Final Design Drawings Seed Project.pdf

PDF 17 MB Posted

Attached to
OK MATOC Federal contract opportunity
Solicitation number
W50S8T-20-B-0001
Issued by
Department of the Army National Guard

About this file

This document outlines a federal contract opportunity for construction services. The MATOC construction IDIQ solicitation number W50S8T-20-B-0001 from the Department of the Army National Guard seeks indefinite delivery/indefinite quantity construction services for WillRogers and Tulsa Air National Guard Bases. The scope of work involves construction at both bases but provides no further details on specific projects or requirements. Responses were due through the described solicitation for an opportunity to compete for future task orders over the lifetime of the multiple award contract.

View the file

Other files for this federal contract opportunity

Other files attached to OK MATOC, newest first.
File Type Posted
RFI 70 loading ramp archive drawings.jpg JPG image
MATOC RFI 2 demo platform.pdf PDF
Pre-Bid RFI OK MATOC.pdf PDF
W50S8T20R0001-0001 Amendment 1.pdf PDF
MATOC RFI 3 details.pdf PDF
RFI 70 loading ramp archive drawings 2.jpg JPG image
MATOC RFI 4 various.pdf PDF
RFI 76 Pavement cross section.pdf PDF
MATOC Preproposal Conference 08 July 2020.pptx PPTX presentation
Exhibit A-B.pdf PDF
MATOC Site Visit Sign In Sheet.pdf PDF
Exhibit D.pdf PDF
Exhibit C.pdf PDF
MATOC Project CE Specs Sheet.pdf PDF
Statement of Work-Loading Ramp Project YZEU162024.pdf PDF
W50S8T20R0001 MATOC Solicitation.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OKLAHOMA AIR NATIONAL GUARD

WILL ROGERS WORLD AIRPORT

RELOCATE CONCRETE LOAD / UNLOAD PLATFORM

PROJECT NO.: YZEU162024

CONTRACT NO.: W912L6-13-D-0006

INDEX:

GS101 TITLE SHEET

GS102 GENERAL NOTES

VF101 EXISTING SITE CONDITIONS

CD101 DEMOLITION PLAN

CE101 EROSION AND SEDIMENTATION CONTROL PLAN

CE501 EROSION AND SEDIMENTATION PLAN / DETAILS

CS101 SITE PLAN

CS401 JOINT LAYOUT PLAN

CG101 GRADING AND DRAINAGE PLAN

CS501 SITE DETAILS

CS502 SITEL DETAILS

CS503 SITE DETAILS

GS101

T I T

L E

S

H E

E T

PROJECT LOCATION

N

ISSUE FOR BID

NOVEMBER 2016

O K

L A

H O

M A

PROJECT #

DRAWING #

DATE

SCALE

D R

A W

I N

G

T

I T

L E

P R

O J E

C T

I T

L E

DRAWN BY: REVIEWED

BASE ENGINEER

10 20 2016

B U

I L

D I N

G

S U

B M

I T

T A

L

L E

V E

L

U S

E R

B C

E

F I R

E

E N

V I R

O

S A

F E

T Y

S E

C U

R I T

Y

C O

M M

C O

O R

D I N

A T

I O

N

S

I G

N A

T U

R E

S D

A T

E M

A R

K R

E V

I S

I O

N

A

R

N

A T

I O

N A

L

G

U A

R D

I S

S U

E

F

O

B

D

AS NOTED

YZEU162024

O

A D

W A

Y

S

U I T

E

O K

L A

H O

M

T

Y

O

K

D A

T E

I S

S U

E

F

D

BASE CIVIL ENGINEER DATE

FIRE CHIEF DATE

ATFP OFFICER DATE

ENVIRONMENTAL MANAGER DATE

BIO ENVIRONMENTAL DATE

COMMUNICATION DATE

BUILDING MANAGER DATE

REAL PROPERTY DATE

DRAWING #

DATE

GENERAL NOTES:

I. SITE WORK

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROMPT PLACEMENT AND/OR REPAIR OF TRAFFIC CONTROL DEVICES AND

APPURTENANCES DAMAGED AS REQUIRED DURING CONSTRUCTION.

2. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING UTILITIES PRIOR TO COMMENCEMENT OF CONSTRUCTION.

3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPLACEMENT OR REPAIR OF ANY PROPERTY DAMAGED DURING

CONSTRUCTION.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONSTRUCTION STAKING. THE STAKING MUST BE DONE BY A REGISTERED

PROFESSIONAL LAND SURVEY.

5. A STORM WATER DISCHARGE PERMIT IS REQUIRED BEFORE ANY LAND DISTURBING ACTIVITIES CAN BEGIN. THE CONTRACTOR

SHALL BE RESPONSIBLE FOR THE MANAGEMENT AND MAINTENANCE OF ALL EROSION AND SEDIMENTATION CONTROL MEASURES.

6. THE CONTRACTOR WILL PERFORM SOIL EXPLORATION STUDIES IN ORDER TO CONFIRM DESIGN CONDITIONS. SHOULD SIGNIFICAT

DIFFERENCE BETWEEN STUDIES RESULT AND DESIGN OCCUR, THE CONTRACTOR WILL PROVIDE THE INFORMATION TO THE

ENGINEER FOR EVALUATION.

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR GRADING ALL DISTURBED AREAS TO DRAIN AS GOOD OR BETTER THAN EXISTING

CONDITIONS.

8. THE CONTRACTOR WILL COORDINATE WITH THE OKANG THE PERIMETER SECURITY FROM THE MOMENT THE FENCE IS

DEMOLISHED UNTIL ITS RELOCATION IS COMPLETED.

9. DURING CONCRETE POURING, THE CONTRACTOR WILL BE RESPONSIBLE FOR THE COLLECTION OF THE CONCRETE SAMPLES FOR

COMPRESSION TESTING AS PER CONTRACT SPECIFICATIONS.

10. SHOULD WEATHER AND ENVIRONMENTAL CONDITIONS REQUIRE IT, THE CONTRACTOR WILL TAKE MEASURES TO CONTROL

EVAPORATION AFTER THE CONCRETE IS POURED.

11. CONTRACTOR IS RESPONSIBLE OF KEEPING THE PROJECT AREA AND PERIMETER CLEAN FROM DEMOLITION AND CONSTRUCTION

DEBRIS.

II. STRUCTURAL DESIGN WORK

1. GOVERNMENT BUILDING CODE: 2012 INTERNATIONAL BUILDING CODE.

III. DESIGN LOADS

1. LIVE LOADS:

SLAB ON GRADE.............................................................................................220 PSI

RAMP AND PLATFORM...................................................................................220 PSI

VEHICLE BARRIERS, CONCENTRATED........................................................6000 LBS

2. DEAD LOAD.........................................ACTUAL WEIGHT OF MATERIALS

IV. MATERIAL PROPERTIES

1. CONCRETE (MINIMUM ULTIMATE COMPRESSIVE STRENGTH AT 28 DAYS):

FOUNDATIONS................................................................................................4000 PSI

SLAB ON GRADE.............................................................................................4000 PSI

RETAINING WALLS..........................................................................................4000 PSI

RAMP AND PLATFORMS.................................................................................4000 PSI

MINIMUM ULTIMATE MODULUS OF RUPTURE..............................................750 PSI

2. CONCRETE REINFORCEMENT (MINIMUM YIELD STRENGTH):

ALL DEFORMED BARS (ASTM A613, A616 OR A617 GRADE 60)......Fy = 60,000 PSI

V. CONCRETE CONSTRUCTION

1. ALL DETAILING, FABRICATION AND PLACING OF REINFORCING BARS, UNLESS OTHERWISE NOTED, SHALL FOLLOW THE ACI

DETAILING MANUAL 2005 (SP-66 {05}).

2. UNLESS OTHERWISE NOTED, LAP SPLICES OR EMBEDMENT LENGTHS SHALL CONFORM TO ACI REQUIREMENTS FOR CLASS B

SPLICES.

3. PROVIDE CORNER BARS IN BOTH FACES OF ALL EXTERIOR WALLS. NUMBER, SIZE AND SPACING OF CORNER BARS SHALL BE

EQUAL TO NUMBER, SIZE AND SPACING OF HORIZONTAL REINFORCING WITH WHICH THEY LAP AND SHALL EXTEND 30 BAR

DIAMETERS IN EACH DIRECTION.

4. UNLESS OTHERWISE NOTED, CONCRETE COVER OVER STEEL REINFORCEMENT SHALL CONFORM TO MINIMUM REQUIRED BY ACI

318-05.

5. AT INTERSECTING FOUNDATIONS FOR THE RAMP, EXTEND ALL HORIZONTAL REINFORCING OF THE INTERSECTING MEMBERS

BEYOND THE POINT OF INTERSECTION TO THE OPPOSITE FACE. BEND TO A STANDARD 90 DEGREE HOOK OR PROVIDE BENT

DOWELS OF EQUAL SIZE AND SPACING AND LAP AS REQUIRED BY NOTE 2 (BUT NOT LESS THAN 12") IN EACH DIRECTION.

6. CAST-IN-PLACE REINFORCED CONCRETE FOR THE RAMP AND PLATFORM WALL FOUNDATION SHALL BE FORMWORK FOR ITS

PERIMETER. IF THE CONTRACTOR MOLDS AGAINST EXCAVATION, A 4 INCH CONCRETE COVER FOR THE REBAR SHALL BE

REQUIRED INSTEAD OF THE 3 INCH COVER AS RECOMMENDED IN ACI 302. 1R-04.

VI. SLAB ON GRADE

1. REINFORCED CONCRETE SLABS ON GRADE:

a) THE REINFORCED SLAB ON GRADE SHALL BE 10" CONCRETE ON 16" STABILIZED AGGREGATE BASE, AND SHALL BE REINFORCED

WITH #5 AT 12" ON CENTER EACH WAY AT APPROXIMATELY 2" CLEAR FROM TOP.

2. CONSTRUCTION JOINTS AND EXPANSION JOINTS SHALL BE PLACED AS SHOWN ON JOINT LAYOUT PLAN. SPACING OF JOINTS

SHALL BE AS SHOWN ON THE CONCRETE PAVEMENT EXPANSION JOINT DETAIL (AS PROVIDED).

3. SMOOTH DOWEL BARS SHALL BE PLACED PERPENDICULAR TO EDGE OF SLAB AND PARALLEL TO FINISH SURFACE OF SLAB, EXCEPT FOR THE CONSTRUCTION JOINT FOR THE RAMP, WHERE THE DOWEL BAR SHALL BE PLACED HORIZONTALLY.

VII. RAMP AND PLATFORM

1. RAMP AND PLATFORM WILL BE PLACED OVER A SUBGRADE THAT IS CONSISTENT WITH THE CURRENT RECOMMENDATIONS

OF ACI 302.1R-04. THE SUBGRAEDE WILL BE COMPOSED OF A 4 INCH THICKNESS OF COMPACTED #10 UNWASHED SCREENING

FROM CRUSHED NATURAL STONE OR CRUSHED NATERAL GRAVEL PER ASTM D448, AND FILLED WITH PROPERLY PLACED

COMPACTED (DENSE) SAND (k > 200 kfc)

O K

L A

H O

M A

PROJECT #

DRAWING #

DATE

SCALE

D R

A W

I N

G

T

I T

L E

P R

O J E

T

L E

DRAWN BY: REVIEWED

BASE ENGINEER

10 20 2016

B U

I L

D I N

G

S U

B M

I T

T A

L

L E

V E

L

U S

E R

B C

E

F I R

E

E N

V I R

O

S A

F E

T Y

S E

C U

R I T

Y

C O

M M

C O

O R

D I N

A T

I O

N

S

I G

N A

T U

R E

S D

A T

E M

A R

K R

E V

I S

I O

N

A

T

I O

N A

L

G

U A

R D

I S

S U

E

F

D

AS NOTED

YZEU162024

O

A D

W A

Y

S

U I T

E

O K

L A

H O

T

Y

O

K

D A

T E

I S

S U

E

F

D

AYKTLM

G E

N E

R A

L

N

O T

E S

GS102

GLOBEMASTER DRIVE.

W V

E X

I S

T I N

G

S

I T

E

C

O N

D I T

I O

N

AYKTLM

O K

L A

H O

M A

PROJECT #

DRAWING #

DATE

SCALE

D R

A W

I N

G

T

I T

L E

P R

O J E

T

L E

DRAWN BY: REVIEWED

BASE ENGINEER

10 20 2016

B U

I L

D I N

G

S U

B M

I T

T A

L

L E

V E

L

U S

E R

B C

E

F I R

E

E N

V I R

O

S A

F E

T Y

S E

C U

R I T

Y

C O

M M

C O

O R

D I N

A T

I O

N

S

I G

N A

T U

R E

S D

A T

E M

A R

K R

E V

I S

I O

N

A

T

I O

N A

L

G

U A

R D

I S

S U

E

F

D

AS NOTED

YZEU162024

O

A D

W A

Y

S

U I T

E

O K

L A

H O

T

Y

O

K

D A

T E

I S

S U

E

F

D

VF101

V

D E

M O

L I T

I O

N

P

L A

N

AYKTLM

O K

L A

H O

M A

PROJECT #

DRAWING #

DATE

SCALE

D R

A W

I N

G

T

I T

L E

P R

O J E

T

L E

DRAWN BY: REVIEWED

BASE ENGINEER

10 20 2016

B U

I L

D I N

G

S U

B M

I T

T A

L

L E

V E

L

U S

E R

B C

E

F I R

E

E N

V I R

O

S A

F E

T Y

S E

C U

R I T

Y

C O

M M

C O

O R

D I N

A T

I O

N

S

I G

N A

T U

R E

S D

A T

E M

A R

K R

E V

I S

I O

N

A

T

I O

N A

L

G

U A

R D

I S

S U

E

F

D

AS NOTED

YZEU162024

O

A D

W A

Y

S

U I T

E

O K

L A

H O

T

Y

O

K

D A

T E

I S

S U

E

F

D

CD101

GLOBEMASTER DRIVE.

V

G R

A V

E L

R

O A

D

E R

O S

I O

N

A

D

D

I M

E N

T A

T I O

N

C

O N

T R

P

A

N

AYKTLM

O K

L A

H O

M A

PROJECT #

DRAWING #

DATE

SCALE

D R

A W

I N

G

T

I T

L E

P R

O J E

T

L E

DRAWN BY: REVIEWED

BASE ENGINEER

10 20 2016

B U

I L

D I N

G

S U

B M

I T

T A

L

L E

V E

L

U S

E R

B C

E

F I R

E

E N

V I R

O

S A

F E

T Y

S E

C U

R I T

Y

C O

M M

C O

O R

D I N

A T

I O

N

S

I G

N A

T U

R E

S D

A T

E M

A R

K R

E V

I S

I O

N

A

T

I O

N A

L

G

U A

R D

I S

S U

E

F

D

AS NOTED

YZEU162024

O

A D

W A

Y

S

U I T

E

O K

L A

H O

T

Y

O

K

D A

T E

I S

S U

E

F

D

CE101

O S

I O

N

C

O N

T R

D

T

A I L

S

AYKTLM

O K

L A

H O

M A

PROJECT #

DRAWING #

DATE

SCALE

D R

A W

I N

G

T

I T

L E

P R

O J E

T

L E

DRAWN BY: REVIEWED

BASE ENGINEER

10 20 2016

B U

I L

D I N

G

S U

B M

I T

T A

L

L E

V E

L

U S

E R

B C

E

F I R

E

E N

V I R

O

S A

F E

T Y

S E

C U

R I T

Y

C O

M M

C O

O R

D I N

A T

I O

N

S

I G

N A

T U

R E

S D

A T

E M

A R

K R

E V

I S

I O

N

A

T

I O

N A

L

G

U A

R D

I S

S U

E

F

D

AS NOTED

YZEU162024

O

A D

W A

Y

S

U I T

E

O K

L A

H O

T

Y

O

K

D A

T E

I S

S U

E

F

D

CE501

REFER TO SHEET CS502 FOR

DETAILS

S I T

E

P

L A

N

AYKTLM

O K

L A

H O

M A

PROJECT #

DRAWING #

DATE

SCALE

D R

A W

I N

G

T

I T

L E

P R

O J E

T

L E

DRAWN BY: REVIEWED

BASE ENGINEER

10 20 2016

B U

I L

D I N

G

S U

B M

I T

T A

L

L E

V E

L

U S

E R

B C

E

F I R

E

E N

V I R

O

S A

F E

T Y

S E

C U

R I T

Y

C O

M M

C O

O R

D I N

A T

I O

N

S

I G

N A

T U

R E

S D

A T

E M

A R

K R

E V

I S

I O

N

A

T

I O

N A

L

G

U A

R D

I S

S U

E

F

D

AS NOTED

YZEU162024

O

A D

W A

Y

S

U I T

E

O K

L A

H O

T

Y

O

K

D A

T E

I S

S U

E

F

D

CS101

t h

S

T R

E E

T

GLOBEMASTER DRIVE.

BLDG. 1047

C

D

D

7 SPACES @ 8.0'' AND 1 SPACE @ 9.0'=65.0''

15 SPACES @ 13.0'=195.0'

10.24'

11.36'

A

C

A

D

D

D

D D

D

2 SPACES @ 12.5'= 25.0'

R

R

R

R

C

A

D D

C

D

D

DD

D

D

D

D

D

D

J O

I N

T

L

A Y

O U

T

P

L A

N

AYKTLM

O K

L A

H O

M A

PROJECT #

DRAWING #

DATE

SCALE

D R

A W

I N

G

T

I T

L E

P R

O J E

T

L E

DRAWN BY: REVIEWED

BASE ENGINEER

10 20 2016

B U

I L

D I N

G

S U

B M

I T

T A

L

L E

V E

L

U S

E R

B C

E

F I R

E

E N

V I R

O

S A

F E

T Y

S E

C U

R I T

Y

C O

M M

C O

O R

D I N

A T

I O

N

S

I G

N A

T U

R E

S D

A T

E M

A R

K R

E V

I S

I O

N

A

T

I O

N A

L

G

U A

R D

I S

S U

E

F

D

AS NOTED

YZEU162024

O

A D

W A

Y

S

U I T

E

O K

L A

H O

T

Y

O

K

D A

T E

I S

S U

E

F

D

CS401

BORDER OF

CONCRETE SLAB

NEW CONCRETE PAVEMENT

TO MATCH EXISTING

G R

A D

I N

G

P

L A

N

CG101

AYKTLM

O K

L A

H O

M A

PROJECT #

DRAWING #

DATE

SCALE

D R

A W

I N

G

T

I T

L E

P R

O J E

T

L E

DRAWN BY: REVIEWED

BASE ENGINEER

10 20 2016

B U

I L

D I N

G

S U

B M

I T

T A

L

L E

V E

L

U S

E R

B C

E

F I R

E

E N

V I R

O

S A

F E

T Y

S E

C U

R I T

Y

C O

M M

C O

O R

D I N

A T

I O

N

S

I G

N A

T U

R E

S D

A T

E M

A R

K R

E V

I S

I O

N

A

T

I O

N A

L

G

U A

R D

I S

S U

E

F

D

AS NOTED

YZEU162024

O

A D

W A

Y

S

U I T

E

O K

L A

H O

T

Y

O

K

D A

T E

I S

S U

E

F

D

NTS

NTS

NTS

NTS

NTS

NTS

O K

L A

H O

M A

PROJECT #

DRAWING #

DATE

SCALE

D R

A W

I N

G

T

I T

L E

P R

O J E

T

L E

DRAWN BY: REVIEWED

BASE ENGINEER

10 20 2016

B U

I L

D I N

G

S U

B M

I T

T A

L

L E

V E

L

U S

E R

B C

E

F I R

E

E N

V I R

O

S A

F E

T Y

S E

C U

R I T

Y

C O

M M

C O

O R

D I N

A T

I O

N

S

I G

N A

T U

R E

S D

A T

E M

A R

K R

E V

I S

I O

N

A

T

I O

N A

L

G

U A

R D

I S

S U

E

F

D

AS NOTED

YZEU162024

O

A D

W A

Y

S

U I T

E

O K

L A

H O

T

Y

O

K

D A

T E

I S

S U

E

F

D

S I T

E

D

E T

A I L

CS501

1"=1'

1"=1'

NTS

NTS

1"=1'

1"=1'

1"=1'

O K

L A

H O

M A

PROJECT #

DRAWING #

DATE

SCALE

D R

A W

I N

G

T

I T

L E

P R

O J E

T

L E

DRAWN BY: REVIEWED

BASE ENGINEER

10 20 2016

B U

I L

D I N

G

S U

B M

I T

T A

L

L E

V E

L

U S

E R

B C

E

F I R

E

E N

V I R

O

S A

F E

T Y

S E

C U

R I T

Y

C O

M M

C O

O R

D I N

A T

I O

N

S

I G

N A

T U

R E

S D

A T

E M

A R

K R

E V

I S

I O

N

A

T

I O

N A

L

G

U A

R D

I S

S U

E

F

D

AS NOTED

YZEU162024

O

A D

W A

Y

S

U I T

E

O K

L A

H O

T

Y

O

K

D A

T E

I S

S U

E

F

D

S I T

E

D

E T

A I L

CS502

PROJECT #

DRAWING #

DATE

SCALE

D R

A W

I N

G

T

I T

L E

P R

O J E

T

L E

DRAWN BY: REVIEWED

BASE ENGINEER

10 20 2016

B U

I L

D I N

G

S U

B M

I T

T A

L

L E

V E

L

U S

E R

B C

E

F I R

E

E N

V I R

O

S A

F E

T Y

S E

C U

R I T

Y

C O

M M

C O

O R

D I N

A T

I O

N

S

I G

N A

T U

R E

S D

A T

E M

A R

K R

E V

I S

I O

N

I S

S U

E

F

D

AS NOTED

YZEU162024

O

A D

W A

Y

S

U I T

E

O K

L A

H O

T

Y

O

K

D A

T E

I S

S U

E

F

D

S I T

E

D

E T

A I L

CS503

File details come from the government source that posted it. Updated .