Attachment_0002_-_PRS_Table_-_ACES.pdf
PDF 262 KB Posted
- Attached to
- ACES - Official RFP
- Solicitation number
- W52P1J-16-R-0047
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRS Table - Army Cybersecurity Enterprise Support.
The Performance Requirements Summary Table identifies the deliverables that will be evaluated:
PWS Para Deliverable Required Performance Svc
Performance Standard
Acceptable Quality Level
Allowable Deviation Standard
Method of Surveillance
(Quality Assurance)
3.1 Post-Award Brief
and Minutes
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review by
COR/GTL
ALL Monthly Status Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Beginning 30 days after award and monthly thereafter.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
ALL Final Technical Report
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. At the end of each performance period.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
3.3.1/Emergi ng PKI Technologies Analysis
PKI Emerging Technologies Reports
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Paper will describe emerging technologies pertaining to PKI.
(30 pgs appx each).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.3.1
PKI Emerging Technology Product Evaluations
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Paper will detail the testing and evaluation of emerging technologies in PKI.
This will encompass 2-5 product evaluations annually. (30 pgs
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review by
COR/GTL
appx each).
PWS,
Paragraph 3.3.1
PKI Analyses of Alternatives
Provide all necessary deliverables for the support of this award. This study will allow Army CIO/G-6 to differentiate between PKI solutions and how they pertain to their changing needs (15 pgs).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.3.1
Technology White Papers
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. This study will provide a snapshot of technological developments that could impact PKI initiatives. (10 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
3.3.2/ PKI
Transformati on
Electronic Library Updates for all program documents
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This is an Army CIO/G-6 repository for its IDAM Division program documents. Appx 2-3 document updates per month throughout the TO period of performance.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.2.2
PKI Architecture Analyses
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This is a review of the Army’s present-state PKI infrastructure. (10 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review by
COR/GTL
PWS,
Paragraph 3.3.2
Technology Implementation Analyses
Provide all necessary quality assurance deliverables and
The contractor shall provide all necessary personnel, 95% error free draft report/docume nts corrected to
5% with no impact to operational requirement, Review/Inspect by the COR/GTL technical reports necessary for the support of this award. This study will review how newly implemented technologies are improving or impacting the Army and DoD PKI (15 pgs appx).
products and deliverables.
100% error free within 24 hours programs and plans
PWS,
Paragraph 3.3.2
PKI Evaluation Papers
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. This study will evaluate the PKI and Public Key Enablement (PKE) to ensure they meet the Army’s evolving needs (15 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.2.2
PKI Configuration Analyses
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This analysis will provide recommendations on how to improve
PKI/PKE
configurations within the Army.
(15 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.3.2
Impact/Risk Assessment Reports
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This study will assess how PKI technologies are deployed within the tactical environment (20 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review by
COR/GTL
PWS,
Paragraph 3.3.2
PKI Guidance Recommendations Report
Provide all necessary deliverables for the support of this award. This report will detail recommended changes based on
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans the testing and evaluation of emerging technologies, and on the research and analysis completed across PKI. (10 pgs appx).
3.3.3/Policy Analysis
Army Policy Memorandum Recommendations
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. These studies will track DoD and Army policies as they pertain to PKI. (10 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours.
5% with no impact to operational requirement, programs and plans.
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.3.3
Army Technology Policy Position Papers
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. These studies will analyze how the Army’s new technology solutions integrate with PKI. (10 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.3.3
Policy Working Group Briefings
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. These papers will summarize policy working groups.
(10 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review by
COR/GTL
3.3.4/ Registration Authority
(RA)
Advancemen t
Registration Practice Statement (RPS) /Certificate Practice Statement Review Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This will provide an annual analysis of how RPS is being utilized by Registration Authorities (RAs).
(20 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Paragraph 3.3.4
RA Process Improvements Recommendations Report
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. This study will analyze current RA operations and make recommendations on how to streamline processes to improve IA across the Army. (15 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.3.4
Issuance Performance Metrics Analysis
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report presents statistical analyses of NIPR and SIPR tokens issued. (1 pg).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.3.4
Next Generation (NexGen) RA Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This study will present futuristic solutions for automating RA technology. (30 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review by
COR/GTL
PWS,
Paragraph 3.4.1
Current State Identity Data Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will analyze redundancies in the collection and maintenance of identity data.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours.
5% with no impact to operational requirement, programs, and plans.
Review by
COR/GTL.
PWS,
Paragraph 3.4.1
Army Identity Attribute Specification (IAS) Business Processes Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This study will examine all
The contractor shall provide all necessary personnel, products, and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours.
5% with no impact to operational requirement, programs, and plans.
COR/GTL.
new identity attributes needed to support the cyber functions of the Army IdAM System.
PWS,
Paragraph 3.4.1
Attribute Change Control Process Development Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report details the requirements necessary to develop an attribute change control process within the Army.
The contractor shall provide all necessary personnel, products, and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours.
5% with no impact to operational requirement, programs, and plans.
Review by
COR/GTL.
PWS,
Paragraph 3.4.1
Requirements Vetting Process Analysis
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will analyze the attributes needed by Army organizations and assess their feasibility.
The contractor shall provide all necessary personnel, products, and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours.
5% with no impact to operational requirement, programs, and plans.
Review by
COR/GTL.
PWS,
Paragraph 3.4.1
Account Life Cycle Management Analysis Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This study will analyze the user account lifecycle to streamline and automate.
The contractor shall provide all necessary personnel, products, and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours.
5% with no impact to operational requirement, programs, and plans.
Review by
COR/GTL.
PWS,
Paragraph 3.4.1
End User Identity Use Case
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This use case will map the identity lifecycle process for users across the Army.
The contractor shall provide all necessary personnel, products, and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours.
5% with no impact to operational requirement, programs, and plans.
COR/GTL.
3.4.2
Reference Architectures Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This study will document the IdAM architectures and how they interface with DISA
The contractor shall provide all necessary personnel, products, and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours.
5% with no impact to operational requirement, programs, and plans.
Review by
COR/GTL.
PWS,
Paragraph 3.4.2
Attribute Based Access Controls (ABAC) and Role Based Access Controls (RBAC) Information Papers
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This study will analyze the effectiveness of ABAC and RBAC and how best to utilize these technologies within the Army (50-100 pgs appx).
The contractor shall provide all necessary personnel, products, and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs, and plans.
Review by
COR/GTL
PWS,
Paragraph 3.4.2
ABAC and RBAC Army Implementation Plans
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. These plans will document how best to implement these technologies.
(30 pgs appx).
The contractor shall provide all necessary personnel, products, and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.4.2
ABAC Operational View and Reference Architecture Analysis
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This study will provide the baseline for analyzing optimal ABAC operational architectures. (50 pgs appx)
The contractor shall provide all necessary personnel, products, and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.4.2
RBAC Operational View and Reference Architecture Analysis
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This study will provide the baseline for analyzing optimal RBAC operational architectures. (50
The contractor shall provide all necessary personnel, products, and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans pgs appx)
Paragraph 3.4.2
ABAC and RBAC Implementation Methodologies Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will examine potential risks associated with ABAC and RBAC implementation and provide recommended methodologies for mitigating these risks (50 pgs appx)
The contractor shall provide all necessary personnel, products, and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.4.2
ABAC and RBAC Best Business Practices Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will analyze efficiencies by effectively implementing ABAC and RBAC technologies (50 pgs appx)
The contractor shall provide all necessary personnel, products, and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs, and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.4.2
Analysis of Alternatives for Federated Dervices Findings and Recommendation Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This analysis will examine which information services can be federated and integrated with Army information services without posting information security threats.
(30 pgs appx).
The contractor shall provide all necessary personnel, products, and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs, and plans
PWS
3.4.3
Identity Management Infrastructure Improvements Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report presents analysis on how to improve the identity management systems within the Army (20 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.4.3
Operation and Reference Architectures Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will provide an update on progress of IdAM in the tactical space (10 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.4.3
Army EIDS Concept of Operations (CONOPS) Update Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will provide updates and recommendations for Army EIDS
CONOPS
improvements. (30 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.4.3
Army IdAM Roadmap Update Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will diagram the Army’s IdAM environment and how it interfaces with DISA.
(diagram)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review by
COR/GTL
PWS,
Paragraph 3.4.3
Army EIDS Identity Provisioning Capability Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will provide a monthly snapshot
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans of accounts provisioned by EIDS. (5 pgs appx)
3.4.3
Army EIDS Authentication and Authorization Framework Analysis
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. This study will analyze the EIDS framework and makes necessary recommendations to ensure EIDS meets the Army’s needs, mission and goals (50 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.4.3
Army EIDS Identity Federation Capability Analysis
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This study will analyze how federating services streamlines the existing DISA EIDS capability (50 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
3.5.1/ Governance and Policy Analysis
Document Review/ Comment Matrix Analysis
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This study will examine overlaps and gaps in existing governance and policy documents (50 pgs appx).
necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review by
COR/GTL
PWS,
Paragraph 3.5.1
Best Business Practices (BBP) Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This study will examine how to build efficiencies into Army business
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans practices (30 pgs appx).
PWS,
Paragraph 3.5.1
Policy Guidance/Updates Recommendations Report
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. This study will provide policy recommendations for COMSEC, as required.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.5.1
Portfolio Management, Line of Efforts (LOE) Roadmap
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This study will provide direction guidance and implementation timeline to support the Army’s key initiatives for effectiveness and efficiency strengthen network operations (e.g.
Mid-Term, Long- Term).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.5.1
Next Generation Cryptographic Policy Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will provide new direction and guidance on how to implement new Cryptographic capability (20 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review by
COR/GTL
PWS,
Paragraph 3.5.1
AR 25-2 - COMSEC
Policy Guidance/Updates Recommendations Report
Provide all necessary deliverables for the support of this award. This report will examine how new Cyber policies and technological advancements
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans impact this policy (20 pgs appx)
PWS,
Paragraph 3.5.1
AR Policies Guidance/Updates Recommendations Report
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. This report will examine how new Cyber policies and technological advancements impact this policy.
(20 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.5.1
DA PAMs Policy Guidance/Updates Recommendations Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will examine how new Cyber policies and technological advancements impact this policy (20 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review by
COR/GTL
3.5.2/Key Managemen t Integration
Electronic Key Management Systems (EKMS) to Key Management Infrastructure (KMI) Transition Plan
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This is a report that analyzes the optimal method for transitioning the Army from EKMS to KMI (20 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.5.2
Life Cycle Management Infrastructure (KMI) Transition Plan
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. This report will track, evaluate, and report the opening/closing of COMSEC accounts (Quarterly)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
3.5.2
Key Management Baseline Standards Report for Common Operating Environment (COE)
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will examine the existing baseline construct for COE (30 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.5.2
Key & Certificate Management Plan (KCMP) BBP Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will identify streamlined, cost-efficient methods for effectively managing key and certificate issuances (30 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review by
COR/GTL
PWS,
Paragraph 3.5.2
Report for Army Network Campaign Plan
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
3.5.3/COMS
EC
Modernizati on Compliance
Cryptographic Modernization Strategy Analysis
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This study will assess how the Army can improve its strategy for acquiring and developing modernized cryptographic capabilities (50-100 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.5.3
Develop, Distribute, and Maintain Cryptographic Evolution Charts
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This will diagram cryptographic evolution and how technological advancements impact legacy Army
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
COR/GTL
Systems Diagram).
Paragraph 3.5.3
Information Systems Security Program Cryptographic Requirements Validation Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will validate the Army’s cryptographic requirements against DoD requirements. (5 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.5.3
Commercial Solutions Integration Strategy Timeline Roadmap
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. This study will analyze how commercial solutions can best integrate into Army systems and assess progress towards Army’s strategic goals (15 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.5.3
New Capabilities/ Technology Report
Provide all necessary deliverables and technical reports necessary for the support of this award. This study will analyze new and emerging technologies and how they can integrate into the Army’s COMSEC program while remaining compliant with existing requirements (50 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
3.5.3
COMSEC
Replacement and Obsolescence and Divestiture Strategy
Provide all necessary quality assurance deliverables necessary for the support of this award. This study will examine how best to leverage legacy COMSEC solutions while adequately disposing of obsolete capabilities (40 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review by
COR/GTL
3.5.6/COMS
EC Strategic Planning
Key Management Roadmap Analysis
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This study will provide an as-is mapping of key management capabilities (30 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.5.6
Cryptographic Roadmap
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. This study will provide an as-is mapping of cryptographic capabilities (30 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.5.6
Cryptographic Modernization Annual Planning Memo
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will examine cryptography advancements and propose a plan for implementing them across the Army (10 pgs appx).
necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
3.5.6
Cryptographic Modernization Guidance Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will provide key guidance on risk mitigation for modernizing Army cryptography capabilities (40 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.5.6
COMSEC
Obsolescence and Divestiture Report
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. This report will provide key guidance CYBERW the Chairman Joint Chiefs Instruction/Notice (CJCSI) 6510 to transition off of legacy cryptography capabilities (15 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.5.6
Document review on BOIPs, technical publications
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will track the Army’s progress in modernizing its cryptographic capabilities with the Programs of Record (POR) (40 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.5.6
Next Generation Cryptographic Capabilities
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will track the Army’s progress in modernizing its cryptographic capabilities (40 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
3.5.6
Cryptographic Modernization Assessment Report (Command Plan Roll-Up)
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. This report will track the Army’s progress in modernizing its cryptographic capabilities with Camp/Post/Stations (40 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
3.5.6
Monitor and track the execution of the COMSEC/ Modernization Budget
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. This report will examine requirements for projecting cryptography capabilities to strengthen and implement a robust network (15 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
3.5.6
Prepare and document input for Army Budget Estimate Submission (BES)
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. This study will assist with examining and reporting data for modernization to deliver enhance capability to the tactical edge (15 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
3.6/ Network Operations Analysis
IA/ NetOps Briefings Reports
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This briefing will provide up-to-date information for key leaders on IA and NetOps advancements (3- 15 pgs Briefings)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
3.6
Impact Statements Provide all necessary deliverables and technical reports necessary for the support of this award. These statements will provide leadership with concise information on the status of NetOps (1 pg)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.6
NetOps Strategy Report
Provide all necessary technical updates, quality assurance deliverables and technical reports necessary for the support of this award. This study will outline a strategy for improving Army NetOps and measure the Army’s progress in meeting strategic goals and objectives (30 pgs appx)
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts and technical updates corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.6
Policy Recommendations Report
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. This report will provide policy recommendations based on changes in NetOps (15 pgs appx).
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.8.8 Emerging Technologie s Integration
Analysis of Alternatives (AoA) for Authentication Methodologies
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Identify and address AuthN methods used in Enterprise environments across industry to identify AuthN alternatives for Army and DoD.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
3.8.8
Authentication Requirements
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Develop and keep up to date formal Army AuthN Requirements document based on specific Army user populations.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.8.8
Authentication Roadmap
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Develop the Army AuthN roadmap to identify the use of AuthN methodologies throughout the Army.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.8.8
Functional Attribute Specification
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Defines the critical attributes that will drive the IT Entitlement Service.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.8.8
Analysis of Alternatives for Authorization Suites
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Analysis of key vendor suites and down selection for further testing and evaluation.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.8.8
Provisioning Roadmap
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Defines the critical iterative processes and coordination requirements between Army, DISA, and DMDC to complete the
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans provisioning services.
PWS,
Paragraph 3.8.8
Provisioning Policies and Guidelines
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Establish the principals and policies that forest owners will adhere to and follow once connected to the DISA provisioning services.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.8.8
Whitepapers and Information Briefings
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Details of emerging ICAM technologies for Army Senior Leadership knowledge.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.8.8
Industry Demonstrations and Briefings
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award.
Coordinating vendor demonstrations of emerging technology for the Army CIO/G-6 Senior Leadership.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.8.8
Annual Emerging Technology Demonstration
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Annual offsite demonstration to Army CIO/G-6 Cyber Security Leadership of emerging security technology and
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans possible integration efforts for consideration.
PWS
Paragraph 3.9.3 Continuous Monitoring and Identity Analytics
Develop Cross Matrix Table for IdAM Security Controls and Policies
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Establish security control requirements and policies to amend AR25-1 and AR25-2.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.9.3
Develop Communication Plan to address Device Authorization Solution
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Coordinate and participate in the Device Authentication Work Group to evaluate service certificate issuance solutions for tactical level, enterprise level and mobile technology.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.9.3
Establish OOBM Solution
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Evaluate current access control policies to recommend an Out of Band Management Solution.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.9.3
Initialize Directory Authentication Monitoring
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Develop a model to audit and monitor directory authentication of devices on the tactical/strategic network to include
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans mobile technology.
Paragraph 3.9.3
Assessment of Privileged User Processes and Procedures, Security, and Systems
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Identify types of privileged user, their access, and review privileged user lifecycle, shared account management, and separation of duties processes and procedures.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.9.3
Analysis of Privileged Identity Management Technologies, Alternatives, and Integration Points
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. In-depth analysis of security controls and technology to manage and monitor privileged user access to include mobile technology.
The contractor shall provide all necessary personnel, products and deliverables.
95% error free draft report/docume nts corrected to 100% error free within 24 hours
5% with no impact to operational requirement, programs and plans
Review/Inspect by the COR/GTL
PWS,
Paragraph 3.9.3
Strategic Guidance Documentation
Provide all necessary quality assurance deliverables and technical reports necessary for the support of this award. Describes the projected security environment and key considerations to be addressed for Insider Threat, Privileged User, Mobile Enterprise, Mobile…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .