This document outlines requirements for rigging services to move three x-ray systems at Crane Army Ammunition Activity in Crane, Indiana. A certified rigging contractor will provide equipment, materials, and personnel to disassemble, pack, protect, rig, move, and reassemble the x-ray systems. One system will be moved from Building 2167 to Building 3679, another will be delivered and installed in Building 2167, and a third will be moved from Building 165 to Building 3679. The contractor must have experience moving heavy machinery weighing approximately 30,000 pounds and complete the work by the target delivery date of September 28, 2023. The contractor will provide documentation including insurance, receipts confirming the moves, and assembly of the new system. Work will be monitored by the CAAA Responsible Level III and performed at the specified CAAA buildings in Crane, Indiana.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 02 - Pricing Sheet.xlsx | XLSX spreadsheet | |
| AMENDMENT 02.docx | DOCX document | |
| Attachment 08 DRAWING SHEET (3 PAGES).pdf | ||
| Attachment 07 NSI X5000 XRAY 450KV INSTALLATION GUJIDE.pdf | ||
| Attachment 05 FAR 52-212-3-Offeror-Representations-and-Certifications.pdf | ||
| Attachment 06 FAR 52-204-24 Full Text Provision Certification.pdf | ||
| Attachment 04 52-212-5-Contract-Terms-and-Conditions-.docx | DOCX document | |
| Attachment 03 15-4821 (1) Rev 24 dated 30JUN2023.pdf | ||
| Attachment 01 PWS dtd 15 Aug 23.docx | DOCX document | |
| Attachment 02 Pricing Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
MOVE X-RAY CABINETS
15 August 2023
Description of Requirement: Crane Army Ammunition Activity (CAAA), Crane, IN, has a requirement to move three x-ray systems:
1. BLDG 2167 NSI Conveyor X-ray system disassembly and move from BLDG 2167 to BLDG 3679 DRMO (approx. 6 miles);
2. New NSI X5000 X-ray system from delivery conveyance into location within BLDG 2167;
3. BLDG 165 X-ray system disassembly and move from BLDG 165 to BLDG 3679 DRMO (approx. 6 miles).
Efforts will include, but not limited to, disassembly to move equipment, rigging, crating, protecting equipment from damage during move, moving equipment, and re-assembly of equipment.
1. SCOPE
1.1 A certified rigging contractor will provide equipment, materials, and manpower for rough disassembly, packing, protecting, rigging, moving, unpacking, general assembly of x-ray equipment.
1.1.1 BLDG 2167 320 kV NSI Conveyor X-ray system disassembly and move from BLDG 2167 to BLDG 3679 DRMO (approx. 6 miles);
1.1.1.1 This task must be complete before moving the new x-ray system into BLDG 2167.
1.1.2 New NSI 450kV X5000 X-ray system from delivery conveyance into location within BLDG 2167;
1.1.2.1 The government will be the liaison to coordinate the moves.
1.1.2.2 Current target delivery date of new x-ray system is 28 SEP 2023.
1.1.2.3 The equipment will be delivered via a dedicated flat-bed, air-ride, Conestoga trailer. The system itself will be loaded directly onto the trailer, with two supporting crates.
1.1.2.4 Appendix A is the x-ray vendor’s customer installation guide.
1.1.3 BLDG 165 X-ray system disassembly and move from BLDG 165 to BLDG 3679 DRMO (approx. 6 miles).
1.2 Each piece of equipment weighs approximately 30,000 lbs.
2. REQUIRMENTS AND TASKS
2.1 REQUIREMENTS
| 2.1.1 | The rigging contractor must have functional knowledge of rigging equipment that weighs approximately 30,000 lbs. |
| 2.1.2 | The rigging contractor must have proven experience moving heavy machinery. |
2.1.3 Contractor must be able to provide the equipment, materials, and personnel to successful execute the task(s) by the required delivery date ETA 28 SEP 2023.
2.2 SPECIFIC TASKS
The rigging contractor shall provide the following general services:
2.2.1 Packing & Crating of machinery parts after disassembly by contractor.
2.2.2 Packing and crating materials.
2.2.3 Rigging the equipment for the moves.
2.2.4 Moving the machines and their accessory parts/pieces out of/ into B2167.
2.2.5 Uncrating of machinery parts (if necessary).
2.2.6 All work needs to be completed in accordance with applicable OSHA standards.
Crane Army Ammunition Activity shall provide the following General Services/Materials:
2.2.7 CAAA maintenance will disconnect power install all necessary power/utilities from the machines prior to the moving date so that the machines can be successfully moved/ installed by the contractor.
2.2.8 CAAA personnel will be the liaison coordination of the moves.
2.3 DOCUMENTATION
The rigging contractor shall provide the following documentation:
2.3.1 Insurance documentation to insure the X-Ray equipment valued at $1.5M each, ($3.0M).
2.3.2 Receipt stating that the old equipment was physically moved from BLDG 2167 and BLDG 165 to BLDG 3679 DRMO signed by CAAA Technical POC.
2.3.3 Receipt stating that the new equipment was physically moved into BLDG 2167 and assembled signed by CAAA Technical POC.
3.0 PLACE OF PERFORMANCE
Work shall be performed at the following locations:
Crane Army Ammunition Activity Building 2167, Building 165, and DRMO 300 Highway 361 Crane, IN 47522-5001
4.0 FACILITY ACCESS
4.1 The contractor will be granted access to the physical location(s) identified in section 3.0. The Contractor shall access the installation through the Visitors Center and the Crane Gate. The CAAA COR or other NDT personnel will escort contractor to the buildings where these machines are located. Contractor will provide transportation for personnel and equipment required to perform service.
4.2 Access shall be limited to the hours of 6:30 a.m. to 4:30 p.m. EST Monday-Thursday (excluding federal holidays) and Friday if requested in advance.
| 5.0 | DELIVERY SCHEDULE |
| Deliverable | |
| Deliverable due date ETA 28 SEP 2023 |
| Insurance information |
| Must be confirmed prior to award. |
| Disassemble machines |
| Work Coord. W/ POC |
| Move machines |
| Work Coord. W/POC |
| Assembly of machine |
| Work Coord. W/POC |
6.0 NOTICE REGARDING LATE DELIVERY
The Rigging Services are required and contingent on delivery of Equipment on/about 28SEP.
Therefore, Services are required in order not to disrupt current delivery schedules affected.
7.0 QUALITY ASSURANCE AND MONITORING OF WORK DELIVERABLES
5.1 All work under this contract shall be monitored by the CAAA Responsible Level III listed in section 10 below, who will act as the primary technical representatives for the government. Final inspection and acceptance of all work performed shall be performed at the place of re-assembly by the CAAA Technical POC. The CAAA Technical POC will communicate this information/acceptance to the Contracting Officer Representative (COR) via email.
8.0 PERSONNEL
8.1 Contractor is responsible for providing personnel with the necessary level of expertise to support the activities and requirements of this SOW. Contractor shall provide a single point of contact that shall serve as the project manager for the life of the contract. Contractor personnel are required to follow all OSHA regulations and the EM 385-1-1, Safety and Health Requirements Manual.
9.0 SECURITY CONSIDERATIONS
9.1 Access and general protection policy and procedures: Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements (CFR clause 52.204-9, Personal Identity Verification of Contract Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
9.2 Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (Army Directive 2014-05/AR 190-13); applicable installation, facility and area commander installation and facility access and local security policies and procedures (provided by Government representative); or, at OCONUS locations, in accordance with status-of-forces agreements and other theater regulations.
10.0 POINTS OF CONTACT
CAAA RL3 Technical POC Dustin Kern (812)-854-3067 dustin.m.kern.civ@army.mil Contracting Officer Representative (COR) Joseph Conner
(812) 854-1618 joseph.r.conner10.civ@army.mil
Contracting Office Rachel Eaggleston U.S. Army Contracting Command - Rock Island Installation Support Contracting Branch, CCRI-AIGC Rachel.J.Eaggleston.civ@army.mil
APPENDIX A: New NSI X5000 X-ray System Installation Guide
Installation shall be in accordance with F455B-Customer Installation Guide – X500 450 and X5000-2020 450kV SYSTEM.SLDDRW
F455B - Customer Installation Guide - X5000 450.pdf
North Star Imaging X5000 / 450kV
Installation Guide
2 North Star Imaging
F455B – X5000 / 450kV Installation Guide 3
Contents Requirements for the operation of an X-ray System
Safety
Shipping
Equipment Considerations
Packaging
Domestic X5000 / 450kV
Domestic X5000 450kV Modular
Domestic X5000 450kV Modular - Continued
International X5000 / 450kV
Standard Cabinet In-Plant Transport
Foundation and Floor Load
Standard System Leveling Feet
Seismic System Leveling Feet
Uncrating Materials
Standard Cabinet
Modular Cabinet
Modular Installation Tooling and Equipment
Modular Installation Process
Electrical Requirements
Workstation Requirements
Environmental conditions for operation
System Heat Load
Support
4 North Star Imaging
North Star Imaging manufactures turn-key industrial 2D & 3D Digital Radiography & Computed Tomography X-ray equipment which is used for R&D, Failure Analysis, Quality Control, Internal Measurements, High-Speed 3D Scanning, 3D Metrology & more. X-ray scanning allows users to inspect the external & internal structures of a part without destroying it.
NSI also offers as-needed X-ray Inspection Services at 6 global sites in Minnesota, California, Massachusetts, Florida, UK, and China and, 24/7 Technical Service and Basic & Advanced NDT classroom and online trainings all year round.
NSI is certified for ISO 9001:2015 QMS and ISO 14001:2015 EMS. Learn more: www.4nsi.com
F455B – X5000 / 450kV Installation Guide 5
Requirements for the operation of an X-ray System NSI cabinet systems are manufactured in accordance with 21 CFR 1020.40 which regulates the certification and requirements of cabinet X-ray systems. NSI system shielding is based on proven designs with more than 30 years of field experience. We inspect 100% of the products we produce to ensure the requirements of 21 CFR 1020.40 are achieved. The federal regulation states maximum radiation leakage allowed is 0.5mr/hr. at 5 cm from the surface of the cabinet.
The certification of the system is represented in the tag that is affixed to the radiation enclosure as indicated in the federal regulation. The language in the federal regulation regarding certification is as follows:
“The certification shall be in the form of a label or tag permanently affixed to, or inscribed on such product, so as to be legible and readily accessible to view when the product is fully assembled for use, unless the applicable standard prescribes some other manner of certification. All such labels or tags shall be in the English language.”
Typically, an X-ray system must be registered with the appropriate state agency. This registration must occur prior to the X-ray system being placed into service. Regulations may require initial and periodic inspections by a government agency or a qualified vendor. In addition, the regulations may require the implementation of standardized operating procedures, specialized training, and posting of radiation exposure warnings and other special notices.
Radiation safety requirements differ significantly from one jurisdiction to another. It is the users' responsibility to ensure the X-ray system is installed and operated in compliance with all applicable governmental regulations. Failure to comply may result in substantial penalties.
Safety The unloading and transport of NSI systems shall be completed by personnel trained and authorized to safely operate the equipment being used. Lifting equipment must be designed to accommodate the size and weight of the transported material. All equipment must be in proper working order and checked in accordance with the applicable standards and directives. NSI is not responsible for damage caused during the offloading or handling of equipment.
Shipping NSI X-ray systems are delivered on dedicated, flat-bed, air-ride, Conestoga style trailers.
Equipment Considerations System weight and lifting height must be used to properly determine the weight capacity requirements of the equipment being used to remove material from the trailer.
6 North Star Imaging
Packaging NSI systems are packaged and delivered in accordance with internal requirements.
Standard domestic shipments are packaged in the following manner:
NSI radiation enclosures are wrapped in polyethylene sheeting to provide some protection from the elements. Shipping channels are affixed to the roof of the enclosure to provide strapping locations for transport. Additionally, 4 swivel hoist rings are provided on the base of the cabinet to provide locations to secure the load.
Two additional wooden crates contain the various system components required. These components are wrapped in VCI poly sheeting to provide moisture protection. The crates are then sealed with a low-density polyethylene material to provide additional moisture resistance and protection.
Upon delivery, the radiation enclosure and system crates should be stored in closed, dry rooms with temperatures between 40 and 104°F (5 to 40°C).
Domestic X5000 / 450kV
Contents Packaging Length Width Height Gross Weight
Radiation Enclosure Pallet 118” 80” 98” 30,500 lbs.
Desk Crate 91” 72” 73” 2,000 lbs.
X-Ray Crate 91” 72” 59” 2,500 lbs.
Actual sizes and weights may vary.
F455B – X5000 / 450kV Installation Guide 7
Modular domestic shipments are packaged in the following manner:
The cabinet radiation enclosure panels are placed and secured onto wooden skids then wrapped in polyethylene sheeting to provide some protection from the elements.
Nine additional wooden crates contain the various system components required. These components are wrapped in VCI poly sheeting to provide moisture protection. The crates are then sealed with a low-density polyethylene material to provide additional moisture resistance and protection.
Upon delivery, the system crates should be stored in closed, dry rooms with temperatures between 40 and 104°F (5 to 40°C).
Domestic X5000 450kV Modular
Desk Crate 91” 72” 73” 2,000 lbs.
X-Ray Crate 91” 72” 74” 2,500 lbs.
Electrical Panel Crate 83” 70” 29” 1,200 lbs.
Electrical Cabinet
Crate 93” 38” 31” 1,500 lbs.
Exterior Skins Crate 96” 60” 29” 1,500 lbs.
Manipulator Base
Crate 141” 68” 43” 2,500 lbs.
Tower
Crate 113” 68” 43” 1,500 lbs.
Tower
Crate 115” 68” 43” 1,500 lbs.
Door Rail / Misc. Crate 109” 31” 28” 1,000 lbs.
Walls Skid 96” 38” 31” 3,000 lbs.
Walls Skid 96” 38” 31” 3,250 lbs.
Walls Skid 96” 38” 31” 4,000 lbs.
Walls Skid 96” 38” 31” 4,250 lbs.
Actual crate quantity, sizes, and weights may vary.
8 North Star Imaging
Domestic X5000 450kV Modular - Continued
Walls Skid 96” 38” 31” 5,250 lbs.
Corners Skid 93” 38” 31” 3,000 lbs.
Door Skid 99” 41” 30” 1,500 lbs.
Roof Skid 96” 44” 22” 4,000 lbs.
Base Skid 96” 44” 25” 3,500 lbs.
International shipments are packaged in the following manner:
NSI radiation enclosures are wrapped in aluminum coated foil, packaged with desiccant, and sealed to provide moisture protection. Shipping channels are affixed to the roof of the enclosure to provide strapping locations for transport. The sealed radiation enclosure is packaged in a wooden shipping crate in conformance with IPPC/ISPM 15 standards. The crate is sealed with a reinforced low-density polyethylene material to provide additional moisture resistance and protection.
Two additional wooden crates contain the various system components required. These components are wrapped in aluminum coated foil, packaged with desiccant, and sealed to provide moisture protection. The crates are then sealed with a reinforced low-density polyethylene material to provide additional moisture resistance and protection.
Upon delivery, the radiation enclosure and system crates should be stored in closed, dry rooms with temperatures between 40 and 104°F (5 to 40°C).
International X5000 / 450kV
Contents Packaging Length Width Height Net Weight Gross Weight
Radiation Enclosure Crate 144” 94” 119” 30,000 lbs. 33,500 lbs.
Desk Crate 91” 72” 73” 1,500 lbs. 2,000 lbs.
X-Ray Crate 91” 72” 59” 2,000 lbs. 2,500 lbs.
Actual sizes and weights may vary.
F455B – X5000 / 450kV Installation Guide 9
Standard Cabinet In-Plant Transport Sufficient floor and ceiling load capacity of the transport routes must be verified prior to moving material. Transport routes must be designed to accommodate the weight of the transported material and transportation equipment.
NSI systems are designed to be lifted only from the base of the enclosure, any other lifting methods may cause damage. NSI is not responsible for damage caused during the offloading or handling of equipment. See Figures 1 and 2 for lifting instructions.
Following movement of the radiation enclosure to the final location, the system’s leveling feet must be installed prior to placement on the ground. The six leveling feet must be installed as shown in Figure 3. Leveling of the cabinet should be completed by the customer during radiation enclosure placement. A contractor grade construction level, 2ft - 4ft in length, should be used in the X (front to back) and Z (left to right) planes to ensure the system is level. Ensure that all mounting feet are in contact with the floor and equal pressure has been applied to each foot.
For systems requiring seismic isolation feet, installation of the concrete anchors must be completed by the customer, see Fig. 4 for details. To determine layout requirements, see provided system specification drawings.
Figure 1 – Lifting should only be completed by areas marked in red.
10 North Star Imaging
Figure 2 – Lifting should only be completed by areas marked in red.
Figure 3 – Distance from base of leveling foot (red) to base of cabinet (green) should be approximately 4”.
F455B – X5000 / 450kV Installation Guide 11
Figure 4 – Orientation of Seismic Feet as shown is required. Anchors may be installed after cabinet is placed in final location.
Foundation and Floor Load The specified surface pressure indicates the maximum load applied to the floor covering. This value must not be used to calculate the permissible floor or ceiling load. The load conditions at the installation sites vary individually and must be clarified and/or calculated by a structural engineer before installation of the NSI system.
Standard System Leveling Feet Mean surface pressure on the 8 support surfaces is approximately 300 PSI, determined from the NSI system weight distributed over the 8 support surfaces.
Seismic System Leveling Feet Mean surface pressure on the 8 support surfaces is approximately 30 PSI, determined from the NSI system weight distributed over the 8 support surfaces. For specific installation instructions, see provided seismic feet drawings.
12 North Star Imaging
Uncrating Materials Standard Cabinet Supporting material crates may be unpackaged, and materials moved to the installation site by the customer. Care should be taken to ensure damage does not occur. Any damage incurred must be immediately communicated to your NSI Project Manager. Disposal of packaging materials and crating is the customer’s responsibility.
Modular Cabinet NSI will uncrate all materials for the installation of the system. Disposal of packaging materials and crating is the customer’s responsibility. Appropriate means of refuse disposal must be supplied while NSI is onsite for installation. Wooden skids and crates contain metal hardware (i.e. lag bolts, metal banding, staples) and may not be accepted by all recycling services.
Modular Installation Tooling and Equipment NSI typically supplies tooling and equipment necessary for the installation of the X5000 modular system. Installation tooling and equipment will be shipped to the site at the commencement of the installation process. Upon installation completion, all NSI equipment and tooling will be shipped back to NSI – Rogers on a dedicated, flat-bed, air-ride, Conestoga style trailer.
Installation Tooling and Equipment
Crate Description Packaging Length Width Height Gross Weight
Rigging Box Skid 55” 36” 51” 900 lbs.
StorageMaster Skid 81” 38” 60” 1,050 lbs.
Tool Chest Crate 77” 42” 83” 1,650 lbs.
Cart and Boom Skid 103” 48” 51” 3,600 lbs.
A-Frame Crate 149” 41” 41” 1,500 lbs.
A-Frame Attachments Crate 144” 39” 41” 1,350 lbs.
Additional equipment necessary for the installation includes a 6,000 lbs. capacity warehouse-style forklift with a minimum of 6’ forks. NSI will need access to the forklift throughout the duration of the installation week. Our entire installation team is forklift certified through a 3rd party agency and can provide proof of certification upon request.
F455B – X5000 / 450kV Installation Guide 13
Modular Installation Process Upon arrival at the site our trained technicians will begin the installation process. A sizeable offload and staging area are required for staging and removal of each component from the transport trucks. Our team requires a free and clear path to the installation location from the staging area. Each component of the assembly will be transported to the final location with the use of a heavy-duty moving cart, as required. Our installation technicians will utilize an A-frame style gantry crane to assemble the cabinet and manipulator in the final location.
The cabinet and manipulator assembly will typically be completed in two days onsite; at which point the electrical provisions will be required, reference “Electrical Requirements” on page 13 for more information.
Electrical Requirements Category Value Line Voltage 230 VAC (L1/N/G) or 240 VAC (L1/L2/G) Frequency 50/60 Hz Current Type Single Phase – L1/N/Ground or L1/L2/Ground Required Fuse 60 Amps Total Amps (FLA) 48 Amps
Due to high leakage current created by operation of the X-ray source, an additional 6 AWG dedicated ground (to structural steel or earth ground) must be supplied to the high voltage generator.
The 60 Amp disconnect shall be placed within 15 feet of the system main electrical cabinet. The power cable/wire will be supplied by and landed in the main electrical cabinet by the customer.
Rigid conduit may also be attached to the cabinet for routing of power and ground wires.
Electrical work shall be performed by a qualified electrician in accordance with state and local code. NSI is not responsible for damage caused by improper wiring.
Continuous power is essential for quality data processing. Other systems with permanent high-power consumption and systems with peak loads should not be connected to the same electrical circuit as the NSI X-ray system. This avoids malfunctions on the NSI X-ray system.
Workstation Requirements NSI provides provisions for power to the acquisition PC to be placed at the supplied ergo desk.
Additional PCs (reconstruction, review, data storage devices, etc.) shall be placed at a location provided by the customer with the required power provisions available.
Additionally, it is the customer’s responsibility to provide means of data transfer between NSI system PCs. This can be accomplished through interfacing with an existing network or direct connection between PCs. NSI system components are networked during start-up by an NSI installation technician in accordance with the applicable specifications and must not be modified by the customer. Any change may lead to connection problems.
An internet connection is not required for NSI system use but is beneficial where available.
14 North Star Imaging
Environmental conditions for operation The following conditions must be met to ensure proper operation of the NSI X-ray system.
Permissible environmental temperature 50-95°F (10-35°C) Permissible humidity (without condensation) 40-70%
System Heat Load
Configuration Total Watts Total BTU/HR 450kV source with DDA 1170 3,990 225kV and 450kV source with DDA 1370 4,675 225kV and 450kV source with DDA and LDA 1380 4,710
Actual output depends on system usage.
Support For additional information, contact your NSI Project Manager.
F455B – X5000 / 450kV Installation Guide 15
Revision History
Revision Effective Date Description of Changes
A 1/10/2022 Initial release – Mike Vojacek author
B 4/13/2023 Renamed document, added modular crating and installation information, revised electrical requirements -Nate Coffin image2.emf
X5000-2020 450kV SYSTEM.SLDDRW.pdf
DOOR
OPENING
DOOR
OPENING
B
POWER REQUIREMENTS 230/240 VAC,
60 AMP, SINGLE PHASE, 50/60Hz DISCONNECT W/IN 15 FEET [4.5 m]
DEDICATED GROUND ROD OR
EQUIVALENT
SERVICE
AREA
REQUIRED
EXAMPLE PLACEMENT ONLY -
ACTUAL PLACEMENT DEPENDENT
ONLY ON CABLE LENGTH NOTED.
CABLE ENTRY POINT
CABLE LENGTH:
10 METERS
FROM ENTRY
POINT
TOUCH SCREEN
EMERGENCY STOP
ERGO CHAIR
MODELS CAN VARY
SEE QUOTATION FOR
OPTIONS ON MONITORS/ERGO
DESK AND ERGO CHAIR
X5500 SHOWN2
NOTE:
NOTED ITEMS MAY NOT BE REQUIRED - (SHOWN IS A DUAL SOURCE SYSTEM)1.
X5500 SYSTEM INCLUDES: ELECTRICAL CABINET (60x13 in) REQUIRING 60x36 in 2.
SERVICE AREA, HMI, 450 I/O BOX, ONE ACCESS DOOR MOTION SAFETY
SWITCH, PREWARN MODULE ~ 3 M (10 FT.) FROM MANIPULATOR; CABLE
LENGTH FROM MANIPULATOR TO ELECTRICAL CABINET ~ 6 FT. [1.83 m]
CABLE LENGTHS APPROX 5 METERS FROM ENTRANCE POINT3.
DIMENSIONS FOR LAYOUT ARE APPROXIMATE ONLY SHOWN IS A MINIMUM 4.
"SPACE LAYOUT"
DIMENSIONS SHOWN WITH [ ] ARE IN MILLIMETERS5.
WEIGHT OF CABINET WITH MANIPULATOR:
APPROX 27500 - 30200 lb (12500-13700 kg.)
WEIGHT OF MANIPULATOR:
APPROX 3000 - 4200 lb (1360 - 1900 kg.)
REVISIONS
REV. DESCRIPTION DATE ENG
A ECO# 162085, INITIAL RELEASE 06-15-2020 GMT
B ECO# 162222, INITIAL RELEASE 08-31-2021 GMT
X5000 450kV SYSTEM- SPECIFICATIONS
THE INFORMATION CONTAINED HEREIN IS
PROPREITARY TO NORTH STAR IMAGING, INC.
AND SHALL NOT BE REPRODUCED OR
DISCLOSED IN WHOLE OR IN PART, NOR USED
FOR ANY DESIGN OR MANUFACTURING
PURPOSES UNLESS AUTHORIZED IN WRITING
BY NORTH STAR IMAGING, INC.
(763) 463-5650
(800) 635-8392
(763) 463-5651
SURFACE ROUGHNESS
UNLESS OTHERWISE
SPECIFIED REMOVE ALL
BURRS AND BREAK SHARP
EDGES .02 MAX.
ALL DIMENSIONING AND
TOLERANCING IN
ACCORDANCE WITH LATEST
ANSI Y14.5 STANDARD
ANGULAR ±1°
.X ±.020 .XXX ± .005
.XX ± .010 .XXXX ± .0005
TOLERANCES
ALL DIMENSIONS ARE IN INCHES
UNLESS OTHERWISE SPECIFIED
05-20-2020
MATERIAL:
FINISH:
Material <not specified>
DESIGNER:
N. Wilson
DO NOT SCALE DRAWING
THIRD ANGLE
PROJECTION
DATE:
PROPRIETARY AND CONFIDENTIAL
DECIMAL
SCALE: 1:36
SIZE DWG. NO.
REV.
SHEET 1 OF 3WEIGHT:
TITLE
19875 S. DIAMOND LAKE ROAD
ROGERS, MINNESOTA 55374
PHONE:
TOLL FREE:
FAX:
WWW.4NSI.COM
X5000-2020 450kV SYSTEM 33386.22220
MAX. VIRTUAL
DETECTOR WIDTH
MAX. VIRTUAL
DETECTOR HEIGHT
DEFINITION OF COORDINATE AXES
TURNTABLE (9 INCH [228] SHOWN)
CONTINUOUS ROTATION
X AXIS
Z AXIS
Y AXIS
93.9
+20°
-20°
MAX. TURNTABLE TRAVEL
MAX. FOCAL DISTANCE
11.8
INTERNAL
TABLE
TRAVEL
23.4
TURNTABLE TRAVEL
EXTENDS TO DOORWAY
FOR PART LOADING
NOTES:
MAXIMUM TURNTABLE TRAVEL DISTANCES ARE WITH THE 1.
TURNTABLE BELOW THE X-RAY SOURCE AND DETECTOR.
ALL TRAVEL DISTANCES DEPEND ON CONFIGURATION 2.
OF SOURCE AND DETECTOR. SEE "X5000 SCANNING
ENVELOPE" FOR DETAILS.
05-20-2020
SCALE: 1:20
SHEET 2 OF 3WEIGHT:
PHONE:
TOLL FREE:
MIN
MINO
PT
IO
N
A
OPTION B
O
PT
IO
N
C
NOTES:
CEILING HEIGHT MINIMUM = 108 IN1
DOOR WIDTH MINIMUM = 30 INCHES 2.
(MUST BE LOCATED IN ONE OF THE
LOCATIONS SHOWN: OPTIONS A, B, C)
ELEVATOR OR PASSAGE WAY MUST FIT 3.
RIGGING BEAM = 12 FT X 4 IN X 4 IN
MINIMUM MODULAR SPACE REQUIREMENTS
06-12-2020
SCALE: 1:20
SHEET 3 OF 3WEIGHT:
PHONE:
TOLL FREE:
Sheet1
Drawing View2
Drawing View3
Drawing View6
Drawing View12
Sheet2
Drawing View7
Drawing View8
Drawing View9
Sheet3
Drawing View10
Drawing View11 image1.emf
File details come from the government source that posted it. Updated .