Exhibit_A_M69_CDRLs.pdf

PDF 1 MB Posted

Attached to
M69 Practice Hand Greande Body
Solicitation number
W52P1J-18-R-0077
Issued by

About this file

CDRLs

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

E. CONTRACT / PR NO.

4I8A08MCM2

F. CONTRACTOR D. SYSTEM/ITEM

M69 Practice Grenade Metal Parts Assembly

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

REQUEST FOR VARIANCE (RFV)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Documentation No.)

DI-SESS-80640D

5. CONTRACT REFERENCE

SECTION C SOW

6. REQUIRING OFFICE

RDAR-EIS-PD

7. DD 250 REQ.

LT

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF

SUBSEQUENT

SUBMISSION

ASREQ

Draft Final

Reg Repro

16. REMARKS:

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)).

*DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY

THE DOD CONFIGURATION CONTROL AUTHORITY. THE PREFERRED

METHOD FOR SUBMITTAL IS DD FORM 1694 LOCATED AT http:// www.dtic.mil/whs/directives/infomgt/forms/. SUBMIT ELECTRONICALLY TO usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil; COPY FURNISH

THIS SUBMITTAL TO THE GOVERNMENT CONTRACTING OFFICE.

ACO 0 1 0

PCO 0 1 0

15. TOTAL 0 2 0

H. DATE

7/26/2018

I. APPROVED BY J. DATE

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 1 of 6 Pages

G. PREPARED BY

K. Mosher for SDMO, RDAR-EIS-PD

(1 Data Item)

Form Approved OMB No. 0704-

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

E. CONTRACT / PR NO.

4I8A08MCM2

F. CONTRACTOR D. SYSTEM/ITEM

M69 Practice Grenade Metal Parts Assembly

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

ENGINEERING CHANGE PROPOSAL (ECP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Documentation No.)

DI-SESS-80639D

5. CONTRACT REFERENCE

SECTION C SOW

6. REQUIRING OFFICE

RDAR-EIS-PD

7. DD 250 REQ.

LT

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF

SUBSEQUENT

SUBMISSION

ASREQ

Draft Final

Reg Repro

16. REMARKS:

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)).

*DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY

THE DOD CONFIGURATION CONTROL AUTHORITY. THE PREFERRED

METHOD FOR SUBMITTAL IS DD FORM 1692 LOCATED AT http:// www.dtic.mil/whs/directives/infomgt/forms/. SUBMIT ELECTRONICALLY TO usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil; COPY FURNISH THIS

SUBMITTAL TO THE GOVERNMENT CONTRACTING OFFICE.

ACO 0 1 0

PCO 0 1 0

15. TOTAL 0 2 0

H. DATE

7/26/2018

I. APPROVED BY J. DATE

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 2 of 6 Pages

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 3 of 6 Pages

(1 Data Item)

Form Approved OMB No. 0704-

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

E. CONTRACT / PR NO.

4I8A08MCM2

F. CONTRACTOR D. SYSTEM/ITEM

M69 Practice Grenade Metal Parts Assembly

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

NOTICE OF REVISION (NOR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Documentation No.)

DI-SESS-80642D

5. CONTRACT REFERENCE

SECTION C SOW

6. REQUIRING OFFICE

RDAR-EIS-PD

7. DD 250 REQ.

LT

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF

SUBSEQUENT

SUBMISSION

ASREQ

Draft Final

Reg Repro

16. REMARKS:

DATA MUST BE IN GOVERNMENT COMPATIBLE SOFTWARE (i.e., MICROSOFT OFFICE OR PORTABLE DOCUMENT FORMAT (pdf)).

*DISTRIBUTION STATEMENT WILL BE ASSIGNED AND IMPLEMENTED BY

THE DOD CONFIGURATION CONTROL AUTHORITY. THE PREFERRED

METHOD FOR SUBMITTAL IS DD FORM 1695 LOCATED AT http:// www.dtic.mil/whs/directives/infomgt/forms/. SUBMIT ELECTRONICALLY TO usarmy.pica.rdecom-ardec.mbx.ecp-document@mail.mil; COPY FURNISH THIS

SUBMITTAL TO THE GOVERNMENT CONTRACTING OFFICE.

ACO 0 1 0

PCO 0 1 0

15. TOTAL 0 2 0

H. DATE

7/26/2018

I. APPROVED BY J. DATE

DD FORM 1423-1 FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page 4 of 6 Pages

(1 Data Item)

Form Approved OMB No. 0704-

Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information Operations and reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project, (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER

E. CONTRACT / PR NO.

4I8A08MCM2

F. CONTRACTOR D. SYSTEM/ITEM

M69 Practice Grenade Metal Parts Assembly

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Operations Security (OPSEC) Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Documentation No.)

DI-MGMT-80934C

5. CONTRACT REFERENCE

OPSEC SOW

6. REQUIRING OFFICE

AMSJM-FP/G2

7. DD 250 REQ.

XX

9. DIST

STATEMENT

REQUIRED

D

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

ASREQ

13. DATE OF

SUBSEQUENT

SUBMISSION

ASREQ

Draft Final

Reg Repro

16. REMARKS:

DELETE REFERENCE 'APPLYING OPSEC TO U.S. GOVERNMENT

CONTRACTS'. REPLACE WITH REFERENCE 'SAMPLE ACQUISITIONS

OPSEC PLAN'. 10 CALENDAR DAYS REQUIRED FOR GOVERNMENT

REVIEW AND APPROVAL. *30 CALENDAR DAYS AFTER THE

CONTRACTING OFFICER PROVIDES THE LIST OF KNOWN CRITICAL

INFORMATION (CI)/THREAT INFORMATION. ** RESUBMIT 10

CALENDAR DAYS AFTER GOVERNMENT REVIEW. SUBMIT

ELECTRONICALLY TO usarmy.ria.jmc.mbx.OPSEC-FD@mail.mil.

JMC OPSEC 0 1 0

PCO 0 1 0

15. TOTAL 0 2 0

H. DATE

7/26/2018

I. APPROVED BY J. DATE

1. DATA ITEM NO.

17. PRICE

GROUP

A005

18. ESTIMATED

TOTAL PRICE

XX

8. APP CODE

0 1 0

Page: 5 of 6DD Form 1423-1, FEB 2001 Previous editions may be used.

15. TOTAL

G. PREPARED BY

K. Mosher for SDMO, RDAR-EIS-PD

H. DATE

7/26/2018

I. APPROVED BY J. DATE

SUBMIT PROCEDURE FOR APPROVAL 60 DAYS PRIOR TO FIRST ARTICLE TEST OR PRODUCTION IF FIRST

ARTICLE IS NOT APPLICABLE. ALLOW 14 DAYS FOR APPROVAL/DISAPPROVAL THROUGH THE

CONTRACTING OFFICER. SUBMIT ELECTRONICALLY TO usarmy.ria.ardec.mbx.ri-corrosion-team@mail.mil. CONTRACTOR SHALL RESUBMIT WITH GOVERNMENT REVISIONS WITHIN 10 DAYS.

RDAR-MEE-W(R) SHALL PROVIDE PROCEDURE REVIEW RESPONSE BACK TO CONTRACTING OFFICER.

COATED PANELS PER PARA 3.2.2 SHALL INCLUDE THREE WITH PHOSPHATE ONLY, THREE WITH

PHOSPHATE AND PRIMER, AND THREE WITH PHOSPHATE, PRIMER AND TOP COAT. A DD FORM 250 IS

NOT REQUIRED FOR PHOSPHATE COATING PROCEDURAL APPROVAL. CONTRACTOR FORMAT

ACCEPTABLE. WRITTEN PROCEDURES SHALL BE SUBMITTED USING A PC COMPATIBLE FORMAT (I.E. PDF, RICH TEXT FORMAT (RTF), OR WORD FILE).

A N/A Reg Repro N/A

16. REMARKS ARDEC CORROSION TEAM

N/A

ONE/R ASREQ

a. ADDRESSEE

b. COPIES

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft

Final

7. DD 250 REQ

9. DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

4. AUTHORITY (Data Acquisition Document

No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NDTI-80603A TT-C-490, TYPE 1, PARAS 3.2.1, 3.2.2 RDAR-MEE-W

2. TITLE OF DATA ITEM

TEST PROCEDURE

3. SUBTITLE

PRE-PRODUCTION PROCEDURE --Phosphate Coating

TDP____________ TM____________ OTHER____________

D. SYSTEM/ITEM

M69 Practice Grenade Metal Parts Assembly

E. CONTRACT / PR NO.

4I8A08MCM2

F. CONTRACTOR

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

Form Approved

OMB No. 0704-0188

10 0

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Designed using Perform Pro, WHS/DIOR, Aug 96

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

(1 Data Item)

16. REMARKS

C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

Form Approved OMB No. 0704-0188

15. TOTAL

PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages

A. CONTRACT LINE ITEM NO. B. EXHIBIT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATEI. APPROVED BY

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

CDRL Distribution block - IPT members list

PQM – Product Quality Manager

PCO – Procuring Contracting Officer

QAR – Quality Assurance Representative

DA – Design Agent (NAVSEA)

PL – Project Lead (NAVAIR)

NQA – Navy Quality

ME – Material Engineer (NAVAIR)

PE – Program Engineer (Air Force)

PO – Project Officer (PM Office)

AEA – Acquisition Engineering Agent (NAVSEA)

GE – Gage Engineer

PM – Production Manager (JMC)

CS – Contract Specialist

AQE – ARDEC Quality Engineer

LE – Lead Engineer

MCEA – Marine Corp Engineering Activity

APO – ARDEC Project Officer

CDM – Configuration/Data Management (NAVAIR)

FOR GOVERNMENT PERSONNEL FOR THE CONTRACTOR

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM -

Technical Manual; Other - other category of data, such as

"Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award). Item F. Self-explanatory (to be filled in after contract award). Item G. Signature of preparer of

CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the

Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items

12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.

The estimated data prices shall not include any amount for rights in data. The

Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423 (BACK)

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the

Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form

1423.

INSTRUCTIONS FOR COMPLETING DD FORM 1423

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form

1423.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the

Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD

Form 1423 at no cost.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the

Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

of

POP_pennock.pdf
A001 - TDP (2018-01-29)
A002 - CICL (2018-01-16)
A003 - MSE (2018-01-16)
A004 - CCCP (2018-01-16)
A005 - Light Phosphate (2018-01-16)
A006 - Heavy Phosphate (2018-01-16)
A007 - QPP (2018-01-16)
A008 - FAT PLAN (2018-01-16)
A009 - SPC (2018-01-16)
A010 - PAITP (2018-01-16)
A011 - FATR (2018-01-29)
A012 - ADC (2018-01-29)
A013 - CPOA (2018-01-16)
A014 - NOR (2018-01-16)
A015 - FACAR (2018-01-16)
A016 - ECP (2018-01-16)
A017 - RFV (2018-01-29)
A018 - Loading Authorization and Descriptive Sheets (2018-01-29)
A019 - LATR (2018-01-11)
A020 - Notification of Critical (2018-01-29)
A021 - Critical Investigation and Restart (2018-01-16)
4A8A18QDM2_gfm.pdf
80438A
INSTRUCTIONS_for_adding.pdf
80603L
80934a
80639
80640
80642
81722
80043
81307
81315
80809B
81987spc
Instructions
spc_81987.pdf
81987_spc
lcaap_gfm.pdf
A001 - TDP (2018-01-29)
A002 - CICL (2018-01-16)
A003 - MSE (2018-01-16)
A004 - CCCP (2018-01-16)
A005 - Light Phosphate (2018-01-16)
A006 - Heavy Phosphate (2018-01-16)
A007 - QPP (2018-01-16)
A008 - FAT PLAN (2018-01-16)
A009 - SPC (2018-01-16)
A010 - PAITP (2018-01-16)
A011 - FATR (2018-01-29)
A012 - ADC (2018-01-29)
A013 - CPOA (2018-01-16)
A014 - NOR (2018-01-16)
A015 - FACAR (2018-01-16)
A016 - ECP (2018-01-16)
A017 - RFV (2018-01-29)
A018 - Loading Authorization and Descriptive Sheets (2018-01-29)
A019 - LATR (2018-01-11)
A020 - Notification of Critical (2018-01-29)
A021 - Critical Investigation and Restart (2018-01-16)
4A8A18QDM2_gfm.pdf
80438A
INSTRUCTIONS_for_adding.pdf
80603L
80934a
80639
80640
80642
81722
80043
81307
81315
80809B
81987spc
Instructions
spc_81987.pdf
81987_spc
QA_CDRLS_418A08MCM2.pdf
ADC
QPP
SPC
PCP for PCCI
MSE/AIE
CCCP
CPOA
CICL Option 1
CICL Option 2
CICL Option 3
CICL Option 4
FAT Plan
FAT Report
LAT Report
FACAR
ADS
ITP Option 1
ITP Option 2
Light Phosphate
Heavy Phosphate
SIED (do not use with MSE)
SIEDD (do not use with MSE)
TDP
Audit Schedule
Baseline Summary Report
Distro List
Instructions
A0(CDRL#):
Exhibit:
ADC OTHER: MISC
ADC System: M69 Practice Grenade Metal Parts Assbly
ADC CDRL #: Q001
ADC Title: Ammunition Data Card (ADC)
ADC Subtitle: Data Input
ADC DID: DI-MISC-80043 (Current Revision)
ADC Contract Reference: Section: C, MIL-STD-1168
6 ADC REQUIRING OFFICE: AMSJM-QAO/P
ADC DD250: XX
9 ADC DIST STATEMENT REQUIRED: B
ADC Freq: ASREQ
ADC Submission: ASREQ
ADC App Code: A
11 ADC AS OF DATE: N/A
ADC second Sub: ASREQ
ADC Add 1: WARP
ADC DraftRow1: 0
ADC RegRow1: 1
ADC ReproRow1: 0
ADC Add 2: Lot Shipment
ADC DraftRow2: 0
ADC RegRow2: 2
ADC ReproRow2: 0
ADC Remarks: BLK 12: Sample ADC shall be submitted into the Munitions History Program (MHP) system and approved prior to First Article Testing (FAT) or initiation of production if FAT is not required. ADCs shall be prepared IAW MIL-STD-1168 by accessing the data repository system WARP on the Munitions History Program website at https://mhp.redstone.army.mil/.

BLK 10/13: An ADC shall be submitted with each lot.

Hard copy ADC provided with lot shipments shall be generated from the WARP and signed/dated by the Government Agency Responsible for Acceptance (GARA).

When ballistic test are required, one hard copy ADC generated from the WARP and signed/dated by the GARA shall be sent to the Proving Ground with sample shipment, plus an additional signed/dated, hard copy provided to the Proving Ground by mail.

If the critical characteristic requirement is in the contract, the critical characteristic information fields in WARP for the ADC shall be completed for each lot.

ADC Add 3: Mail to Dest
ADC DraftRow3: 0
ADC RegRow3: 2
ADC ReproRow3: 0
ADC Add 4:
ADC DraftRow4:
ADC RegRow4:
ADC ReproRow4:
ADC Add 5:
ADC DraftRow5:
ADC RegRow5:
ADC ReproRow5:
ADC Add 6:
ADC DraftRow6:
ADC RegRow6:
ADC ReproRow6:
ADC Add 7:
ADC DraftRow7:
ADC RegRow7:
ADC ReproRow7:
ADC Add 8:
ADC DraftRow8:
ADC RegRow8:
ADC ReproRow8:
ADC Reg15 TOTAL: 5
ADC number: 1
TDP:
QPP(CDRL#):
QPP Exhibit:
TM:
QPP OTHER: MISC
QPP System: M69 Practice Grenade Metal Parts Assbly
E CONTRACTPR NO: 4I8A08MCM2
F CONTRACTOR:
QPP DID: Q002
QPP TITLE OF DATA ITEM: Quality Program Plan (QPP)
QPP SUBTITLE: Quality Management System Plan
QPP Authority: DI-QCIC-81722 (Current Revision)
QPP CONTRACT REFERENCE: Section: E
QPP REQUIRING OFFICE: AMSJM-QAO/P
QPP DD 250: LT
17:
18:
QPP 9 DIST STATEMENT REQUIRED: B
QPP FREQUENCY: ONE/R
QPP DATE OF FIRST SUBMISSION: 150DAC
QPP App Code: A
11 QPP AS OF DATE: N/A
QPP DATE OF SUBSEQUENT SUBMISSION: ASREQ
QPP Addressee 1: PCO
DATE: 7/5/2018
QPP DraftRow1: 0
QPP RegRow1: 1
QPP ReproRow1: 0
QPP Addressee 2: PQM
QPP DraftRow2: 0
QPP RegRow2: 1
QPP Remarks: BLK 12: Quality Program Plan (QPP) shall be submitted no later than 150 calendar days after contract award. The Government shall provide response within 30 calendar days of initial submission. If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions and the Government shall provide response within 15 calendar days. Approval is required prior to first article test (FAT), if FAT is required, or prior to initiation of production. Disposition will be provided by the Procuring Contracting Officer (PCO).

BLK 13: Submit updates/revisions for review and approval prior to implementation.

BLK 14: Submit via email or AMRDEC SAFE https://safe.amrdec.army.mil/safe/Welcome.aspx Specific email addresses for the distribution list will be provided after contract award.

QPP ReproRow2: 0
QPP Addressee 3:
QPP DraftRow3:
QPP RegRow3:
QPP ReproRow3:
QPP Addressee 4:
QPP DraftRow4:
QPP RegRow4:
QPP ReproRow4:
QPP Addressee 5:
QPP DraftRow5:
QPP RegRow5:
QPP ReproRow5:
QPP Addressee 6:
QPP DraftRow6:
QPP RegRow6:
QPP ReproRow6:
QPP Addressee 7:
QPP DraftRow7:
QPP RegRow7:
QPP ReproRow7:
QPP Addressee 8:
QPP DraftRow8:
QPP RegRow8:
QPP ReproRow8:
Draft15 TOTAL: 0
QPP Reg15 TOTAL: 2
Repro15 TOTAL: 0
A DATE:
number: 11
QPP number: 2
SPC Exhibit:
A0(CDRL#) SPC:
SPC OTHER: MGMT
SPC System: M69 Practice Grenade Metal Parts Assbly
F SPC CONTRACTOR:
SPC CDRL #: Q003
SPC DID: DI-MGMT-81987 (Current Revision)
SPC DATA Item: Statistical Process Control (SPC)
SPC Subtitle: N/A
5 SPC CONTRACT REFERENCE: Section: E
6 SPC REQUIRING OFFICE: AMSJM-QAO/P
SPC DD 250: LT
SPC 9 DIST STATEMENT REQUIRED: B
SPC FREQUENCY: ONE/R
SPC Submission: 150DAC
SPC App Code: A
SPC N/A: N/A
SPC Sub: ASREQ
SPC Addressee 1: PCO
SPC DraftRow1: 0
SPC RegRow1: 1
SPC ReproRow1: 0
SPC Addressee 2: PQM
SPC DraftRow2: 0
SPC RegRow2: 1
SPC ReproRow2: 0
SPC Remarks: BLK 12: The general plan shall be submitted no later than 150 calendar days after contract award. The final detailed plan shall be submitted 200 calendar days after contract award. Approval is required prior to first article test (FAT), or initiation of production if FAT is not required. The Government requires 30 days for review. Disposition of the general and detailed sections will be provided through the procuring contracting officer (PCO).

BLK 13: If further revisions are necessary, the contractor shall have 15 calendar days to provide revisions and the Government shall review and provide disposition within 15 calendar days of receipt.

BLK 14: Submit via email or AMRDEC Safe https://safe.amrdec.army.mil/safe/Welcome.aspx.

Specific email addresses for the distribution list will be provided after contract award.

Required Characteristics for SPC:

M69 Practice Hand Grenade Metal Parts, MIL-DTL-32590/Drawing reference:

Torque, insert to top cup – 4.3.3.4 Depth of perfect threads (top cup assembly) – Dwg. 13071181 Phosphate Coating Weight - Dwg. 9235207 Paint Thickness, First Coat - Dwg. 9235207 Paint Thickness, Top Coat - Dwg. 9235207 Assembled weight of grenade (after painting) - 9235207 Outer Diameter Maximum – 4.3.3.5

SPC Addressee 3: AQE
SPC DraftRow3: 0
SPC RegRow3: 1
SPC ReproRow3: 0
SPC Addressee 4:
SPC DraftRow4:
SPC RegRow4:
SPC ReproRow4:
SPC Addressee 5:
SPC DraftRow5:
SPC RegRow5:
SPC ReproRow5:
SPC Addressee 6:
SPC DraftRow6:
SPC RegRow6:
SPC ReproRow6:
SPC Addressee 7:
SPC DraftRow7:
SPC RegRow7:
SPC ReproRow7:
SPC Addressee 8:
SPC DraftRow8:
SPC RegRow8:
SPC ReproRow8:
SPC Reg15 TOTAL: 3
SPC number: 3
A MSE 0(CDRL#):
MSE Exhibit:
MSE OTHER: QCIC
MSE System: M69 Practice Grenade Metal Parts Assbly
E MSE CONTRACTPR NO: 4I8A08MCM2
F MSE CONTRACTOR:
MSE CDRL #: Q004
MSE TITLE OF DATA ITEM: Measurement System Evaluation (MSE) – Measurement and Inspection Equipment System Design Documentation for Acce
MSE SUBTITLE: Measurement System Evaluation/Acceptance Inspection Equipment (MSE/AIE)
MSE Authority: DI-QCIC-81960 (Current Revision)
MSE CONTRACT REFERENCE: Section: E
6 MSE REQUIRING OFFICE: AMSJM-QAO/P
MSE DD 250: DD
9 MSE DIST STATEMENT REQUIRED: B
MSE FREQUENCY: ONE/R
MSE DATE OF FIRST SUBMISSION: 120DAC
MSE App Code: A
11 MSE AS OF DATE: N/A
MSE DATE OF SUBSEQUENT SUBMISSION: ASREQ
MSE Remarks: BLK 12: The Contractor shall submit a completed AIE package no later than (120) calendar days after contract award. The AIE shall be approved prior to First Article Testing (if First Article Testing is required), production, and/or all acceptance of product under the contract. The PCO will provide disposition within (45) calendar days of final AIE package receipt.

BLK 13: If further revisions are necessary, the Contractor shall have (30) calendar days to generate them and the Government shall have (30) calendar days to review and respond to them. The approved AIE shall be available for First Article Testing (if First Article Testing is required), production, and/or all acceptance of product under the contract.

If Contractor revises a previously Government accepted AIE for this contract, the revised AIE must be submitted to the Government for review and approval. Approval must be granted before AIE is used for acceptance of product. The Government will respond within (30) calendar days.

The Contractor shall notify the responsible Government technical agency a minimum of (30) calendar days prior to acceptance (prove out) testing for AAIE.

BLK 14: Submit via email or AMRDEC SAFE https://safe.amrdec.army.mil/safe/Welcome.aspx.

Specific email addresses for the distribution list will be provided after contract award.

An MSE Review Guide is available to assist Contractors on the ARDEC Public Website (http://www.ardec.army.mil/organizations/QESA/) in the application of the MSE Clause. The MSE Review Guide's content, in its entirety, is provided solely for REFERENCE and GUIDANCE PURPOSES ONLY- it is not, nor is it intended to be, contractually binding. Accordingly, the information contained within the MSE Review Guide is expressly not, nor shall it be construed to be, incorporated either directly or by reference into the terms of the MSE clause itself nor into the terms and conditions of any underlying contract which contains the MSE clause.

MSE Addressee 1: PCO
MSE DraftRow1: 0
MSE RegRow1: 1
MSE ReproRow1: 0
MSE Addressee 2: PQM
MSE DraftRow2: 0
MSE RegRow2: 1
MSE ReproRow2: 0
MSE Addressee 3: AQE
MSE DraftRow3: 0
MSE RegRow3: 1
MSE ReproRow3: 0
MSE Addressee 4:
MSE DraftRow4:
MSE RegRow4:
MSE ReproRow4:
MSE Addressee 5:
MSE DraftRow5:
MSE RegRow5:
MSE ReproRow5:
MSE Addressee 6:
MSE DraftRow6:
MSE RegRow6:
MSE ReproRow6:
MSE Addressee 7:
MSE DraftRow7:
MSE RegRow7:
MSE ReproRow7:
MSE Addressee 8:
MSE DraftRow8:
MSE RegRow8:
MSE ReproRow8:
MSE Reg15 TOTAL: 3
MSE number: 4
FATP Exhibit:
A FATP 0(CDRL#):
FATP OTHER: NDTI
FATP System: M69 Practice Grenade Metal Parts Assbly
E FATP CONTRACTPR NO: 4I8A08MCM2
F FATP CONTRACTOR:
FATP CDRL #: Q005
FATP TITLE OF DATA ITEM: First Article Qualification Test Plan and Procedure
FATP SUBTITLE: N/A
FATP Authority: DI-NDTI-81307 (Current Revision)
FATP CONTRACT REFERENCE: Section: E
6 FATP REQUIRING OFFICE: AMSJM-QAO/P
FATP DD 250: LT
FATP DIST STATEMENT REQUIRED: B
FATP FREQUENCY: ASREQ
FATP DATE OF FIRST SUBMISSION: 120DAC
FATP App Code: A
FATP AS OF DATE: N/A
FATP DATE OF SUBSEQUENT SUBMISSION: ASREQ
FATP Addressee 1: PCO
FATP DraftRow1: 0
FATP RegRow1: 1
FATP ReproRow1: 0
FATP Addressee 2: PQM
FATP DraftRow2: 0
FATP RegRow2: 1
FATP ReproRow2: 0
FATP Remarks: BLK 12: First Article Test Plans shall be submitted no later than 120 calendar days after contract award. Government shall provide response within 30 calendar days of initial submission. If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions and the Government shall provide response within 15 calendar days.

Disposition will be provided by the procuring contracting officer (PCO). Approval of the plan shall be obtained prior to FAT.

BLK 14: Submit via email or AMRDEC SAFE.

https://safe.amrdec.army.mil/safe/Welcome.aspx Specific email addresses for the distribution list will be provided after contract award.

FATP Addressee 3:
FATP DraftRow3:
FATP RegRow3:
FATP ReproRow3:
FATP Addressee 4:
FATP DraftRow4:
FATP RegRow4:
FATP ReproRow4:
FATP Addressee 5:
FATP DraftRow5:
FATP RegRow5:
FATP ReproRow5:
FATP Addressee 6:
FATP DraftRow6:
FATP RegRow6:
FATP ReproRow6:
FATP Addressee 7:
FATP DraftRow7:
FATP RegRow7:
FATP ReproRow7:
FATP Addressee 8:
FATP DraftRow8:
FATP RegRow8:
FATP ReproRow8:
FATP Reg15 TOTAL: 2
FATP number: 5
A FATR 0(CDRL#):
FATR Exhibit:
FATR OTHER: NDTI
FATR System: M69 Practice Grenade Metal Parts Assbly
E FATR CONTRACTPR NO: 4I8A08MCM2
F FATR CONTRACTOR:
FATR CDRL #: Q006
FATR TITLE OF DATA ITEM: Test/Inspection Reports
FATR SUBTITLE: First Article Test Report (FATR)
FATR Authority: DI-NDTI-80809 (Current Revision)
5 FATR CONTRACT REFERENCE: Section: E
6 FATR REQUIRING OFFICE: AMSJM-QAO/P
FATR DD 250: XX
FATR DIST STATEMENT REQUIRED: B
FATR FREQUENCY: ASREQ
FATR DATE OF FIRST SUBMISSION: 270DAC
FATR App Code: A
FATR AS OF DATE: N/A
FATR DATE OF SUBSEQUENT SUBMISSION: ASREQ
FATR Addressee 1: PCO
FATR DraftRow1: 0
FATR RegRow1: 1
FATR ReproRow1: 0
FATR Addressee 2: PQM
FATR DraftRow2: 0
FATR RegRow2: 1
FATR ReproRow2: 0
FATR Remarks: BLK 12: The First Article Test report shall be submitted with QAR findings on DD Form 1222. The FATR shall be submitted 270 calendar days after contract award and no later than 30 calendar days after completion of the FAT. The Government requires 30 calendar days for review. Disposition of the FAT report will be provided through the Procuring Contracting Officer.

If further revisions are necessary, the Contractor shall have 15 calendar days to provide revisions and the Government shall provide response within 15 calendar days. PCO approval of the FATR shall be obtained prior to start of production.

BLK 14: Submit electronically via email or AMRDEC SAFE https://safe.amrdec.army.mil/safe/Welcome.aspx.

Specific email addresses for the distribution list will be provided after contract award.

FATR Addressee 3:
FATR DraftRow3:
FATR RegRow3:
FATR ReproRow3:
FATR Addressee 4:
FATR DraftRow4:
FATR RegRow4:
FATR ReproRow4:
FATR Addressee 5:
FATR DraftRow5:
FATR RegRow5:
FATR ReproRow5:
FATR Addressee 6:
FATR DraftRow6:
FATR RegRow6:
FATR ReproRow6:
FATR Addressee 7:
FATR DraftRow7:
FATR RegRow7:
FATR ReproRow7:
FATR Addressee 8:
FATR DraftRow8:
FATR RegRow8:
FATR ReproRow8:
FATR Reg15 TOTAL: 2
FATR number: 6
A LATR 0(CDRL#):
LATR Exhibit:
LATR OTHER: NDTI
LATR System: M69 Practice Grenade Metal Parts Assbly
E LATR CONTRACTPR NO: 4I8A08MCM2
F LATR CONTRACTOR:
LATR CDRL #: Q007
LATR TITLE OF DATA ITEM: Test/Inspection Reports
LATR SUBTITLE: Lot Acceptance Test Report
LATR Authority: DI-NDTI-80809 (Current Revision)
5 LATR CONTRACT REFERENCE: Section: E
LATR REQUIRING OFFICE: AMSJM-QAO/P
LATR DD 250: NO
LATR DIST STATEMENT REQUIRED: B
LATR FREQUENCY: ASREQ
LATR DATE OF FIRST SUBMISSION: 30DATC
LATR App Code: N/A
LATR AS OF DATE: N/A
LATR DATE OF SUBSEQUENT SUBMISSION: ASREQ
LATR Addressee 1: WARP
LATR DraftRow1: 0
LATR RegRow1: 1
LATR ReproRow1: 0
LATR Addressee 2: DCMA
LATR Addressee 7:
LATR DraftRow2: 0
LATR RegRow2: 1
LATR Remarks: BLK 10/12: Lot Acceptance Test Reports (LATRs) shall be submitted for each lot and contain [Add conformance testing requirements per DRDSL].

LATRS shall be submitted 30 calendar days after completion of LAT.

BLK 14: LATRs shall be submitted by accessing the worldwide ammunition data card repository program which is located on the munitions history program website at https://mhp.redstone.army.mil/.

LATR ReproRow2: 0
LATR Addressee 3:
LATR DraftRow3:
LATR RegRow3:
LATR ReproRow3:
LATR Addressee 4:
LATR DraftRow4:
LATR RegRow4:
LATR ReproRow4:
LATR Addressee 5:
LATR DraftRow5:
LATR RegRow5:
LATR ReproRow5:
LATR Addressee 6:
LATR DraftRow6:
LATR RegRow6:
LATR ReproRow6:
LATR DraftRow7:
LATR RegRow7:
LATR ReproRow7:
LATR DraftRow8:
LATR Addressee 8:
LATR RegRow8:
LATR ReproRow8:
LATR Reg15 TOTAL: 2
LATR number: 7
A FACAR 0(CDRL#):
FACAR Exhibit:
FACAR OTHER: SESS
FACAR System: M69 Practice Grenade Metal Parts Assbly
E FACAR CONTRACTPR NO: 4I8A08MCM2
F FACAR CONTRACTOR:
FACAR DID: Q008
FACAR TITLE OF DATA ITEM: Failure Summary and Analysis Report
FACAR SUBTITLE: N/A
FACAR Authority: DI-SESS-80255 (Current Revision)
FACAR CONTRACT REFERENCE: Section: E
FACAR REQUIRING OFFICE: AMSJM-QAO/P
FACAR DD 250: LT
FACAR DIST STATEMENT REQUIRED: B
FACAR FREQUENCY: ASREQ
FACAR DATE OF FIRST SUBMISSION: ASREQ
FACAR App Code: A
FACAR AS OF DATE: N/A
FACAR DATE OF SUBSEQUENT SUBMISSION: ASREQ
FACAR Addressee 1: PCO
FACAR DraftRow1: 0
FACAR RegRow1: 1
FACAR ReproRow1: 0
FACAR Addressee 2: PQM
FACAR DraftRow2: 0
FACAR RegRow2: 1
FACAR Remarks: BLK 10/12/13: Contractor shall notify the the addressee list in block 14 via email within 24 hours after the occurrence of a failure during acceptance testing, including but not limited to, any failures during FAT/LAT and any destructive/nondestructive test failures. Formal submittal shall be no later than 10 calendar days after reported failure. Final report shall be submitted no later than 30 calendar days after determining/conducting root cause/failure

analysis.

The Government will provide a response within 15 calendar days of initial submission. If further revisions are necessary, the contractor shall have 15 calendar days to provide revisions. Disposition will be provided by the procuring contracting officer (PCO).

BLK 14: Submit via email or AMRDEC SAFE.

https://safe.amrdec.army.mil/safe/Welcome.aspx Specific email addresses for the distribution list will be provided after contract award.

FACAR ReproRow2: 0
FACAR Addressee 3: AQE
FACAR DraftRow3: 0
FACAR RegRow3: 1
FACAR ReproRow3: 0
FACAR Addressee 4:
FACAR DraftRow4:
FACAR RegRow4:
FACAR ReproRow4:
FACAR Addressee 5:
FACAR DraftRow5:
FACAR RegRow5:
FACAR ReproRow5:
FACAR Addressee 6:
FACAR DraftRow6:
FACAR RegRow6:
FACAR ReproRow6:
FACAR Addressee 7:
FACAR DraftRow7:
FACAR RegRow7:
FACAR ReproRow7:
FACAR Addressee 8:
FACAR DraftRow8:
FACAR RegRow8:
FACAR ReproRow8:
FACAR Reg15 TOTAL: 3
FACAR number: 8

File details come from the government source that posted it.