Engineering_Exception_Data_for_Fiber_Tubes_(00000002).pdf
PDF 27 KB Posted
- Attached to
- FIBER TUBES REQUIREMENTS CONTRACT
- Solicitation number
- W52P1J-15-R-3060
About this file
Engineering_Exception_Data_for_Fiber_Tubes_(00000002).pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W52P1J15R3060Amendment0002.pdf | ||
| Packaging_Photo_for_Fiber_Tubes.pdf | ||
| Grenade_Tube_Drawing.pdf | ||
| SolicitationW52P1J15R3060Amendment0001.pdf | ||
| SolicitationW52P1J15R3060.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBJECT: Engineering Exception Data for Drawing GRENADE TUBE FOR D563 155mm PROJECTILE DEMIL
1.Reference Letter D under the Drawing's SERRATED METAL PLUG TO BE specifications:
"MADE 126 GAUGE COLD ROLLED STEEL (INDUSTRY STANDARD .0159 - TO .0199 THICK)"
The above specification is hereby deleted and replaced with the following:
"MADE 26 GAUGE COLD ROLLED STEEL (INDUSTRY STANDARD .0159 TO .0199 THICK)".
2.Additional technical information follows:
a. The cap on the closed end needs to be stapled in three different places.
b. The metal plugs will be serrated.
c. There is not a temper requirement as long as the steel is between .0159 and .0199 thick and meets the other requirements of the Drawing.
d. The Tube shall be constructed out of chipboard.
e. Change Drawing Note #3 from:
THE TUBE SHOULD BE CONSTRUCTED OUT OF 0.095" WALL THICKNESS CHIPBOARD
To:
THE TUBE SHALL BE CONSTRUCTED OUT OF 0.095" WALL THICKNESS CHIPBOARD.
(END of Engineering Exception Data)
File details come from the government source that posted it. Updated .