B 01 Attachment 2 Flameholder Repair PWS.docx
DOCX document 13 KB Posted
- Attached to
- Flameholder BPA COMBO
- Solicitation number
- W50S8Y-20-Q-5003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B 01 Attachment 3 WD.pdf | ||
| B 01 COMBO.docx | DOCX document | |
| B 01 Attachment 1 BPA Terms and Conditions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
DESCRIPTION: The purpose of this BPA is for the servicing of flameholders for the F-15 aircraft on the Portland Air National Guard Base. Specifically, this requirement is for the repair of F-15/F-16 PW-220 flameholders, NSN 2840- 01-326-4066. Flameholders will be shipped out from the Portland Air National Guard Base and serviced per T.O. 2J‐F100‐46‐5 (SWP 523 02) at the contractor’s location. Flameholders will then be shipped back to the Portland Air National Guard Base in serviceable condition within 60 days of the ship out date. If the contractor determines that a flameholder cannot be repaired, it shall be returned at no cost to the government.
Applicable Document and References:
- T.O. 2J-F100-46-5, WP523 02
- ISO 9001 Compliant Quality Control Manual
- T.O. 2-1-111 and T.O. 2J-F100-46-1
- AFI 21-123
***CONCTRACOR SHALL POSSES A CURRENT SOURCE APPROVAL LETTER FROM AFREP FROM THE AIR FORCE REPAIR ENHANCEMENT PROGRAM***
***ALL SHIPPING COST MUST BE INCLUDED IN EACH LINE ITEM PRICE WITH
FINAL QUOTE. SEE ADDRESS BELOW. ***
The shipping address is as follows:
142 MXG
6801 NE Cornfoot Rd Portland, Oregon 97218-2743
CONTRACTOR MANPOWER REPORTING (CMR)
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the AIR FORCE collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at http://www.ecmra.mil.
Information regarding CMR, including contractor guides, can be found at the following website: https://cmra.army.mil/help/glossary.html
File details come from the government source that posted it. Updated .