This presentation outlines a solicitation for a firm fixed-price contract to perform drainage repairs at the Tulsa Air National Guard base in Oklahoma. Work includes removing existing concrete and installing new drainage systems, sidewalks, landscaping, and parking areas near several buildings. The solicitation will be posted on SAM.gov under number W50S8U-20-B-0003, with bids due September 14, 2020. The contract is set aside for small businesses and will be awarded based on lowest price. The period of performance is 180 days. The Army National Guard is the contracting agency. Interested parties must submit questions by September 2nd and meet security requirements to access the installation for site visits.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

XHZG201601826

Central Base Drainage Repair

AT TULSA ANG BASE, OK

Pre-Bid Conference 25 August 2020

138 MSC, TULSA ANG BASE, OK

INTRODUCTION

Mr. Dan Tatro – Contracting Officer

SMSgt Amanda Lonsdale – Contracting Officer

MSgt David Hugueley – Contract Specialist

MSgt Chris Dallas – Technical Representative Supervisor

Mr. Scott Agee – Technical Representative

SYNOPSIS

Central Base Drainage at Tulsa Air National Guard Base, OK. W50S8U-20-B-0003
Disclosure of magnitude is -$250,000 and $500,000 IAW FAR 36.204(d)
A firm-fixed price contract will be awarded.
Award is set aside for small businesses (NAICS – 237990)
Small Business Size Standard is $39.5 Million
The contract will be awarded based on lowest price.

SOLICITATION, PLANS

& SPECIFICATIONS

On the web: https://beta.sam.gov/

- Solicitation Plans and Specifications Questions & Answers document Pre-Bid presentation Amendments check regularly & refresh web page

IFB

In the invitation for bid (IFB), FAR Part 14, process, a public bid opening occurs when the bids are due and the prices are read to the public There can be no discussion No correction of mistakes in most cases Award is always to the low responsible bidder

WHAT IS THE CONTRACT PERIOD

Construction period is 180 calendar days after receiving the Notice to Proceed

BID PACKAGE IN ACCORDANCE WITH SECTION 00010 NOTES, NOTE 11

Offer, Standard Form (SF) 1442 front and back signed Section 00010 Line Items- all items must be priced A valid Bid Bond. Section 00100 – Clause 52.228-1.

Section 00600, Representations and Certifications, completed and return only additional certifications found in this section In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at https://www.sam.gov see 52.204-8 in solicitation ALERT: If you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator before your registration will be activated.

BID PACKAGE IN ACCORDANCE WITH SECTION 00010 NOTES, NOTE 11 - Continued When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF1442 is required to have an original signature. Section 00010 Line Items- all items must be priced All amendments to the solicitation must be acknowledged.

Mark the front of the envelope with the following: “BID No. W50S8U-20-B-0003” and the Name and Address of Bidder. See Block 13A of SF 1442 for required number of copies.

BID PACKAGE IN ACCORDANCE WITH SECTION 00010 NOTES, NOTE 11 - Continued ALL ITEMS ON THE PREVIOUS SLIDES ARE IN THE SOLICITATION INSTRUCTIONS. IT IS THE RESPONSIBILITY OF THE BIDDER TO MAKE SURE THAT THEIR BID CONFORMS TO THE SOLICITATION.

BID DUE DATES

W50S8U-20-B-0003 - Bids are due 1:00 P.M. (CST) 14 September 2020 Proposal must be signed by officer of your company No facsimile or electronic offers will be accepted

IMPORTANT REMINDERS

W912L7-17-B-5001 Questions concerning these project must be received by 0900hours on 02 September 2020. Section 00100 Paragraph 4 for format.

Contractor must submit information listed in Section 00100 Notes, paragraph 3.2 in order to gain access to installation for dropping off bids. Delivery must allow for vehicle inspection time at gate.

Wage determination OK20200017, Dated 1/03/2020, Building is applicable

HELPFUL WEBSITES

https://www.sam.gov https://www.beta.sam.gov Both the contracting opportunities and wage determinations modules https://www.aptac-us.org

HOW QUESTIONS WILL BE HANDLED

Questions must be submitted in writing only via email to:

daniel.r.tatro.civ@mail.mil And 138.fw.msc@us.af.mil

Use Format in Section 00100, Para 4.1

DO NOT CALL TECHNICAL PERSONNEL OR A&E- THIS WILL DELAY GETTING AN ANSWER AND COULD RESULT IN DISQUALIFICATION

ANSWERS TO QUESTIONS

All questions, on a non-attribution basis, and the answers will be posted to the web site https://www.beta.sam.gov If necessary addendums, issued by an amendment, will also be posted Check web site regularly and don’t forget to refresh web page!!

IMPORTANT

BIDDERS ARE STRONGLY CAUTIONED TO CAREFULLY READ THE REQUIREMENTS OF THE SOLICITATION AND COMPLY ACCORDINGLY

Questions ???

Site Visit Follows This Briefing