This document is an outreach event presentation for two Master Task Order Contracts (MATOCs) for construction services in Puerto Rico and the US Virgin Islands, conducted by the US Army Corps of Engineers Latin America & Caribbean District on July 22, 2026.
General Construction MATOC: This contract targets 5-7 contractors with a 5-year ordering period and minimum program capacity of $99 million. Task orders will range from approximately $350,000 to $30 million. The scope covers design-build and design-bid-build construction for new facilities and real property repair, alterations, and maintenance supporting the U.S. Department of War, other federal agencies, and state/local governments in Puerto Rico and the US Virgin Islands. Work categories include civil and infrastructure (road/airfield pavement, utilities, stormwater management, excavation), facilities and trades (new construction, plumbing, mechanical, electrical, structural, concrete, demolition), specialized systems (power and communication), and environmental remediation. Expected projects include facilities renovations (HVAC, electrical, fire systems, PA systems), new facility construction (operations buildings, barracks, fitness centers, microgrids), and future projects such as Coast Guard waterfront improvements, training centers, entry control facilities, and airfield aprons. Advertisement is scheduled for 4th Quarter FY26 with award in 2nd Quarter FY27.
Water and Power Infrastructure MATOC: This contract also targets 5-7 contractors with a 5-year ordering period and minimum program capacity of $200 million. Task orders will range from approximately $1 million to $100 million. The scope covers design-build and design-bid-build construction, repair, rehabilitation, and modernization of heavy infrastructure in Puerto Rico, supporting U.S. agencies and state/local governments. Work categories include dams and reservoirs (repair, rehabilitation, intake structures), water pipelines and transmission (large-diameter pipelines, pipe bridges, flood control pump stations), power generation (emergency generators, gas pipelines, hydroelectric rehabilitation), and distribution networks (electrical substations, microgrids, utility modernization). Associated work includes general construction (earthwork, concrete, demolition, cofferdam structures, structural steel) and environmental services (remediation, hazardous waste abatement, compliance support). Potential future projects involve water conveyance structures, hydroelectric repair, gates/valves repairs, pipeline and penstock replacement, and utility system repairs. Advertisement is scheduled for 1st Quarter FY27 (October-December 2026) with award in 3rd Quarter FY27 (April-June 2027).
Both MATOCs will be competed using FAR Part 15 negotiated acquisition with a tradeoff source selection approach. Contracts are Firm Fixed Price and unrestricted. The North American Industry Classification System codes are 236220 (Commercial and Institutional Building Construction) and 237990 (Other Heavy and Civil Engineering), with a $45 million small business size standard. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) website. A subcontracting plan is required from other than small business firms. Small business goals include 69.24% small business, 12.40% small disadvantaged business (including 8(a)), 1.00% service-disabled veteran-owned small business, 0.57% women-owned small business, and 64.85% HUBZone small businesses, with proposed subcontracting percentages ranging from 1.00% to 31.00% across categories. All contract announcements will be posted on SAM.gov, and firms must be registered in SAM to receive an award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OUTREACH EVENT
SAA CONSTRUCTION MATOCS
PR AND USVI
US Army Corps of Engineers Latin America & Caribbean District 22 July 2026
9:00 am – 10:30 am
• Welcome Remarks
• Purpose of Event
• How to submit questions
• MATOC 1: General Construction
• Contract Details
• Scope of Work
• Acquisition Timeline
• MATOC 2: Water & Power Infrastructure
• Contract Details
• Scope of Work
• Acquisition Timeline
• Contracting Requirements
• Small Business Opportunities
• Break
AGENDA
10:30 am – 12:00 pm
• Question and Answer Session
To support upcoming requirements in the Commonwealth of Puerto Rico and the United States Virgin Islands (USVI).
Gather information and feedback from industry partners for potential input into the MATOCs.
Disclaimer: This is an informational outreach event. This is not a solicitation for proposals and no contract shall be awarded from this notice.
PURPOSE OF EVENT
• Notecards are available at the registration table
• Write down your questions on the notecards and place them in the basket on the registration table.
• Questions that can be answered during this event will be addressed during the Q&A session
• All questions and answers will be provided on SAM.gov
QUESTION AND ANSWER SESSION
GENERAL CONSTRUCTION MATOC
GENERAL CONSTRUCTION MATOC DETAILS
Target Contractor Pool 5 to 7
Contractors
Ordering Period 5 Years
Program Capacity At Least $99M
Task Order Value Range $350k - $30M
(Approximate)
GENERAL CONSTRUCTION MATOC
SCOPE AND LOCATIONS
Construction Requirements Covers design-build and design-bid-build construction requirements for new facilities and real property repair, alterations, and maintenance.
Locations & Supported Agencies U.S. Department of War, other U.S. agencies operations, state and local governments in Puerto Rico and the US Virgin Islands.
GENERAL CONSTRUCTION MATOC
WORK CATEGORIES
Civil & Infrastructure Facilities & Trades
• Road pavement
• Airfield pavement
• Utilities installation
• Stormwater management
• Erosion control
• Excavation
• New facility construction
• Minor construction
• Plumbing & Mechanical
• Demolition
• Electrical & Structural
• Concrete work
Specialized Systems Power and Communication Systems and Related
Structures.
Environmental Environmental remedial work (hazardous waste abatement and disposal) and environmental compliance work.
Past Projects:
- Facilities Renovation Projects:
- PA Systems Upgrades
- Electrical Upgrades
- HVAC Upgrades
- Fire systems replacement
- Fitness Center Renovations
- New Facility Construction:
- Operations Building
- Barracks
- Fitness Center
- ERCIP Microgrid projects
TYPES OF PROJECTS THAT CAN BE EXPECTED
Potential Future Projects:
- U.S. Coast Guard – Waterfront
Improvements
- DoDEA Facilities – Renovation projects
- New Facility Construction:
- Training Center
- Entry Control Facilities
- Indoor Shooting Range
- Communication Compound
- Munition Storage Facilities
- Airfield Aprons
- Water and Sanitary Sewer Systems repairs
ACQUISITION TIMELINE
• Anticipated Milestones
• Advertisement – 4th Quarter FY26
• Award – 2nd Quarter FY27
WATER AND POWER INFRASTRUCTURE
MATOC
WATER AND POWER INFRASTRUCTURE MATOC
DETAILS
Target Contractor Pool 5 to 7
Contractors
Ordering Period 5 Years
Program Capacity At Least $200M
Task Order Value Range $1M - $100M
(Approximate)
WATER AND POWER INFRASTRUCTURE MATOC
SCOPE AND LOCATIONS
Covers design-build and design-bid-build construction, repair, rehabilitation, and modernization of heavy infrastructure.
Locations & Supported Agencies U.S. agencies operations, state and local governments in Puerto Rico.
Heavy Infrastructure Requirements
15WATER AND POWER INFRASTRUCTURE MATOC
WORK CATEGORIES
Dams & Reservoirs Water Pipelines & Transmission
• Repair and rehabilitation of Dam components
• Structural repairs of reservoir components
• Intake structure construction
• Large-diameter water transmission pipelines
• Pipe bridge construction
• Flood Control Pump Stations
Power Generation Distribution Networks
• Installation of large-scale emergency generators
• Gas Pipelines
• Rehabilitation of hydroelectric power plants
• Electrical substations
• Microgrids
• Critical utility distribution network modernization
16WATER AND POWER INFRASTRUCTURE MATOC
ASSOCIATED WORK CATEGORIES
Associated General Construction Environmental Services
• Earthwork and excavation operations
• Concrete works
• Demolition
• Environmental remediation
• Hazardous waste abatement
• Environmental compliance support
• Temporary cofferdam structures
• Other incidental construction
• Structural Steel Works
• Other Environmental Services
Potential Future Projects:
- Water Conveyance Structures
- Hydroelectric Repair & Retrofit
- Cofferdams
- Gates, valves and component repairs
- Repair/replace damaged pipelines, canals, penstocks and supports.
- Repair or replace electrical substations, power lines, and utility systems
ACQUISITION TIMELINE
Anticipated Milestones
Advertisement – 1st Quarter FY27 (October – December 2026)
Award – 3rd Quarter FY27 (April – June 2027)
CONTRACTING INFORMATION
• System for Award Management (SAM) - the Official U.S. Government System for contract opportunities. Every contract announcement is posted in the SAM.gov website.
To receive an award with us your firm must be registered in SAM.
• Federal Acquisition Regulations System (FAR 1.101) - is established for the codification and publication of uniform policies and procedures for acquisition by all executive agencies.
• The Federal Acquisition Regulations System - consists of the Federal Acquisition Regulation (FAR), which is the primary document, and agency acquisition regulations that implement or supplement the FAR.
https://www.acquisition.gov/browse/index/far
DOING BUSINESS WITH
USACE – LATIN AMERICAN & CARIBBEAN DISTRICT
http://www.sam.gov/ https://www.acquisition.gov/browse/index/far
Procurement Integrated Enterprise Environment (PIEE):
• The only authorized transmission method of proposals in response to the subject solicitation is electronically via the Procurement Integrated Enterprise Environment (PIEE) website. No other transmission methods, such as email, facsimile, hand-carried, proprietary or DOD SAFE submissions, proposals submitted by mail, etc. will be accepted. Offers submitted via any other transmission method other than the PIEE website will not be evaluated.
• The Offeror’s bid/proposal must be received by the Government no later than the date/time specified in the solicitation and cited above. Offerors shall submit their bid using the following link:
https://piee.eb.mil/
DOING BUSINESS WITH
USACE – LATIN AMERICAN & CARIBBEAN DISTRICT
https://piee.eb.mil/
• Solicitation Number: TBD
• Contract Type: MATOC; Firm Fixed Price
• Unrestricted
• North American Industry Classification System (NAICS) code:
236220 – Commercial and Institutional Building Construction 237990 – Other Heavy and Civil Engineering
• The Small Business Size Standard: $45.0 million.
• Current Range of Magnitude (DFARS 236.204): $350,000.00 - $200M
• Period of Performance: 5 years after issuance of Notice to Proceed (NTP)
• Subcontracting Plan is required from Other than Small Business Firms (FAR Part 19).
CONTRACT GENERAL INFORMATION
Competition will be promoted, and competitive acquisitions utilized in accordance with (IAW) Procedures established in FAR part 6.101.
FAR Part 15 – Request for Proposals (RFP). Best value obtained in negotiated acquisitions by using any one or a combination of source selection approaches, or
Other procedures established in the FAR or supplements pertinent to the requirement.
ACQUISITION APPROACH
FAR Part 15 – Contracting by Negotiation
Source Selection Approach:
• Tradeoff Process (FAR 15.103-1) - The Tradeoff approach to source selection is appropriate when it may be in the Government's best interest to consider award to other than the lowest priced offeror or other than the highest technically rated offeror.
Note: Solicitation will state the relative importance of all non-priced factors, and their combined relative importance as they relate to price.
Other Important References
• Defense Federal Acquisition Regulation Supplement
(DFARS)
• Army Federal Acquisition Regulation Supplement (AFARS) Part 5115.000
• DoD Source Selection Procedures
• Army Source Selection Supplement (AS3), Appendix AA
RESOURCES
Looking for Opportunities in All the Right Places
• Puerto Rico Federal Contracting Center is a division of the Puerto Rico Department of Commerce focused to assist local business sell their goods and services to the federal government.
https://www.federalcontractingpr.com
• Dynamic Small Business Search (DSBS) is a database where Small Business firms keep a profile current with bonding, past performance, and capabilities.
http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm https://www.federalcontractingpr.com/ http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm
OFFICE OF SMALL
BUSINESS PROGRAMS
MARIANO TORRES FELICIANO
CHIEF, OFFICE OF SMALL BUSINESS
PROGRAMS
USACE, CARIBBEAN DISTRICT
DATE: JULY 2026
Working Today to Build a Better Tomorrow
OFFICE OF SMALL BUSINESS PROGRAMS
MISSION: USACE Office of Small Business leads the organization to fully utilize small businesses, to deliver the USACE mission.
VISION: Expand the USACE Office of Small Business and community, Commit to add value to all projects and communicate outcomes & Maximize innovation to lead the small business program into the future.
29SMALL BUSINESS’ ROLES DURING THE
CONTRACTING PROCESS
Pre-Solicitation: Attend planning meeting as the requirement is developed. Once the projects is clearly defined, assist in market research to identify potential work for small businesses. After market research is completed, assist in developing the acquisition strategy.
Solicitation-Award: Asist in the development of the solicitation and source selection plan (if required).
Ensure the solicitation contains proper small business clauses required by the regulations and policies. During award, assist in evaluating bids or proposals and subcontracting plans. Also, take lead to resolve protests concerning small business related issues.
Post Award: Monitor the performance of small business contractors and evaluate how well large businesses comply with subcontracting requirements.
30SMALL BUSINESS GOALS
FY26
SOCIO ECONOMIC CATEGORY FY26 GOALS
SMALL BUSINESS 69.24%
SMALL DISADBANTAGED BUSINESS (SDB)
INCLUDING 8(a) SB DEVELOPMENT PROGRAM
12.40%
SERVICE DISABLE VETERAN OWNED SB (SDVOSB) 1.00%
WOMEN OWNED SB (WOSB) & ECONOMICALLY
DISADVANTAGED WOSB
0.57%
HUBZONE SMALL BUSINESSES 64.85%
SMALL BUSINESS PROPOSED
SUB-CONTRACTING PERCENTAGES
SOCIO ECONOMIC CATEGORY FY26
SMALL BUSINESS 13.00% - 31.00%
SMALL DISADBANTAGED BUSINESS (SDB)
INCLUDING 8(a) SB DEVELOPMENT PROGRAM
5.00% - 25.37%
SERVICE DISABLE VETERAN OWNED SB (SDVOSB) 0.50% - 2.59%
WOMEN OWNED SB (WOSB) & ECONOMICALLY
DISADVANTAGED WOSB
2.30% - 3.61%
HUBZONE SMALL BUSINESSES 1.00% - 5.00%
PROCUREMENT ASSISTANCE
SBA Resources
• Business Opportunity Specialist
• Procurement Center Representative
Marketing Resources
• Contract Opportunities on SAM.gov
• Contract Data on SAM.gov
• System for Award Management
• Dynamic Small Business Search System
• Subcontracting Networking System
(SubNet)
Other Resources
• USASpending
• GSA Subcontracting Directory
• DoD Prime Contracting Directory https://beta.sam.gov/ https://beta.sam.gov/ https://beta.sam.gov/ https://beta.sam.gov/ https://beta.sam.gov/ https://beta.sam.gov/ https://beta.sam.gov/ https://beta.sam.gov/ https://beta.sam.gov/ https://beta.sam.gov/ https://beta.sam.gov/ https://beta.sam.gov/ https://beta.sam.gov/ https://beta.sam.gov/ http://web.sba.gov/pro-net/search/dsp_dsbs.cfm http://web.sba.gov/pro-net/search/dsp_dsbs.cfm http://web.sba.gov/pro-net/search/dsp_dsbs.cfm http://web.sba.gov/pro-net/search/dsp_dsbs.cfm http://web.sba.gov/pro-net/search/dsp_dsbs.cfm http://web.sba.gov/pro-net/search/dsp_dsbs.cfm https://eweb1.sba.gov/subnet/client/dsp_Landing.cfm https://eweb1.sba.gov/subnet/client/dsp_Landing.cfm https://eweb1.sba.gov/subnet/client/dsp_Landing.cfm https://eweb1.sba.gov/subnet/client/dsp_Landing.cfm https://eweb1.sba.gov/subnet/client/dsp_Landing.cfm https://eweb1.sba.gov/subnet/client/dsp_Landing.cfm https://eweb1.sba.gov/subnet/client/dsp_Landing.cfm https://www.usaspending.gov/ https://www.usaspending.gov/ https://www.gsa.gov/small-business/find-and-pursue-government-contracts/seek-opportunities/subcontracting-directory-for-small-businesses https://www.gsa.gov/small-business/find-and-pursue-government-contracts/seek-opportunities/subcontracting-directory-for-small-businesses https://www.gsa.gov/small-business/find-and-pursue-government-contracts/seek-opportunities/subcontracting-directory-for-small-businesses https://www.gsa.gov/small-business/find-and-pursue-government-contracts/seek-opportunities/subcontracting-directory-for-small-businesses https://business.defense.gov/ https://business.defense.gov/ https://business.defense.gov/ https://business.defense.gov/ https://business.defense.gov/
CONTACT INFORMATION
Mariano Torres-Feliciano Chief Small Business Programs
USACE, Latin America & Caribbean District Fundación Angel Ramos, Annex Building
2nd Floor, Suite 202 383 Franklin D. Roosevelt Ave.
San Juan, PR 00918 Mobile: 787-220-0225
SB Email: saa-sb@usace.army.mil mailto:taskforcevipr-sb@usace.army.mil
QUESTIONS & ANSWERS
The floor is now open for your questions regarding the procurement, acquisition approach, and procedures for the General Construction
MATOC and Water & Power Infrastructure MATOC.
| OutReach Event�SAA Construction MATOCs �PR and USVI� |
| AGENDA |
| Purpose of Event |
| QUESTION and ANSWER SESSION |
| General Construction MATOC |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Types of Projects that can be expected |
| Types of Projects that can be expected |
| ACQUISITION TIMELINE |
| Water and power infrastructure MATOC |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Types of Projects that can be expected |
| ACQUISITION TIMELINE |
| Contracting information |
| Doing Business with �usace – LATin American & Caribbean district |
| Slide Number 21 |
| Contract General Information |
| Acquisition approach |
| ACQUISITION APPROACH |
| ACQUISITION APPROACH |
| resources |
| Office of Small Business Programs |
| Office of Small Business Programs |
| Small Business’ Roles During The Contracting process |
| SMALL BUSINESS GOALS�FY26 |
| SMALL BUSINESS Proposed�Sub-contracting percentages |
| PROCUREMENT ASSISTANCE |
| CONTACT INFORMATION |
| Slide Number 34 |
File details come from the government source that posted it. Updated .