INSTALLATION OF CONVENTIONAL RADIO SYSTEM
Solicitation number
W50S97-20-Q-0033
Issued by

View the file

Other files

File Type Posted
QA_2 W50S97-20-Q-0033.pdf PDF
PWS_2_CONVENTIONAL RADIO SYSTEM.pdf PDF
20Q0033 Site Visit signin sheet.pdf PDF
QA_1 W50S97-20-Q-0033.pdf PDF
QASP LMR Repeater.pdf PDF
PWS CONVENTIONAL RADIO SYSTEM.pdf PDF
Wage Determination No 2015-4648_06-28-2020.pdf PDF
Quote Sheet W50S97-20-Q-0033.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

118 COMM FLT

CONVENTIONAL RADIO SYSTEM

W50S97-20-Q-0033/ SITE VISIT

1ST LT GREG ALLEN

CONTRACTING OFFICER

Key Personnel

• Contract Officer: Greg Allen

• Contract Specialist: Jonathan Forren

• Customer: Randy Neblett

Scope

• The Contractor shall provide the personnel, management, and materials necessary to complete installation of conventional radio system

• Must adhere to the PWS

Scope

• Contractor will accomplish the work within the period of performance through the following integrated/synchronized efforts to include:

• Analyzing, designing, engineering, procuring, integrating, pre-staging prior to transport to the site

• Installing, testing, user training, warranting, and ensuring quality workmanship throughout the process and inspection of the room

• Execute a controlled, systematic, coordinated and integrated procedure and process that addresses approved requirements

• Procure all Commercial-Off-The Shelf (COTS) equipment, accessories, parts, pre-molded factory-terminated cables

Background

• In 2019 the existing LMR repeater system failed and was removed from service

• There are multiple dead spots on and around Berry Field ANGB due to low lying areas and obstacles

• Existing Motorola XTS2500s are being replaced with 2 different models of Land Mobile Radio. Harris XL-200s and Motorola APX7000 series handhelds (This includes the applicable base stations and mobiles)

• Equipment will need to be multi-band (operating frequencies are VHF and UHF). Additionally, channels will utilize encryption

• Equipment will be installed in Building 736. This building allows for sufficient transmission and reception to ensure proper radio coverage.

Performance Work Statement (PWS)

• Customer will cover the PWS

– All work must be in accordance with PWS

– Task and Deliverables

– Quality Control

– Schedule

Quote Evaluation

• Quotes will be evaluated on Lowest Price Technically Acceptable (LPTA)

– Technical will be evaluated first

– Price will be evaluated second

– Will Be evaluated on an all or none basis

Key Dates

• Site Visit:

– 26 August 2020 at 9:00am CST to gregory.allen.8@us.af.mil

• Questions Submitted:

– 1 September 2020 at 9:00am CST to gregory.allen.8@us.af.mil

• Quotes due:

– 10 September 2020 9:00AM CST to gregory.allen.8@us.af.mil mailto:gregory.allen.8@us.af.mil mailto:gregory.allen.8@us.af.mil mailto:gregory.allen.8@us.af.mil

Questions

ANY QUESTIONS