Exhibit A- Technical Evaluation - Subfactor 1.docx
DOCX document 18 KB Posted
- Attached to
- Building 8 Renovation Federal contract opportunity
- Solicitation number
- W50S8J-20-R-0005
About this file
This document contains a technical evaluation worksheet for a federal contract opportunity to renovate Building 8 at Stratton Air National Guard Base in Scotia, New York. Offerors are required to submit details on their three most relevant past construction and renovation projects within the last five years using the provided template. Experience should demonstrate capability managing multi-discipline renovation projects similar in size, scope, and complexity to the anticipated work, which includes HVAC removal and installation, minor interior demolition and structural work, plumbing, electrical and security systems, carpentry and finishes, ADA-compliant bathrooms and accessibility renovations, fire suppression systems, and industrial flooring. Submissions will be evaluated based on the degree of relevance and experience demonstrated across these work categories. The pre-solicitation notice for Solicitation Number W50S8J-20-R-0005 provides additional details on the building renovation project at Stratton Air National Guard Base to be awarded by the Department of the Army New York Army National Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003 - W50S8J20R0005-0003.pdf | ||
| W50S8J-20-R-0005-0002 - Extend Due Date.pdf | ||
| Bldg 8 Reno Site Visit Sign-In _ 22May20.pdf | ||
| W50S8J-20-R-0005-0001 Bldg 8 Reno.pdf | ||
| Building 8 Drawings - Complete.pdf | ||
| RFP W50S8J-20-R-0005_Bldg 8 Reno.pdf | ||
| Drawings_Building 8 Reno.pdf | ||
| Specifications_Building 8 Reno.pdf | ||
| Exhibits B and C - Past Peformance Reference Questionnaire.docx | DOCX document | |
| Synopsis-Pre-Solicitation Notice _ Bldg 8 Reno.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT A
Technical Evaluation - Subfactor 1 Worksheet General Construction and Renovation Experience This form shall be submitted by each offeror outlining the three (3) most relevant contracts (Government or Commercial) which are currently in performance or have been completed by the offeror within the past five (5) year period. Submit one (1) form per project; Limit page count to four (4) pages per project, to include Part 1: Project Information.
The intent of this information is to give the Government insight into the offerors experience managing multi-discipline renovation projects, focusing on the relevance and extent that contracts submitted for review are similar in size, scope and complexity to the work anticipated under this project.
The offeror shall fill in PARTS 1 & 2 below for each project submitted. Part 2 shall include a brief narrative relating the size, scope and complexity of the identified project to each Key Point. If the scope of an identified project does not include one or more of the Key Points, the offeror shall insert “N/A”. Offerors are cautioned that projects submitted for review which contain relevant experience with more (or all) of the Key Points listed above will be evaluated more favorably than projects that contain less (or none) of the Key Points.
PART 1 – PROJECT INFORMATION
Contract Number:
Project Title:
Date of Award:
Period of Performance (Days)
Project Completion Date:
Project Location:
| Dollar Value (Original/ Final): |
| $ / $ |
Brief Description of Project:
Your role in referenced contract (Prime/ Sub):
PART 2 – EXPERIENCE NARRATIVE
KEY POINT #1: HVAC Removal and Installation, Ductwork and Rebalancing
KEY POINT #2: Minor Interior Demolition and Structural Work:
KEY POINT #3: Plumbing – Domestic Water & Fixtures, Sanitary Drainage Lines:
KEY POINT #4: Electrical, Security, Telecommunications & Lighting:
KEY POINT #5: Carpentry, Drywall, Trim, Painting, Tile, and Other Finish Work:
KEY POINT #6: ADA Compliant Bathroom, Stairwell/Lift Installation and Other Access Renovation:
KEY POINT #7: Fire Sprinkler System and/or Dry Chem System Installation:
KEY POINT #8: Industrial Flooring, Epoxy Coating Applications:
Page | 1
RFP: W50S8J-20-R-0005
File details come from the government source that posted it. Updated .