20Q0033 LMR Site Visit Slide Show.pdf
PDF 755 KB Posted
- Attached to
- INSTALLATION OF CONVENTIONAL RADIO SYSTEM
- Solicitation number
- W50S97-20-Q-0033
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA_2 W50S97-20-Q-0033.pdf | ||
| PWS_2_CONVENTIONAL RADIO SYSTEM.pdf | ||
| 20Q0033 Site Visit signin sheet.pdf | ||
| QA_1 W50S97-20-Q-0033.pdf | ||
| QASP LMR Repeater.pdf | ||
| PWS CONVENTIONAL RADIO SYSTEM.pdf | ||
| Wage Determination No 2015-4648_06-28-2020.pdf | ||
| Quote Sheet W50S97-20-Q-0033.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
118 COMM FLT
CONVENTIONAL RADIO SYSTEM
W50S97-20-Q-0033/ SITE VISIT
1ST LT GREG ALLEN
CONTRACTING OFFICER
Key Personnel
• Contract Officer: Greg Allen
• Contract Specialist: Jonathan Forren
• Customer: Randy Neblett
Scope
• The Contractor shall provide the personnel, management, and materials necessary to complete installation of conventional radio system
• Must adhere to the PWS
Scope
• Contractor will accomplish the work within the period of performance through the following integrated/synchronized efforts to include:
• Analyzing, designing, engineering, procuring, integrating, pre-staging prior to transport to the site
• Installing, testing, user training, warranting, and ensuring quality workmanship throughout the process and inspection of the room
• Execute a controlled, systematic, coordinated and integrated procedure and process that addresses approved requirements
• Procure all Commercial-Off-The Shelf (COTS) equipment, accessories, parts, pre-molded factory-terminated cables
Background
• In 2019 the existing LMR repeater system failed and was removed from service
• There are multiple dead spots on and around Berry Field ANGB due to low lying areas and obstacles
• Existing Motorola XTS2500s are being replaced with 2 different models of Land Mobile Radio. Harris XL-200s and Motorola APX7000 series handhelds (This includes the applicable base stations and mobiles)
• Equipment will need to be multi-band (operating frequencies are VHF and UHF). Additionally, channels will utilize encryption
• Equipment will be installed in Building 736. This building allows for sufficient transmission and reception to ensure proper radio coverage.
Performance Work Statement (PWS)
• Customer will cover the PWS
– All work must be in accordance with PWS
– Task and Deliverables
– Quality Control
– Schedule
Quote Evaluation
• Quotes will be evaluated on Lowest Price Technically Acceptable (LPTA)
– Technical will be evaluated first
– Price will be evaluated second
– Will Be evaluated on an all or none basis
Key Dates
• Site Visit:
– 26 August 2020 at 9:00am CST to gregory.allen.8@us.af.mil
• Questions Submitted:
– 1 September 2020 at 9:00am CST to gregory.allen.8@us.af.mil
• Quotes due:
– 10 September 2020 9:00AM CST to gregory.allen.8@us.af.mil mailto:gregory.allen.8@us.af.mil mailto:gregory.allen.8@us.af.mil mailto:gregory.allen.8@us.af.mil
Questions
ANY QUESTIONS
File details come from the government source that posted it. Updated .