comments (DD Form 1998) to the buyer identified in block 7 of the solicitation cover sheet (SF 33), block 5 on the Standard Form 26, or block 6 on the DD Form 1155. Indicate end item application (if known) in subject line, along with the NSN and contract number.
(f) Approval of ECPs, VECPs and RFVs.
(1) ECPs should be used to make permanent changes in the Government Technical Data Package (TDP). Contractual relief should be requested using a Request for Deviation. This is because the Government requires more time to analyze any proposal to permanently change the specification or TDP. Cost saving improvements to the TDP should be submitted as a VECP, if a VE clause is contained in the contract.
(2) ECPs. TACOM will review and make a decision within the ninety day timeframe. Notification of our decision will be made by the contracting officer or representative.
(3) RFVs. Decision on RFVs will be made within 30 days from the date we receive them from the ACO.
(g) Processing Emergency and Urgent ECPs. Ordinarily, ECPs submitted by the contractor will be deemed routine. If you submit an
ECP that you consider to be an emergency or urgent (as defined in paragraph 11 of DDD for ECPs), you must immediately notify the PCO.
TACOM will review the criticality of the ECP, and, if we determine that it is urgent or critical, we'll follow the appropriate processing time-frames as outlined in paragraph 11 of the DDD for ECPs.
(h) Reminder - Only the PCO can change the Contract. NO OTHER GOVERNMENT REPRESENTATIVE is authorized to make a commitment for, or bind the Government.
(i) RFVs shall contain sufficient pricing data to determine if a downward equitable adjustment to the contract is required.
(j) Questions.
(1) Questions about preparation and submittal of change request should be directed to the Government Quality Assurance
Representative (QAR).
(2) Questions about using the SAFE FTP website, the site has a ://safe.amrdec.army.mil/SAFE/guide.aspx and
://safe.amrdec.army.mil/SAFE/Help.aspx.
(2) Questions about the status of change requests you've already submitted, contact the buyer. You can find the buyer's name, number and e-mail address in block 7 of the solicitation cover sheet (SF 33), block 5 on the Standard Form 26, or block 6 on the DD Form
1155.
[End of Clause]
C-2 ADDED 52.211-4008 DRAWING LIMITATIONS NOV/2005
(TACOM)
(a) The drawings supplied with this contract are not shop or process drawings. They are engineering design drawings. They are ___ adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DON'T cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if
7 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
you meet all the dimensions and tolerances specified in the engineering design drawing for each individual part, a cumulative unacceptable fit for the contract item could result.
(c) YOU ARE RESPONSIBLE for producing the shop or process drawings needed to cover intermediate steps in the manufacturing ___________________ process.
(d) You, the contractor, are responsible for obtaining all specifications and drawings necessary to manufacture the items being solicited in accordance with the TDP including all incorporated specifications and drawings. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) If you fail to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, you'll be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
(End of Clause)
C-3 ADDED 52.211-4010 ACQUISITION OF SOURCE-CONTROLLED PART NUMBER FEB/1998
(TACOM)
Acquisition under this contract is restricted to:
(1) The manufacturer's part number or numbers set forth in the Schedule or the Technical Data Package; and
(2) Other manufacturer's part numbers that are physically, functionally, and mechanically interchangeable with the manufacturer's part number(s) listed in the Technical Data Package; provided (i) that these nonlisted part numbers have been furnished ________ to one of the approved manufacturers listed in the Technical Data Package, which firm has then, without making any changes in the characteristics or properties of the part, redesignated that part with one of the approved part numbers; and (ii) that firms tendering a nonlisted part number as described in this paragraph (2) have executed the provision 52.211-4038 entitled REPRESENTATION OF INTENT TO
SUPPLY A SOURCE-CONTROLLED ITEM herein.
[End of Clause]
8 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
E-1 CHANGED 52.209-4000 NOTICE REGARDING FIRST ARTICLE TEST SAMPLE MAR/2000
(TACOM)
(a) The first article items lot, as described in CLIN 0003BB, consists of a quantity of 19 each Firing Pin Assemblies (PN
12524510) and 5 each Firing Pin Springs (PN 12524510) that will be consumed or destroyed in testing. Any items consumed or destroyed in ___________________________________ testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that__________________________________________________________________________________________________________ are consumed or destroyed shall be included in the unit price of CLIN 0003BB. Any quantity that successfully passes all specified tests, less the destructive tests, if any, SHALL NOT serve as a manufacturing standard for the remainder of the contract.
(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design. 2) as an aid in identifying any process changes, or 3) as the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the contractor will notify the contracting officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
9 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
F-1 CHANGED 52.242-4022 DELIVERY SCHEDULE SEP/2008
(TACOM)
(a) Delivery under this contract must conform to the required schedule specified below, unless acceleration is acceptable.
(b) DEFINITIONS:
(1) DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.
(2) DELIVERY is defined as follows:
FOB Origin - Contractor is required to deliver its shipment as provided in FAR 52.247-29(a)(1)-(4) by the time specified in the individual contract; or
FOB Destination - Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract. The contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract, to ensure that the item reaches its destination by the time reflected in the contract.
(c) The Government requires delivery to be made according to the following schedule:
CLIN____ QTY___ DAYS AFTER AWARD________________
0001AA 200 ea 400
0001AA 200 ea 430
0001AA 169 ea 460
0002 569 ea UNDEFINITIZED
0003AA 1 ea 180
0003BB 1 lot 190
A004 (Phosphate) 1 ea 060
(d) Accelerated delivery schedule is acceptable.
(e) You may propose an accelerated delivery schedule at no additional cost; fill in the appropriate information here:
CLIN____ QTY___ DAYS AFTER AWARD________________
0001AA 200 ea ___
0001AA 200 ea ___
0001AA 169 ea ___
0002 569 ea UNDEFINITIZED
0003AA 1 ea ___
0003BB 1 lot ___
A004 (Phosphate) 1 ea ___
[End of Clause]
10 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
I-1 CHANGED 52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (SEP 1989) -- ALTERNATE SEP/1989
I (JAN 1997) AND ALTERNATE II (SEP 1989)
(a) The Contractor shall test 005 units of CLIN 0001 (Firing Pin Assembly PN 12524512) as specified in this contract. At least 015 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within 180 calendar days from the date of this contract award via email to ___________________________________________________________________________________ the Contract Specialist listed on page 1, box 10A, marked "First Article Test Report; Firing Pin Assembly". Within 030 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the
Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the
Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the Contracting Officer may, by written authorization, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in the contract price.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
(i) The Contractor shall produce both the first article and the production quantity at the same facility.
(End of Clause)
I-2 CHANGED 52.209-4 FIRST ARTICLE APPROVAL -- GOVERNMENT TESTING (SEP 1989) -- ALTERNATE SEP/1989
I (JAN 1997) AND ALTERNATE II (SEP 1989)
(a) The purpose of this Government-conducted First Article testing is to approve Firing Pin Springs (PN 12524510) from sources other than those previously approved in drawing 12524510 (dated 12 Mar 1990): Bauman Springs or E.N. Santa Barbara. The Contractor shall _____________________ deliver the following no later than 190 calendar days from the date of this contract to the Government at the Aberdeen Proving Grounds,________________________________________________________________________________________________________________________________________
MD. Full address TBD._____________________
11 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
1) NINETEEN units of Firing Pin Assembly (PN 12524512).
2) FIVE additional units of Firing Pin Spring (PN 12524510).
3) The completed certificate from the Firing Pin Spring source as described in Clause 52.211-4038 (Section K). None of the ____________
Firing Pin Assemblies or additional Firing Pin Springs to be delivered as part of this qualfication testing may contain Firing Pin___________________________________________________________________________________________________________________________________
Springs (PN 12524510) from a previously approved source (Bauman Springs or E.N. Santa Barbara)._______________________________________________________________________________________________
4) The completed certificate from the Firing Pin Spring source as described in Clause 52.211-4038 (Section K) shall also be copy furnished via email to the Contract Specialist listed on page 1, Box 10A of the solicitation.
The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
(b) Within 120 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in __________________________ writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing.
After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the
Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) The delivered items ARE NOT PART OF THE CONTRACT QUANTITY and will be consumed or destroyed in testing pursuant to Clause 52.209- _________________________________________________________________________________________________________________________________
4000.____
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the Contracting Officer may, by written authorization, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
If first article tests reveal deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in the contract price.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
(j) The Contractor shall produce both the first article and the production quantity at the same facility.
(End of Clause)
12 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
K-1 ADDED 52.211-4038 REPRESENTATION OF INTENT TO SUPPLY A SOURCE-CONTROLLED ITEM APR/1997
(TACOM)
Manufacturers whose part number is not listed in the Schedule or in the Technical Data Package, but who have successfully manufactured and supplied the required item to a firm whose part number is set forth in the Schedule or Technical Data Package, must complete the following certificate if they wish to submit a responsive offer on the basis of their nonlisted part numbers.
REPRESENTATION______________
(1) On (date) we manufactured and supplied to (approved manufacturer) items to which we have _______________ _____________________ assigned our part number . _________________________
(Approved manufacturer) then redesignated our item with their part number _________________________ without reworking or modifying our item in any way, and without rejecting more than % of the_________________________ _______ total items we supplied them for failure to conform to specification.___________
(2) Our redesignated item is in continued satisfactory use, and the approved manufacturer has furnished us no unresolved report of deficiencies in our item as previously supplied to them, or as currently being produced for them.
(3) We will supply items to the Government under our part number that are identical to items supplied by _________________________
(approved manufacturer) under their part number . _________________________ _________________________
[End of Provision]
13 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
L-1 ADDED 52.211-4048 NOTICE REGARDING REQUIRED MANUFACTURER'S PART NUMBER FEB/1998
(TACOM)
(a) Please see the provision entitled ACQUISITION OF MANUFACTURER'S PART NUMBER in this solicitation. As stated there, this acquisition is restricted to the manufacturer's part number or numbers identified in the Schedule (Section B), or in the Technical Data
Package. Thus, with the exceptions described in paragraph b. below, and in the provision entitled REPRESENTATION OF INTENT TO SUPPLY A
SOURCE-CONTROLLED ITEM, offers that propose to furnish any alternative to the required manufacturer's part number(s) will not be considered for contract award. It is understood that, by submitting an offer under this solicitation, offeror agrees to supply one of the required part numbers unless he meets the conditions set forth either in paragraph (b) below or in the provision entitled
REPRESENTATION OF INTENT TO SUPPLY A SOURCE-CONTROLLED ITEM.
(b) Required Approval for Equivalent Items
(1) If a firm manufacturers an item which it believes to be totally equivalent to the required item(s), it may submit an offer based on the equivalent item if the following conditions are met:
(i) Prior to receipt of this solicitation, the firm must have received written TACOM approval of a test procedure on its _____ nonlisted item.
(ii) The firm must indicate in its offer the date of the written TACOM approval of its test procedure, and the name and title of the approving official.
(iii) The firm indicates in its offer that it is in the process of having its item independently tested per the approved test procedure to demonstrate full physical, functional, and mechanical interchangeability of its part with an already approved part cited in this solicitation, or that it is awaiting final TACOM engineering approval of the summary report furnished at the conclusion of independent testing; and
(iv) The firm must have secured final written approval of its part from TACOM engineering by the time of bid opening, (in the case of formally advertised acquisitions), or by the time of contract award, (in the case of negotiated acquisitions).
(2) Notwithstanding the foregoing, the Government expressly reserves to the Procuring Contracting Officer the right to waive the conditions set forth in paragraph (b)1 above in making an award when it is clearly established, in his sole discretion, that written approval from TACOM engineering of a nonlisted part number can be obtained without delay in the anticipated date of award.
When the foregoing conditions are met, the Government reserves the right to make an award for a nonlisted item. In no other instance will award be made to any firm that does not agree to furnish one of the required part numbers listed in this solicitation.
(c) Any firm that manufactures or regularly sells an item which it views as equivalent in all respects to one of our required part numbers, but that has not initiated approved qualification testing in order to demonstrate that its part is totally equivalent to the required part, should see the notice entitled PART NUMBERS NOT CURRENTLY APPROVED, located elsewhere in this Section L.
L-2 ADDED 52.211-4049 PART NUMBERS NOT CURRENTLY APPROVED NOV/1982
(TACOM)
As specified elsewhere in this solicitation, part or all of the contract item to be procured hereunder is restricted to certain approved manufacturer's part numbers as set forth in the Schedule and/or the Technical Data Package. Any firm that produces an item which it believes to be equivalent to one of these approved part numbers is hereby encouraged to have such item tested and approved, so that the item will be eligible to be bought on future acquisitions. Please write to the attention of the buyer at the address indicated on the cover page of this solicitation and request a statement of the procedures by which items can be tested and approved for procurement. Such an enquiry should cite the applicable National Stock Number (NSN), the already approved part number, the part number of the item which the enquirer believes to be identical to our approved item, and a brief statement of the basis on which the new item is believed to be equivalent to our already approved item.
[End of Provision]
L-3 ADDED 52.211-4050 NOTICE REGARDING SOURCE-CONTROLLED CONTRACT ITEMS FEB/1998
(TACOM)
14 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(a) The drawings in the Technical Data Package for this requirement contain reference notes indicating one or more sources of supply that have previously furnished the items depicted on the drawings. Such notes also specify some sort of approval requirement, typically phrased in one of the following ways:
(1) or equal
(2) or approved substantial equal
(3) Ordnance Corps approval required
(4) Ordnance Corps engineering approval required
(b) With the exceptions described in paragraph (c) below, and in the provision entitled REPRESENTATION OF INTENT TO SUPPLY A
SOURCE-CONTROLLED ITEM), the listing of sources of supply on drawings with such approval requirements means that only those listed sources may furnish the items depicted on such drawings. Thus, any offeror responding to this solicitation and not meeting the exception criteria set forth herein will be deemed to have agreed to furnish the contract item from a listed source.
(c) Required Approval for Nonlisted Part Number:
(1) When the following conditions are met, the Government reserves the right to consider and accept an offer conditioned on a manufacturer's part number not cited in the Technical Data Package. In order to be eligible for such consideration, any firm offering a nonlisted part number must:
-- have received, prior to receipt of this solicitation, written TACOM approval of a test plan on its item, _____ designed to demonstrate that the nonlisted part is physically, functionally, and mechanically interchangeable with the listed part number(s) cited herein;
-- indicate in its offer the date of the formal TACOM approval of the test plan, and the name and title of the approving official;
-- be in the process of having its nonlisted part number tested by an independent testing facility under the terms of the approved plan, or be awaiting final TACOM engineering approval of the summary report furnished at the conclusion of testing; and
-- have secured final written approval of its part from TACOM engineering by the time of bid opening, (in the case of formally advertised acquisitions), or by the time of contract award, (in the case of negotiated acquisitions).
(2) Notwithstanding the foregoing, the Procuring Contracting Officer has the right to waive the above conditions in making an award when it is clearly established, in his sole discretion, that written approval from TACOM engineering can be obtained without delay in the anticipated date of award.
(d) Any firm that cannot comply with conditions in paragraph (c) above upon submission of its offer under this solicitation, but that believes one of its part numbers to be equivalent to the approved part number(s) cited in this solicitation, is invited to begin the qualification procedure to gain approval of such nonlisted part number for purposes of future acquisition action. Please see the provision entitled PART NUMBERS NOT CURRENTLY APPROVED, which is located elsewhere in this Section L.
[End of Provision]
L-4 ADDED 52.211-4051 NOTICE REGARDING SOURCE-CONTROLLED COMPONENTS FEB/1998
(TACOM)
(a) Please see the provision entitled ACQUISITION OF MANUFACTURER'S PART NUMBER: COMPONENTS in this solicitation. At least one component of the item to be purchased under this acquisition is restricted to specified manufacturer's part numbers as set forth in the
Technical Data Package. It is the responsibility of each offeror to ensure the availability of sufficient quantities of such source- _______ controlled components before making an offer in response to this solicitation. Except as described in paragraph (b) below, offers that__________ propose to substitute alternatives to the source-controlled components, even if the substitute items are represented as equivalent in all respects to the source-controlled components, will not be considered for contract award.
(b) Required Approval for Alternatives to the Source-Controlled Component:
(1) By meeting the following conditions, a firm may submit an offer conditioned on acceptance by the Government of alternatives to the source-controlled component(s) listed in the Technical Data Package:
-- Prior to receipt of this solicitation, the firm must have received written TACOM approval of a test procedure _____ on its proposed equivalent component.
15 16
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
-- The firm must indicate in its offer the date of the written TACOM approval, and the name and title of the approving official.
-- The firm must certify in its offer that it is in the process of having its item independently tested per the approved test procedure to demonstrate full physical, functional, and mechanical interchangeability of its part with an already-approved part cited in this solicitation, or that it is awaiting final TACOM engineering approval of the summary report furnished at the conclusion of testing; and
-- The firm must have secured final written approval of its part from TACOM engineering by the time of bid opening, (in the case of formally advertised acquisitions), or by the time of contract award, (in the case of negotiated acquisitions).
(2) Notwithstanding the foregoing, the Procuring Contracting Officer has the right to waive the above conditions in making an award when it is clearly established, in his sole discretion, that written approval of a nonlisted part from TACOM engineering can be obtained without delay in the anticipated date of award.
When either of the foregoing conditions are met, the Government reserves the right to make an award where use of the equivalent item is authorized in lieu of the source-controlled item. Where the foregoing conditions are not met, offeror will not be eligible for award unless he agrees to furnish the source-controlled item(s) from the indicated source(s).
(c) Any firm that manufactures or regularly sells an item which it views as equivalent in all respects to one of our required components, but that has not initiated approved qualification testing in order to demonstrate that its part is totally equivalent to the required component, should see the notice entitled PART NUMBERS NOT CURRENTLY APPROVED, located elsewhere in this Section L.
L-5 ADDED 52.211-4052 SOURCE NOTES ON DRAWINGS: CONFORMANCE TO MILITARY TECHNICAL DATA NOV/1982
(TACOM) REQUIREMENTS
Notwithstanding the fact that ordnance drawings furnished with this solicitation may list particular manufacturer part numbers as approved sources, or as being the same as, or equivalent to, the ordnance part described on the drawing, the item to be supplied under this solicitation must conform to all specific technical requirements expressed on such drawing(s). To the extent that there may be any inconsistency between a manufacturer's part number and specific technical requirements expressed on an ordnance drawing which references the manufacturer's part number, the specific technical requirements shall control and take precedence. Offerors shall bear the responsibility of verifying that the approved part as supplied will conform with all such specific technical requirements.
[End of Provision]
16 16
| SECTION A |
| SECTION B |
| SECTION C |
| SECTION E |
| SECTION F |
| SECTION I |
| SECTION K |
| SECTION L |
File details come from the government source that posted it. Updated .