SolicitationW52P1J15R3060.pdf
PDF 258 KB Posted
- Attached to
- FIBER TUBES REQUIREMENTS CONTRACT
- Solicitation number
- W52P1J-15-R-3060
About this file
Solicitation for vendor download completion and submittal
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A X B X C X D
EX
X
G F 41 - 49
50 - 56 X H 57 michael.e.perez24.civ@mail.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-C9 1 57
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W52P1J 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
MICHAEL E. PEREZ (309) 782-3360
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 3 4 - 6
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
7 - 9
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
11 - 14 15 - 19
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 20 - 21 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 22 - 30 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
31 - 39
PART II - CONTRACT CLAUSES
ARMY CONTRACTING COMMAND ROCK ISLAND
3055 RODMAN AVENUE
ROCK ISLAND IL 61299-8000
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
14 Sep 2015
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W52P1J-15-R-3060
Section A - Solicitation/Contract Form
GOVERNMENT POINTS OF CONTACT
This Notice implements a local Government requirement to incorporate a list of Government Points of Contact (POCs) into our solicitations and contracts at no cost to the Government. Contractors are encouraged and advised to start communications with the Government at the lowest possible level. The POC list follows:
TITLE NAME PHONE E-MAIL
Contract Specialist Mike Perez 309-782-3360 michael.e.perez24.civ@mail.mil Procuring Contracting Officer Elvia Jaggers 309-782-3271 elvia.jaggers.civ@mail.mil Branch Chief Valiant M. DuHart 309-782-8517 valiant.m.duhart.civ@mail.mil Division Chief Mary J. Donovan 309-782-7946 mary.j.donovan4.civ@mail.mil Deputy Executive Director Amy J. Hayden 309-782-7564 amy.j.hayden.civ@mail.mil Executive Director Melanie A. Johnson 309-782-3815 melanie.a.johnson.civ@mail.mil
(End of Notice)
CONTRACTOR REPRESENTATIVE
* CONTRACTOR REPRESENTATIVE (POINT OF CONTACT - TYPED):
POC NAME: _________________________
POC TITLE: _________________________
POC TELEPHONE: _________________________
POC EMAIL ADDRESS: _________________________
DUNS NUMBER: _________________________ (http://fedgov.dnb.com/webform)
CAGE CODE: _________________________ (http://www.dlis.dla.mil/cage_welcome.asp)
TAXPAYER ID NUMBER: _________________________
ELECTRONIC BID SUBMISSION
* ELECTRONIC BID SUBMISSION:
Proposals/ bids/ quotes may be submitted electronically by email if the solicitation is filled out completely, and signed by an authorized representative, scanned, included as an attachment, and emailed to the address provided in the solicitation. All emailed quotes and attachments must be in Adobe Acrobat (.pdf) format and the solicitation must be submitted in its entirety along with any amendments including contractor’s attachments, drawings, or supporting documents by the specified date and time in order to be considered for award. This instruction takes precedence over any other direction for ASFI Quote Submission. NOTE: Proposals/ bids/ quotes will NOT be accepted for this solicitation through the ASFI web site.
CLAUSES INCORPORATED BY FULL TEXT
52.0000-4000 02 NON-RELEASE OF CONTRACT INFORMATION (MAR 2000)
1. Any proprietary, confidential commercial, trade secret or similar type of information in the contract resulting from this solicitation may not be released to anyone outside the Government.
2. Do not release proprietary, confidential commercial, trade secret or similar type of information from this contract to anyone inside the Government that does not have a legitimate need to know the information.
3. If in doubt about what information in the contract may be released, contact the Contracting Officer.
4. Criminal penalties are provided by 18 U.S.C. for the improper release of proprietary and/or confidential commercial information. (End of notice)
52.0000-4000 04 ASFI NOTICE (DEC 2013)
NOTE: Effective immediately
Contractors are requested to use ASFI to view solicitations and amendments.
To view the Rock Island Contracting Center’s solicitations/amendments go to https://acquisition.army.mil/asfi/ and click on the link Contracting Opportunities Search. Next to the title Solicitation Number type in a W52P1J%.
Click the Continue Button at the bottom of the screen. The next page will give a listing of all open solicitations/amendments for Rock Island Contracting Center. Please contact the contract specialist listed on the solicitation/amendment for instructions with your bid response. You can also bid electronically using the ASFI bid response module. For guidance and information of the electronic bidding response system please go to https://acquisition.army.mil/asfi/ and click on the link ASFI FAQ Page.
52.0000-4003 DISCLOSURE OF UNIT PRICE INFORMATION (JUN 2005)
This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23,1987), of our intention to release unit prices of the awardee in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the Contracting Officer is notified of your objection to such release prior to submission of initial proposals.
(End of clause)
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
0001 298,400 Each
GRENADE TUBE, FIBER TUBE WITH LID
FFP
Fiber Grenade Tube with Lid IAW drawing entitled GRENADE TUBE FOR D563 155mm PROJECTILE DEMIL. These containers are used to pack grenades and they must fit precisely into the equipment in the production area.
Minimum Quantity: Zero (0) Each Maximum Quantity: 298,400 Each
NOTICES:
1.CONTRACT: The contract will be an unfunded one-year requirements contract with funded orders placed on an as-needed basis.
2.OFFER SUBMITTAL: Vendors must follow the offer submittal instructions given at 52.215-1 in Section L.
3. DRAWING & SPECIFICATIONS: The drawing entitled GRENADE TUBE FOR D563 155mm PROJECTILE DEMIL is available in accordance with 52.0000-4502. Specifications are available in accordance with 52.211-2. Also see Section C - Descriptions and Specifications and Section J - List of documents, exhibits, and other attachments.
4. PACKAGING: Product shall be packaged in accordance with Section D, Packaging & Marking.
5. SHIPMENTS: All contract shipments shall include a Packing List IAW 52.0000-4002, Certificate of Conformance IAW 52.246-15, and Material Inspection and Receiving Report IAW 252.246-7000.
6. SAMPLE UNITS PRIOR TO AWARD: Prior to award of this contract, vendors may be required to submit a quantity of four (4) sample Tubes for customer inspection and approval. If samples are requested, the vendor shall have two (2) weeks from notification to provide samples to the Government. The address to where the samples will be sent will be provided with the Government notification/request for the samples. Samples MUST be representative of the process used for the production quantity.
7. ORDERING: Any supplies to be furnished under this contract shall be ordered by issuance of delivery orders IAW the DFARS 252.216-7006 Ordering clause.
8. CONTRACT EFFECTIVE PERIOD: The contract effective period shall be from date of award through one (1) year from date of award.
FOB: Destination
ESTIMATED
NET AMT
Section C - Descriptions and Specifications
52.0000-4180 CONFIGURATION MANAGEMENT DOCUMENTATION (AUG 2015)
(a) The contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the Government provided Technical Data Package (TDP). The contractor shall prepare and submit ECPs, Notices of Revision (NORs), and RFVs as required by the accompanying DD Form 1423, Contract Data Requirements List (CDRL). If a Value Engineering Change Proposal (VECP) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all NORs necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR (or equivalent) shall be submitted to completely describe the desired change on each affected document.
(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the
ECP.
(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule.
If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).
52.0000-4502 (ACC-RI)
TECHNICAL DATA PACKAGE INFORMATION, AND DISTRIBUTION AND DESTRUCTION OF
RESTRICTED TECHNICAL DATA
Nov 2012
Text:
(a) Army Contracting Command - Rock Island (ACC-RI) will no longer make Technical Data Packages (TDPs) available for order via CD-ROMS. TDPs will be obtained electronically via the link(s) below which will direct you to the Federal Business Opportunities (FBO) website. You must have an FBO account prior to accessing any TDP(s). To register for an account in FBO, please visit http://www.fbo.gov/index and click on “Register Now” under Vendors/Citizens. The toll free FBO helpdesk phone number is (866) 606-8220 and for international (334) 206-7828. Vendors are responsible for placing correct information in FBO.
(b) You may need to use special software to view the documents that we post to the FBO. This viewing software is freeware, available for download at no cost from commercial websites like Microsoft and Adobe. Additionally, some TDPs may require Lucent Viewer to view the TDP(s) which is available as freeware at: http://www.ec-edi.com/.
(c) The TDP(s) for this solicitation will be accessible via the FBO website (as described below) from the date of issue through the time specified in the solicitation for receipt of offers.
(d) FOR UNRESTRICTED TDPs:
(1) TDPs for this solicitation are unrestricted and can be accessed electronically via the FBO website. The URL will take you to that CLIN’s web-located TDP. You must have an FBO account prior accessing the TDP.
(2) To access the TDP(s), click directly on the link provided below to be directed to the TDP. You may also copy and paste the link into your browser and hit the Enter key. You will be prompted for your FBO username and password prior to gaining access to the TDP.
CLIN: 0001
TDP Link (URL): https://www.fbo.gov/notices/392cb01be64f4a87004faebf67f84f63
(e) FOR RESTRICTED TDPs:
TDPs and any other related documents, if applicable, for this solicitation is restricted and can be accessed electronically via the FBO website, with valid contractor login credentials. TDPs and any other related documents are posted with various options, such as Restricted and Export Control. These additional controls are described below:
(1) Access to RESTRICTED TDPs
Technical Data Packages that have been marked as 'Restricted' can be accessed electronically via the FBO website, with valid contractor login credentials. TDPs that have been marked as 'Restricted' will require approval from the Contracting Officer prior to gaining access to the requested information. To request access click on the link(s) provided below, log in to FBO, click on the “packages” sub-tab and then click on the “request explicit access” button. Completion of a “Use and Non-Disclosure Agreement” may be required prior to gaining access to the TDP. Please allow 2-3 working days to process your request. You will receive a system generated email from FBO stating you have been granted permission for viewing or downloading the TDP items.
(2) Access to EXPORT CONTROL TDPs
(i) TDPs that have been marked as 'Export Control' can be accessed electronically via the FBO website, with valid contractor login credentials. In addition, to obtain access to these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense Logistics Information Service (DLIS). If you do not have an approved DD 2345, Militarily Critical Technical Data Agreement on file with DLIS then you will not be able to access the TDP. To obtain certification, go to http://www.logisticsinformationservice.dla.mil/jcp/, click on documents and follow instructions provided.
Processing time is estimated at five working days after receipt.
(ii) TDPs that have been marked as ‘Export Control’ will require approval from the Contracting Officer prior to gaining access to the requested information. To request access click on the link(s) provided below, log in to FBO, click on the “packages” sub-tab, enter your Marketing Partner Identification Number (MPIN) and click on the “request explicit access” button. The requestor must be the "data custodian" that is listed on the DD 2345. Please allow 2-3 working days to process your request. If the company MPIN changes the user will be required to verify the MPIN again to gain access to ‘Export Control’ TDP(s). Completion of a “Use and Non-Disclosure Agreement” may be required prior to gaining access to the TDP. You will receive a system generated email from FBO stating you have been granted permission for viewing or downloading the TDP items.
(iii) If multiple individuals in your company need access to the Export Control TDP for a solicitation, it can be obtained from your data custodian that is listed on the DD 2345.
(iv) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq.
CLIN: NA
TDP Link (URL): NA
(3) Further dissemination of Restricted TDPs must be in accordance with provisions of DoD Directive 5230.25.
This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(4) Upon completion of the purposes for which the restricted technical data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
(f) Questions related to registration in FBO should be directed to http://www.fbo.gov/index. The FBO helpdesk phone number is (866) 606-8820. Vendors are responsible for placing correct information in FBO. A user guide for FBO can be found at http://www.fbo.gov/index - on the right of the screen is User Guides - click on “Vendor”.
Section D - Packaging and Marking
PACKAGING AND MARKING
Tubes will be skid-mounted. Also see the SHIPPING REQUIREMENTS in the Drawing entitled GRENADE TUBE FOR D563 155mm PROJECTILE DEMIL. The Drawing and a packaging photo are attachments to this solicitation. See the Section J - List of documents, exhibits, and other attachments.
All shipments under any future delivery orders shall include a Packing List IAW 52.0000-4002, Certificate of Conformance IAW 52.246-15, and Material Inspection and Receiving Report IAW 252.246-7000.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984
52.246-15 CERTIFICATE OF CONFORMANCE (APR 1984)
(a) When authorized in writing by the cognizant Contract Administration Office (CAO), the Contractor shall ship with a Certificate of Conformance any supplies for which the contract would otherwise require inspection at source.
In no case shall the Government's right to inspect supplies under the inspection provisions of this contract be prejudiced. Shipments of such supplies will not be made under this contract until use of the Certificate of Conformance has been authorized in writing by the CAO, or inspection and acceptance have occurred.
(b) The Contractor's signed certificate shall be attached to or included on the top copy of the inspection or receiving report distributed to the payment office or attached to the CAO copy when contract administration (Block 10 of the DD Form 250) is performed by the Defense Contract Administration Services. In addition, a copy of the signed certificate shall also be attached to or entered on copies of the inspection or receiving report accompanying the shipment.
(c) The Government has the right to reject defective supplies or services within a reasonable time after delivery by written notification to the Contractor. The Contractor shall in such event promptly replace, correct, or repair the rejected supplies or services at the Contractor's expense.
(d) The certificate shall read as follows:
"I certify that on ______ [insert date], the ____ [insert Contractor's name] furnished the supplies or services called for by Contract No._____ via ____ [Carrier] on ________[identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies or services are of the quality specified and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document."
Date of Execution: _______________________________
Signature: ______________________________________
Title: __________________________________________
52.246-4550 CRITICAL CHARACTERISTICS (FEB 2004)
Local Clause
a. The contractor’s processes shall be designed to prevent the creation or occurrence of critical nonconformances.
The contractor shall establish, document and maintain specific procedures, work and handling instructions and process controls relating to any critical characteristics.
b. The contractor shall assure his critical processes are robust in design such that product and performance are relatively insensitive to design and manufacturing parameters. A robust design anticipates changes and problems.
Robust processes shall be designed to yield less than one nonconformance in one million.
c. An inspection/verification system shall be employed that will verify the robustness of your critical processes.
Maximum use should be made of automated inspection equipment to accomplish verification of product quality.
Mistake proofing techniques of your material handling and inspection systems are encouraged.
d. Previous Practices/Special Characteristics. As a result of previous practices, the government’s technical data may refer to “Critical” (not annotated with I or II) and “Special” characteristics. Characteristics classified as “Critical” (not annotated with a I or II) shall be subject to all requirements herein associated with Critical (I) characteristics and level I Critical nonconformances. Unless otherwise stated in Section C, characteristics classified as “Special” shall be subject to all requirements herein associated with Critical (II) and Level (II) Critical nonconformances.
e. Contractor Identified Critical Characteristics List (CICCL). Not including critical characteristics defined in the government’s technical data (drawings, specifications, etc.), the contractor shall identify and document all material, component, subassembly and assembly characteristics whose nonconformances may result in hazardous or unsafe conditions for individuals using, maintaining or depending upon the product. All additional critical characteristics identified by the contractor shall comply with the critical characteristic requirements of the technical data package, supplemented herein. The contractor’s additional critical characteristics shall be classified as “Critical (I)” or “Critical (II)”, and shall be reviewed and approved by the procuring activity prior to manufacturing (DI-SAFT- 80970A). The following definitions are provided.
Level I critical nonconformance. A nonconformance of a critical characteristic that judgment and experience indicate would result in hazardous or unsafe conditions for individuals using, maintaining or depending upon the product; or a nonconformance that judgment and experience indicate would prevent performance of the tactical function of a weapon system or major end item. The following (as a minimum) are classified as Level I critical nonconformances:
(1) A nonconformance that will result in a hazardous or unsafe condition (often referred to as a single point failure).
(2) A nonconformance that will remove or degrade a safety feature (such as those in a safe and arm device or fuzing system).
(3) A nonconformance that will result in violation of mandatory safety policies or standards.
Level II critical nonconformance: A nonconformance of a critical characteristic, other than Level I. This includes the nonconformance of a characteristic that judgment and experience indicate may, depending upon the degree of variance from the design requirement, the presence of other nonconformances or procedural errors,:
(1) result in a hazardous or unsafe conditions for individuals using, maintaining or depending upon the product, or
(2) prevent performance of the tactical function of a major end item.
f. In the event that a Critical nonconformance is found anywhere in the production process, the contractor, as part of his quality system, shall have procedures in place to ensure:
(1) The nonconformance is positively identified and segregated so that there is no possibility of the item inadvertently re-entering the production process. This control shall be accomplished without affecting or impairing subsequent defect analysis.
(2) The operation that produced the defective component or assembly and any other operations incorporating that component or assembly is immediately stopped.
(3) The government is immediately notified of the critical nonconformance (telephonically and electronic mail.)(DI-SAFT-80970A).
(4) Any suspect material (material in process that may contain the same defect) is identified, segregated and suspended from any further processing.
(5) An investigation is conducted to determine the cause of the deficiency and required corrective actions. A report of this investigation shall be submitted to the government (DI-SAFT-80970A). The use of the DID report shall not delay notification to the government.
(6) A request to restart manufacturing or to use any suspect material associated with the critical nonconformance is submitted to the government (DI-SAFT-80970A). Restart of production shall not occur until the investigations are complete or upon authorization from the procuring contracting officer. All objective evidence of the investigations to date shall be available for review at the time of restart. Suspect materiel found to be nonconforming shall not be used without Government approval.
g. The contractor may develop alternative plans and provisions relative to government or contractor identified Critical level (I) and Critical Level (II) characteristics. The provisions shall be submitted to the government for advanced approval and shall address the following:
(1) Complete explanation of potential failure mode(s) together with supporting historical and statistical data.
(2) Pre-established plan of action (POA) to be taken when a critical nonconformance occurs and a description of controls to ensure there is no possibility of the nonconforming item inadvertently entering the production process.
(3) Means of tracking nonconformance rate, investigative results and corrective actions taken.
(4) Method to immediately verify that a produced critical nonconformance is consistent with the identified failure mode(s) and does not exceed the historical nonconformance rate.
The contractor can resume production without specific government approval based upon the pre-approved alternate plans and provisions for Critical (I) characteristics and level (I) Critical nonconformances and Critical (II) characteristics and level (II) Critical nonconformances.
h. If a critical nonconformance is discovered during further processing or loading, the original manufacturer who introduced the critical nonconformance shall bear responsibility for the nonconformance.
i. The Government Quality Assurance Representative will perform the surveillance actions necessary to ensure compliance with this clause. (End of clause)
(ES7500)
252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)
(a) At the time of each delivery of supplies or services under this contract, the Contractor shall prepare and furnish to the Government a material inspection and receiving report in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense FAR Supplement.
(b) Contractor submission of the material inspection and receiving information required by Appendix F of the Defense FAR Supplement by using the Wide Area WorkFlow (WAWF) electronic form (see paragraph (b) of the clause at 252.232-7003) fulfills the requirement for a material inspection and receiving report (DD Form 250). Two copies of the receiving report (paper copies of either the DD Form 250 or the WAWF report) shall be distributed with the shipment, in accordance with Appendix F, Part 4, F-401, Table 1, of the Defense FAR Supplement.
Section F - Deliveries or Performance
RECEIVING OFFICE REQUIREMENT
RECEIVING OFFICE REQUIREMENT - MCAAP (FEB 2004)
At the McAlester Army Ammunition Plant truck shipments are accepted at Warehouse 8, Receiving Office, Monday through Thursday (except holidays) from 6:30 A.M. until 3:00 P.M. only. All shipments and deliveries must be at the main gate (truck gate) on or before 3:00 P.M. No shipments will be accepted after 3:00 P.M. unless prior arrangements have been made.
Any deliveries for Thursday afternoons during the months of May and June SHALL BE scheduled in advance by calling 918-420-6695 to verify that deliveries are being accepted that day.
Delivery drivers will have a valid drivers license and no outstanding warrant history to gain entry for shipment/delivery. Any other occupants of the delivery vehicle will have a valid picture ID and no outstanding warrant history.
No shipments will be accepted on government holidays.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 30 dys. ADC 298,400 MCALESTER ARMY AMMUNITION
PLANT
RECEIVING OFFICER
WAREHOUSE 8
1 C TREE ROAD
MCALESTER OK 74501-9002
FOB: Destination
W44W9M
52.211-17 Delivery of Excess Quantities SEP 1989 52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991
52.0000-4002 SHIPPING/DELIVERY INSTRUCTIONS AND INFORMATION (FEB 2004)
1. THE COMPLETE 13-DIGIT PURCHASE ORDER, DELIVERY ORDER, OR CONTRACT NUMBER (The Number that starts with W52P1J----) MUST BE ON THE OUTSIDE OF THE SHIPPING CONTAINER. This number must also appear on all packing slips, invoices, bills, or any communications regarding this order.
2. A Packing List must be included with each shipment.
3. Any excess quantity delivered, that is not covered by a Variation in Quantity clause, is subject to rejection.
4. SHIPMENT OR DELIVERY TO ANY ADDRESS OTHER THAN THE “SHIP TO” ADDRESS
DESIGNATED IN THE PURCHASE ORDER/DELIVERY ORDER/CONTRACT (Block 14 of the DD1155, Block 15 of the SF1449, or Block 11 of the SF 26) MAY RESULT IN A DELAY IN PAYMENT.
5. ANY CHANGE IN THE “SHIP TO” ADDRESS MUST BE APPROVED BY A WRITTEN CONTRACT
MODIFICATION FROM THE CONTRACTING OFFICER.
6. Information from FAR clause 52.232-25, Prompt Payment (FEB 2002), Paragraph (a)(5)(i): For the sole purpose of computing an interest penalty that might be due the Contractor, Government acceptance is deemed to occur constructively on the 7th day (unless otherwise specified in this contract) after the Contractor delivers the supplies or performs the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. If actual acceptance occurs within the constructive acceptance period, the Government will base the determination of an interest penalty on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.
(End of Provision)
CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEM – FOR WORK PERFORMED AT
MCALESTER ARMY AMMUNITION PLANT (OCT 2008)
52.0023-4000 MC
The Contractor shall perform work under this contract consistent with all applicable federal, state, local requirements and with the relevant policy and objectives identified in McAlester Army Ammunition Plant’s (MCAAP’s) environmental management system (EMS) located to http:www.mcaap.army.mil. The Contractor shall perform work in a manner that conforms to all applicable Environmental Management Programs and Operational Controls identified by the MCAAP EMS, and provide monitoring and measurement information as necessary for the organization to address environmental performance relative to MCAAP’s EMS objectives and goals. In the event an environmental nonconformance or noncompliance associated with the contracted services is identified, the Contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall respond and take corrective action immediately. In violations caused by Contractor negligence, the Contractor shall reimburse the Government for the amount of that fine and all associated costs. The Contractor shall also provide cleanup of any spills, including oil, that result from the Contractor’s operations and report spills to MCAAP’s Environmental Management Office. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the Environmental Management Office and approved by the Contracting Officer. In addition, the Contractor shall ensure that their employees are aware of the roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract.
Prior to commencing work, all on-site Contractors shall provide documentation to the Contracting Officer that any required EPA sponsored environmental training specified for the type of work conducted has been obtained. Upon contract award, and during performance of the contract, the Contracting Officer’s Representative will provide or arrange EMS training for appropriate Contractor staff.
(End of Clause)
PROHIBITED WITHIN GENERAL CONFINES OF INSTALLATION (FEB 2004)
52.0045-4001 MC
The following are prohibited within the general confines of the McAlester Army Ammunition Plant at any time:
(a) Firearms/dangerous weapons
(b) Drugs/intoxicants
(c) Binoculars, cameras, camera equipment, cell phones and PDAs with camera capability (unless authorized by the Security Officer)
(d) Matches, lighters or other fire flame or spark producing devices in designated areas
(e) Gas cans/flammable material storage containers (unless approved by MCAAP Fire Department)
(f) Fireworks without the Commander's approval
(g) Smoking in all buildings, when handling flammable and hazardous materials, in railroad cars, trucks and vans, on warehouse docks and platforms, in open storage containing combustibles, within 50 feet of a gasoline refueling storage or drainage area, where posted signs prohibit smoking.
SECURITY REQUIREMENTS – BADGING
52.0045-4002 MC
(a) Any foreign nationals without a green card will not be allowed entrance to the installation. Those individuals with a green card must be escorted within the restricted area at all times
(b) Contractors by virtue of contract award will be given access privileges to McAlester AAP. Contractors/Sub- Contractors are required to provide security at McAlester AAP a letter of introduction for company personnel by providing the following: 1) Name; 2) Physical Address (including city and state); 3) Date of Birth; 4) Place of Birth; and 5) Whether or not they are a U.S. Citizen on company letterhead. Information shall be provided to McAlester AAP, Security Division, Attn: Ms. Traci Howard, McAlester, OK 74501 or faxed to 918-420-7379.
(Applies to contracts that require access to restricted areas)
(c) Each member of the Contractor's work force shall be individually badged at the Security Office in Building 31.
The badge shall be retained and worn by the Contractor's employees throughout the contract period. (Applies to contracts that require access to restricted areas)
(d) Contractor is responsible for the turn-in of all security badges, including sub-contractors badges, daily and upon completion of the contract or termination of individual employees. (Applies to contracts that require access to restricted areas)
(e) Report lost badges to the Security Office and the KO as soon as the loss is discovered. (Applies to contracts that require access to restricted areas)
(f) Be prepared to produce security badges each time entering a security area. Temporary badges for any individual who may have forgotten his/her badge can be obtained from the Security Office. (Applies to contracts that require access in restricted areas).
HOURS OF OPERATION – MCAAP
52.0047-4001 MC
Normal work hours are Monday through Thursday 6:30 A.M. until 5 P.M. Contractors will not be permitted to work on Fridays, Saturdays, Sundays, or legal holidays for any reason, unless otherwise approved by the Contracting Officer. The following legal holidays will be observed:
January 1st 3rd Monday of January 3rd Monday of February Last Monday of May July 4th 1st Monday of September 2nd Monday of October November 11th 4th Thursday of November December 25th
When one of the designated holidays falls on a Friday or Saturday, holiday will be observed on Thursday. If the holiday falls on a Sunday, holiday will be observed on the following Monday.
52.211-8 TIME OF DELIVERY (JUN 1997)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
Deliveries will be within 30 Days after receipt of each Delivery Order.
Item No. Quantity of Contract CLIN 0001
Minimum Quantity: 0 Each
Maximum Quantity: 298,400 Each
***Earlier Delivery authorized at no additional cost to the Government***
Deliver to:
MCALESTER ARMY AMMUNITION PLANT
RECEIVING OFFICER
WAREHOUSE 8
1 C TREE ROAD
MCALESTER, OK 74501-9002
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
Within Days
After Date
Item No. Quantity of Contract
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
52.211-16 VARIATION IN QUANTITY (APR 1984)
(a) A variation in the quantity of any item called for by this contract will not be accepted unless the variation has been caused by conditions of loading, shipping, or packing, or allowances in manufacturing processes, and then only to the extent, if any, specified in paragraph (b) below.
(b) The permissible variation shall be limited to:
5 Percent increase 0 Percent decrease This increase or decrease shall apply to CLIN 0001.
Section G - Contract Administration Data
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Combo
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
See Schedule
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC See Schedule Issue By DoDAAC W52P1J Admin DoDAAC See Schedule Inspect By DoDAAC See Schedule Ship To Code See Schedule Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
michael.e.perez24.civ@mail.mil
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Karen Blaylock, McAlester Army Ammunition Plant, 918-420-7461
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
Section H - Special Contract Requirements
252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (DEC 2013)
(a) Definitions. As used in this clause'
Automatic identification device means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.
Concatenated unique item identifier means--
(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or
(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number;
and serial number within the original part, lot, or batch number.
Data Matrix means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200 (ECC200) specification found within International Standards Organization (ISO)/International Electrotechnical Commission (IEC) 16022.
Data qualifier means a specified character (or string of characters) that immediately precedes a data field that defines the general category or intended use of the data that follows.
DoD recognized unique identification equivalent means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid_equivalents.html.
DoD item unique identification means a system of marking items delivered to DoD with unique item identifiers that have machine-readable data elements to distinguish an item from all other like and unlike items. For items that are serialized within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier and a unique serial number. For items that are serialized within the part, lot, or batch number within the enterprise identifier, the unique item identifier shall include the data elements of the enterprise identifier; the original part, lot, or batch number; and the serial number.
Enterprise means the entity (e.g., a manufacturer or vendor) responsible for assigning unique item identifiers to items.
Enterprise identifier means a code that is uniquely assigned to an enterprise by an issuing agency.
Government's unit acquisition cost means--
(1) For fixed-price type line, subline, or exhibit line items, the unit price identified in the contract at the time of delivery;
(2) For cost-type or undefinitized line, subline, or exhibit line items, the Contractor's estimated fully burdened unit cost to the Government at the time of delivery; and
(3) For items produced under a time-and-materials contract, the Contractor's estimated fully burdened unit cost to the Government at the time of delivery.
Issuing agency means an organization responsible for assigning a globally unique identifier to an enterprise (e.g., Dun & Bradstreet's Data Universal Numbering System (DUNS) Number, GS1 Company Prefix, Allied Committee 135 NATO Commercial and Government Entity (NCAGE)/Commercial and Government Entity (CAGE) Code, or the Coded Representation of the North American Telecommunications Industry Manufacturers, Suppliers, and Related Service Companies (ATIS-0322000) Number), European Health Industry Business Communication Council (EHIBCC) and Health Industry Business Communication Council (HIBCC)), as indicated in the Register of Issuing Agency Codes for ISO/IEC 15459, located at http://www.nen.nl/Normontwikkeling/Certificatieschemas-en-keurmerken/Schemabeheer/ISOIEC-15459.htm.
Issuing agency code means a code that designates the registration (or controlling) authority for the enterprise identifier.
Item means a single hardware article or a single unit formed by a grouping of subassemblies, components, or constituent parts.
Lot or batch number means an identifying number assigned by the enterprise to a designated group of items, usually referred to as either a lot or a batch, all of which were manufactured under identical conditions.
Machine-readable means an automatic identification technology media, such as bar codes, contact memory buttons, radio frequency identification, or optical memory cards.
Original part number means a combination of numbers or letters assigned by the enterprise at item creation to a class of items with the same form, fit, function, and interface.
Parent item means the item assembly, intermediate component, or subassembly that has an embedded item with a unique item identifier or DoD recognized unique identification equivalent.
Serial number within the enterprise identifier means a combination of…
This is the start of the file's text. The full file is on GovTribe.