SOW RED HORSE Wifi Rev1 22Aug23.docx
DOCX document 88 KB Posted
- Attached to
- Commercial Wifi
- Solicitation number
- W50S9B23Q0026
- Issued by
-
Department of the Army National Guard
About this file
This statement of work outlines requirements for a commercial WiFi project at a Virginia Air National Guard facility. The contractor will provide WiFi access points, dedicated internet backhaul, and maintenance for 12 months at Building 203 on the 203rd Horse Drive site in Virginia Beach, VA. The project objectives are to enable WiFi coverage throughout the building. The contractor must install approximately six access points using the existing fiber optic entry point in Room 153, placing new equipment in Room 137. Equipment must support speeds up to 1,000 Mbps download and upload. The contractor will deliver as-built drawings, a project CD, owner's manuals, and warranties upon completion within 21 days of notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B203 Floorplan.pdf | ||
| Question and Answers 1.docx | DOCX document | |
| Information Sheet.pdf | ||
| W50S9B23Q0026 RFQ Commercial Wifi.docx | DOCX document | |
| SOW RED HORSE Wifi.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VIRGINIA AIR NATIONAL GUARD
192d CIVIL ENGINEER FLIGHT
165 SWEENEY BLVD BLDG.768
JOINT-BASE LANGLEY-EUSTIS, VA 23665
STATEMENT OF WORK
RED HORSE Commercial Wifi
DATE: 22 August 2023
FOR
UNITED STATES PROPERTY AND FISCAL OFFICES
VIRGINIA AIR NATIONAL GUARD
HAMPTON, VA 23665
TABLE OF CONTENTS
SECTION PAGE
1. GENERAL INFORMATION
1.1 CUSTOMER
1.2 LOCATION
1.3 PROJECT OBJECTIVES
1.4 WORK HOURS
1.5 PERIOD OF PERFORMANCE
1.6 POCs
2. SCOPE OF WORK
2.1 DIMENSIONS AND REQUIREMENTS
3. DELIBVERABLES
3.1 AS BUILTS
3.2 DRAWINGS/PROJECT CDs
3.3 OWNERS MANUALS
3.4 WARRANTIES
1. GENERAL INFORMATION
1.1 CUSTOMER
203 Red Horse Squadron
1.2 LOCATION
203 Red Horse Squadron Building 203 203d Horse Drive Virginia Beach, VA 23451
1.3 PROJECT OBJECTIVES
The purpose of this project is to provide commercial WIFI, access points, and optical dedicated internet backhaul to Building 203 for 12 months.
1.4 WORK HOURS
Work hours are Tuesday through Friday 0700-1645
1.5 PERIOD OF PERFORMANCE
21 days from NTP Period of Performance may be adjusted for material procurement lead times.
1.6 POCs
Contracting Officer: SMSgt Santos Desiree Contracting Officer’s Representative: Capt. Oscar Alonso
2. SCOPE OF WORK
The work herein includes the furnishing of all materials and equipment and performing all labor for the work indicated per statement of work listed below. All work shall conform to those standards stipulated in the applicable industry codes in the local jurisdiction. Any deviation from the manufacturer installation requirements must be approved prior. All stated quantities are approximate, contractor required to field verify.
2.1 DIMENSIONS AND REQUIREMENTS
Quantity and Dimensions are approximate- contractor to field verify. Contractor to provide Wi-Fi in building 203 of the RED HORSE compound, State Military Reservation, Virginia Beach, VA. Scope includes 12 months of Wi-Fi services, plus 4 option years. Contractor must provide the necessary infrastructure and an approximate 6 Access points throughout Building 203, enough to provide Wi-Fi to the entire building. Existing fiber optic infrastructure enter building 203 at room 153. There is a dedicated AC circuit and UPS surge protector/battery backup provided by customer.
New modem, router and support equipment to be located in room 137. Router switch must have at least 2 open fiber optic ports for future extension of Wi-Fi service to other facilities. Speeds must be capable of up to 1000 Mbps download and 1000 Mbps upload. Contractor to provide optical dedicated internet backhaul, as required. Satellite internet is not acceptable. Contractor must provide software updates, troubleshooting, and general maintenance to equipment as needed for optimal performance.
3. DELIVERABLES
3.1 AS BUILTS
3.1.1 STAND ALONE DRAWING SHEETS WITH NO EXTERNAL REFERENCE FILES.
3.1.2 DWG AND PDF FORMATS
3.2 DRAWINGS/PROJECT CDs
3.3 OWNERS MANUAL
3.4 WARRANTIES
4. ANTITERRORISM/OPERATIONS SECURITY/INFORMATION PROTECTION
4.1 The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
4.2 Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 10-245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
4.3 All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities, and controlled access areas shall complete Antiterrorism (AT) Level I training within 7 calendar days after contract start date. AT Level I training may be accomplished via Joint Knowledge Online at https://jko.jten.mil/. Tracking for each contractor employee is the responsibility of the COR.
5. CONTRACTOR MANPOWER REPORTING (CMR)
5.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract utilizing a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://www.sam.gov. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.