Site Visit Slides - B35 Chiller Replacement.pptx

PPTX presentation 881 KB Posted

Attached to
B40 Heat pump Replacement
Solicitation number
W50S7X26Q0014
Issued by

About this file

This file is a site visit presentation for solicitation W50S7X-26-Q-0014, B40 Heat Pump Replacement at McConnell Air Force Base in Kansas. The Kansas Air National Guard is seeking a firm-fixed price contract for the removal and replacement of a geothermal heat pump system in Building 40, with an estimated value between $25,000 and $50,000. The contract is 100% set aside for small businesses under NAICS code 238220. The solicitation is a combined synopsis/solicitation for commercial items prepared under FAR Subpart 12.202(b), with quotations requested rather than a formal written solicitation. All offers are due by 9:00 a.m. CST on September 14, 2026, and must be submitted electronically to 184wg.msg.contracting@us.af.mil with the subject line referencing solicitation W50S7X-26-Q-0014.

Offerors must submit single quotes addressing all solicitation requirements in MS Office 365-compatible formats (Word, Excel, or PDF). Each quote must include the solicitation number, submission date, offeror name and address, CAGE code, UEI, and contact information for the point of contact. Evaluation will be based on price and technical factors. The period of performance is 60 days from Notice to Proceed. Questions must be submitted in writing by 9:00 a.m. CST on September 8, 2026, and responses will be posted on SAM.gov. All offerors must have current representations and certifications on file at SAM.gov within the past year. The applicable wage determination is 2015-5341 REV32, dated May 13, 2026. The contracting office point of contact is 2d Lt Joshua Kingori, with the contracting specialist as MSgt Kevin Smith and the COR as Mr. Jeremiah Shaw.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B40 Heat Pump Replacement McConnell AFB Site Visit/Conference 27 August 2026 184 MSC McConnell AFB, KS

LETHAL | READY | RESILIENT

Introduction Contracting Officer 2d Lt Joshua Kingori

Contracting Specialist:

MSgt Kevin Smith

Contracting Office Representative (COR):

Mr. Jeremiah Shaw

Project Superintendent:

Mr. Rick Rader

Synopsis Solicitation:

W50S7X-26-Q-0014 – B40 Heat Pump Replacement Disclosure of Magnitude:

$25,000 to $50,000 Contract Award:

Firm-Fixed Price Set Aside:

100% Small business

NAICS

238220

Synopsis (Cont) Offer Evaluation Criteria:

Price Technical

Contact Information 184WG.MSG.CONTRACTING@us.af.mil

Solicitation, plans & specifications All information will be available on https://sam.gov Solicitation Plans and Specifications Questions & Answers Document Site Visit Presentation Amendments

Please remember to check the site regularly & Refresh your web page

Period of Performance Construction Period 60 Days after Notice to Proceed

Solicitation package

Specify quote acceptance period Provide single quote submission with one approach to meeting all the requirements of this solicitation Acceptable electronic formats for quotes shall be compatible with MS Office 365, specifically MS Word and MS Excel and PDF format is acceptable Representations and Certifications Offer must have entered current and complete data w/in the past year in Online Representations and Certifications at https://www.sam.gov

ALERT:

If you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating you are the authorized Entity Admin before registration will be activated

Solicitation package (cont) Quote shall include:

Solicitation No. W50S7X-26-Q-0014 Date submitted Offeror’s name Offeror’s address, CAGE code, and UEI Offeror contact information for quote POC(s) Quote Acceptance Period

Send all offers to 184wg.msg.contracting@us.af.mil

Solicitation package (cont.)

All items on previous slides are in the solicitation instructions

It is the responsibility of the offeror to make sure their offer conforms to the solicitation

Offer due dates All offers are due:

9:00 A.M. (CST) 14 September 2026

Electronic offers will be accepted Send to 184wg.msg.contracting@us.af.mil Subject: W50S7X-26-Q-0014 Offer; Company name Ensure you receive email response confirmation of receipt

Offers must be signed by an officer of your company

All amendments must be acknowledged

Important reminders Questions concerning this project must be received by:

9:00 AM (CST) 08 September 2026

Questions should be submitted in writing only EMAIL: 184wg.msg.contracting@us.af.mil Subject: W50S7X-26-Q-0014 RFI’s

DO NOT CALL TECHNICAL PERSONNEL

This will delay getting an answer

Wage Determination Applicability:

2015-5341 REV32, Dated 05/13/2026

Answers to rfi’s All questions, on a non-attribution basis and answers will be posted:

https://www.sam.gov

If necessary, addendums, issued by amendment will also be posted

Remember:

Check the web site regularly Don’t forget to refresh the page

Final reminders and helpful websites Offerors are STRONGLY Cautioned to CAREFULLY read the REQUIREMENTS of the SOLICITATION and COMPLY ACCORDINGLY https://www.sam.gov Both contracting opportunities and wage determination modules https://www.aptac-us.org

Site visit to follow

QUESTIONS?

image1.png image2.png image3.png image4.png image5.png

File details come from the government source that posted it. Updated .