Attach_15_W50S8B21B0001_RFIs_CES.pdf
PDF 182 KB Posted
- Attached to
- Repair Corrosion Control Facility Federal contract opportunity
- Solicitation number
- W50S8B-21-B-0001
- Issued by
- Department of the Army National Guard
About this file
This document contains a request for information (RFI) log and federal contract opportunity related to a project to repair a corrosion control facility. The RFI log addresses 63 questions about project specifications, drawings, and scope of work. The federal contract opportunity is a 100% small business set-aside between $500,000-$1,000,000 to reconfigure 2,500 square feet of space for bathrooms, locker rooms, and shop areas at a secure military facility. The contractor must provide all materials, equipment, labor, and supervision for a complete and usable space, as well as a dedicated superintendent through project completion. A stand-alone contract award will be made without a task order. The contractor must submit a critical path method construction schedule within five days of award and ensure all personnel accessing the base undergo a background check.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
108TH CES - LOCALLY PRODUCED FORM
108 CES
Tracking # QUESTION REPLY REMARKS:
1 Please provide the current manufacturer for the fire control panel and horn strobe in the building.
See file "B3336 Fire Panel-BOM.pdf"
Drawing P-001 Plumbing Note #16 calls for the water pipe insulation to have a fire retardant vapor barrier jacket sealed with a fire resistive adhesive. Please advise if the mineral fiber factory applied ASJ jacket suffices as the fire retardant vapor barrier and please provide specifications or indicate what constitutes a fire resistive adhesive. – Does mineral fiber ( fiberglass ) insulation with a factory applied ASJ jacket simply suffice for the domestic water pipe insulation?
See specification section 220719 - Plumbing Pipe Insulation Factory- Applied ASJ Jacket should comply with ASTM C-1136, Type 1, per paragraph 2.6 - Factory-Applied Jackets. Also referenced in paragraphs 2.1.F, 2.1.F.5, and 2.1.H.2. Also see paragraph 2.7.A.7 for use of ASJ Tapes.
ASTM C1136 — Standard Specification for Flexible Low Permeance Vapor Retarders for Thermal Insulation.
Specification section 221116 3.12 – 3 list PEX tube as an approved material for the domestic water piping. Please advise if PEX is to be utilized for only pipe size 2” and below or 1” and below.
Piping 2" and below to be hard copper tube, ASTM B 88, Type L, cast or wrought-copper, solder-joint fittings; and soldered joints, or pressure-seal-joint fittings; and pressure-sealed joints. Only pipe sizes 1" and below may be PEX tubing.
Please advise if pressure sealed ( Mega-press ) type connections are acceptable for the natural gas piping serving the duct heater.
Specification section 235513.16 - Gas Fired Duct Heaters, paragraph 3.2.C. Gas Piping: Comply with section 231123 for Facility Natural Gas Piping, paragraphs 2.2 - Pipes, Tubes and Fittings, sections 2.2.A, and 2.2.B.
Drawing P-501 detail #6 shows an enclosure under the lavatory – it is noted to see specifications. Drawing P-601 Plumbing Fixture Schedule and Commercial Lavatory Specification 224216 do not call for enclosures under the lavatories. Please advise if an enclosure is required and if so please provided specifications or advise if simple trap wraps suffice.
See specification section 102800 - Toilet and Bath Accessories, paragraph 2.4 Lavatory Piping Protection. Product listed by manufacturer Truebro, Inc. (Lav Guard) or approved equal. Use of a Lav Shield type product would also be acceptable.
6 Same detail as above shows a loose key bypass valve – please provide specifications ( make / model # ) for a loose key straight valve as shown.
See specification section 220523.14 - Check Valves for Plumbing Piping, paragraph 2.1.H. Valve Bypass and Drain Connections: MSS SP-45, an industry standard for bypass valves.
Drawing P-501 detail #4 illustrates a trap primer for each floor drain – Please advise if trap guards ( flappers ) will suffice in lieu of trap primers to protect the integrity of the floor drain traps.
Also referenced in specifications section 221319 - Sanitary Waste Piping Specialties, paragraph 2.2.B., Floor Drain Trap Seal Primer Fittings, and paragraph 3.1.E., for installation of Floor Drain Trap Seal Primer Fitting. See also section 221119 - Domestic Water Piping Specialties, paragraph 2.10., Trap Seal Primer Device, and paragraph 3.1.E., Install of a trap seal primer valve.
The specs require an AISC Certified Fabricator, as there are many fabricators that fabricate to AISC Standards but are not certified, could this requirement be waived for this project?
To ensure AISC standards are followed, AISC certification required per specification section 051200 - Structural Steel Framing. Noted in paragraphs 1.8 Quality Assurance, 2.1.B Connection Design, and 2.7 Fabrication requirements.
9 Please advise if there will be an area designated for the contractor to place dumpsters and portable toilet facilities near the work area.
To be identified during Pre Construction Meeting. Preferred area, in front of building 3336.
10 Reference Drawing AD101: Please advise what type of preparation of the existing epoxy flooring is required.
Reference specification section 096710 - Epoxy Resin Flooring, paragraph section 3.1 Preparation.
REQUEST FOR INFORMATION (RFI) LOG
PROJECT NUMBER / NAME
PTFL 132039 Repair Corrosion Facility, 3336
Tracking # QUESTION REPLY REMARKS:
REQUEST FOR INFORMATION (RFI) LOG
PROJECT NUMBER / NAME
PTFL 132039 Repair Corrosion Facility, 3336
Reference Drawing AD101: Please advise if the new epoxy flooring is intended to be applied over the existing epoxy flooring. If so, please identify what type of “prep” should be accounted for.
Existing epoxy flooring to be removed. See specification section 096710 - Epoxy Resin Flooring, paragraph section 3.1.B. Concrete Surfaces shall be Shot-blast with apparatus that abrades the concrete surface with steel shot within the shot blast apparatus and recirculating the shot by vacuum pick-up to remove the weak surface layer of concrete to provide an etched surface.
Reference Drawing AE111: The interior finish Legend identifies a “speckled” pattern identifying where new epoxy flooring is required. The Finish Plan has room finish tag which look like the image below. These tags appear to show additional areas which are NOT “speckled” to receive new epoxy floor finish. Please advise if new epoxy flooring is required at only speckled areas or all areas identified by the room finish tags.
Drawing AD101 Demolition Plan states reference to the Finish Plan, AE111. Only speckled area receives ERF-2 Epoxy flooring. Rooms 220, 251, and 252 call for LVT-2 type flooring. Note under room tags for (Bid Alternate A1: ERF-2) will not be used for rooms 220, 251, and 252.
Room Finish Tag:
13 Due to the various roof penetrations, please advise if the current roof is under warranty.
The membrane roof was replaced in 2013 with TPO roofing, and has a ten year warranty till March 22, 2023.
Reference Drawing AE100: The following note on the drawings referenced seems to indicate that only those walls marked by a “dashed” line are to extend to the underside of the roof deck (scaled to be 24’ A.F.F.). This would mean all other partitions which do not have a “dashed line” extend up to the 8” framed platform above the ACT as shown on drawing AE300. Is this a correct interpretation of the required partition heights?
Follow wall type details shown on drawing AE100. Question stated is correct for type B6 walls, requiring 5/8" GWB on each side of framed studs, to underside of the roof deck. See detail on drawing AE111 for area of platform, B6 wall stops at bottom of the platform. Type A3 wall also extends to underside of roof deck with GWB on one side (behind showers, toilets, and lavatories). Type D3, D4, and D6 walls vary.
Type "D" walls shown with "Dashed" line along the Corridor extend to the underside of the roof deck with GWB on one side extending to the underside of the roof deck, and GWB on the other side only going 6" above the acoustic ceiling. With type "D" walls that are not dashed, will have GWB on each side of framed studs at 16" oc, to 6" above the acoustic ceiling, stud framing for these walls will continue above the acoustic ceiling to the upper roof deck at 32" oc, per wall detail notes for bracing.
Please describe the access to the work area that the contractor will have so we can determine where all construction materials loaded and debris discarded.
Storage of materials will likely be in the area being constructed and area between the large paint booth and overhead door. Dumpster to be located in front of building 3336.
Please advise how close of a proximity the contractor will be allowed to bring a vehicle to the overhead / egress doors near the work location.
Descriptions of the intended vehicles are concrete truck, pickup trucks, delivery box trucks, dumpster pickup, porta potty pump trucks, welding trucks, and small cranes for roof equipment rigging.
To be identified during Pre Construction Meeting. Preferred area for dumpster, porta-potty, and pickup trucks in front of building 3336.
Concrete trucks, rigging equipment, and larger deliveries will need to be escorted onto, and off of the flight-line side of building 3336.
Tracking # QUESTION REPLY REMARKS:
REQUEST FOR INFORMATION (RFI) LOG
PROJECT NUMBER / NAME
PTFL 132039 Repair Corrosion Facility, 3336
Will the walls in the existing bathroom required to be demolished/removed to perform the sawcutting?
No, removal of the wall entrance to the existing bathroom will only provide less than 12" additional space to work. This block wall also supports the door header, and brick above. The sprinkler system pipe, exhaust metal ductwork, and two 4" PVC conduits run above the doorway, through the existing block wall. Removal, and reuse of the door and threshold is expected.
Will the walls in the existing hallways required to be demolished/removed to perform the sawcutting?
See drawing "B3336_F5.pdf", Floor Slab Plan, and wall footings. See referenced typical Hallway wall detail Q/F7 (shown to the right). The sawcut into the existing Paint Booth room will be through the existing double doors, being removed for a single door. Sawcut as close to existing hallway wall to the office area corridor. See drawing "F5" for location of the thicker hallway wall footings. Only sawcut the 6" thick slab, which includes 6"x6"x W2.9x W2.9 WWF.
19 Do we have access to 280/3 phase power? The power panels are 120/208, 3 ph, serving the exist wall outlets.
20 How thick is the concrete floor? Concrete slabs are 6" thick with 6"x6"x W2.9x W2.9 WWF. see "3336_F5" floor slab plan
Please advise what the existing fire alarm system is and please provide the contact information for any fire alarm contractors who service the existing system.
See file "B3336 Fire Panel-BOM.pdf". The Base has Fire Alarm Technicians that only monitor the fire alarm system, and a contractor which only perform tests of the sprinkler system and fire pumps annually.
Reference Spec Section 230923: This spec section provides multiple DDC system manufacturers. Please advise if the new mechanical equipment controls are required to be tied into a specific existing DDC system.
The present facility BAS system is by Johnson Controls. Devices from other manufacturers listed in specification section 230923, section 2.1, may be used if compatible with Johnson Controls Systems, and BACnet compatable.
Reference Drawing S-102: Please advise if the slab demo, mechanical pipe installation, slab patch, and floor finishes in corridor 109 and corridor 115 can be performed during normal work hours or if this work is to be performed on nights and/or weekends
See specification section 01000 - General Requirements, paragraph
1.2. Work Scheduling.
On Drawing AE-111 some of the rooms have the speckle finish code and some have white. However, every room is listed as RF-2 for the finish.
Should the white rooms be RF-1 or should the entire thing be speckled coded?
Drawing AD101 Demolition Plan states reference to the Finish Plan, AE111. Only speckled area receives ERF-2 Epoxy flooring. Rooms 220, 251, and 252 call for LVT-2 type flooring. Note under room tags for (Bid Alternate A1: ERF-2) will not be used for rooms 220, 251, and 252.
Similar to question #12.
Drawing P-100 between Columns B/C and 4/7 (Men’s & Women Locker Room) shows to remove sanitary pipe and patch the floor. There are no finishes for patched floor and walls.
Hatch pattern on drawing AE111 for Corridor 109 to the existing bathrooms is the same as Corridor 115, use LVT-1. Walls for existing Corridors refer to specification 024119 - Selective Demolition, paragraph 3.3.B.2. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations. No finish identified for tiled floor and wall area effected within existing Men's bathroom.
Repair any existing wall surfaces damaged during construction. Color match existing wall paint finish.
Hallway side
Tracking # QUESTION REPLY REMARKS:
REQUEST FOR INFORMATION (RFI) LOG
PROJECT NUMBER / NAME
PTFL 132039 Repair Corrosion Facility, 3336
Drawing FX-101 between Columns B/C and 4/7 states existing sprinkler head to be removed and modified as required to suit "New Layout". We do not see "New Layout" in the solicitation documents.
There is no new layout in solicitation documents. Reference drawing FX001, see the Fire Protection Design Criteria, note 5. System shall be designed on a hydraulically calculated basis utilizing the area density method per the NFPA 13 by the sprinkler contractor.
Calculations and shop drawings shall be signed and sealed by a professional engineer licensed in the state of New Jersey. See specification 211313 - Wet Pipe Sprinkler System, paragraph 1.4 Submittals, line B. Shop Drawings: For wet-pipe sprinkler systems.
Drawing FX101 note for existing sprinkler head to be removed and modified as required to suit "New Layout".
Refers only to the Paint Booth area, modified for connection of the new sprinkler heads in new area. No sprinkler heads between columns 4 and 7 need to be modified. See question 41.
Is there any phasing involved? Project phasing should not be required. Reference specification section 01000 – General Requirements, 1.9.B. Activities in the vicinity of this project may be kept in full or partial operation during construction. The Contractor shall coordinate with the Contracting Officer and schedule construction activities. Reference Contract Clause FAR 52.236-8, “Other Contracts”. See also specification section 024119 Selective Demolition, paragraph 1.4.B. Schedule of Selective Demolition Activities.
Mechanics may require use of the Hangar space, and access to the Tool Room, during the length of the project. This would require limiting shutdowns of the utilities serving the Hangar space.
28 Who is responsible for moving the existing equipment in the work area? The area will be cleared by the Users, before construction begins.
29 Since the bid is due on April 22nd April 10Am, When will you issue the answers to the RFI? Please extend the bid due date.
Contracting Office will respond to this RFI
Is there a place for General contractors trailer and storage trailer next to the building?
To be identified during Pre Construction Meeting. Preferred area, in front of building 3336. Actual location may depend on trailer type.
See answers to questions number 9, 15, and 16.
31 Please provide the light type to be utilized for type ‘s’ and ‘u’ as it is not found on the drawings.
There are no type 's' or 'u' light fixtures located on drawings. Type 's' or 'u' fixtures will not be used in this project.
On Sheet AE-100 what new walls are determined to be fire rated assemblies?
Type B6 walls are fire rated, per note on detail; Provide fire rated sealant both sides for all fire rated assemblies (typ.).
Fire rated or smoke rated walls shown with thick dashed line, along new Corridor.
33 On Sheet AE-100 what new wall are determined to be smoke rated? Smoke rated walls type D6, D4, and D3 shown with thick dashed line, along new Corridor.
Sheet AE-100 wall type A3 states 1-layer 5/8” GWB both sides however is depicted as one side only. Please confirm GWB at one side only.
Type A3 walls are pipe chase/cavity walls located behind the showers, toilets, and lavatories. Install only one layer of 5/8" GWB to upper deck, on room finish side of metal studs.
Sheet AE-100 wall type B3/B6 states provide sound attenuation blankets at all sound partitions. Which partitions are determined to be sound partitions?
Type B6 walls are fire rated, and sound rated, separating the industrial area from the new restrooms and locker room area.
36 Unable to find wall type B3. Does this wall type exist? No. There are no Type B3 walls.
37 Unable to find Toilet Accessory 12, where and how many of this item? Toilet Accessory 12, utility shelf locations not found on drawings, or in Specifications. Utility shelfs will not be installed.
Tracking # QUESTION REPLY REMARKS:
REQUEST FOR INFORMATION (RFI) LOG
PROJECT NUMBER / NAME
PTFL 132039 Repair Corrosion Facility, 3336
Signage as shown on detail 10 sheet AE-401 has multiple types of signage shown but we could only locate type R. Can you please confirm if the other signage is utilized?
See specification 101425, paragraph 1.2.B. Provide identification plaque at each interior door opening to each interior space and as indicated on the drawings. Note applies to all of the new doors only.
Paragraph 1.3.B. Obtain Owner’s written approval of sign text prior to fabrication of signs.
Room 254, sign type R. Room 251, sign type RW. Room 252, sign type RM. Other doors use sign type A.
As per the door & frame schedule door 153 is 90-minute fire rated, as per the specifications door 152 is 90 minute fire rated. Can you please confirm door 152 shall be the fire rated door?
Door 152 should be noted as a 90-minute fire rated door, as shown in specification 087100. Door 153 should not be labeled as fire rated on the door schedule on AE401.
Door 153 listed correctly in specification 087100.
The hardware sets listed in the specification do not match with the door sets provided in the door and frame schedule, can you please confirm the door hardware sets?
See specification 087100 - Hardware Schedule, which is correct, except for doors 143 and 188 labeled as doors 043 and 088. These doors do have the correct Hardware set #6.
Door schedule on AE401 lists wrong hardware sets for doors 143 and 188.
Drawing FX101 states to modify existing sprinkler piping within room 110, 111,and 114 to suit new layout. No new layout has been provided for this area; can you please clarify the expectations for these locations?
Original design plans called for renovating existing restrooms to an office area. Rooms 110, 111, and 114, will remain. No modification to these existing rooms, or sprinkler systems, other than to tie into existing utilities, and install new water heater.
See question 26.
Electrical EP101 shows a duplex receptacle going in the alcove of the corridor adjacent the men’s locker room for what appears to be a water cooler however is not referenced on the plumbing drawings for plumbing rough-in or listed in the equipment schedule, will this be included within the bid?
The duplex receptacle referenced will be installed during this construction project. The water cooler will not be installed.
Sink sanitary drain?
Sheet AE111 Interior finish legend calls for ERF-1 as no hatch and ERF- 2 as a speckled hatch. As per the finish plan, both hatched and non-hatched areas are called out as ERF-2. Please clarify shall the entire space receive ERF-2 or shall only the speckled hatch area receive ERF- 2 with the remainder of the space being ERF-1?
Only speckled area receives ERF-2 Epoxy flooring. Rooms 220, 251, and 252 call for LVT-2 type flooring. Note under room tags for (Bid Alternate A1: ERF-2) will not be used for rooms 220, 251, and 252.
see question 12 & 24.
44 Will there be any benches in the men’s locker room? Currently none are shown.
Only in the men's shower areas, as shown on AE401.
Please provide contact information for current Fire Alarm vendor. See file "B3336 Fire Panel-BOM.pdf". The Base has Fire Alarm
Technicians that only monitor the fire alarm system, and a contractor which only perform tests of the sprinkler system and fire pumps annually.
see question 21.
Drawing number FX101 states existing sprinkler heads and piping in this area to be removed and/or modified as required to suit new lay out.
According to the architectural plans, no new lay out is proposed in this area. Please clarify.
Rooms 110, 111, and 114, will remain. No modification to these existing rooms, or sprinkler systems, other than to tie into existing utilities, and install new water heater.
see questions 41 & 26
What is the process to access the base daily? For example, will you require contractor/subcontractor contact information daily/weekly/etc.?
Please clarify.
Follow the guidelines in the project "Scope of Work", and paragraph
1.3.1 Pass and ID. Do not the follow guidelines in specification section 01000 General Requirements, paragraph 1.3.
Individual passes will be issued for the project duration.
On drawing AE111 it depicts floor finish ERF-2 with and without a hatch.
For example Toilet/Shower 254 and Women’s Locker Room 251 both have floor finish ERF-2 but only Toilet/Shower 254 has the hatch. Please clarify.
Only speckled area receives ERF-2 Epoxy flooring. Rooms 220, 251, and 252 call for LVT-2 type flooring. Note under room tags for (Bid Alternate A1: ERF-2) will not be used for rooms 220, 251, and 252.
see questions 12 & 24
Tracking # QUESTION REPLY REMARKS:
REQUEST FOR INFORMATION (RFI) LOG
PROJECT NUMBER / NAME
PTFL 132039 Repair Corrosion Facility, 3336
49 Please clarify who is responsible to furnish and install aluminum locker units in rooms 252 and 251.
See specification section 105210 - Personal Storage Lockers, paragraph 1.6 Submittals.
If GC is to furnish and install Personal Storage lockers, please clarify design intent for corners and endpoints shown on AE111 as not full-size lockers.
See specification section 105210 - Personal Storage Lockers, paragraph 1.4.A.1.b. Sizes: Personal Storage Lockers; 18 inches wide by 18 inches deep by 6 feet high.
see question 56
Please provide corner guard spec. Referenced in specification 092116 - GWB Accessories, paragraph
3.10.B. Install metal corner beads at external corners of drywall work.
52 P100 shows new sanitary piping however the new sanitary does not service the new emergency shower. Please clarify?
install a floor drain near or in place of the 4" cleanout?
Plumbing demolition plan on P-100 shows the demolition of underslab piping in Room 110 and 111. The architectural plans do not show demolition of partitions in this area. Is the intent for the GC to remove these partitions and demolish the slab and piping? If so, how are these rooms to be left after concrete repair. Please clarify.
The plans on P-100 show the existing floor drains and sanitary piping, and the new plan, with outline of floor sawcut for new work. Drawing P- 100 does not show demolition work. Reference drawings AD-101 and S-102 for concrete slab removal for new drains and sanitary lines.
On drawing S501 in detail 6, please clarify “pipe bedding.” See specification 312000 - Earth Moving, paragraph 2.1 Soil
Materials. Section provides information for sub base material, base course, fill, and bedding and drainage courses.
Is there is a preferred control contractor for the building HVAC. If so, please provide their information.
Not advisable under FAR 46.405, paragraph (d). All oral and written statements and contract terms and conditions relating to Government quality assurance actions at the subcontract level shall be worded so as not to-
(1) Affect the contractual relationship between the prime contractor and the Government, or between the prime contractor and the subcontractor;
(2) Establish a contractual relationship between the Government and the subcontractor; or
(3) Constitute a waiver of the Government’s right to accept or reject the supplies or services.
Please provide make/model/manufacturer of the lockers and bathroom partitions. The provided drawings did not include a schedule or specifications as to what kind, color, etc.
See specification section 105210 - Personal Storage Lockers, paragraph 2.1 for Manufacturer, or approved equal.
see question 50
Will the existing (new) vinyl flooring need to be removed and reused for the trench work or we will need to provide a price for providing and installing new flooring?
Provide new flooring, quality of removed flooring difficult to meet specification requirement 096500 - Resilient Flooring, paragraph 3.3.H. Match floor tiles for color and pattern by using tile from cartons of the same batch and mixing tiles as recommended in writing by the manufacturer. Cut tile neatly around all fixtures. Broken, cracked, chipped or deformed tiles are not acceptable.
58 Will the area of work be occupied? All areas within the scope of work will not be occupied
59 Can saw cutting of floors be done during normal hours? See specification section 01000 - General Requirements, paragraph
1.2. Work Scheduling.
Tracking # QUESTION REPLY REMARKS:
REQUEST FOR INFORMATION (RFI) LOG
PROJECT NUMBER / NAME
PTFL 132039 Repair Corrosion Facility, 3336
60 Are fixture types S & U still in scope, if so, where are they located? There are no type 's' or 'u' light fixtures located on drawings. Type 's' or 'u' fixtures will not be used in this project.
61 In regards to the QC Manager that is required to be on site per specifications section 01451, Please confirm that the QC Manager can
Yes
62 Can the supervisor also act as QC? Yes
63 Please confirm the type of ceiling in the Men's Latrine (Room 110) Men's latrine (Room 110) is not within the scope of work in its entirety