Text version

OPS Paint QUESTIONS PWS-RFQ SECTION ANSWERS We would like to visit the site to better understand the full requirements of the project. A site vist will not be conducted. A3-D image of the room is linked in the SOW Are we painting the back room entirely as well as the main gym? ENTIRELY PAINTING BACK ROOM; HEAVY TOUCH UP OF MAIN GYM

Is the Government supplying the cable tray? In 2. SCOPE it says reinforce, however we do not see an existing cable tray in the 3d viewing.

GOVT NOT SUPPLYING CABLE TRAY FOR BACK ROOM; EXISTING CABLE TRAY

IN MAIN NEEDS REPLACEMENT OR HEAVY REINFORCING

How many new cable trays are being installed, many different cable pathways are existing, who is responsible for rerouting of cables to one location?

ONE NEW TRAY INSTALLED; COMM HAS REROUTED CABLES; REMAINING

CABLES WILL BE SECURED TO BEAMS BEFORE PAINT BY CONTRACTOR

Are we to paint the wires in the ceiling as well? YES Who will be responsible for removing existing items hanging on walls? Who will be rehanging? CONTRACTOR Will this need to be off hours work or will the Gym be closed and out of use during the painting and construction work? Performance will be conducted during normal duty hours. (0700-1700) There is not cove base in the back part of the gym, will the replacement of this be done by others or should we account for installing new cove base? INSTALL NEW BASE COVE

2.1.4 is the intent of this project to paint the entirety of the gym and the annex or only touch up main gym walls? SEE #3 Are the lights in the annex to be removed? If no should they be installed to match the existing in the main gym?

NEW LIGHTS WILL BE INSTALLED BY BASE CE AFTER PAINTING; CONTRACTOR

IS TO WORK AROUND EXISTING LIGHTS

Will the gym equipment be removed from the gym? If so, is this the contractors responsibility? Where would we store this once removed? NO

Is the red fire alarm conduit to be painted or is this required to stay red? STAY RED What are we replacing the flex duct with? (spiral duct or flex duct). CONTRACTOR RECCOMENDATION

Are we providing air devices that appear to be missing on the flex duct? If so how should they be supported? YES

Are we to re-support fire alarm devices? NO

I wanted to know If I can stop by today to look at work A site vist will not be conducted. A3-D image of the room is linked in the SOW

In regards to the operations paint project, would it be impossible for us to set up a site visit this week to get a better look at the required work? A site vist will not be conducted. A3-D image of the room is linked in the SOW

Do we need to replace the HVAC duct and repaint it or just repaint the existing ductwork? REPLACE AND REPAINT

By removing the existing non-load bearing closet facility, are we required to demolish the walls of the tool room? REMOVE ALL WALLS AND DEBRIS

Do we need to repair the ceiling of the empty room located in the southwest (top-view perspective)? YES IF REPAIRS ARE DEEMED REQUIRED BY CONTRACTOR

Are there drawings for this project? As per 2.1.4 “where indicated on the drawings” A3-D image of the room is linked in the SOW Will all equipment and wall hanging items be moved/removed by COTR? NO

As per the 3D scan of the building, the lighting is not in good shape. Is it required for us to fix and reinstall lights that are currently installed incorrectly?

NO; BASE CE IS REPLACING THE LIGHTS AFTER THE CEILING HAS BEEN

PAINTED

Does the government have a budget for this project? The Government has a budget for this project.

How many coats of paint is the government asking for on walls and floor? PER CONTRACTOR RECCOMENDATION