Pre-Bid RFI Central Drainage 09-03-2020.pdf
PDF 85 KB Posted
- Attached to
- Base Central Drainage Federal contract opportunity
- Solicitation number
- W50S8U-20-B-0003
- Issued by
- Department of the Army National Guard
About this file
This document contains responses to questions submitted regarding a solicitation for base central drainage work at Tulsa Air National Guard Base. The solicitation seeks a firm fixed-price contract to remove and replace concrete sidewalks, install new drainage structures and area drains, and complete grading, landscaping and concrete work around multiple buildings. Work hours are specified as 7:00 AM to 5:30 PM Monday through Thursday. While security personnel were initially indicated as needed, that requirement has been removed. A single competent safety supervisor may also serve as the quality control manager. Existing damage to a drainage box was inspected and the contractor is to reuse the existing grate.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sealed Bid OF 1419A Base Central Drainage.pdf | ||
| Sealed Bid OF 1419 Base Central Drainage.pdf | ||
| Sign In Sheet Bid Opening Central Drainage 20-B-0003_Redacted.pdf | ||
| W50S8U-20-B-0003-01.pdf | ||
| Inlet detail.pdf | ||
| Compliance Checklist Sealed Bids.pdf | ||
| Bid Bond Checklist Sealed Bid.pdf | ||
| Site Visit Sign in Redacted.pdf | ||
| Site Visit Slides Central Drainage.ppt | PPT presentation | |
| Central Drainage Site Visit Minutes.pdf | ||
| W50S8U-20-B-0003.pdf | ||
| Central Base Drainage XHZG201601826 Final specs.pdf | ||
| AF66 Central Drainage.pdf | ||
| ESOH Clause SOW.DOCX | DOCX document | |
| EMS Commitment Statement.docx | DOCX document | |
| SOW 1.02 - Central Drainage 2020.pdf | ||
| Central Base Drainage Final Plan Set.pdf | ||
| 138FW Safety Accident Prevention Guide_2018.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: RFI RFP Reference QUESTION GOVERNMENT RESPONSE
8/26/2020 1 Can a copy of the Pre‐Bid Meeting Sign in sheet be sent out in an Addendum?
It has been added to the solicitation on beta.sam.gov
8/26/2020 2
Statement of Work #9 States all Work to be Performed 7:00 AM to 5:30 PM Monday thru Thursday and Section 011400 Sheet 1 of 2 States Working Hours 10 Monday thru Friday. Please Clarify the correct work Hours and Days?
The correct work hours and days are 7:00 AM to 5:30 PM Monday thru Thursday.
8/26/2020 3 Section 01140 2 of 2 indicates Security Personnel is needed at the front Gate. Does this person need to have minimum qualifications?
Security personnel is not necessary for this project. Contractor will be responsible for escorting those not possesssing a DBIDS badge with escort privileges to and from the gate.
8/26/2020 4
Section 013526 3 of 13 1.5.1.1 states contractor to provide 1 competent person to oversee safety and that the Contractor QC Person can be the SSHO on this project. If a Certified Person as an SSHO and the same person who is not QC Certified per Section 0145000040 2 of 6 1.3.1 but has experience still be both?
the same person can be both and if a request to subsitute experience for the certification this will be evaluated by contracting and BCE post award.
8/26/2020 5 On the site visit we noticed damage to the box north of building 305. We are to tie into this box and doesn't show to be repaired. Please advise.
After inspection only the lid appears to be damaged. Please see the attached drawing and reuse existing grate.